Q AND A.docx
DOCX document 14 KB Posted
- Solicitation number
- 1240LT22R0023
- Issued by
-
Department of Agriculture Forest Service
About this file
This document contains questions and answers regarding a federal solicitation for a trail bridge replacement project on the Payette National Forest. The project involves designing, purchasing, delivering and installing a 60 foot span prefabricated steel truss trail bridge and two precast concrete grade beams at a remote site that will require use of a helicopter to transport materials. Access to the bridge location is limited to non-motorized use, so any equipment would need to be flown in. The contractor is responsible for coordinating equipment weights with helicopter lift capacity and ensuring footings are appropriately located for bridge placement. Compaction testing is not required. A 6-inch geocell material meeting the attached specification is suitable for placement below the precast beams.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| GWLS-Geoweb-load-support-csi-spec.doc | DOC document | |
| Amendment 1.pdf | ||
| ATTACH 2_Jenkins plans.pdf | ||
| ATTACH 3_Jenkins Crossing Bridge Project_Aviation for contractors.pdf | ||
| ATTACH 5_Determination of Responsibility.pdf | ||
| ATTACH 6_Past Performance Questi.docx | DOCX document | |
| 1240LT22R0023.pdf | ||
| ATTACH 1_Jenkins Crossing Specs.pdf | ||
| ATTACH 4_Wage Determination.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Q&A
1. The plans do not indicate where the trail can be accessed from, please provide information as to the nearest trail access point from the project area.
Trail access is via trail #144 and #145 near burgdorf or by trail #500 off of the FSR 50257 Goose lake and FSR 50308 Elk Meadows
1. Will we be able to access the bridge location with equipment (i.e. mini-excavator, roller) to complete this work? If so, will we be able to access the site from the ground, or will equipment need to be flown to the worksite?
Trail access is limited to two wheel motorized. Any equipment would have to be flown in.
1. If the site is accessible for equipment, is crossing the stream with equipment allowed/possible?
Equipment fording of the river is limited to two trips
1. It appears that any materials required to backfill the new bridge would be obtained from on-site, please verify this.
That is correct
1. Will surveying by the contractor be required?
Contractor is responsible for ensuring that footings are located appropriately for bridge segments to be placed on top.
1. Will compaction testing be required?
No
1. This project calls for Geocell to be placed below the precast grade beams. Neither the Special Provision nor FP-14 contain a specification for geocell. Please provide a specification for this material.
A 6” geo cell such as those found in the attached specification would be suitable