B - Schedule of Items- Rev 5-24-23.pdf

PDF 158 KB Posted

Attached to
Beaverhead-Deerlodge NF - Pintler RD Waterline Replacement
Solicitation number
1240LU23Q0028
Issued by

View the file

Other files

File Type Posted
Amend0001_Spec Section 02510.pdf PDF
SF30Amendment0001.pdf PDF
Specs.pdf PDF
Experience Questionnaire.docx DOCX document
FinalSolicitation_Portfolio.pdf PDF
DB_heavyWageDeterm.pdf PDF
Plans.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PART I - SCHEDULE OF ITEMS updated 5/24/23

SECTION B - SERVICES AND PRICES

PINTLER DISTRICT RANGER STATION WATER DISTRIBUTION SYSTEM DESIGN

Beaverhead-Deerlodge National Forest

Pintler Ranger District Granite County, Montana

B-1 (Updated) - SCHEDULE OF ITEMS

ITEM

NO. DESCRIPTION PAY UNIT QTY.

TYPE

EST.

QTY. UNIT PRICE TOTAL PRICE

1 Mobilization Lump Sum AQ All $________ $________

2 Construction Survey and Staking Lump Sum AQ All $________ $________

3 6-Inch Waterline, PVC Foot AQ 10 $________ $________

4 4-Inch Waterline, Polyethylene (Open-cut installation) Foot AQ 500 $________ $________

6 2-Inch Waterline, Polyethylene (Open-cut installation) Foot AQ 150 $________ $________

7 1-1/2-Inch Waterline, Polyethylene (Open-cut installation) Foot AQ 100 $________ $________

8 1-Inch Waterline, Polyethylene (Open-cut installation) Foot AQ 420 $________ $________

10 4-Inch Valve, Gate w/Box Each AQ 1 $________ $________

11 2-Inch Valve, Gate w/Box Each AQ 1 $________ $________

12 2-Inch Valve, Curb w/ Box Each AQ 1 $________ $________

13 1-1/2-Inch Valve, Curb w/ Box Each AQ 1 $________ $________

14 1-Inch Valve, Curb w/ Box Each AQ 2 $________ $________

15 6" Fire Hydrant w/ Auxiliary Gate Valve Each AQ 1 $________ $________

16 1-inch Frost-Free Hydrant w/ Backflow Preventer Each AQ 2 $________ $________

17 6" x 6" Tee Each AQ 1 $________ $________

18 6" x 4" Tee Each AQ 1 $________ $________

19 4" x 4" Tee Each AQ 1 $________ $________

20 4" x 2" Tee Each AQ 4 $________ $________

21 2" x 2" Tee Each AQ 1 $________ $________

22 1" x 1" Tee Each AQ 2 $________ $________

23 4" x 1-1/2" Reducer Each AQ 1 $________ $________

24 4" x 1" Reducer Each AQ 1 $________ $________

25 2" x 1" Reducer Each AQ 1 $________ $________

26 2" Blind Flange Each AQ 2 $________ $________

27 4" x 90º Bend Each AQ 1 $________ $________

28 4" x 11.25º Bend Each AQ 3 $________ $________

29 1" x 90º Bend Each AQ 3 $________ $________

30 6" Cap Each AQ 1 $________ $________

31 Remove Existing Meter Pits Lump Sum AQ All $________ $________

32 Water Meter and Pressure Reducing Valve Vault Each AQ 1 $________ $________

33 Install 2" Service into Garage/Shop w/ Demolition and Rehab Lump Sum AQ All $________ $________

34 Install 1-1/2" Service into District Office w/ Demolition and Rehab Lump Sum AQ All $________ $________

35 Install 1" Service into Warehouse/Garage w/ Demolition and Rehab Lump Sum AQ All $________ $________

36 Connect to Existing 2" Curb Stop at Bunkhouse Lump Sum AQ All $________ $________

37 Connect to Existing Horse Waterer Lump Sum AQ All $________ $________

38 Remove Existing Hydrants Lump Sum AQ All $________ $________

39 Type C Surface Restoration LF AQ 955 $________ $________

40 Asphalt Patching LF AQ 270 $________ $________

B-2 NOTES: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under Pay Item #1 Mobilization.

One award will be made from this solicitation, contractors must submit pricing for all items.

Price quotation furnished by:

Vendor Name_______________________________________ Phone ( )

Contact Name & E-mail _________________________________ UEI #_______________

File details come from the government source that posted it. Updated .