Minerals Support Project - Superior NF
Solicitation number
12443927Q0015
Issued by

About this file

Solicitation Summary

This is a Statement of Work (SOW) for Solicitation No. 12443927Q0015, issued by the Superior National Forest for Minerals Project Support. The contract provides technical assistance in environmental review of the Twin Metals Minnesota copper-nickel mine plan of operation (MPO) and related effects analysis. Work is entirely virtual with no anticipated travel costs, and the contract expires on December 30, 2028. The contractor must commence work within seven calendar days of receiving the notice to proceed.

The solicitation requires three mandatory positions and one optional position: Wildlife Biologist Project Manager (mandatory, minimum 10 years experience with expertise in NEPA, ESA, and forest management; Bachelor's degree in Wildlife Biology or Management required); Night Sky Specialist (mandatory, with knowledge of photometry, artificial light at night impacts, GIS mapping, and DarkSky International guidelines); Soundscape Specialist (mandatory, preferably INCE-USA certified with Bachelor's degree in Acoustics, Engineering, or Natural Resource Management); and Botanist (optional, minimum 10 years experience with Bachelor's degree in Plant Ecology or related field). Key deliverables include participation in kick-off and ongoing meetings, review of the Mine Plan of Operation and Biological Resources Report, technical support for Environmental Impact Statement development, guidance on Endangered Species Act consultation documentation, production of Regional Forester Sensitive Species biological evaluations, and review of public comments and responses. Invoices may be submitted monthly or quarterly and must clearly identify costs by task. All data, methods, and results collected using Forest Service funding become property of the Forest Service and are subject to Freedom of Information Act disclosure unless exempt.

View the file

Other files

File Type Posted
C04.2_Attach 02_Experience Questionaire.docx DOCX document
SF1449_PKG.pdf PDF

On GovTribe

Work with this file

  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation No: 12443927Q0015 Minerals Project Support Superior National Forest

Attachment 01

Revised 09-28-2026 Page 1 of 10

1. DESCRIPTION/STATEMENT OF WORK

Background / Purpose: The Superior National Forest (SNF) needs technical assistance in the environmental review of forthcoming mineral projects including a potential hardrock copper-nickel project mine plan. The purpose of this contract is to provide technical support in the evaluation of the Twin Metals Minnesota copper-nickel mine plan of operation (MPO) and related effects analysis required for environmental review and SNF decisions.

A MPO will be submitted by the project proponent to the Bureau of Land Management (BLM) for consideration. Information from the applicant will include data packages that describes the methods and results of analysis for various disciplines including noise and vibration, biological resources, and visual resources. The SNF needs technical support in the review of the data packages and development of an Environmental Impact Statement (EIS), including the project review and effects analysis.

The SNF as the surface management agency will provide BLM support with resource specialists as part of a federal interdisciplinary team to review the Mine Plan information, EIS and resource reports, and determine their adequacy in support of SNF decisions for the mine plan, special use permits and other associated decisions. The SNF contractor will be part of the SNF team to review data packages and assist in the development of the environmental review document(s) produced by the BLM.

The following technical expertise is required for the review.

• Wildlife Biologist shall serve as the project manager (Mandatory)

• Night Sky Specialist (Mandatory)

• Soundscape Specialist (Mandatory)

• Botanist (Optional)

Project Schedule: The contract shall expire on 12/30/2028.

Superior National Forest

Attachment 01

Revised 09-28-2026 Page 2 of 10

Project Scope:

General Conditions:

The following general requirements apply to work performed under the Contract.

1. As needed, the Contracting Officer Representative (COR) shall schedule meetings to review and discuss the progress and to discuss any problems or concerns that may arise.

Dates and locations for these meetings shall be mutually agreed upon as necessary.

2. The Contractor must not perform any inherently Governmental actions. A Contractor employee must not hold himself or herself out to be a Forest Service employee, agent or representative. A Contractor employee must not state orally or in writing at any time that he or she is acting on behalf of the Forest Service. In all communications with third parties in connection with this Contract, Contractor employees must identify themselves as Contractor employees and specify the name of the company for which they work.

Through communicating with third parties in connection with this Contract, the Contractor employee must state that they have no authority to in any way change the Contract. In the event of any potential conflict or misunderstanding, the Contractor must notify the order CO immediately.

3. The Contractor must furnish all labor, personnel, supervision, equipment, materials, supplies, tools, transportation, travel, and incidentals (except those designated as Forest Service-furnished property) to perform all work necessary for completion of orders. The Contractor has the responsibility for all other data collection and reports that will be used as the basis for deliverables resulting from the orders. The Forest Service retains approval authority for these documents.

4. All planning data, maps, files, reports, and other records will be collected and compiled and made available to the Forest Service, upon request, for possible inclusion in the permanent administrative record. Once requested and delivered, all information and data collected by the Contractor and any subcontractors becomes the property of the Forest Service regardless of the author. This information and data will be considered non-proprietary and non-confidential and subject to the Freedom of Information Act (FOIA) unless otherwise determined by the Forest Service per any applicable FOIA exemptions.

Information exempt from disclosure under FOIA must not be disclosed. Any data provided in support of the National Environmental Policy Act (NEPA) analysis by the non-Federal Party which they believe is sensitive or exempt from FOIA must be marked as such.

5. The Contractor must not release data or information gathered under a Contract order to parties outside of the Forest Service without advance written permission from the contracting officer.

6. All raw data, methods, and results collected and prepared using Forest Service funding must be delivered to the Forest Service at the conclusion of the order in an appropriate

Superior National Forest

Attachment 01

Revised 09-28-2026 Page 3 of 10 electronic format that is compatible with corporate data standards and that allows for future use by the Forest Service. Original hard copy information such as field data collection forms and electronic data collected in the field, such as GPS files, must be delivered to the Forest Service. In addition, the Contractor must document any updates made to Forest Service furnished data as a result of field checking or other means of verification. If applicable, the Contractor must state what the updates were, what areas were affected, and why updates were made.

TRAVEL

There are no anticipated travel costs associated with the project described herein. All work is anticipated to be virtual.

DELIVERABLES

Deliverables shall be electronically submitted to the COR and any other Forest representatives upon request of the COR. Additionally, the contractor shall upload deliverables to any electronic folders or websites provided by the COR.

Deliverables due dates and timelines will be discussed with COR as far as weekly, monthly, etc. prior to work commencing.

PAYMENTS AND INVOICING

The contractor will submit invoices for payment no more than once a month and no less than once a quarter. Invoices will clearly identify those costs associated with tasks/deliverables.

Detailed Scope of Work for Support Services:

Task 1. MEETINGS:

Meetings to provide updates on project deliverable status, becoming informed on project operation and scope, coordination with SNF staff, and reporting of technical results will be required for the project.

The distribution and purpose of individual meetings may shift, but for consideration of the expected scope of work the following assumptions for meeting time are provided.

The participation of the Wildlife Biologist is mandatory and the other attendees are part of optional scopes of work.

Superior National Forest

Attachment 01

Revised 09-28-2026 Page 4 of 10

Meeting Title

Purpose / Description

Anticipated Labor Hours

(per participant) Frequency Deliverable(s) Attendees(1)

Kick-off Introduce team members, review project scope / schedule / deliverables, roles, logistics, and expectations

Single meeting

Develop agenda, manage logistics, lead the meeting, develop and distribute meeting notes

WBPM,

NS, SS,

Optional

B

Project Status

Meet with SNF Project Manager to discuss project status, scope, and progress of the technical team

Weekly (assume 25 meetings)

Send relevant notes on decisions / discussions

WBPM

Project Specialist Meetings

Attend / meet with project proponent / BLM to understand MPO scope of work and effects analysis

4 6

Attendance and notes on relevant decisions / discussions

WBPM,

NS, SS,

Optional

B

SNF

Specialist Meetings

Meeting with SNF staff / lead technical specialist to discuss analysis and deliverables

2 10

Attendance and notes on relevant decisions / discussions

WBPM,

NS, SS,

Optional

B

(1) WBPM = Wildlife Biologist Project Manager, NS = Night Sky Specialist, SS = Soundscape Specialist , Optional B = Botanist, Task 2. TECHNICAL SUPPORT OF ENVIRONMENTAL REVIEW

• Wildlife Biologist Project Manager (Mandatory)

• Night Sky Specialist (Mandatory)

• Soundscape Specialist (Mandatory) o Botanist (Optional)

Become familiar with the list of SNF Regional Forester Sensitive Species, their habitat requirements, survey results / background population data (from proponent, public, tribal, and SNF sources), provided effects analysis, and project elements that may impact the population.

Superior National Forest

Attachment 01

Revised 09-28-2026 Page 5 of 10

Review MPO elements and Biological Resources Report authored by the project proponent (anticipated for release in January 2027) for adequacy, completeness, and consistency with the SNF Land Management Plan. Recommend any changes to MPO to better avoid and minimize adverse effects. Provide guidance to contractor retained by BLM to prepare the EIS so that the analysis methods, measures, indicators and supporting data used by the contractor for effects analysis are adequate for NEPA compliance, to demonstrate consistency with the SNF Land Management Plan, and other applicable regulatory requirements. Provide comments and edits on agency environmental review documents.

Project management activities such as invoicing, tracking deliverables and scope of work, etc.

shall be considered part of the technical support.

Task 3. USFWS ENDANGERED SPECIES ACT CONSULTATION / REGIONAL FORESTER

SENSITIVE SPECIES (RFSS) EVALUATION:

• Wildlife Biologist Specialist (Mandatory) o Botanist (Optional) It is anticipated that the contractor retained by BLM will develop a biological assessment (BA) and supporting documents to be used for the U.S. Fish and Wildlife consultation. Provide guidance to contractor retained by BLM so that the analysis methods, measures, indicators and supporting data used by the contractor are adequate to comply with the Endangered Species Act and USFWS expectations for the BA. Contractor shall review and offer comments / edits to the draft biological assessment (BA) and supporting documents for consideration by the SNF.

Provide guidance to contractor retained by BLM so that the analysis methods, measures, indicators and supporting data used by the contractor are adequate to meet Forest Service Manual requirements for a Biological Evaluation for RFSS. Contractor shall review the effects analysis and produce a draft RFSS biological evaluation (BE) for consideration by the SNF.

Contractor shall submit draft documents for review and incorporate SNF comments into a final document.

Task 4. REVIEW / RESPONSE TO COMMENTS:

• Wildlife Biologist Project Manager (Mandatory)

• Night Sky Specialist (Mandatory)

• Soundscape Specialist (Mandatory) o Botanist (Optional)

Review formal public comments regarding the environmental document and provide edits / comments on the response to comments documents, the EIS, BA, and BE. Provide input on any changes to project design based on public comments. Comments will be organized by the BLM consultant and an initial response to comments will be offered by their consultant. These responses will be reviewed for consistency with the SNF Land Management Plan and contractor will provide edits offered for consideration.

Superior National Forest

Attachment 01

Revised 09-28-2026 Page 6 of 10

2. SPECIFICATIONS:

2.1 Key Personnel and Required Qualifications or Certifications

Title Qualifications Night Sky Specialist

(Mandatory)

Knowledge of photometry and measuring night sky brightness (using Sky Quality Meters or radiometers). Understanding of artificial light at night (ALAN) and its impacts on wildlife, ecosystems, cultural resources, and human health. Familiarity with GIS mapping software and lighting inventory tools. Experience with DarkSky International (formerly IDA) guidelines, lighting management plans, and fully shielded fixture standards.

Experience:

• Identifying project design features to reduce artificial light emissions from industrial projects

• Performing / reviewing lighting effects analysis for environmental review

• Ideally, a proven understanding of the 1964 Wilderness Act and the 1978 Boundary Waters Wilderness Act

Soundscape Specialist

(Mandatory)

Preferred Certification: certification by Institute of Noise Control Engineering (INCE-USA)

Preferred Education: Bachelor’s degree in Acoustics, Engineering, or Natural Resource Management

Experience:

• Identifying project design features to reduce sound emissions from industrial projects

• Performing / reviewing soundscape effects analysis for environmental review

• Ideally, a proven understanding of the 1964 Wilderness Act and the 1978 Boundary Waters Wilderness Act

Wildlife Biologist Project Manager

(Mandatory)

Experience managing environmental review projects. Deep knowledge of federal environmental laws that include but are not limited to the NEPA and ESA and work experience applying them to forest management actions. Experience or knowledge of Forest System structure, culture, manuals, and processes.. Excellent writing skills.

Deep knowledge of northeastern Minnesota wildlife, wildlife ecology, forest ecology, game or wildlife opening management, pollinator biology, and forest management actions and work experience applying that knowledge. Deep knowledge of federal environmental laws that include but are not limited to the NEPA and the Endangered Species Act (ESA) and work experience applying them to forest management actions. Experience or knowledge of Forest System structure, culture, manuals, and processes. Excellent writing skills.

• Minimum Education: Bachelor of Science in Wildlife Biology or Wildlife Management

• Experience:

• At least 10 years working as a wildlife biologist or natural resources manager.

• Developing frameworks for and writing project Biological Assessments under Section 7 of the ESA, preferably experience with listed species within the SNF.

• Producing Biological Evaluations for USFS Regional Forester Sensitive Species

(Wildlife)

• Working with USFS Land and Resource Management Plans, preferably experience with the SNF Land and Resource Management Plan

• Identifying project design features to reduce adverse effects to wildlife habitat

• Producing and evaluating NEPA effects analysis and related documentation for the

Superior National Forest

Attachment 01

Revised 09-28-2026 Page 7 of 10

USFS

Performing or evaluating effects associated with hardrock mining proposals

Title Qualifications Botanist

(Optional)

Knowledge of federal environmental laws that include but are not limited to the NEPA and ESA and how to apply them to forest management actions. Experience planning and managing non-native invasive plant species eradication programs. Experience managing, surveying for, and identifying plants in northeastern Minnesota.

• Minimum Education: Bachelor of Science in Plant Ecology, Botany, or related field

• Experience:

• Minimum Education: Bachelor of Science in Plant Ecology, Botany, or related field

• Experience: At least 10 years working as a botanist, preferably with field experience in Northeastern Minnesota.

• Producing Biological Evaluations for USFS Regional Forester Sensitive Species (Plants)

• Working with USFS Land and Resource Management Plans, preferably the SNF Land and

Resource Management Plan

• Identifying project design features to reduce adverse effects to sensitive plants

• Producing and evaluating NEPA effects analysis and related documentation for the USFS

Preferred experience performing or evaluating effects associated with hardrock mining proposals

2.2 Government Property FAR 52.245-1 GOVERNMENT PROPERTY (SEP 2021) Not applicable.

Superior National Forest

Attachment 01

Revised 09-28-2026 Page 8 of 10

3. PROJECT LOCATION AND DESCRIPTION

4. INSPECTION AND ACCEPTANCE:

4.1 FAR 52.246-4 INSPECTION OF SERVICES--FIXED-PRICE (AUG 1996)

a. Definition. “Services”, as used in this clause, includes services performed, workmanship, and material furnished or utilized in the performance of services.

b. The Contractor shall provide and maintain an inspection system acceptable to the Government covering the services under this contract. Complete records of all inspection work performed by the Contractor shall be maintained and made available to the Government during contract performance and for as long afterwards as the contract requires.

c. The Government has the right to inspect and test all services called for by the contract, to the extent practicable at all times and places during the term of the contract. The Government shall perform inspections and tests in a manner that will not unduly delay the work.

d. If the Government performs inspections or tests on the premises of the Contractor or a subcontractor, the Contractor shall furnish, and shall require subcontractors to furnish, at no increase in contract price, all reasonable facilities and assistance for the safe and convenient performance of these duties.

e. If any of the services do not conform with contract requirements, the Government may require the Contractor to perform the services again in conformity with contract requirements, at no increase in contract amount. When the defects in services cannot be corrected by reperformance, the Government may—

1) Require the Contractor to take necessary action to ensure that future performance conforms to contract requirements; and

2) Reduce the contract price to reflect the reduced value of the services performed.

f. If the Contractor fails to promptly perform the services again or to take the necessary action to ensure future performance in conformity with contract requirements, the Government may—

1) By contract or otherwise, perform the services and charge to the Contractor any cost incurred by the Government that is directly related to the performance of such service; or

2) Terminate the contract for default.

Superior National Forest

Attachment 01

Revised 09-28-2026 Page 9 of 10

4.2 CONTRACTOR INSPECTION PROCEDURES

(A) General Instructions

1) The Contractor shall perform quality assurance and quality control of documents prior to submission to the USFS

4.3 GOVERNMENT INSPECTION PROCEDURES – COMPLIANCE INSPECTION:

Work will be reviewed for compliance with required submittals as completed by the Contractor.

5. COMMENCEMENT PROSECUTION, AND COMPLETION OF WORK

The Contractor shall be required to (a) commence work under this contract within 7 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work as directed.

6. POST AWARD CONFERENCE

A project kick-ff meeting is required as described in the scope of work

7. LIST OF ATTACHMENTS

The following attachments are made a part of this solicitation and any resultant contract.

Title Pages SF1449, Solicitation for Commercial Items with Clauses 9 Schedule of Items 2 (pages 3 & 4) Attachment 01: Statement of Work 10 Attachment 02: Experience Questionnaire 2

FAR Overhaul | FAR Companion Guide 1

Superior National Forest

Attachment 01

Revised 09-28-2026 Page 10of 10

Page last modified on October 15, 2025 FAR Overhaul | FAR Companion Guide

Oct 30, 2025

The Federal Acquisition Regulatory Council has released an update to the FAR Companion as part of the ongoing Revolutionary FAR Overhaul (RFO) Initiative, in accordance with Executive Order 14275 and OMB Memorandum M-25-26.

The following RFO update was posted on October 30, 2025:

• FAR Companion, Version 2.0, includes the initial release of FAR Companion (FC) parts 2, 3, 7, 13, 14, 15, 16, 17, 19, 20, 21, 22, 23, 24, 25, 27, 30, 32, 37, 41, 42, 44, 45, 47, 48, 52, and 53.

• Version 2.0 also includes updates to previously released content: update to FC 8.104 pertaining to “required use” contracts and providing more information and resources on Category Management, including beta version content of the Category Management Buying Guide; update to FC 8.401 pertaining to evaluation factors; updates to FC 8.401(b) and FC 12.301 removing references to debriefings; new annotation under FC 8.401(b) related to sole source justification content for FSS orders; new annotation under FC 12.001 related to contracting methods for commercial construction; update to FC

11.204 to clarify brand name or equal as distinct from brand name justifications under FAR 6.104; updates to thresholds referenced due to the October 1, 2025 inflation adjustment rule; various citation corrections throughout; and changed “Reserved” to “No additional guidance” when the FAR Companion does not provide any practice recommendations for that associated FAR part.

• FAR Companion, Version 2 is posted on www.acquisition.gov/far-overhaul.

To view the FAR Companion, Version 2.0. inclusive of all parts and updates, visit: https://www.acquisition.gov/sites/default/files/page_file_uploads/far-companion.pdf

To view all available rewritten FAR Parts and agency deviations, visit: https://www.acquisition.gov/far-overhaul/far-part-deviation-guide.

Stay informed. View the latest FAR Overhaul news and announcements at: https://www.acquisition.gov/far-overhaul.

https://links-2.govdelivery.com/CL0/https:%2F%2Flinks-2.govdelivery.com%2FCL0%2Fhttps:%252F%252Fwww.whitehouse.gov%252Fpresidential-actions%252F2025%252F04%252Frestoring-common-sense-to-federal-procurement%252F%2F1%2F0101019a2c554a32-f0246afd-e2b4-418c-817b-e6a76b6d073a-000000%2FUX8vjw5CHuC8f77RXf4Fu_Fb-_GNv8DPn3ftoPjCF5w=428/1/0101019a2c60554d-c2540c50-6d63-472c-95dc-38b51df370df-000000/iQRSADqlGWrqB7R_fB5Wg3JNajtZsj28p5OVudC_BNc=428 https://links-2.govdelivery.com/CL0/https:%2F%2Flinks-2.govdelivery.com%2FCL0%2Fhttps:%252F%252Fwww.whitehouse.gov%252Fpresidential-actions%252F2025%252F04%252Frestoring-common-sense-to-federal-procurement%252F%2F1%2F0101019a2c554a32-f0246afd-e2b4-418c-817b-e6a76b6d073a-000000%2FUX8vjw5CHuC8f77RXf4Fu_Fb-_GNv8DPn3ftoPjCF5w=428/1/0101019a2c60554d-c2540c50-6d63-472c-95dc-38b51df370df-000000/iQRSADqlGWrqB7R_fB5Wg3JNajtZsj28p5OVudC_BNc=428 https://links-2.govdelivery.com/CL0/https:%2F%2Flinks-2.govdelivery.com%2FCL0%2Fhttps:%252F%252Fwww.acquisition.gov%252Fsites%252Fdefault%252Ffiles%252Fpage_file_uploads%252FM-25-26-Overhauling-the-Federal-Acquisition-Regulation-002.pdf%2F1%2F0101019a2c554a32-f0246afd-e2b4-418c-817b-e6a76b6d073a-000000%2FV2fElIf9f7QdG6m5Ww5jhArdcb1aIH_aeS4ElUjVmc4=428/1/0101019a2c60554d-c2540c50-6d63-472c-95dc-38b51df370df-000000/xV7YtpptB-6N9VpzH2pxYTGN8LdN8SNn64No6C5amvE=428 http://www.acquisition.gov/far-overhaul https://www.acquisition.gov/sites/default/files/page_file_uploads/far-companion.pdf https://links-2.govdelivery.com/CL0/https:%2F%2Flinks-2.govdelivery.com%2FCL0%2Fhttps:%252F%252Fwww.acquisition.gov%252Ffar-overhaul%252Ffar-part-deviation-guide%2F1%2F0101019a2c554a32-f0246afd-e2b4-418c-817b-e6a76b6d073a-000000%2F5uwlAI9fF6_-jn5dDrAJ48p0ONjbyVaveJ8mw6NFErg=428/1/0101019a2c60554d-c2540c50-6d63-472c-95dc-38b51df370df-000000/hKblUJZVwmanVmACgNxzdtGcTCp_8oeUkYIXHQ6RvZg=428 https://links-2.govdelivery.com/CL0/https:%2F%2Flinks-2.govdelivery.com%2FCL0%2Fhttps:%252F%252Fwww.acquisition.gov%252Ffar-overhaul%2F1%2F0101019a2c554a32-f0246afd-e2b4-418c-817b-e6a76b6d073a-000000%2FukMJUCl7XyhWDI2ryQDSaDkjAdvpP13mSWTjRrsTJgw=428/1/0101019a2c60554d-c2540c50-6d63-472c-95dc-38b51df370df-000000/swhJC4pXT7o0UtFbXNL-dK3Q6ehR3wIq3ZsJ5q7R3-s=428

1. DESCRIPTION/STATEMENT OF WORK
2.2 Government Property FAR 52.245-1 GOVERNMENT PROPERTY (SEP 2021)

File details come from the government source that posted it. Updated .