1240LU22Q0032.pdf
PDF 576 KB Posted
- Attached to
- LEWIS & CLARK NATIONAL FOREST - Augusta Garage Siding Replacement Federal contract opportunity
- Solicitation number
- 1240LU22Q0032
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Plans.pdf | ||
| Wage Determination.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NUMBER
1240LU22Q0032
2. TYPE OF SOLICITATION
RFQ
3. DATE ISSUED
08/03/2022
PAGE OF PAGES
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER
7. ISSUED BY CODE 8. ADDRESS OFFER TO
wesley.dudley@usda.gov USDA Forest Service 3710 Fallon St Suite C Bozeman, MT 59718
9. FOR INFORMATION
CALL:
a. NAME
Wes Dudley
b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
406 920 1530
SOLICITATION
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
All items identified in this solicitation, 08/03/2022.
11. The contractor shall begin performance within 15 calendar days and complete it within 30 calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See Solicitation documents ).
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.)
YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
12b. CALENDAR DAYS
a. Sealed offers in original and copies to perform the work required are due at the place specified in Item 8 by (hour) local time (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
b. An offer guarantee is, is not required.
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
STANDARD FORM 1442 (REV. 8/2014)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d)
1 5:00 PM
08/17/2022 mailto:wesley.dudley@usda.gov wesleydudley Highlight
OFFER (Must be fully completed by offeror)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NUMBER (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14.)
CODE FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT
NUMBER
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
21. ITEMS ACCEPTED:
AWARD (To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA
BY
31c. DATE
STANDARD FORM 1442 (REV. 8/2014) BACK
AMOUNTS
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) ( ) 41 U.S.C. 3304(a) ( )
26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BY
IPP
PART I—THE SCHEDULE
SECTION B--SUPPLIES OR SERVICES AND PRICES
SCHEDULE OF ITEMS
Garage Siding Replacement
Augusta Ranger Garage Rocky Mountain Ranger District
B- 1 - SCHEDULE
ITEMS
Pay Estimated Pay Unit Item Item Item Description Quantity Unit Price Cost
1510 Mobilization 1 Lump Sum $ $
0616 Wall Assembly Improvements (sheathing, weather barrier) 1 Lump
Sum $ $
0746 Siding, Trim – Replace 1 Lump
Sum $ $
0800 Doors, Overhead Door & Man Door 1 Lump Sum $ $
2605 Electrical 1 Lump
Sum $ $
TOTAL
COST: $
SPECIAL NOTES:
1. Must quote on all items. Round to the nearest cent.
2. Work for the base items will be awarded.
3. In the event of an error in extending the prices, unit prices will govern unless otherwise determined by the Contracting Officer in accordance with applicable regulations.
4. Offers for quantities less than those listed in the numbered items may be rejected.
5. Payment for bond premiums in accordance with Clause 52.232-5. Payments under Fixed-Price
Construction Contracts shall not be in addition to the contract price but can be included under Mobilization.
SECTION C – DESCRIPTION AND SPECIFICATIONS
C.1 PROJECT SCOPE
a. Description:
This project is for the replacement of existing wood siding, trim, pre-hung man door, and overhead door on the Augusta Warehouse with a new Fiber-Cement siding system.
Finished Fiber-Cement siding and trim color, texture, and appearance shall match the existing configuration. Scope of work includes, but is not limited to, removal of the existing siding, trim, door, overhead door, and electrical fixtures; and the installation of all new exterior wall sheathing, weather barrier, Fiber-Cement siding, trim, man door, and overhead door. Remove and replace soffit if necessary to replace siding. Door opening may need to be modified to accommodate new door installations.
Drawings are attached for estimating purposes. Contractor is responsible to verify dimensions and anticipated material quantities prior to estimating and material purchasing.
b. Location: Rocky Mountain District Office, Augusta Ranger Garage, 303 Manix St, Augusta, MT
59410
c. Contractor will be allowed 30 calendar days for this project.
d. Magnitude of Construction: Between $25,000 and $100,000.
C.2 SPECIFICATIONS
SECTION 01 33 00 – SUBMITTAL PROCEDURES
PART 1 – GENERAL
1.01 PROCEDURES FOR SUBMITTALS
A. Reviewing, Certifying, Approving Authority: Contractor shall be responsible for reviewing and certifying that submittals are in compliance with contract requirements.
B. Scheduling: Allow review period, beginning with receipt by approving authority that includes at least 5 working days for submittals for contracting officer approval. Period of review for submittals with contracting officer approval begins when Government receives submittal from contractor. Period of review for each resubmittal is the same as for initial submittal.
C. Variations: Variations from contract requirements require Government approval pursuant to contract Clause entitled “FAR 52.236-21, Specifications and Drawings for Construction” and will be considered where advantages to government.
D. Submittal Schedule:
SECTION DESCRIPTION SUBMITTED APPROVED
07 25 00-1.02A Building Paper 07 46 00-1.02A Siding Product Data 07 46 00-1.02B Siding Maintenance Data 07 46 00-2.01f Siding Colors 07 46 00-1.02C Siding 25 yr Warranty (Sample) 07 46 00-1.02C Siding 25 yr Warranty (Final) 08 00 00-1.2A Doors; Solid Core 08 00 00-1.2B Doors; OHD Insulated
END OF SECTION 01 33 00
SECTION 01 74 00 – CLEAN UP AND DISPOSAL
1.01CLEAN UP
A. The contractor shall keep the work site free from accumulation of waste materials and rubbish resulting from the work. Clean areas daily as required to maintain a safe working site.
B. Before final acceptance of the project by the Government, the contractor shall remove from the site all excess material, waste, and rubbish resulting from this work.
1.02 - DISPOSAL
A. Disposal includes, but is not limited to, the following; all existing siding, trim, existing door, existing overhead door, and light fixture.
B. Waste and excess material:
a. Material that is either waste or in excess of the needs of the contractor shall be disposed of at the contractor’s expense in accordance with all local, state and federal regulations at an approved offsite location.
b. Burning of waste or excess material on site is not permitted.
END OF SECTION 01 74 00
SECTION 06 16 36 – WALL SHEATHING
PART 1 – GENERAL
1.01SUMMARY
A. Work includes the installation of ½ inch CDX Plywood Sheathing necessary to cover all portions of the structure to receive siding.
1.02SUBMITTALS
A. Product Data: For each type of product indicated, include construction details, material descriptions, dimensions of individual components and profiles, and finishes.
PART 2 – PRODUCTS
2.01WALL SHEATHING
A. General: Plywood, CDX, ½ inch thick.
PART 3 – EXECUTION
3.01INSTALLATION
A. General: Comply with the International Building Code and sheathing manufacturer’s written installation instructions applicable to products and applications indicated unless more stringent requirements apply.
END OF SECTION 06 16 36
SECTION 07 25 00 – WEATHER BARRIER
PART 1 – GENERAL
1.01SUMMARY
A. Work includes the installation of house wrap necessary to cover all portions of the structure to receive siding.
descriptions, dimensions of individual components and profiles, and finishes.
PART 2 – PRODUCTS
2.01BUILDING PAPER
A. General: house-wrap, exterior, spun bonded polypropylene.
PART 3 – EXECUTION
3.01INSTALLATION
A. General: Comply with building paper manufacturer’s written installation instructions applicable to products and applications indicated unless more stringent requirements apply.
END OF SECTION 07 25 00
SECTION 07 46 00 – SIDING
1.01SUMMARY
A. Work includes the removal and disposal of all existing siding and exterior trim. All new siding and trim will be of Fiber-Cement. New siding installation configuration shall match the existing siding configuration; Horizontal siding on upper portion, vertical siding on lower portion.
descriptions, dimensions of individual components and profiles, and finishes.
B. Maintenance Data: For each type of siding and related accessories to include in maintenance manuals.
C. Warranty: Sample of special warranty.
1.03WARRANTY
A. Special Warranty: Standard form in which manufacturer agrees to repair or replace siding and soffit that fail(s) in materials or workmanship within specified warranty period.
a. Failures include, but are not limited to, the following:
i. Structural failures, including cracking, deforming, and fading.
ii. Deterioration of metals, metal finishes, and other materials beyond normal weathering.
b. Fading is defined as loss of color, after cleaning with product recommended by manufacturer, of more than 7 Hunter units as measured according to ASTM D 2244.
c. Warranty Period: 25 years from date of substantial completion.
PART 2 – PRODUCTS
2.01FIBER-CEMENT SIDING
A. General: ASTM 1186, Type A, Grade II, Fiber-cement board, noncombustible when tested according to ASTM E 136; with a flame-spread index of 25 or less when tested according to ASTM E 84.
a. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
b. Basis-of-Design Product: Subject to compliance with requirements, provide James Hardie products from the HZ5 product line (engineered for Montana climate zone): Hardiplank Lap Siding or comparable product by one of the following:
i. Cemplank.
ii. CertainTeed Corp.
iii. GAF Materials Corporation.
iv. James Hardie
v. MaxiTile, Inc; a California Corporation.
vi. Nichiha Fiber Cement
vii. Everlog Siding
c. Horizontal Pattern: Match existing configuration.
d. Vertical Pattern: Match existing configuration.
e. Texture: Select Cedarmill or approved equal.
f. Factory Priming: Manufacturer’s standard acrylic primer.
g. Finish: Colors;
1. Siding = Chestnut Brown – JH80-30
2. Trim = Woodstock Brown – JH30-30
2.01ACCESSORIES
A. Siding Accessories, General: Provide starter strips, edge trim, corner trim, outside and inside corner caps, and other items as recommended by siding manufacturer for building configuration.
a. Provide accessories made from same materials as adjacent siding unless otherwise indicated.
B. Decorative Accessories: Provide the following fiber-cement decorative accessories as indicated:
a. Moldings and trim
b. Soffit (As needed)
C. Flashing: Provide flashing complying with Division 07 Section “Sheet Metal Flashing and Trim” when needed at doors and windows.
D. Fasteners: Siding fasteners should be of sufficient length and location to meet manufacturer and ICC code requirements.
a. For fastening to wood, use siding nails of sufficient length to penetrate a minimum of 1 inch into substrate.
b. For fastening fiber-cement, use stainless-steel fasteners. Stainless fasteners may be substituted with alternate fastening material components only per manufacturer’s approval/recommendation.
PART 3 – EXECUTION
3.02INSTALLATION
A. General: Comply with siding manufacturer’s written installation instructions applicable to products and applications indicated unless more stringent requirements apply.
a. Do not install damaged components.
b. Center nails in elongated nailing slots without binding siding to allow for thermal movement.
B. Install fiber-cement siding and related accessories.
a. Install fasteners no more than 24 inches o.c.
C. Where necessary, install joint sealants to produce a weather tight installation.
D. Where necessary, install flashing to protect wall assemblies from water intrusion.
END OF SECTION 07 46 00
SECTION 080000 - DOORS
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Doors
2. Overhead Doors.
1.2 SUBMITTALS
A. Product Data: Solid Core Doors.
B. Product Data: Insulated Overhead Garage Doors.
C. Product Data: Overhead Garage Doors
PART 2 - PRODUCTS
2.1 SOLID-CORE DOORS
A. Doors: Provide pre-hung metal solid-core doors meeting the following criteria;
1. Width: 30”
2. Height: 6’-8”
3. Type: Metal, solid-core, exterior
4. Operation: side hinge, swing in the direction of egress
B. Hardware: Provide door hardware meeting the following criteria; WDMA I.S.1-A
Performance Grade:
1. Hardware: Lever; Door handles, pulls, latches, locks and other operating devices are required to be accessible and shall not require tight grasping, tight pinching or twisting of the wrist to operate.
C. Locks and Latches: Provide door locks and latches meeting the following criteria;
1. Locks: Door locks shall be keyed to the standard Forest Service Yale
2. Latches: Doors shall be readily openable from the egress side without the use of a key or special knowledge
2.2 INSULATED 8X7 OVERHEAD GARGE DOOR
A. Overhead Garage Doors: Provide non-insulated overhead garage doors meeting the following criteria;
1. Width: 8’-0”
2. Height: 7’-0”
3. Type: Metal, Insulated
4. Thermal Value: R12.9 minimum
5. Seal: Weather Stripping
6. Operation: Manual
B. Locks and Latches: Provide clasp, bolt, or other locking mechanism to allow for locking the door in the closed position from the exterior using a pad-lock.
2.3 FABRICATION
A. Factory fit doors to suit frame-opening sizes indicated. Comply with clearance requirements of referenced quality standard for fitting unless otherwise indicated.
B. Factory machine doors for hardware that is not surface applied.
2.4 FACTORY FINISHING
A. General: Comply with referenced quality standard for factory finishing.
Complete fabrication, including fitting doors for openings and machining for hardware that is not surface applied, before finishing.
1. Finish faces, all four edges, edges of cutouts, and mortises. Stains and fillers may be omitted on top and bottom edges, edges of cutouts, and mortises.
PART 3 - EXECUTION
3.1 INSTALLATION
A. Installation Instructions: Install doors to comply with manufacturer's written instructions and referenced quality standard, and as indicated.
B. Job-Fitted Doors: Align and fit doors in frames with uniform clearances and bevels as indicated below; do not trim stiles and rails in excess of limits set by manufacturer or permitted for fire-rated doors. Machine doors for hardware. Seal edges of doors, edges of cutouts, and mortises after fitting and machining.
1. Clearances: Provide 1/8 inch at heads, jambs, and between pairs of doors.
Provide 1/8 inch from bottom of door to top of decorative floor finish or covering unless otherwise indicated. Where threshold is shown or scheduled, provide 1/4 inch from bottom of door to top of threshold unless otherwise indicated.
C. Factory-Finished Doors: Restore finish before installation if fitting or machining is required at Project site.
END OF SECTION 081416
SECTION 26 05 00 – ELECTRICAL
1.01SUMMARY
A. Work includes the removal of a light fixture and removal/reinstallation of one exterior
GFCI protected receptacles. Leave an opening for the light fixture and place wire nuts on the exposed wires.
A. NA
PART 2 – PRODUCTS
2.01EXTERIOR RECEPTACLES
A. Receptacles: 20 Amp, Weather/Tamper Resistant GFCI Duplex Outlet B. Miscellaneous: Provide any additional wire nuts, fastening hardware, conductors, etc to complete the installations.
PART 3 – EXECUTION
3.01INSTALLATION
A. General: Comply with the electrical manufacturer’s written installation instructions applicable to products and applications indicated unless more stringent requirements apply.
END OF SECTION 26 05 00
C-3 GENERAL SPECIFICATIONS
a) Existing Facilities. In addition to the requirements of the Use of Premises Clause, AGAR 452.236-70, all existing facilities structures damaged by the Contractor shall be replaced or repaired by the Contractor at no additional cost to the Government. This includes any facilities inside or outside the project limits, including along any access routes.
Do not trim or damage vegetation except with specific Contracting Officers (CO) approval.
b) Pollution and Erosion Control. During all operations under this contract, the
Contractor shall exercise reasonable measures to prevent or minimize soil erosion and pollution of water and other resources. All refuse, including garbage, rubbish, and solid or liquid wastes, from the Contractor's operations, including camps, parking areas, and equipment maintenance areas shall be stored, collected, and disposed of in a sanitary and nuisance-free manner. Refuse shall be disposed of in State-approved landfills unless otherwise approved by the Contracting Officer (CO).
c) Coordination with District Operations. The work will take place in areas critical to daily ranger district operations. The Contractor shall maintain regular contact and coordination with the district representative to assure that district operations are not hindered by the work.
d) Storage and Stockpiling. The Contractor shall confine storage of equipment, materials, and vehicles to within the limits delineated by the Contracting Officer. The Contractor shall be solely responsible for the loss of or damage to materials stored on Forest Service lands or elsewhere.
e) Coordination with Other Contractors. The Contractor shall maintain regular contact and coordination with all other contractors working on the district compounds to assure that the operations of other contractors are not hindered by the work.
f) Worksite Cleanliness and Final Cleanup. Maintain the project work areas in a clean and orderly condition throughout the progress of work under this contract. All refuse, including garbage, rubbish, and solid or liquid wastes from the Contractor's operations shall be stored and collected in a sanitary manner and disposed of off Government property in a legal manner. Maintain strict control of hazardous materials to prevent contamination of the site.
g) Equipment Specifications. Equipment and tools shall be in good mechanical and operating condition, fully capable of performing all phases of the specified work.
h) Weather Conditions. Work will be suspended if, in the opinion of the Contracting
Officer, weather conditions preclude effective protection of resources, site rehabilitation, or otherwise impact project end results in a significant, negative manner.
i) Sanitary Facilities – Sanitary facilities are available on site.
j) Notification. Contractor shall notify the C.O. at least two weeks prior to entering a work site.
C-4 HAULING AND DISPOSAL OF MATERIALS
a) All loads shall be completely covered during hauling.
b) All materials removed from the site shall be disposed of in a legal manner off National
Forest System lands. All fees associated with material disposal shall be paid by the Contractor.
C-5 CLEANUP AND DISPOSAL
The Contractor shall at all times keep the area in an orderly condition. Upon completing the work, the Contractor shall remove from the site and premises any rubbish, tools, equipment, and materials that are not the property of the Forest Service. Upon completing the work, the Contractor shall leave the work areas in a clean, neat, and orderly condition satisfactory to the Contracting Officer.
C-6 EXISTING UTILITIES
The Contractor is responsible for location of all utilities prior to beginning work. Damaged utilities shall be repaired at the Contractor’s expense.
C-7 - FOOD AND GARBAGE STORAGE
All food, beverages, and scented or flavored toiletries must be stored unavailable to bears at night and when unattended during the day. Attractants include but are not limited to canned food, pop, beer, garbage, grease, processed livestock or pet food, toothpaste, and chap stick. All attractants shall be hung at least 10-feet off the ground and 4-feet from any vertical support, or stored inside a bear resistant container or vehicle. Cars, pick-up cabs, enclosed horse trailers, hard sided campers or camper shells are all considered bear resistant. Food should be stored out of sight in vehicles. Coolers, pop-up campers, backpacks, and tents are not considered bear resistant.
C-8 – FIRE CONTROL (FS.236.1)
(a) Contractor's Responsibility for Contractor-Caused Fires – The Contractor, whether or not directed by the Forest Service, shall immediately extinguish, without expense to the Government, all fires on or in the vicinity of the project which are caused by Contractor's employees, whether set directly or indirectly as a result of Contractor operations. The Contractor may be held liable for all damages and costs of additional labor, subsistence, equipment, supplies, and transportation resulting from fires set or caused by the Contractor's employees or resulting from contract operations.
(b) Other Fires – For the purpose of fighting forest fires on or in the vicinity of the project, which are not caused by the Contractor or his employees, the Contractor when requested by the Contracting Officer shall place his employees and equipment temporarily at the disposal of the Forest Service. Payment for such services will be made by the Government at not less than the current rate for fire-fighting services established by the Forest Service in the area concerned.
Any employees and equipment furnished will be relieved from fire fighting as soon as the Forest Service finds that it is practicable to employ other labor and equipment adequate for the protection of the area.
An equitable adjustment in contract time may be made for this period.
(c) Fire Plan – At all times during closed fire season period, as specified by State law, the
Contractor shall comply with each of the following provisions to the extent applicable to his operation under the contract.
1. Fire Tools – The Contractor will provide for each employee in the contract area at least one approved hand tool of a type appropriate in the contract area, such as shovel, pulaski, or ax. Tools required and furnished under (2) and (4) below, shall count toward fulfillment of the above requirement. Where additional tools, beyond those required under (2) and (4) below, are to be provided, the Contractor shall seal such tools in one or more boxes painted red and marked "Tools for Fire Only." All tools required herein shall be kept sharp and in good serviceable condition and maintained at locations to be designated by the Forest Service.
2. Fire Extinguishers and Tools on Mobile or Stationary Equipment – Each unit of powered equipment used in connection with this contract, including automobiles, trucks, tractors, etc., shall be equipped with serviceable tools and fire extinguishers as follows:
One - fire extinguisher, dry chemical type of not less than 2-1/2 pound capacity with 4 BC or higher rating.
One - shovel, round point #0 lady or equal.
One - ax, 2 pounds or over, 26-inch minimum length, or one pulaski.
One - water container (at least 1-gallon capacity), not required with stationary equipment.
3. Blasting – Fuse or prima cord shall not be used unless authorized in writing by the
CO with special precautions stated.
4. Smoking – Smoking shall not be permitted within the contract area except on surfaced or dirt roads, at landings, within closed vehicles, in camps, or at other posted places, and shall never be allowed while working or traveling on foot.
5. Storage of Petroleum and Other Highly Flammable Products – Gasoline, oil, grease, or other highly flammable material will be stored either in a separate building used exclusively for such storage, or at a site where all combustible debris and vegetation is cleared away within a radius of 25 feet. Fire extinguishers and/or sand barrels may be required at such locations specified by the Forest Service when unusually hazardous conditions exist.
6. Precautions for Stoves – Stovepipes on all temporary buildings, trailers, and tents using wood burning stoves, will be equipped with roof jacks and serviceable spark arresters of mesh with openings no larger than 5/8 inch.
All stovepipes, inside and out, will not be closer than 2 feet from any wood or other flammable material or 1 foot if the combustible material is protected by a metal or asbestos shield.
7. Welding – Welding or use of cutting torches will be permitted only in areas that have been cleared or are free of all material capable of carrying fire. Flammable debris and vegetation must be removed from within a minimum of 10 feet radius of all welding and cutting torch operations. A shovel and a 5-gallon standard backpack water container (filled), with hand pump attached, shall be immediately available for use in the event of a fire start.
8. Fire Plan – Prior to initiating work on the contract area, during the closed fire season period, a fire prevention and suppression plan will usually be prepared. The Contractor and the Forest Service will jointly prepare this plan. Such plan shall include a detailed list of men and equipment at the Contractor's disposal for implementing the plan. The fire plan shall also specify additional measures and/or special requirements, such as Hoot Owl restrictions, necessary during periods of critical fire weather conditions.
When Hoot Owl restrictions are invoked, the Forest Service may curtail or shut down all or portions of a Contractor's operations. The following requirements may be imposed:
a) All high fire risk operations could be terminated at 1300 local time.
b) All burning could be stopped, including debris burning fires.
c) Patrolman may be required for a period of 2 hours after high fire risk operations and 1 hour after end of work shift. The Contractor shall provide the patrolman unless the contract is for equipment rental, in which case the Government will provide the patrolman.
C-9 MEASUREMENT AND PAYMENT
The method of measurement will be as designated in the SCHEDULE OF ITEMS. The accepted quantity will be paid for at the contract unit price for the Pay Item shown in the SCHEDULE OF ITEMS. Payment will be for all labor, equipment, transportation, supervision, operating supplies, materials, and incidentals necessary to complete the work as specified.
SECTION D--PACKAGING AND MARKING
D-1 PACKING AND MARKING
All shipments of materials, equipment and/or supplies shall be addressed to the Contractor and not to the Government.
D-2 PROJECT LABELING FOR OFFICIAL CORRESPONDENCE
The Government singularly identifies each project with a contract number at time of award. The contract number is a unique identifier to purposely and permanently represent an awarded project. The Government issued contract number is to be referenced on all official communication starting upon notice of award.
SECTION E--INSPECTION AND ACCEPTANCE
E.1 CLAUSES
52.246-12 Inspection of Construction (AUG 1996)
SECTION F--DELIVERIES OR PERFORMANCE
F.1 CLAUSES
52.211-13 Time Extensions (SEP 2000) 52.211-18 Variation in Estimated Quantity (APR 1984) 52.242-14 Suspension of Work (APR 1984)
SECTION G--CONTRACT ADMINISTRATION DATA
G.1 CLAUSES
G.2 OTHER REQUIREMENTS
Post Award Conference (NOV 1996)
A post award conference with the successful offeror is required. It will be scheduled and held within 60 days after the date of contract award. The conference will be held via telephone.
SECTION H--SPECIAL CONTRACT REQUIREMENTS
H.1 CLAUSES
H.2 OTHER REQUIREMENTS
USE OF PREMISES
(a) Before any camp, quarry, borrow pit, storage, detour, or bypass site, other than shown on the drawings, is opened or operated on USDA land or lands administered by the USDA, the Contractor shall obtain written permission from the Contracting Officer. A camp is interpreted to include a campsite or trailer parking area of any employee working on the project for the Contractor.
(b) Unless excepted elsewhere in the contract, the Contractor shall (i) provide and maintain sanitation facilities for the work force at the site and (ii) dispose of solid waste in accordance with applicable Federal, State and local regulations.
ARCHAEOLOGICAL OR HISTORIC SITES
If a previously unidentified archaeological or historic site(s) is encountered, the Contractor shall discontinue work in the general area of the site(s) and notify the Contracting Officer immediately.
CONTROL OF EROSION, SEDIMENTATION, AND POLLUTION
(a) Operations shall be scheduled and conducted to minimize erosion of soils and to prevent silting and muddying of streams, rivers, irrigation systems, and impoundments (lakes, reservoirs, etc.).
(b) Pollutants such as fuels, lubricants, bitumens, raw sewage, and other harmful materials shall not be discharged on the ground; into or nearby rivers, streams, or impoundments; or into natural or man-made channels. Wash water or waste from concrete or aggregate operations shall not be allowed to enter live streams prior to treatment by filtration, settling, or other means sufficient to reduce the sediment content to not more than that of the stream into which it is discharged.
(c) Mechanized equipment shall not be operated in flowing streams without written approval by the Contracting Officer.
INSURANCE COVERAGE
Pursuant to FAR clause 52.228-5, Insurance-Work on a Government Installation, the Contractor will be required to present evidence to show, as a minimum, the amounts of insurance coverage indicated below:
(a) Workers Compensation and Employer's Liability. The Contractor is required to comply with applicable Federal and State workers' compensation and occupational disease statutes. If occupational diseases are not compensable under those statutes, they shall be covered under the employer's liability section of the insurance policy, except when contract operations are so commingled with a Contractor's commercial operations that it would not be practical to require this coverage. Employer's liability coverage of at least $100,000 shall be required, except in States with exclusive or monopolistic funds that do not permit worker's compensation to be written by private carriers.
(b) General Liability. (1) The Contractor shall have bodily injury liability coverage written on a comprehensive form of policy of at least $500,000 per occurrence. (2) The Contractor shall have property damage liability insurance shall be required in the amount of $200,000 per occurrence.
(c) Automobile Liability. The Contractor shall have automobile liability insurance written on a comprehensive form of policy. The policy shall provide for bodily injury and property damage liability covering the operation of all automobiles used in connection with performing the contract. Policies covering automobiles operated in the United States shall provide coverage of at least $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage or loss.
(d) Aircraft Public and Passenger Liability. When aircraft are used in connection with performing the contract, the Contractor shall have aircraft public and passenger liability insurance. Coverage shall be at least $200,000 per person and $500,000 per occurrence for bodily injury, other than passenger injury. Coverage for passenger injury shall be at least $200,000 multiplied by the number of seats or passengers, whichever is greater.
PART II--CONTRACT CLAUSES
SECTION I--CONTRACT CLAUSES
I.1 CLAUSES
52.252-2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
Federal Acquisition Regulation (FAR) Clauses:
https://www.acquisition.gov/browse/index/far (FAR clauses begin with 52) Department of Agriculture Acquisition Regulation (AGAR) Clauses:
https://www.acquisition.gov/agar (AGAR clauses begin with 452) Deviations to clauses may be viewed at:
https://www.dm.usda.gov/procurement/policy/FARClassDeviations.htm
52.203-7 Anti-Kickback Procedures (JUN 2020) 52.203-12 Limitation on Payments to Influence Certain Federal Transactions (JUN 2020) 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or
Statements (JAN 2017) 52.204-2 Security Requirements (MAR 2021) Alternate II (APR 1984) 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (JUN
2020) 52.204-13 System for Award Management Maintenance (OCT 2018) 52.204-18 Commercial and Government Entity Code Maintenance (AUG 2020) 52.204-19 Incorporation by Reference of Representations and Certifications (DEC 2014) 52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or
Provided by Kaspersky Lab and Other Covered Entities (NOV 2021) 52.204-25 Prohibition on Contracting for Certain Telecommunications and Video
Surveillance Services or Equipment (NOV 2021) 52.209-6 Protecting the Government's Interest when Subcontracting with Contractors
Debarred, Suspended, or Proposed for Debarment (NOV 2021) 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (NOV 2015) 52.215-8 Order of Precedence—Uniform Contract Format (OCT 1997) 52.219-6 Notice of Total Small Business Set-Aside (NOV 2020) 52.219-14 Limitations on Subcontracting (SEP 2021)
[Contracting Officer check as appropriate.] ☐ By the end of the base term of the contract and then by the end of each subsequent option period; or ☐ By the end of the performance period for each order issued under the contract.
52.219-28 Post Award Small Business Program Rerepresentation (SEP 2021) 52.222-3 Convict Labor (JUN 2003) https://www.acquisition.gov/browse/index/far https://www.acquisition.gov/agar
52.222-4 Contract Work Hours and Safety Standards -- Overtime Compensation (MAY 2018)
52.222-6 Construction Wage Rate Requirement (AUG 2018) 52.222-7 Withholding of Funds (MAY 2014) 52.222-8 Payrolls and Basic Records (JUL 2021) 52.222-9 Apprentices and Trainees (JUL 2005) 52.222-10 Compliance with Copeland Act Requirements (FEB 1988) 52.222-11 Subcontracts (Labor Standards) (MAY 2014) 52.222-12 Contract Termination - Debarment (MAY 2014) 52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations
(MAY 2014)
52.222-14 Disputes Concerning Labor Standards (FEB 1988) 52.222-15 Certification of Eligibility (MAY 2014) 52.222-21 Prohibition of Segregated Facilities (APR 2015) 52.222-26 Equal Opportunity (APR 2016) 52.222-27 Affirmative Action Compliance Requirements for Construction (APR 2015) 52.222-30 Construction Wage Rate Requirements-Price Adjustment (None or Separately
Specified Pricing Method) (AUG 2018) 52.222-35 Equal Opportunity for Veterans (JUN 2020) 52.222-36 Equal Opportunity for Workers with Disabilities (JUN 2020) 52.222-37 Employment Reports on Veterans (JUN 2020) 52.222-50 Combating Trafficking in Persons (NOV 2021) 52.222-54 Employment Eligibility Verification (NOV 2021) 52.222-55 Minimum Wages for Contractor Workers under Executive Order 14026 (JAN
2022) 52.222-62 Paid Sick Leave under Executive Order 13706 (JAN 2022) 52.223-2 Affirmative Procurement of Biobased Products under Service and Construction
Contracts (SEP 2013) 52.223-3 Hazardous Material Identification and Material Safety Data Alt 1 (FEB 2021) 52.223-5 Pollution Prevention and Right-to-Know Information (MAY 2011) 52.223-11 Ozone-Depleting Substances and High Global Warming Potential
Hydrofluorocarbons (Jun 2016) 52.223-12 Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air
Conditioners (JUN 2016) 52.223-15 Energy Efficiency in Energy Consuming Products (MAY 2020) 52.223-17 Affirmative Procurement of EPA-designated Items in Service and Construction
Contracts (AUG 2018) 52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving (JUN
2020) 52.223-20 Aerosols (Jun 2016) 52.223-21 Foams. (Jun 2016) 52.225-13 Restrictions on Certain Foreign Purchases (FEB 2021) 52.226-1 Utilization of Indian Organizations and Indian-Owned Economic Enterprises
(June 2000) 52.227-1 Authorization and Consent (JUN 2020)
52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement (JUN 2020) 52.227-4 Patent Indemnity -- Construction Contracts (DEC 2007) 52.228-2 Additional Bond Security (OCT 1997) 52.228-5 Insurance – Work on a Government Installation (JAN 1997) 52.228-12 Prospective Subcontractor Requests for Bonds (MAY 2014) 52.228-14 Irrevocable Letter of Credit (NOV 2014) 52.232-5 Payments under Fixed-Price Construction Contracts (MAY 2014) 52.232-17 Interest (MAY 2014) 52.232-23 Assignment of Claims (MAY 2014) 52.232-27 Prompt Payment for Construction Contracts (JAN 2017) 52.232-33 Payment by Electronic Funds Transfer – System for Award Management (OCT
2018) 52.232-39 Unenforceability of Unauthorized Obligations (JUN 2013) 52.233-1 Disputes (MAY 2014) Alt 1 (DEC 1991) 52.233-3 Protest after Award (AUG 1996) 52.233-4 Applicable Law for Breach of Contract Claim (OCT 2004) 52.236-2 Differing Site Conditions (APR 1984) 52.236-3 Site Investigation and Conditions Affecting the Work (APR 1984) 52.236-5 Material and Workmanship (APR 1984) 52.236-6 Superintendence by the Contractor (APR 1984) 52.236-7 Permits and Responsibilities (NOV 1991) 52.236-8 Other Contracts (APR 1984) 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and
Improvements (APR 1984) 52.236-10 Operations and Storage Areas (APR 1984) 52.236-11 Use and Possession Prior to Completion (APR 1984) 52.236-12 Cleaning Up (APR 1984) 52.236-13 Accident Prevention (NOV 1991)
Alternate I (NOV 1991) 52.236-14 Availability and Use of Utility Services (APR 1984) 52.236-16 Quantity Surveys (APR 1984)
Alternate 1 (APR 1984) 52.236-17 Layout of Work (APR 1984) 52.236-21 Specifications and Drawings for Construction (FEB 1997)
Alternate I (APR 1984) Alternate II (APR 1984)
52.243-5 Changes and Changed Conditions (APR 1984) 52.244-6 Subcontracts for Commercial Products and Commercial Services (JAN 2022)
(DEVIATION APR 2020)
52.245-1 Government Property (SEP 2021) - Alt 1 (APR 2012) 52.245-9 Use and Charges (APR 2012) 52.246-21 Warranty of Construction (MAR 1994)
Alternate I (MAR 1994) 52.248-3 Value Engineering – Construction (OCT 2020)
52.249-1 Termination for Convenience of the Government (Fixed-Price) (Short Form)
(APR 1984)
Alternate I (SEP 1996)
52.249-10 Default (Fixed-Price Construction) (APR 1984) Alternate I (APR 1984)
52.253-1 Computer Generated Forms (JAN 1991)
52.225-9 Buy American Act-Construction Materials (NOV 2021)
(a) Definitions. As used in this clause-
Commercially available off-the-shelf (COTS) item-
(1) Means any item of supply (including construction material) that is-
(i) A commercial product (as defined in paragraph (1) of the definition of “commercial product” at Federal Acquisition Regulation (FAR) 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace;
and
(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.
"Construction material" means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work.
The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
Cost of components means-
(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
Domestic construction material means-
(1) For construction material that does not consist wholly or predominantly of iron or steel or a combination of both-
(i) An unmanufactured construction material mined or produced in the United States;
or
(ii) A construction material manufactured in the United States, if-
(A) The cost of its components mined, produced, or manufactured in the United
States exceeds 55 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic. Components of unknown origin are treated as foreign; or
(B) The construction material is a COTS item; or
(2) For construction material that consists wholly or predominantly of iron or steel or a combination of both, a construction material manufactured in the United States if the cost of foreign iron and steel constitutes less than 5 percent of the cost of all components used in such construction material. The cost of foreign iron and steel includes but is not limited to the cost of foreign iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the construction material and a good faith estimate of the cost of all foreign iron or steel components excluding COTS fasteners. Iron or steel components of unknown origin are treated as foreign. If the construction material contains multiple components, the cost of all the materials used in such construction material is calculated in accordance with the definition of "cost of components".
Fastener means a hardware device that mechanically joins or affixes two or more objects together. Examples of fasteners are nuts, bolts, pins, rivets, nails, clips, and screws.
Foreign construction material means a construction material other than a domestic construction material.
Foreign iron and steel means iron or steel products not produced in the United States.
Produced in the United States means that all manufacturing processes of the iron or steel must take place in the United States, from the initial melting stage through the application of coatings, except metallurgical processes involving refinement of steel additives. The origin of the elements of the iron or steel is not relevant to the determination of whether it is domestic or foreign.
Predominantly of iron or steel or a combination of both means that the cost of the iron and steel content exceeds 50 percent of the total cost of all its components. The cost of iron and steel is the cost of the iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the product and a good faith estimate of the cost of iron or steel components excluding COTS fasteners.
Steel means an alloy that includes at least 50 percent iron, between 0.02 and 2 percent carbon, and may include other elements.
"United States" means the 50 States, the District of Columbia, and outlying areas.
(b) Domestic preference. (1) This clause implements 41 U.S.C.chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the domestic content test of the Buy American statute is waived for construction material that is a COTS item, except that for construction material that consists wholly or predominantly of iron or steel or a combination of both, the domestic content test is applied only to the iron and steel content of the construction materials, excluding COTS fasteners. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.
(2) This requirement does not apply to information technology that is a commercial product or to the construction materials or components listed by the Government as follows:
None.
(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that-
(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 20 percent;
(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or
(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.
(c) Request for determination of inapplicability of the Buy American statute. (1) (i) Any
Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including-
(A) A description of the foreign and domestic construction materials;
(B) Unit of measure;
(C) Quantity;
(D) Price;
(E) Time of delivery or availability;
(F) Location of the construction project;
(G) Name and address of the proposed supplier; and
(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.
(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.
(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).
(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.
(2) If the Government determines after contract award that an exception to the Buy
American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.
(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute.
(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:
Foreign and Domestic Construction Materials Price Comparison
Construction Material Description Unit of Measure Quantity Price (dollars)* Item1:
Foreign construction material _______ _______ _______ Domestic construction material _______ _______ _______
Item2:
Foreign construction material _______ _______ _______ Domestic construction material _______ _______ _______
[* Include all delivery costs to the construction site and any…
This is the start of the file's text. The full file is on GovTribe.