C05a Questions and Answers from Sol 1240LT27Q0025.pdf
PDF 84 KB Posted
- Attached to
- SNPLMA Kalamazoo Fence
- Solicitation number
- 1240LT27Q0025
- Issued by
-
Department of Agriculture Forest Service
About this file
This is a Questions and Answers (Q&A) document for federal contract solicitation 1240LT27Q0025 for Kalamazoo Fence work.
The solicitation involves approximately 2,500 feet of new fence construction (excluding removal), with four 12-foot gates, braces, and cattleguard connections included in the contract price. Work is contracted under two line items in the SOI (Schedule of Items), with payment methods and quantities governed by those items rather than conflicting drawing specifications. The contracting officer clarified that no existing fence removal is required despite conflicting drawing notes, and that D-3's brace table governs bracing requirements, requiring corner braces at alignment changes of 20 degrees or more and inline braces at intervals not exceeding 1,320 feet based on 30-degree categories. Contractors must lay out exact brace locations as the design provides only general fence line locations. The design is based on FP-24 Standard Specifications with no Forest Service Supplement referenced.
Bidders must submit a bid guarantee equal to 100% of the contract price with their December 4 quotation, citing FAR 52.228-1. Post-award performance and payment bonds are required within 15 calendar days of award notice for contracts over $150,000. Work is scheduled for a 90-day performance period from June 1 to August 29, 2027, with wage determination WD NV20260067 (dated 7-30-2026) applicable. Contractors must comply with MUTCD traffic control standards, follow equipment restrictions specified in SOW 1.1, and coordinate staging areas. Small traffic delays are permitted during this summer 2027 work window.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions from 1240LT27Q0025 – Kalamazoo Fence
1. Existing-fence removal: Drawing D-2 calls for removal of roughly 13.1 miles of burned and unburned fence and off-site disposal. The SOW describes approximately 0.5 miles of new fence, and D-1 states there is no existing fence line to follow. Is removal included? If so, please provide its quantity, mapped locations, removal and disposal requirements, and pay item. If not, please amend the conflicting drawing notes.
Getting the drawings redone and resigned will take time. Can you tell the bidders there is no removal.
2. Quantity and payment: The SOW and SF1442 describe approximately 2,500 feet, including an estimated four 12-foot gates, as a lump sum. C04a lists 2,640 feet under item 619-01, method “DQ,” plus separate mobilization. D-2 specifies measurement by linear mile along the bottom-wire slope, including gate openings.
Which quantity and payment method govern? Are the four gates, braces and cattleguard connections included in item 619-01?
The SOI items govern. All work in included in the two items.
3. Offer guarantee: SF1442 block 13(b) requires an offer guarantee. Please specify the required amount or percentage, permitted form and submission requirements, including whether it must accompany the December 4 quotation.
Answer: Bid guarantee is 100% of price, submitted with quote. FAR 52.228-1.
4. Post-award bonds and payment protection: SF1442 requires performance and payment bonds within 15 calendar days after award, while page 14 describes payment protection equal to 100% of the contract price within 10 days. Please confirm the required security instruments, when alternatives are permitted, and the governing amounts, deadlines and duration.
Answer: Over 35K, a payment bond is required within 15 days of award notice and over 150K the payment and performance bonds are required within the 15 days of award notice.
FAR 52.228-15
5. Complete documents: The SF1442 PDF has 19 pages but is numbered “of 20.” Is a page missing? Please provide it if applicable.
Answer: It is 19 Pages, no pages missing.
Please also identify or provide the Forest Service Supplement and edition referenced in C04b, section 1.9.
No FS Supplement. Design based on FP-24 Standard Specifications.
6. Bracing: D-2 requires corner braces at alignment changes of 20 degrees or more and inline braces at intervals not exceeding 1,320 feet. D-3’s brace table uses 30-degree categories and run lengths through 990 feet. Which criteria govern? Please identify the required brace types and locations, and confirm whether the northeast rock crib is required.
D-3 Table will govern. It is more strict.
Contractor needs to lay out exact locations and needs for bracing. Design only gives general location of fence line.
7. Access and traffic control: Please identify allowable work hours, permitted short traffic holds, minimum flagging and signing requirements, equipment access and staging restrictions, and any additional site-specific permit or environmental restrictions.
SOW 1.1 ( C ) ( D ) gives equipment restrictions
SOW 1.4 States need to follow MUTCD for traffic control. Small delays will be allowed.
SOW 1.5 States staging areas will be considered.
8. Wages and schedule: Please confirm the wage determination and modification to use for the anticipated summer 2027 work and how FAR 52.222-32 applies. Is June 1–August 29, 2027 the required performance window, or does the 90-day period follow the actual notice to proceed?
Answer: WD NV20260067 dtd 7-30-2026, yes, 90 day period is 6/1/2027 – 8/29/2027, notice to proceed will be effective starting 6/1/2027 whenever it is issued. Current Wage Determination will be used at time of solicitation.