1240LU23Q0011 Attachment 2 Schedule Of Items GAOA Bridger Bangtail Trail Facility Renovation.docx

DOCX document 17 KB Posted

Attached to
Bridger/Bangtails Trail Facility Renovations Custer-Gallatin National Forest
Solicitation number
1240LU23Q0011
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1240LU23Q0011 Trail Maintenance -Bozeman Ranger District-Custer-Gallatin National Forest GAOA Bridger Bangtail Trail Facility Renovation

CUSTER GALLATIN NATIONAL FOREST

SCHEDULE OF ITEMS

ITEM

DESCRIPTION

EST.

QTY

UNIT

UNIT

PRICE

AMOUNT

1.

Trail Restoration.

Mini Compact Trail Excavator. Maximum track width = 42”. Trail Maintenance and Restoration - Restore trail to the original trail template, including clearing, grading, blading, removing slough, berm, rocks, roots and stumps from tread and backslope, filling ruts and troughs, reshaping trail tread and backslope, and restoring, reshaping and cleaning drainage structures.

Per mile by mechanical means. (Est. June 15, 2023)

9.0
MI

2.

Switchback Restoration.

Restore existing switchbacks to original template, including clearing, blading, grading, removing slough, berm, rocks, and roots from tread and backslope, filling ruts and troughs, reshaping and widening trail tread and backslope.

Per each by mechanical means. (Est. June 15, 2023)

16.0
EA
3.
Mini Compact Trail Excavator Rental, one each, fully operated.

Maximum track width = 42”.

Install road and trail signposts and bulletin boards, including post hole excavation, setting posts and bulletin board, and filling post holes after installation. Excavation for culvert installation.

Per hour by mechanical means.

(Est. June 15, 2023)

25
HR

TOTAL $

File details come from the government source that posted it. Updated .