This document is a Statement of Work (SOW) for the replacement of T1-11 siding with vertical metal siding on three buildings at the Coeur d'Alene Nursery in Idaho. The SOW provides the technical requirements and tasks for the siding replacement, including details on the square footage, materials, and color specifications for each building. Key details include:

The siding on Buildings 2240 and 2830 is cracked and delaminating, requiring replacement with 26-gauge vertical metal siding in a brown color. Building 2136 requires all four sides to be replaced with 26-gauge vertical metal siding in a white color to match the new greenhouse. The contractor must have a minimum of 3 years' experience with metal siding installation. The solicitation number is 1240LU24Q0034, the estimated magnitude of the work is between $25,000 and $100,000, and the work must be completed by September 30, 2024. The contracting agency is the Department of Agriculture Forest Service R1-Northern Region.

View the file

Other files for this federal contract opportunity

Other files attached to Coeur d Alene Nursery Siding, newest first.
File Type Posted
Sol_ExperienceQuestionnaire.pdf PDF
1240LU24Q0034 Nursery Siding.pdf PDF
id107.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US Department of Agriculture (USDA)

Statement of Work

Contents Project General Information

1.0 Scope of Work

2.0 Background

Contractor Requirements

3.0 Technical Requirements / Tasks

4.0 Government Furnished

5.0 Deliverables / Schedule

6.0 Travel

7.0 Contractor’s Key Personnel

8.0 Security Requirements

9.0 Data Rights

10.0 Section 508 – Electronic and Information Technology Standards Attachment

Project CDA Nursery Building Siding Replacement

General Information

1.0 Scope of Work

Replace T1-11 siding with vertical metal siding in a Board and Batton Pattern on the S and W sides of buildings 2240 and 2830.

The siding will be replaced on all four sides of Building 2136.

2.0 Background

T1-11 siding replacement on buildings. The siding on Buildings 2240 and 2830 is cracked and delaminating and no longer is holding paint. This siding needs to be replaced with vertical metal siding panels which would mimic the look of the existing building profile. Vertical metal would also prevent on-going damage from woodpeckers. There is 1850 square feet of wall on building 2240 and 280 sqft on Building 2830.

Building 2136 has deteriorating siding on the south and west sides. All four sides of this building will be replaced with vertical metal siding that matches the siding being installed the north walls of the new greenhouses. Total square forage is 1340 sqft.

2240 Pesticide Building South Side.

2240 Pesticide building West side.

2830 North Well House south and west sides.

2830 South Side.

2136 West Side 2136 South Side

2136 East Side 2136 North Side

Contractor Requirements

3.0 Technical Requirements / Tasks

T1-11 siding replacement with vertical metal siding. Remove and replace the siding on buildings 2136, 2240 and 2830 with vertical metal siding.

Building 2240 - 1850 sqft.

- Remove existing wood siding on the South and West sides and replace with 7/16 plywood or OSB sheets to provide a firm structural surface.

- Attach a weather-resistive barrier to the new sheathing prior to installing the vertical metal siding.

- Contractor will be required to install all metal trim, j-channels and seals around all doors, windows, and other openings.

- Metal shall be 26-gauge.

- Building 2240 requires a hooded wall vent on the West side of the building.

- Siding color for Building 2240 shall be Brown.

Building 2830 – 280 sqft.

- Remove existing wood siding on the South and West sides and replace with 7/16 plywood or OSB sheets to provide a firm structural surface.

- Attach a weather-resistive barrier to the new sheathing prior to installing the vertical metal siding.

- Contractor will be required to install all metal trim, j-channels and seals around all doors, windows, and other openings.

- Metal shall be 26-gauge.

- Building 2830 will require the removal of two wood 4 ft by 4 ft fixed louver panels and replace them with 4 ft. x 4 ft. Galvanized metal louver panels with fixed blades.

- Siding color shall be Brown.

Building 2136 – 1340 sqft.

- Remove existing wood siding on the South and West sides and replace with 7/16 OSB sheets to provide a firm structural surface.

- North and East siding needs to be evaluated to determine if it is a stable surface for the installation of vertical metal siding.

- Attach a weather-resistive barrier to the sheathing on all 4 sides prior to installing the vertical metal siding.

- Contractor will be required to install all metal trim, j-channels and seals around all doors, windows, and other openings.

- Metal shall be 26-gauge.

- Siding color for building 2136 shall be White and match the existing color of the north wall of the new greenhouse structure.

- Fasteners should be the same color as the siding color.

All Buildings

- Contractor is responsible for removal of all construction debris from the job site.

4.0 Government Furnished

N/A

5.0 Deliverables / Schedule

N/A

6.0 Travel

N/A

7.0 Contractor’s Key Personnel

Contractor's key personnel must have a minimum of 3 years’ experience with installing metal siding.

8.0 Security Requirements

Contractor or representatives are required to check in at the front office when on site.

9.0 Data Rights

N/A

10.0 Section 508 – Electronic and Information Technology Standards N/A Attachment

Buildings 2240 and 2830

Building 2136

Project
General Information
1.0 Scope of Work
2.0 Background
Contractor Requirements
3.0 Technical Requirements / Tasks
4.0 Government Furnished
5.0 Deliverables / Schedule
6.0 Travel
7.0 Contractor’s Key Personnel
8.0 Security Requirements
9.0 Data Rights
10.0 Section 508 – Electronic and Information Technology Standards
Attachment

File details come from the government source that posted it. Updated .