This is a United States Department of Agriculture (USDA) Forest Service solicitation for multiple life safety improvements at the Angell Job Corps Civilian Conservation Center in Yachats, Oregon. The solicitation (No. 12441925Q0016) seeks a contractor to perform seven distinct construction items across multiple buildings, including six base items and one optional item:

Base Items include: 1) Lumber and Equipment Storage metal roof reconstruction and drainage repairs, 2) Urban Forestry entrance landing and stair installation, 3) Education building masonry pier and step repairs, 4) Hazmat Storage explosion-proof ventilation upgrades, and two additional electrical room door modifications. The optional item involves roof painting for the Lumber Equipment Storage building. The project is valued between $100,000 and $250,000, with a performance period from July 11, 2025 to October 10, 2025. Offers are due by June 10, 2025 at 2:00 PM EDT, with a 90-day delivery timeline after notice to proceed. The solicitation uses a Lowest Price Technically Acceptable (LPTA) evaluation method, requiring offerors to have an active System for Award Management (SAM) registration and meet specific technical and past performance criteria.

View the file

Other files

File Type Posted
12441925Q0016 v2.pdf PDF
12441925Q0016 JCC.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

1. SOLICITATION NO. 3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION

a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

CALL:

FOR

SEALED BID (IFB)

NEGOTIATED (RFP)

1144865

USDA FOREST SERVICE

SPOC EAST

1400 INDEPENDENCE AVE SW MS-1138

WASHINGTON DC 20250-0001

USDA SPOC East Contracting Office

POC: Nicholas Bartolomei Email: nicholas.bartolomei@usda.gov See additional POCs below:

NICHOLAS BARTOLOMEI

104/02/2025

12441925Q0016

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

The purpose of this amendment 001 is to correct a mistake in the original solicitation. Items 0001 and 0002 from the original solicitation have been removed and the remaining items 0003 - 0007 have been renumbered as items 0001 - 0005 within this amendment 001. The remaining items are unchanged from the original solicitation. Offerors are advised to review the updated specifications and revise and resubmit offers for this solicitation by 1400 Eastern Daylight Time (EDT) on June 10th, 2025. No further rounds of questions or site visits will be held, however the site remains available during normal business hours for offerors to visit at their own discretion if needed. Please call 541-547-3137 if planning to revisit the site.

This request for proposal is for the furnishing of all labor, equipment, incidentals, and materials to accomplish to Scope of Work (SOW under section C) covering all items listed on Part 1 Schedule B Supplies or Services.

Project is located at the USDA Forest Service Angell Job Corps Civilian Conservation Center at 335 NE Blodgett Rd, Yachats, OR 97498. Driving Instruction can be obtained by calling 541-547-3137.

Submit Revised offers to Nicholas Bartolomei, nicholas.bartolomei@usda.gov and Ian Continued ...

11. The Contractor shall begin performance within

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and is not required.is, b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

d. Offers providing less than

12b. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in Item 12b.)

10 90 calendar days and complete it within ________________ ________________ calendar days after receiving

___06/10/2025

NSN 7540-01-155-3212

x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________

STANDARD FORM 1442 (Rev. 8/2014)

Prescribed by GSA

FAR(48 CFR) 53.236-1(d)

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14.)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (Must be fully completed by offeror)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document and return (Contractor is not required to sign this document.)

Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.

No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE

BY

2PAGE OF

USDA FOREST SERVICE

SPOC EAST

1400 INDEPENDENCE AVE SW MS-1138

WASHINGTON DC 20250-0001

IAN K. BARNES

28. NEGOTIATED AGREEMENT 29. AWARD

Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

copies to issuing office.)

10 U.S.C. 2304(c) 41 U.S.C. 3304(a)

STANDARD FORM 1442 (REV. 8/2014) BACK

Continued...

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

3 137

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

12441925Q0016

Barnes at ian.barnes@usda.gov.

Delivery: 90 Days After Notice to Proceed

Delivery Location Code: 04TT

ANGELL JCC

335 NE BLOGETT RD

STAR ROUTE NORTH BOX 900

YACHATS OR 97498 US

Mark For:

USDA FOREST SERVICE

SPOC EAST

1400 INDEPENDENCE AVE SW MS-1138

WASHINGTON DC 20250-0001

Period of Performance: 07/11/2025 to 10/10/2025

0001 B2191 Lumber Equipment Storage Metal Roof, Decay, Reconstruction and Drainage

0002 B2880 Urban Forestry Entrance Landing, Stair, Handrail

0003 B2887 Education Masonry Repairs and Painting

0004 B2892 Hazmat Storage Explosion Proof Ventilation

0005 B2191 Lumber Equipment Storage Roof Painting

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

Table of Contents

PART I—THE SCHEDULE

SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS

B.1 SCHEDULE OF ITEMS

B.2 SCHEDULE NOTES

SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

C.1 SCOPE OF CONTRACT

C.2 PROJECT LOCATION

C.3 MAGNITUDE OF CONSTRUCTION PROJECT

C.4 TECHNICAL SPECIFICATIONS

SECTION D--PACKAGING AND MARKING

D.1 PACKING AND MARKING

D.2 PROJECT LABELING FOR OFFICIAL CORRESPONDENCE

SECTION E--INSPECTION AND ACCEPTANCE

E.1 CLAUSES

SECTION F--DELIVERIES OR PERFORMANCE

F.1 CLAUSES

F.2 OTHER REQUIREMENTS

SECTION G--CONTRACT ADMINISTRATION DATA

G.1 CLAUSES

G.2 OTHER REQUIREMENTS

SECTION H--SPECIAL CONTRACT REQUIREMENTS

H.1 CLAUSES

H.2 OTHER REQUIREMENTS

PART II--CONTRACT CLAUSES

SECTION I--CONTRACT CLAUSES

I.1 CLAUSES

PART III--LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

SECTION J--LIST OF ATTACHMENTS

J.1 ATTACHMENTS

PART IV--REPRESENTATIONS AND INSTRUCTIONS

SECTION K--REPRESENTATIONS, CERTIFICATIONS, AND

OTHER STATEMENTS OF OFFERORS OR RESPONDENTS

K.1 PROVISIONS

SECTION L--INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR

RESPONDENTS

L.1 PROVISIONS

L.2 QUOTE PREPARATION INSTRUCTIONS

SECTION M--EVALUATION FACTORS FOR AWARD

M.1 PROVISIONS

M.2 QUOTE EVALUATION

M.3 TECHNICAL EVALUATION FACTORS

PART I—THE SCHEDULE

SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS

B.1 SCHEDULE OF ITEMS

B.2 Schedule of items Point of Contact for this solicitation is Contract Specialist, Nicholas Bartolomei, who can be reached at nicholas.bartolomei@usda.gov. Any email correspondence regarding this posting must have the Solicitation number listed in the subject line.

All offers are to be received by June 13th no later than 14:00 EDT. All submissions shall have separate attachments in Microsoft word, Excel, or Adobe format. It is the offeror’s responsibility to confirm the receipt of submissions of the offer from the Contract Specialist, Nicholas Bartolomei.

Please see notice below:

"System updates may lag policy updates. The System for Award Management (SAM) may continue to require entities to complete representations based on provisions that are not included in agency solicitations, including 52.223-22, Public Disclosure of Greenhouse Gas Emissions and Reduction Goals-Representation, and paragraph (t) of 52.212-3, Offerer Representations and Certifications-Commercial Products and Commercial Services. Agencies will not consider or use these representations. Entities are not required to, nor are they able to, update their entity registration to remove these representations in SAM."

Item Supplies/Services Qty Unit of Issue

Unit Price Total Price

0001 B2191 Lumber Equipment Storage Metal Roof, Decay, Reconstruction and Drainage

Jb

0002 B2880 Urban Forestry Entrance Landing, Stair, Handrail

Jb

0003 B2887 Education Masonry Repairs and Painting

Jb

0004 B2892 Hazmat Storage Explosion Proof Ventilation

Jb

0005 B2191 Lumber Equipment Storage Roof Painting

Jb

Grand Total =

SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

C.1 SCOPE OF CONTRACT

Work for this project required the contractor to be responsible for supplying all labor, materials, equipment, utilities, miscellaneous items, freight and delivery and all necessary valid licenses for work summarized in B1 Schedule of items as well as listed in the SOW.

C.2 PROJECT LOCATION

The location of this project is at the Angell Job Corps Civilian Conservation Center located at Yachats Oregon. The address is 335 NE Blodgett Rd, Yachats, OR 97498. The Driving instructions can be obtained from the center by calling 541-547-3137.

C.3 MAGNITUDE OF CONSTRUCTION PROJECT

The magnitude of this project is expected to be $100,000.00 to $250,000.00

C.4 TECHNICAL SPECIFICATIONS

All technical specifications can be found in the SOW.

AGAR 452.211-72 Statement of Work/Specifications (FEB 1988) The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J.

AGAR 452.211-73 Attachments to Statement of Work/Specifications (FEB 1988) The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.

SECTION D--PACKAGING AND MARKING

D.1 PACKING AND MARKING

All shipments of materials, equipment and/or supplies shall be addressed to the Contractor and not to the Government.

D.2 PROJECT LABELING FOR OFFICIAL CORRESPONDENCE

The Government singularly identifies each project with a contract number at time of award. The contract number is a unique identifier to purposely and permanently represent an awarded project. The Government issued contract number is to be referenced on all official communication starting upon notice of award.

E.1

CLAUSES

SECTION E--INSPECTION AND ACCEPTANCE

FAR 52.246-12 Inspection of Construction (AUG 1996)

SECTION F--DELIVERIES OR PERFORMANCE

F.1

FAR

CLAUSES

52.242-14

Suspension of Work (APR 1984)

FAR 52.211.10 Commencement, Prosecution, and Completion of Work (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 90 days. The time stated for completion shall include final cleanup of the premises.

(End of clause)

F.2 OTHER REQUIREMENTS

SECTION G--CONTRACT ADMINISTRATION DATA

G.1 CLAUSES

AGAR 452.204-70 Modification for Contract Closeout (DEVIATION JUN 2024)

AGAR 452.215-73 Post Award Conference (NOV 1996)

A post award conference with the successful offeror is required. It will be scheduled and held within 10 days after the date of contract award. The conference will be held virtually.

G.2 OTHER REQUIREMENTS

SECTION H--SPECIAL CONTRACT REQUIREMENTS

H.1 CLAUSES

AGAR 452.228-71 Insurance Coverage (NOV 1996)- Alternate I (NOV 1996)

Pursuant to FAR clause FAR 52.228-5, Insurance-Work on a Government Installation, the Contractor will be required to present evidence to show, as a minimum, the amounts of insurance coverage indicated below:

(a) Workers Compensation and Employer's Liability. The Contractor is required to comply with applicable Federal and State workers' compensation and occupational disease statutes. If occupational diseases are not compensable under those statutes, they shall be covered under the employer's liability section of the insurance policy, except when contract operations are so commingled with a Contractor's commercial operations that it would not be practical to require this coverage. Employer's liability coverage of at least $100,000 shall be required, except in States with exclusive or monopolistic funds that do not permit worker's compensation to be written by private carriers.

(b) General Liability. (1) The Contractor shall have bodily injury liability coverage written on a comprehensive form of policy of at least $500,000 per occurrence.

(c) Automobile Liability. The Contractor shall have automobile liability insurance written on a comprehensive form of policy. The policy shall provide for bodily injury and property damage liability covering the operation of all automobiles used in connection with performing the contract. Policies covering automobiles operated in the United States shall provide coverage of at least $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage or loss.

(d) Aircraft Public and Passenger Liability. When aircraft are used in connection with performing the contract, the Contractor shall have aircraft public and passenger liability insurance. Coverage shall be at least $200,000 per person and $500,000 per occurrence for bodily injury, other than passenger injury. Coverage for passenger injury shall be at least $200,000 multiplied by the number of seats or passengers, whichever is greater.

(End of clause)

AGAR 452.237-74 Key Personnel (FEB 1988)

(a) The Contractor shall assign to this contract the following key personnel:

1. Site Supervisor

(b) During the first ninety (90) days of performance, the Contractor shall make no substitutions of key personnel unless the substitution is necessitated by illness, death, or termination of employment. The Contractor shall notify the Contracting Officer within 15 calendar days after the occurrence of any of these events and provide the information required by paragraph (c) below. After the initial 90-day period, the Contractor shall submit the information required by paragraph (c) to the Contracting Officer at least 15 days prior to making any permanent substitutions.

(c) The Contractor shall provide a detailed explanation of the circumstances necessitating the proposed substitutions, complete resumes for the proposed substitutes, and any additional information requested by the Contracting Officer. Proposed substitutes should have comparable qualifications to those of the persons being replaced. The Contracting Officer will notify the Contractor within 15 calendar days after receipt of all required information of the decision on substitutions. The contract will be modified to reflect any approved changes of key personnel.(End of clause)

PART II--CONTRACT CLAUSES

SECTION I--CONTRACT CLAUSES

I.1 CLAUSES

FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

Federal Acquisition Regulation (FAR): https://www.acquisition.gov/browse/index/far (Clauses are located at FAR part 52 and begin with 52)

Department of Agriculture Acquisition Regulation (AGAR):https://www.acquisition.gov/agar (Clauses are located at AGAR part 452 and begin with 452)

Deviations to clauses may be viewed at: Policies & Regulations | USDA

FAR 52.203-17 Contractor Employee Whistleblower Rights (NOV 2023) (Whistleblower Guidance to contractor employees)

FAR 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017)

FAR 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards

(JUN 2020)

FAR 52.204-13 System for Award Management Maintenance (OCT 2018) FAR 52.204-19 Incorporation by Reference of Representations and Certifications (DEC

2014) FAR 52.204-23 Prohibition on Contracting for Hardware, Software, and Services

Developed or Provided by Kaspersky Lab Covered Entities (DEC 2023) FAR 52.204-25 Prohibition on Contracting for Certain Telecommunications and Video

Surveillance Services or Equipment (NOV 2021) FAR 52.204-27 Prohibition on a ByteDance Covered Application (JUN 2023) FAR 52.204-30 Federal Acquisition Supply Chain Security Act Orders—Prohibition (Dec

2023) FAR 52.209-6 Protecting the Government's Interest when Subcontracting with

Contractors Debarred, Suspended, or Proposed for Debarment (NOV 2021) FAR 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (NOV

2015) FAR 52.215-8 Order of Precedence—Uniform Contract Format (OCT 1997) FAR 52.219-6 Notice of Total Small Business Set-Aside (NOV 2020) FAR 52.222-3 Convict Labor (JUN 2003) FAR 52.222-6 Construction Wage Rate Requirement (AUG 2018) FAR 52.222-7 Withholding of Funds (MAY 2014) FAR 52.222-8 Payrolls and Basic Records (JUL 2021)

FAR 52.222-9 Apprentices and Trainees (JUL 2005) FAR 52.222-10 Compliance with Copeland Act Requirements (FEB 1988) FAR 52.222-11 Subcontracts (Labor Standards) (MAY 2014) FAR 52.222-12 Contract Termination - Debarment (MAY 2014) FAR 52.222-13 Compliance with Construction Wage Rate Requirements and Related

Regulations (MAY 2014) FAR 52.222-14 Disputes Concerning Labor Standards (FEB 1988) FAR 52.222-15 Certification of Eligibility (MAY 2014) FAR 52.222-30 Construction Wage Rate Requirements-Price Adjustment (None or

Separately Specified Pricing Method) (AUG 2018) FAR 52.222-36 Equal Opportunity for Workers with Disabilities (JUN 2020) FAR 52.222-50 Combating Trafficking in Persons (NOV 2021) FAR 52.222-55 Minimum Wages for Contractor Workers under Executive Order 14026

(JAN 2022)

FAR 52.222-62 Paid Sick Leave under Executive Order 13706 (JAN 2022) FAR 52.223-2 Reporting of Biobased Products Under Service and Construction Contracts

(MAY 2024)(DEVIATION FEB 2025)

FAR 52.223-5 Pollution Prevention and Right-to-Know Information (MAY 2024) FAR 52.223-11 Ozone-Depleting Substances and High Global Warming Potential

Hydrofluorocarbons (MAY 2024) FAR 52.223-12 Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and

Air Conditioners (MAY 2024) FAR 52.223-20 Aerosols (MAY 2024) FAR 52.223-21 Foams (MAY 2024) FAR 52.223-23 Sustainable Products & Services (MAY 2024) FAR 52.225-13 Restrictions on Certain Foreign Purchases (FEB 2021) FAR 52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving

(MAY 2024)

FAR 52.227-4 Patent Indemnity -- Construction Contracts (DEC 2007) FAR 52.228-2 Additional Bond Security (OCT 1997) FAR 52.228-5 Insurance – Work on a Government Installation (JAN 1997) FAR 52.228-11 Individual Surety - Pledge of Assets (FEB 2021) (DEVIATION MAY

2023) FAR 52.228-12 Prospective Subcontractor Requests for Bonds (DEC 2022) FAR 52.228-14 Irrevocable Letter of Credit (NOV 2014) FAR 52.232-5 Payments under Fixed-Price Construction Contracts (MAY 2014) FAR 52.232-23 Assignment of Claims (MAY 2014) FAR 52.232-27 Prompt Payment for Construction Contracts (JAN 2017) FAR 52.232-33 Payment by Electronic Funds Transfer – System for Award Management

(OCT 2018)

FAR 52.232-39 Unenforceability of Unauthorized Obligations (JUN 2013) FAR 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (MAR

2023) FAR 52.233-1 Disputes (MAY 2014) Alt 1 (DEC 1991) FAR 52.233-3 Protest after Award (AUG 1996)

FAR 52.233-4 Applicable Law for Breach of Contract Claim (OCT 2004) FAR 52.236-5 Material and Workmanship (APR 1984) FAR 52.236-6 Superintendence by the Contractor (APR 1984) FAR 52.236-7 Permits and Responsibilities (NOV 1991) FAR 52.236-8 Other Contracts (APR 1984) FAR 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and

Improvements (APR 1984) FAR 52.236-10 Operations and Storage Areas (APR 1984) FAR 52.236-11 Use and Possession Prior to Completion (APR 1984) FAR 52.236-12 Cleaning Up (APR 1984) FAR 52.236-13 Accident Prevention (NOV 1991) FAR 52.236-17 Layout of Work (APR 1984) FAR 52.243-5 Changes and Changed Conditions (APR 1984) FAR 52.244-6 Subcontracts for Commercial Products and Commercial Services (FEB

2024) FAR 52.249-1 Termination for Convenience of the Government (Fixed-Price) (Short

Form) (APR 1984) FAR 52.249-10 Default (Fixed-Price Construction) (APR 1984) FAR 52.253-1 Computer Generated Forms (JAN 1991) AGAR 452.236-71 Prohibition Against the Use of Lead-Based Paint (NOV 1996) AGAR 452.236-72 Use of Premises (NOV 1996) AGAR 452.236-76 Samples and Certificates (FEB 1988) AGAR 452.236-77 Emergency Response (NOV 1996)

FAR 52.225-9 Buy American Act-Construction Materials (OCT 2022)

(a) Definitions. As used in this clause—

Commercially available off-the-shelf (COTS) item—

(1) Means any item of supply (including construction material) that is–

(i) A commercial product (as defined in paragraph (1) of the definition of “commercial product” at Federal Acquisition Regulation (FAR) 2.101);

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.

"Construction material" means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies.

However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.

Cost of components means—

(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or

(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.

Critical component means a component that is mined, produced, or manufactured in the United States and deemed critical to the U.S. supply chain. The list of critical components is at FAR 25.105.

Critical item means a domestic construction material or domestic end product that is deemed critical to U.S. supply chain resiliency. The list of critical items is at FAR 25.105.

Domestic construction material means—

(1) For construction material that does not consist wholly or predominantly of iron or steel or a combination of both-

(i) An unmanufactured construction material mined or produced in the United States; or

(ii) A construction material manufactured in the United States, if–

(A) The cost of its components mined, produced, or manufactured in the United States exceeds 60 percent of the cost of all its components, except that the percentage will be 65 percent for items delivered in calendar years 2024 through 2028 and 75 percent for items delivered starting in calendar year 2029.

Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic. Components of unknown origin are treated as foreign; or

(B) The construction material is a COTS item; or

(2) For construction material that consists wholly or predominantly of iron or steel or a combination of both, a construction material manufactured in the United States if the cost of foreign iron and steel constitutes less than 5 percent of the cost of all component used in such construction material. The cost of foreign iron and steel includes but is not limited to the cost of foreign iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the construction material and a good faith estimate of the cost of all foreign iron or steel components excluding COTS fasteners.

Iron or steel components of unknown origin are treated as foreign. If the construction material contains multiple components, the cost of all the materials used in such construction material is calculated in accordance with the definition of "cost of components".

Fastener means a hardware device that mechanically joins or affixes two or more objects together. Examples of fasteners are nuts, bolts, pins, rivets, nails, clips, and screws.

Foreign construction material means a construction material other than a domestic construction material.

Foreign iron and steel means iron or steel products not produced in the United States.

Produced in the United States means that all manufacturing processes of the iron or steel must take place in the United States, from the initial melting stage through the application of coatings, except metallurgical processes involving refinement of steel additives. The origin of the elements of the iron or steel is not relevant to the determination of whether it is domestic or foreign.

Predominantly of iron or steel or a combination of both means that the cost of the iron and steel content exceeds 50 percent of the total cost of all its components. The cost of iron and steel is the cost of the iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the product and a good faith estimate of the cost of iron or steel components excluding COTS fasteners.

Steel means an alloy that includes at least 50 percent iron, between 0.02 and 2 percent carbon, and may include other elements.

"United States" means the 50 States, the District of Columbia, and outlying areas.

(b) Domestic preference.

(1) This clause implements 41 U.S.C. Chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the domestic content test of the Buy American statute is waived for construction material that is a COTS item, except that for construction material that consists wholly or predominantly of iron or steel or a combination of both, the domestic content test is applied only to the iron and steel content of the construction materials, excluding COTS fasteners. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.

(2) This requirement does not apply to information technology that is a commercial product or to the construction materials or components listed by the Government as follows: NONE

(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that-

(i) The cost of domestic construction material would be unreasonable.

(A) For domestic construction material that is not a critical item or does not contain critical components.

(1) The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 20 percent;

(2) For construction material that is not a COTS item and does not consist wholly or predominantly of iron or steel or a combination of both, if the cost of a particular domestic construction material is determined to be unreasonable or there is no domestic offer received, and the low offer is for foreign construction material that is manufactured in the United States and does not exceed 55 percent domestic content, the Contracting Officer will treat the lowest offer of foreign construction material that exceeds 55 percent domestic content as a domestic offer and determine whether the cost of that offer is unreasonable by applying the evaluation factor listed in paragraph (b)(3)(i)(A)(1) of this clause.

(3) The procedures in paragraph (b)(3)(i)(A)(2) of this clause will no longer apply as of January 1, 2030.

(B) For domestic construction material that is a critical item or contains critical components.

(1) The cost of a particular domestic construction material that is a critical item or contains critical components, subject to the requirements of the Buy American statute, is unreasonable when the cost of such material exceeds the cost of foreign material by more than 20 percent plus the additional preference factor identified for the critical item or construction material containing critical components listed at FAR 25.105.

(2) For construction material that does not consist wholly or predominantly of iron or steel or a combination of both, if the cost of a particular domestic construction material is determined to be unreasonable or there is no domestic offer received, and the low offer is for foreign construction material that does not exceed 55 percent domestic content, the Contracting Officer will treat the lowest foreign offer of construction material that is manufactured in the United States and exceeds 55 percent domestic content as a domestic offer, and determine whether the cost of that offer is unreasonable by applying the evaluation factor listed in paragraph (b)(3)(i)(B)(1) of this clause.

(3) The procedures in paragraph (b)(3)(i)(B)(2) of this clause will no longer apply as of January 1, 2030.

(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or

(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.

(c) Request for determination of inapplicability of the Buy American statute.

(1) (i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including-

(A) A description of the foreign and domestic construction materials;

(B) Unit of measure;

(C) Quantity;

(D) Price;

(E) Time of delivery or availability;

(F) Location of the construction project;

(G) Name and address of the proposed supplier; and

(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.

(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.

(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).

(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.

(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.

(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute.

(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:

Foreign and Domestic Construction Materials Price Comparison Construction Material Description Unit of Measure Quantity Price (Dollars)*

Item1

Foreign construction material

Domestic construction material

Item 2

Foreign construction material

Domestic construction material

[*Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued)].

[List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.] [Include other applicable supporting information.]

(End of clause)

FAR 52.228-13 Alternative Payment Protections (JUL 2000)

(a) The Contractor shall submit one of the following payment protections

1. Payment Bond

2. Irrevocable Letter of Credit

The amount of the payment protection shall be 100 percent of the contract price.

The submission of the payment protection is required within days of contract award.

The payment protection shall provide protection for the full contract performance period plus a one-year period.

Except for escrow agreements and payment bonds, which provide their own protection procedures, the Contracting Officer is authorized to access funds under the payment protection when it has been alleged in writing by a supplier of labor or material that a nonpayment has occurred, and to withhold such funds pending resolution by administrative or judicial proceedings or mutual agreement of the parties.

When a tripartite escrow agreement is used, the Contractor shall utilize only suppliers of labor and material that signed the escrow agreement.

(DEVIATION FEB 2025)

Executive Order 14148, “Initial Rescissions of Harmful Executive Orders and Actions,” of January 20, 2025, revocation of Executive Order 14057, “Catalyzing Clean Energy Industries and Jobs Through Federal

Sustainability,” of December 8, 2021

Baseline is FAC 2025-03, published in the Federal Register on January 3, 2025, effective January 17, 2025.

Changes to the baseline are shown as [additions] and deletions.

PART 1—FEDERAL ACQUISITION REGULATIONS SYSTEM

Subpart 1.1—Purpose, Authority, Issuance

1.106 OMB approval under the Paperwork Reduction Act.

The Paperwork Reduction Act of 1980 (44 U.S.C. chapter 35) imposes a requirement on Federal agencies to obtain approval from the Office of Management and Budget (OMB) before collecting information from 10 or more members of the public. The information collection and recordkeeping requirements contained in this regulation have been approved by the OMB. The following OMB control numbers apply:

FAR Segment OMB control No.

52.223-22 9000-0107.

PART 2—DEFINITIONS OF WORDS AND TERMS

Subpart 2.1—Definitions

2.101 Definitions.

Biobased product means a product determined by the U.S. Department of Agriculture to be a commercial product or industrial product (other than food or feed) that is composed, in whole or in significant part, of biological products, including renewable domestic agricultural materials and forestry materials, or that is an intermediate ingredient or feedstock. The term includes, with respect to forestry materials, forest products that meet biobased content requirements, notwithstanding the market share the product holds, the age of the product, or whether the market for the product is new or emerging. (7 U.S.C. 8101) (7 CFR 3201.2[7 CFR part 4270.2)]).

Sustainable products and services means products and services that are subject to and meet the following applicable statutory mandates and directives for purchasing:

(1) Statutory purchasing programs.

(i)[(1)] Products containing recovered material designated by the U.S. Environmental Protection Agency (EPA) under the Comprehensive Procurement Guidelines (42 U.S.C. 6962) (40 CFR part 247) (https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program#products).

(ii)[(2)] Energy- and water-efficient products that are ENERGY STAR® certified or Federal Energy Management Program (FEMP)-designated products (42 U.S.C. 8259b) (10 CFR part 436, subpart C) (https://www.energy.gov/eere/femp/search-energy-efficient-products and https://www.energystar.gov/products?s=mega).

(iii)[(3)] Biobased products meeting the content requirement of the U.S. Department of Agriculture under the BioPreferred® program (7 U.S.C. 8102) (7 CFR part 3201[7 CFR part 4270]) (https://www.biopreferred.gov).

(iv)[(4)] Acceptable chemicals, products, and manufacturing processes listed under EPA's Significant New Alternatives Policy (SNAP) program, which ensures a safe and smooth transition away from substances that contribute to the depletion of stratospheric ozone (42 U.S.C. 7671l) (40 CFR part 82, subpart G) (https://www.epa.gov/snap).

(2) Required EPA purchasing programs.

(i) WaterSense® labeled (water efficient) products and services (https://www.epa.gov/watersense/watersense-products).

(ii) Safer Choice-certified products (products that contain safer chemical ingredients) (https://www.epa.gov/saferchoice/products).

(iii) Products and services that meet EPA Recommendations of Specifications, Standards, and Ecolabels in effect as of October 2023 (https://www.epa.gov/greenerproducts/recommendations-specifications-standards-and-ecolabels-federal-purchasing).

United States, when used in a geographic sense, means the 50 States and the District of Columbia, except as follows: * * *

(9) For use in subpart 23.1, see definition at 23.101.[Reserved]

PART 11—DESCRIBING AGENCY NEEDS

11.002 Policy.

(d)(1) Agencies shall procure sustainable products and services (as defined in 2.101) in accordance with subpart 23.1.

(2) Unless it is not practicable (see 23.104(a)) or an exception or exemption applies (see 23.105 and 23.106, respectively), agencies shall incorporate the use of sustainable products and services when—

(i) Developing, reviewing, or revising Federal and military specifications, product descriptions (including commercial item descriptions) and standards;

(ii) Describing Government requirements for products and services; and

(iii) Developing source-selection factors.

(3) The Green Procurement Compilation (GPC) available at https://sftool.gov/greenprocurement provides a comprehensive list of sustainable products and services and other related sustainable acquisition guidance. Agencies should [consult the GPC when determining which statutory purchasing programs apply to a specific product or service and incorporate applicable requirements into the requirement document.] —

(i) Consult the GPC when determining which purchasing programs apply to a specific product or service;

and

(ii) Incorporate into agency requirements any required standards, specifications, or ecolabels identified in the GPC for a specific product or service.

Subpart 11.3—Acceptable Material

11.301 Policy.

(c) * * *

(2) For biobased products, agencies may not require, as a condition of purchase of such products, the vendor or manufacturer to provide more data than would typically be provided by other business entities offering products for sale to the agency, other than data confirming the biobased content of a product (see 7 CFR 3201.8[7 CFR 4270.14]).

PART 18—EMERGENCY ACQUISITIONS

Subpart 18.2—Emergency Acquisition Flexibilities

18.202 Defense or recovery from certain events.

(e) Sustainable products and services. Contracting officers are encouraged, but not required, to procure sustainable products and services if the head of the agency determines the supplies or services are to be used to facilitate defense against or recovery from cyber, nuclear, biological, chemical, or radiological attack; to facilitate provision of international disaster assistance; or to support response to an emergency or major disaster (see 23.106(c)).

PART 23—ENVIRONMENT, SUSTAINABLE ACQUISITION, AND MATERIAL

SAFETY

23.000 Scope of part.

This part prescribes acquisition policies and procedures supporting the Government’s program to protect and improve the quality of the environment, to foster markets for sustainable products and services, and to ensure proper handling and notification of hazardous materials.

23.001 Definitions.

As used in this part— Environmental means environmental aspects of internal agency operations and activities, including those aspects related to energy and transportation functions.

Greenhouse gas means carbon dioxide, methane, nitrous oxide, hydrofluorocarbons, perfluorocarbons, nitrogen trifluoride, or sulfur hexafluoride.

23.002 Policy.

In accordance with section 208(a) of Executive Order 14057, Catalyzing Clean Energy Industries and Jobs Through Federal Sustainability, agencies shall reduce emissions, including greenhouse gas emissions; promote environmental stewardship; support resilient supply chains; drive innovation; and incentivize markets for sustainable products and services.

Subpart 23.1—Sustainable Products and Services

23.100 Scope of subpart.

This subpart provides policies and procedures for procuring sustainable products and services. This subpart applies to all contract actions, including those using part 12 procedures for the acquisition of commercial products, including commercially available off-the-shelf (COTS) items, and commercial services and acquisitions valued at or below the micro-purchase threshold.

23.101 Definitions.

As used in this subpart— * * *

U.S. Department of Agriculture (USDA)-designated product category means a generic grouping of products that are or can be made with biobased materials—

(1) That are listed by USDA in a procurement guideline (7 CFR part 3201, subpart B)[available at https://www.biopreferred.gov/resources/categories.html]; and

(2) For which USDA has provided purchasing recommendations (available at https://www.biopreferred.gov[ or 7 CFR part 4270]).

United States, as defined in the Executive Office of the President's Office of Management and Budget, Council on Environmental Quality, and Climate Policy Office Memorandum M-22-06, when used in a geographical sense means—

(1) The fifty States;

(2) The District of Columbia;

(3) The commonwealths of Puerto Rico and the Northern Mariana Islands;

(4) The territories of Guam, American Samoa, and the United States Virgin Islands; and

(5) Associated territorial waters and airspace.

23.102 Authorities.

(a) Section 208 of Executive Order 14057, Catalyzing Clean Energy Industries and Jobs Through Federal Sustainability, dated December 8, 2021.

(b) Paragraph G of section I of the Executive Office of the President's Office of Management and Budget, Council on Environmental Quality, and Climate Policy Office Memorandum M-22-06, Catalyzing Clean Energy Industries and Jobs Through Federal Sustainability, dated December 8, 2021.

(c) Implementing instructions for Executive Order 14057, Catalyzing Clean Energy Industries and Jobs Through Federal Sustainability, dated August 2022.

(d) The[See the] authorities referenced in 23.107 for statutory purchasing programs.

23.103 Policy.

(a) Agencies shall procure sustainable products and services (as defined in 2.101) to the maximum extent practicable.

(1) Procuring sustainable products and services is considered practicable, unless the agency cannot acquire products or services—

(i) Competitively within a reasonable performance schedule;

(ii) That meet reasonable performance requirements; or

(iii) At a reasonable price (see 23.103(a)(2)).

(2) When considering whether the price of a sustainable product is reasonable, agencies should consider whether the product is cost-effective over the life of the product. For ENERGY STAR® or Federal Energy

Management Program (FEMP)-designated products, a price is reasonable if it is cost-effective over the life of the product taking energy cost savings into account (42 U.S.C. 8259b(b)(2)). Life-cycle cost savings tools for energy-efficient products are available at https://www.energystar.gov/buildings/save_energy_commercial_buildings/ways_save/energy_efficient_products and https://www.nrel.gov/analysis/tech-lcoe.html.

(b) When procuring sustainable products and services, agencies shall—

(1) Ensure compliance with applicable statutory purchasing program requirements (see 23.107); and

(2) Prioritize multi-attribute sustainable products and services (see 23.104(c)(2)).

(c) Regarding products under contract actions for services or construction, the contractor is required to provide products that meet the definition of sustainable products and services at 2.101, if the products are—

(1) Delivered to the Government;

(2) Furnished by the contractor for use by the Government;

(3) Incorporated into the construction of a public building or public work; or

(4) Acquired by the contractor for use in performing services under a Government contract where the cost of the products is a direct cost to a Government contract (versus costs which are normally applied to a contractor’s general and administrative expenses or indirect costs).

23.104 General procedures.

(a) Maximum extent practicable. If the requiring activity submits a written justification addressing the reasons described in 23.103(a)(1), the contracting officer may consider it not practicable to procure sustainable products or services. A written justification may be for a specific product or service or at the line item or contract level. The contracting officer shall maintain the written justification in the contract file.

(b) Identification.

(1) Except as provided in paragraph (b)(2) of this section, the contracting officer shall ensure the solicitation and contract identifies—

(i) The sustainable products and services, including the purchasing program and type of product or service, that are applicable to the acquisition, as identified by the requiring activity; and

(ii) Any products and services that are not subject to the requirements of this subpart and the clause at 52.223-23, Sustainable Products and Services, based on the written justification under paragraph (a) of this section [or an exception at 23.105], an exception at 23.105, or an exemption at 23.106.

(2) The requirement in paragraph (b)(1) of this section does not apply if the justification [or exception], exception, or exemption covers the entirety of the contract action requirements.

(c) Prioritization. Agencies shall prioritize sustainable products and services as follows:

(1) Procure[procure] products and services that meet applicable statutory purchasing program requirements (see 23.107). When both an EPA-designated item (see 23.107-1) and a biobased product in a USDA-designated product category (see 23.107-2) could be used for the same purposes, and there is not an EPA-designated item that is also a biobased product in a USDA-designated product category that meets the agency's needs, procure the EPA-designated item.

(2) Consistent with other statutory procurement requirements, prioritize multi-attribute sustainable products and services, which are those that meet applicable statutory purchasing program requirements (see 23.107) and one or more required EPA purchasing programs (see 23.108).

(3) If no statutory purchasing program requirements apply, procure sustainable products and services that meet required EPA purchasing program requirements (see 23.108).

(d) Resource. The Green Procurement Compilation (GPC) available at https://sftool.gov/greenprocurement provides a comprehensive list of sustainable products and services and other related sustainable acquisition guidance.

In addition to the resources identified for each purchasing program listed in 23.107 and 23.108, agencies[Agencies] should consult the GPC when determining which [statutory] purchasing programs apply to a specific product or service.

23.105 Exceptions.

The following are excepted from the requirement to procure sustainable products and services: * * *

(d) Biobased products to be used in military equipment (products or systems designed or procured for combat or combat-related missions), spacecraft systems, or launch support equipment are not subject to the requirements in 23.107-2 (7 CFR 3201.3(e)[7 CFR part 4270.3(a)(5)]).

23.106 [Reserved]Exemptions.

(a) The Director of National Intelligence may exempt an intelligence activity of the United States and related personnel, resources, and facilities to the extent the Director determines necessary to protect…

This is the start of the file's text. The full file is on GovTribe.