Attachment 1 - GMNF FR59-4.9 Culvert Replacement Schedule of Items Rev1.xlsx
XLSX spreadsheet 13 KB Posted
- Attached to
- GMNF FR59-4. 9 Culvert Replacement
- Solicitation number
- 12441923B0003
- Issued by
-
Department of Agriculture Forest Service
About this file
This document includes an attachment schedule of items and related federal contract opportunity for a culvert replacement project. The project is located in the Green Mountain National Forest in Ripton, Vermont and includes excavation, removal of an existing culvert, construction of a plate arch, concrete substructures, stream simulation, roadway reconstruction, and approach work. A government-furnished plate arch will be utilized and the contractor must furnish all new hardware. The estimated price range for this total small business set-aside is between $250,000 to $500,000. Questions are due by May 22, 2023 to the Contract Specialist at the USDA Forest Service. Itemized work includes mobilization, construction surveying, soil erosion controls, clearing, structure removal, excavation, riprap, geotextiles, backfill, aggregate surfacing, structural concrete, reinforcing steel, guardrail installation, seeding, erosion controls, signs, and stream simulation materials.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
BID SCHEDULE
IFB 12441923B0003 Amendment 0001 PROJECT TITLE: FR59 - 4.9 Culvert Replacement
| Item | ||||||
| Number | Item Description | Quantity | Unit of Issue | Unit Cost | Total Cost | |
| 15101 | MOBILIZATION | 1 | LS | $ - 0 | $ - 0 | |
| 15201 | CONSTRUCTION SURVEY AND STAKING, METHOD I, TOLERANCE A | 1 | LS | $ - 0 | $ - 0 | |
| 15702 | SOIL EROSION CONTROL, SILT FENCE | 100 | LF | $ - 0 | $ - 0 | |
| 15713 | SOIL EROSION AND POLLUTION CONTROL | 1 | LS | $ - 0 | $ - 0 | |
| 20102 | CLEARING AND GRUBBING | 1 | LS | $ - 0 | $ - 0 | |
| 20305 | REMOVAL OF STRUCTURES AND OBSTRUCTIONS | 1 | EA | $ - 0 | $ - 0 | |
| 20401 | ROADWAY EXCAVATION | 195 | CY | $ - 0 | $ - 0 | |
| 20801 | STRUCTURE EXCAVATION | 975 | CY | $ - 0 | $ - 0 | |
| 20809 | COFFERDAMS | 2 | EA | $ - 0 | $ - 0 | |
| 25101 | PLACED RIPRAP, CLASS 1 | 80 | CY | $ - 0 | $ - 0 | |
| 25101 | PLACED RIPRAP, CLASS 6 | 265 | CY | $ - 0 | $ - 0 | |
| 25116 | GEOTEXTILE, TYPE IV, CLASS C | 670 | SY | $ - 0 | $ - 0 | |
| 25503 | SELECT GRANULAR BACKFILL | 525 | CY | $ - 0 | $ - 0 | |
| 30110 | AGGREGATE SURFACE COURSE, GRADING C, 6 INCH DEPTH, COMPACTION METHOD D | 65 | CY | $ - 0 | $ - 0 | |
| 55201 | STRUCTURAL CONCRETE, CLASS A | 115 | CY | $ - 0 | $ - 0 | |
| 55401 | REINFORCING STEEL | 16,750 | LB | $ - 0 | $ - 0 | |
| 60305 | GOVERNMENT-FURNISHED PREFABRICATED BRIDGE SUPERSTRUCTURE, TRANSPORT AND INSTALL* | 1 | LS | $ - 0 | $ - 0 | |
| 61701 | GUARDRAIL SYSTEM G4, TYPE IV, CLASS A | 250 | LF | $ - 0 | $ - 0 | |
| 61702 | TERMINAL SECTION, TYPE FLARED (G-1d) | 4 | EA | $ - 0 | $ - 0 | |
| 62503 | SEEDING, DRY METHOD | 1 | LS | $ - 0 | $ - 0 | |
| 62703 | 12" GRUBBING MATERIAL | 300 | SY | $ - 0 | $ - 0 | |
| 62901 | EROSION CONTROL MAT, TYPE 2.D | 425 | SY | $ - 0 | $ - 0 | |
| 63301 | SIGN SYSTEM (INCLUDING POSTS) | 4 | EA | $ - 0 | $ - 0 | |
| 64804 | PLACED STREAMBED SIMULATION ROCK, | |||||
| PLACEMENT METHOD A | 260 | CY | $ - 0 | $ - 0 | ||
| 64856 | ROCK WEIR, MAN ROCK 4, PLACEMENT METHOD A | 4 | EA | $ - 0 | $ - 0 | |
| 64869 | PLACED STREAMBED CHANNEL ROCK, MAN ROCK 4, PLACEMENT METHOD A | 55 | CY | $ - 0 | $ - 0 | |
| Total | $ - 0 | |||||
| *Note: "Government-Furnished Prefabricated Bridge Superstructure, Transport and Install' , cost includes loading and transportation of structure to site, erection, and assembly. Cost does not include purchase of the structure. |
File details come from the government source that posted it. Updated .