This is a Statement of Work for a federal contract opportunity issued by the US Department of Agriculture's Forest Service for the Hoosier National Forest.
The contract requires mechanical bush hogging (mowing) services at the Hardin Ridge Recreation Area to maintain early successional habitat characteristics across designated treatment units. The contractor must remove all unwanted woody species 3 inches or less in diameter at breast height (DBH) using GPS-guided mechanical mowing equipment, while preserving desirable tree species including Oak, Hickory, Cherry, Sassafras, Redbud, Dogwood, and Persimmon. The base scope includes 55.6 acres across 13 mandatory contract line items (CLINs), with an additional 53.4 acres available across 7 optional CLINs pending funding availability, totaling approximately 109 acres. The performance period runs from July 1, 2027, through October 30, 2027. The contractor must provide all labor, equipment, materials, permits, and worker personal protective equipment, and is responsible for cleaning equipment before mobilization (minimum 3 business days' notice required), managing spills, repairing ground disturbance caused by operations, and complying with cultural resource protocols. Low ground pressure equipment is mandatory to prevent soil disturbance and rutting. The government will furnish gate keys and GPS shapefiles of treatment boundaries and access routes. Work quality is measured by an Acceptable Quality Level (AQL) requiring minimum 95% removal of woody vegetation in designated areas, with the contractor responsible for re-mowing at their expense if AQL standards are not met. All invoicing is tied to successful inspection and approval by the Contracting Officer's Representative, submitted through the U.S. Treasury's Invoice Processing Platform. The contractor must designate a Contract Supervisor to serve as the primary point of contact for all contract communications, work schedules, safety concerns, and completion status.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| C04_SF1449_12443927Q0013_23Nov26.pdf | ||
| C04_Attach3_WD 1981-1257.pdf | ||
| C04_CSS_12443927Q0013.pdf | ||
| C04_Attach4_Experience Questionnaire.pdf | ||
| C04_Attach2_HRRA Maps.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Department of Agriculture (USDA)
Statement of Work
Hardin Ridge Recreation Area
Bush Hogging
Hoosier National Forest
Solicitation: 12443927Q0013
Contents Project
General Information
1.0 Scope of Work
2.0 Background
Contractor Requirements
3.0 Technical Requirements / Tasks
4.0 Government Furnished
5.0 Deliverables / Schedule
7.0 Contractor’s Key Personnel
Project Hardin Ridge Recreation Area Bush Hogging
General Information
1.0 Scope of Work
The purpose of the project is to maintain the early successional habitat characteristics of designated areas and their respective access paths. Contractor shall be able to identify and remove all unwanted woody species 3-inches and less Diameter at Breast Height (DBH) in project area via mechanical mowing (i.e. bush hog). Contractors shall use a GPS device to stay within designated boundary area and access routes.
Approximately 109 acres may be awarded. Base amount is 55.6 acres (units # 1-13) with potential optional line items (units # 14-20) being awarded pending funds.
2.0 Background
The project area occurs within Hoosier National Forest which includes streamside, roadside, steep/narrow trails, open-land, forest habitats and karst features (i.e. sink holes). Work may require small creek/stream crossing. Project units 1-20 had same treatment in 2022.
Contractor Requirements
3.0 Technical Requirements / Tasks
General Information
• Access routes will be cleared by Forest Service (FS) personnel of any major logs blocking access before Start of the contract. Any trees that come down after will be the contractors’ responsibility. FS personnel may be responsible if downed trees are complicated (i.e. large size, high volume or large clusters).
• Project boundaries and access trails will not be flagged by FS personnel. This will all be determined by the use of a GPS device.
• Access routes may tend to wash out due to high volume of rain, especially at creek crossings. FS personnel will have access passable for machinery before start of the contract. If the access route washes out during the contract time frame, the contractor shall get permission from the Contracting Officer Representative (COR) before implementing improvements to gain access safely.
• The Contractor shall provide all expertise, labor, supervision, services, materials, equipment, tools, supplies, transportation, licenses, permits, worker personal protective equipment (PPE), and incidentals necessary to perform the required work, for which the desired outcome is in strict accordance with the standards in the contract. The Contractor shall perform and accomplish the work in accordance with all applicable federal, state, and local laws, regulations, and ordinances.
• The Contractor is responsible for the cleanup of any spills and will notify the COR immediately of any spills.
• Where appropriate, vehicle or ATV/UTV/OHV is permissible down access routes and inside designated project unit.
• Contractor will place caution signs on both ends of trail and roads systems during mowing operations.
• The Contractor shall progressively accomplish the work at a rate that will result in completion of the work within the time specified as determined by the final accepted work schedule for the awarded contract.
• Access into the treatment area will be determined by FS personnel using provided GPS shapefiles. Where necessary, contractor must pull and then replace barrier posts when egress to contract area is needed. Going off trail/road or around gates and barrier posts is not allowed.
• Maps will be provided by USFS along with GPS shapefiles of treatment unit boundaries and access routes.
Before implementation, the project leader will meet the contractor on site.
• Contractor shall notify COR no less than 48 hours prior to start of contract work.
• The Contractor is responsible for the cleanup of their trash, any spills, and repair damage to resources. The
Contractor will notify the COR immediately of any spills or damage. Operations will not be conducted during wet ground conditions where rutting will occur and cause damage. Any ruts made will be reported to the COR and repaired by the contractor at the contractor’s expense. Payments will be withheld until fixed.
• Mowing operations may entail some midstory type of work, mainly on the perimeter of units. Be sure to mow as far up to GPS boundary as allowed.
Equipment Cleanliness Prior to starting the project, the Contractor must clean all equipment off site before entering the treatment areas.
Contractor shall mobilize all equipment to the project site clean and dirt/weed free to reduce spread of invasive species. If equipment is mobilized off site it will need re-inspected in order to return to FS land. Inspection of cleaned equipment will be done by COR designated FS personnel before it is unloaded at the site. Minimum of 3 business days’ notice of mobilization to site is required.
Cultural Resources If artifacts or cultural materials are discovered (old homesites/foundations, wells, etc.) during project implementation, cease work and notify the COR. If human remains are discovered, cease work, notify the COR, and secure the area.
Inspections Interim inspections Can only be requested upon completion of at least one line item (CLIN). The Contractor shall complete the CLIN work according to the approved Work Schedule then request an inspection by the COR.
Inspection process by FS includes:
• Walking the boundaries with GPS unit to ensure unit is completed up to the boundary and not beyond or shy. The mow-able boundary may be smaller than the GPS boundary due to operator being unable to mow based on trees being too large (over 3-inches DBH) or snags in the way.
• Visual inspection of damage to desirable and flagged trees.
• Visual inspection that all unwanted trees have been mowed to proper height.
• Visual inspection of ground disturbance (i.e. rutting). This includes inside units and access routes.
Invoicing Invoicing is tied to successful inspection of completed work. The Contractor may only invoice after the COR has inspected the line-item(s) work and the work is determined to have met the AQL. This applies to both interim and final payments. All invoices will be submitted via U.S. Treasury’s Invoice Processing Platform (IPP).
4.0 Government Furnished
Keys for gates along the access routes will be provided to the Contractor. Prior to receiving government-issued keys, the Contractor shall sign a Key Control Receipt acknowledging responsibility for the custody, protection, and return of all issued keys. The use of government-issued keys solely for performance of this contract.
The Contractor must immediately notify the Contracting Officer (CO) and Contracting Officer's Representative (COR) of any lost, stolen, damaged, or unaccounted-for keys. Upon completion, termination, or expiration of the contract, or upon request by the government, the contractor must return all government-issued keys to the COR or designated government representative.
The government reserves the right to recover government-issued keys and deny access to government facilities if the Contractor fails to comply with key control requirements.
5.0 Deliverables / Schedule
Specification:
The specified areas will be mechanically mowed of all Live standing woody vegetation 3-inches and less DBH including all shrubs/saplings. Leave desirable or flagged trees greater than 3in DBH unharmed from operations. Desirable trees include Oak, Hickory, Cherry, Sassafras, Redbud, Dogwood, and Persimmon.
All snags 3-inches DBH or bigger will be left standing and undamaged. Winter cover of grasses and forbs (flowers) may remain un-mowed whenever possible.
Machinery must be capable of mowing/grinding all vegetation as close to ground surface as possible to reduce hazards from tripping and punji sticks without soil disturbance. Low ground pressure equipment is mandatory for this contract, including equipment used to mow (i.e. bush hog).
Routes will be mowed to the width of the established path. Usually 4-8ft wide pending road/trail design. Generally, this is accomplished by offsetting tracks and mowing path on one side of access going in and mow other side on the way out.
Contractor will mow as close to ground as possible to not create a hazard. Some paths are too narrow and cannot be off set, so Contractor will only need to mow on the way in. Contractor will not deviate off the specified GPS access path.
Access paths will be cleared of any downed trees by FS personnel by the start date, and any subsequent downed trees or obstacles shall be cleared by the contractor.
Performance period: Begins July 1, 2027, and concluding end of day on October 30, 2027.
The Contracting Officer may, when determined to be in the U.S. government's best interest, extend or otherwise modify the period of performance by written contract modification. The Contractor shall continue performance in accordance with the terms and conditions of the contract for any revised period of performance established by the modification.
*Meeting the AQL for Line Items: Contractor(s) must re-mow at their expense upon failure to meet AQL values at the final inspection for each contract line item where the work performed failed to reach the minimum acceptable target ratio and re-pair any damages.
Contract Line- Item No. –
Work Requirement
Task / Critical Sub-tasks Inspection requirements *Acceptable Quality Level (AQL)
Monitoring Method
Line Item: All
Mowing
Contractor will mechanically treat woody vegetation to the entire area according to the specifications on the Statement of Work.
Designated area 95% treated.
AQL determinations are made by the COR upon inspection of the work.
These determinations are unilateral and not protestable.
Minimum 95% removal of woody vegetation 3inches
DBH and less.
Visual and with use of GPS unit.
Line Item: All
Mowing
Staying within designated boundary and along access routes.
AQL determinations are made by the COR upon inspection of the work.
Not going off trail/road.
Staying off private land.
Visual and
GPS unit.
Schedule (non-Line Item)
Timely Completion of the contract work.
Per the Work Schedule, the Contractor will complete all work prior to the contract end date.
AQL determinations are made by the COR upon inspection of the work.
These determinations are unilateral and not protestable.
All work must be complete by the end date of the contract and meet the AQL.
Visual and
GPS unit.
Hardin Ridge Recreation Area Bush Hogging Line Items (CLINs): Mandatory CLINs identified in Orange and CLINs (additional quantities contingent to award based on funding) identified in multiple colors and annotated with “*.”
Unit # Acres 1 0.8 2 1.7 3 4.7 4 8.9 5 4.3 6 3.4 7 2.5 8 2 9 1.9 10 6.1 11 2.6 12 4 13 12.7
14* 16.3 15* 14.4 16* 4 17* 4.7 18* 5.1 19* 7.4 20* 1.3
7.0 Contractor’s Key Personnel
The Contractor shall provide qualified personnel necessary to perform all services required under this contract.
Personnel designated as Key Personnel, whether employed by the prime contractor or a subcontractor, are considered essential to successful contract performance due to their responsibility for contract management, safety oversight, and field operations.
The Contractor shall ensure that all Key Personnel remain available throughout the period of performance. Any proposed substitution of Key Personnel shall be submitted in writing to the Contracting Officer and Contracting Officer's Representative (COR) prior to replacement. Replacement personnel shall possess qualifications and experience equal to or greater than those of the individual being replaced.
The Contractor shall designate a Contract Supervisor who shall serve as the primary point of contact for all contract matters. The contract supervisor must maintain communication with the COR regarding work schedules, delays, safety concerns, and completion status.
Definitions:
1. Contracting Officer (CO): A Forest Service employee with the authority to: enter into, administer, and terminate contracts, as well as issue determinations regarding such matters as claims.
2. Contracting Officer’s Representative (COR): A Forest Service employee that is appointed and officially designated by the Contracting Officer to assist the Contracting Officer with the technical matters related to contract administration. The COR will assist the Contracting Officer with surveillance of contractor performance.
3. Forest Service Inspector: A Forest Service employee designated by the Contracting Officer or COR to perform surveillance of contractor performance.
4. Acceptable Quality Level (AQL): A suitable level of conformance based on an established percentage of defects.
5. Quality Assurance: Those actions taken by the Forest Service to assure services meet specified requirements.
6. Quality Control: Those actions taken by a Contractor to control the performance of services so that they meet the specified requirements.
| Project |
| General Information |
| 1.0 Scope of Work |
| 2.0 Background |
| Contractor Requirements |
| 3.0 Technical Requirements / Tasks |
| 4.0 Government Furnished |
| 5.0 Deliverables / Schedule |
| 7.0 Contractor’s Key Personnel |