Amendment 1_Paintrock Road_Schedule of Items.doc

DOC document 68 KB Posted

Attached to
GAOA-Paintrock Road (NFSR #17) Road Reconstruction
Solicitation number
1240LT22R0029
Issued by

View the file

Other files

File Type Posted
Amendment 1.pdf PDF
Attach_2_Paintrock Road FSSS.pdf PDF
Attach_4_Determination of Responsibility.pdf PDF
Attach_3_Wage Determination.pdf PDF
Attach_1_Paintrock Road Improvements Drawings.pdf PDF
1240LT22R0029.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PART I - SCHEDULE OF ITEMS

SECTION B – SERVICES AND PRICES

GAOA – PAINTROCK ROAD (NFSR #17) ROAD IMPROVEMENTS

WYOMING

BIG HORN COUNTY

BIGHORN NATIONAL FOREST

MEDICINE WHEEL RANGER DISTRICT

B- 1 - SCHEDULE OF ITEMS

BASE ITEMS

Pay Item Number
Base Item
Pay Unit
Est Quantity NFSR 17
Total Quantities
Unit Price
Amount
15101
Mobilization
LS
All Required
1
$________
$________
20103
Clearing and Grubbing, Disposal Method G
Miles
1.58
1.58
$________
$________
20207
Removal of Individual Trees, Disposal of tops and limbs Method F, logs Method I, and stumps Method F (8" to 18" dia)
Each
65
65
$________
$________
20208
Removal of Individual Stumps, Disposal Method F
Each
65
65
$________
$________
20302(A)
Remove Existing Sign, Disposal Method A
Each
3
3
$________
$________
20302(B)
Remove Existing CMP, Disposal Method A
Each
10
10
$________
$________
20302(c)
Remove Existing Cattleguard, Disposal Method A
Each
1
1
$________
$________
20304
Remove Asphalt Pavement, Disposal Method A
SY
9093
9093
$________
$________
20415
Excavation and Embankment, Type Road widening, Compaction placement method 2, Tolerance class B*
CY
18
18
$________
$________
20424
Excavation and Embankment, Type Ditch reconstruction
LF
90
90
$________
$________
20425
Excavation and Embankment, Type Drivable dip
Each
1
1
$________
$________
30115(A)
Aggregate Surface Course, Nominal grading F, Compaction Method 2, Government Source
CY
4710
4710
$________
$________
30315
Road Reconditioning, Compaction Method 2
Miles
5.90
5.90
$________
$________
60201(A)
18-inch Pipe Culvert, .064 Inch Thickness Steel, .075 Inch Thickness Aluminum, Compaction Method 6
LF
275
275
$________
$________
60201(B)
24-inch Pipe Culvert, .064 Inch Thickness Steel, .075 Inch Thickness Aluminum, Compaction Method 6
LF
230
230
$________
$________
61903
Install 14’ Wide Cattleguard with Concrete Base and Metal Wings
Each
1
1
$________
$________
63302
Permanent Traffic Control, Road Signs, Government-furnished
Each
4
4
$________
$________
63306(A)
Posts; Installation of Wooden Sign Posts
Each
6
6
$________
$________
63306(B)
Posts; Installation of Metal Sign Posts
Each
94
94
$________
$________
63307
Permanent Traffic Control, Object Markers
Each
192
192
$________
$________
63501
Temporary Traffic Control
LS
All Required
1
$________
$________

* Denotes Contract Quantity

Total Base Items

OPTIONAL ITEMS

Pay Item Number
Optional Item
Pay Unit
Est Quantity NFSR 17
Total Quantities
Unit Price
Amount
30115(B)
Aggregate Surface Course, Nominal grading F, Compaction Method 2, Government Source
CY
Up to 3644
3644
$________
$________

* Denotes Contract Quantity

Total Optional Items
$________
Total All Items - Base and Optional
$________

B-2 - NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under 151.01 Mobilization.

Payment will be made on actual work performed as described in the Project Notes.

File details come from the government source that posted it. Updated .