This document is a set of Questions and Answers related to two federal contract opportunities for the construction of fences on the Wisdom Ranger District of the Beaverhead-Deerlodge National Forest in Montana.
The key details are:
- The contract opportunities are for 1240LU24Q0072 Meadow Creek Fence & Eagle Rock Ranch Habitat Improvement Fence and 1240LU24Q0073 Tie-Johnson Creek Fence.
- The work includes removing existing fencing and constructing new 4-wire fences with associated braces and gates.
- The government will provide most of the required materials, with the contractors needing to pick them up from a designated site with 48 hours' notice.
- The terrain and accessibility of the project areas vary, with some areas having significant deadfall that needs to be cleared.
- The magnitude of construction for each contract is between $100,000 and $250,000.
- The federal agency involved is the Department of Agriculture Forest Service.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1240LU24Q0073Amendment001.pdf | ||
| 1240LU24Q0073.pdf | ||
| J2TieJohnsonProjectMap1.pdf | ||
| J4TieJohnsonExperienceQuestionnaire.pdf | ||
| J3TieJohnsonProjectMap2.pdf | ||
| J1TieJohnsonWD.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1240LU24Q0072
Meadow Creek Fence &
Eagle Rock Ranch Habitat Improvement Fence
1240LU24Q0073
Tie-Johnson Creek Fence
Wisdom Ranger District, Beaverhead-Deerlodge National Forest
Questions and Answers As of 9/18/2024
In both contracts/solicitations, it states posts are both set and driven in different places within documents.
Can both driving and drill/set/pack be used based on soil conditions? (ie. To rocky to drive a wood post, so use drill and set)? Answer: Yes
Is the area of the solicitations largely accessible with compact track loader or is more specific machinery likely required? Answer: Compact track loader should work, but it is highly recommended to visit the site to determine what is needed. Some of the area has a large amount of deadfall that needs to be cleared.
Are there any requirements on the clearing equipment? Example, low ground pressure, rubber track only, etc.) Answer: Terrain varies, see answer above.
In material list provided for fence construction, 21 foot pressure treated split rails and Jack legs are noted.
No mention of these materials is noted in the specifications. Are these items used anywhere in construction? Can you specify if this product is used or if it was just included? Answer: Jackleg will not be constructed, the materials were inadvertently included in the list. An amendment has been issued to delete that from the solicitation.
No mention of smooth 9 wire, brace rail pipe, and other potential materials are included in material lists.
Will these smaller items be provided by the government or by contractor? Answer: All materials will be provided by the Forest Service unless specifically specified.
Will the corner and brace posts used on the Eagle rock boundary fence (contractor provides material portions) be provided by contractors or government? They are not included in solicitation as provided by contractor. But it seems ambiguous if the government is providing them. Answer: This is a straight fence where corner braces are not required. One end of the fence will tie into an existing fence with a line brace, the other end will need a line brace to end at a scree slope.
CLARIFICATION NOTE:
On both solicitations, under C.5 General Specifications, Materials (see excerpt below) information in red is referencing the Pay Items in the Schedule of Items. As an example, the Pay Items 1.3, 1.5, 1.6, 1.7, 1.8, 2.3, 2.5, 2.6, 2.7, 2.8, etc.
C.5 GENERAL SPECIFICATIONS
Government-Furnished Materials. Materials for Pay Item 3, 5, 6, 7, 8 (fence construction) will be provided (listed below) and must be picked up at the Forest Service Administration site, 65600 MT-Hwy 43 Wise River, MT 59762. Contractor must provide the Forest Service a minimum of 48 hours’ notice of when they will need to pick up materials.
C.5 GENERAL SPECIFICATIONS