BURGESS ROAD (NFSR #15) ROAD IMPROVEMENTS
Solicitation number
1240LT22R0014
Issued by

About this file

This document contains a work list summarizing improvements planned for Burgess Road (NFSR #15) under solicitation number 1240LT22R0014 issued by the USDA Forest Service. Key work items include reconditioning 25.85 miles of roadway, placing over 7,000 cubic yards of aggregate surface course, clearing and grubbing over 11 miles, reconstructing 2,640 linear feet of ditch, installing culvert wings and cleaning culverts, flattening slopes, producing 30,000 tons of aggregate, and installing over 1,000 delineators and object markers along the roadway. The proposal due date was extended from February 28, 2022 to March 15, 2022 with proposals to be emailed to the contracting officer and contract specialist by 2:00 PM Mountain Time on the due date.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1

1. CONTRACT ID CODE

I

PAGE OF PAGES

1 I 5

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO.

5. PROJECT NO. (If applicable)

0001 02/25/2022 GAOA

6. ISSUED BY CODE 40LT 7. ADMINISTERED BY (If other than Item 6) CODE I

USDA-FS CSA INTERMOUNTAIN 8

324 25TH ST

OGDEN UT 84401-2310

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

J&

9A. AMENDMENT OF SOLICITATION NO.

1240LT22R0014

X

9B. DATED (SEE ITEM 11)

01/25/2022

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

� The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers � is extended. Dis not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment. and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

ORDER NO. IN ITEM 10A.

E. IMPORTANT:

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Contractor Dis not Dis required to sign this document and return ______ _ copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

THIS AMENDMENT INCORPORATES THE FOLLOWNG INFORMATION:

1. RFI#l QUESTIONS AND ANSWERS

2. THE PROPOSAL DUE DATE IS CHANGED FROM FEBRUARY 28, 2022 2:00 PM MST TO MARCH 15, 2022

2:00 PM MST.

3. PROPOSALS MUST BE EMAILED BY THE DUE DATE AND TIME TO:

CONTRACTING OFFICER:

CONTRACT SPECIALIST:

lonnie.root@usda.gov sherri.mitchell@usda.gov

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 1 0A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED

(Signature of person authorized to sign)

Previous edition unusable

LONNIE D. ROOT

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Burgess Road RFI#1 - Questions and Answers

1. Do you have any information on the pit where the gravel will be crushed? We won't be able to look at the aggregate size before bidding. Curious what the maximum size rock is. Also, could we set up the crusher in the area that has already been mined?

Response: The pit has been developed before and has some room for more development. For rock sizes, look at the supplemental specifications (Spec 703) for Grade F. A crusher can be set up in the area that is already mined however it is highly recommended prospective contractors use google earth and the plans to develop a pit development plan

2. For dust control would an alternative to magnesium chloride called Perma-Zyme soil stabilization work?

Response: We cannot determine if this is acceptable or not until we see more information on the product.

3. Is the government going to provide staking for the roadway?

Response: Yes. The government will stake the major work items.

4. Will there be shape files provided for machine grade control?

Response: No. Refer to details on the plans.

5. What are the testing methods for road moisture and density?

Response: Testing is not required for compaction on the roadway. Check plans and specs for testing requirements for testing requirements for the crushing at the pit.

6. What is the hand broadcast rate for seeding?

Response: Rate for hand broadcast seeing is 21lb/acre.

7. For the reflectors does it have a requirement for the backing on the reflector (metal or plastic)?

Response: Reflectors and object markers do not require the brown FS backing.

8. The company giving the quote for all of the signs had a question regarding a special provision to have Federal Brown as the back color (instead of seeing the silver color of the sign). Is this something that would be required?

Response: This only applies to the regulatory signs. The Object Markers and Delineators DO NOT need the federal brown background.

9. Please provide the worklists in a format for printing them out in 8.5 x 11.

Response: See attachment

BURGESS ROAD (NFSR #15) ROAD IMPROVEMENTS

SUMMARY WORK LIST

ROAD NO. 15

Mile Post Item Number Description Quantity Unit Remarks

0.00 Begin Project Jct Hwy 14A

0.20 Existing Cattleguard

" 30115 Begin Aggregate Surface Course 5210 CY Place 4" ASC " 30315 Begin Road Reconditioning 25.85 Miles Begin Road Reconditioning " 31201 Apply Magnesium Chloride 0.97 Miles Begin Magnesium Chloride Application " 63306(b) Install U-post 1 Each Install 1 U-post for Object Marker

0.58 Jct 539 Left

0.62 Existing Slope 5' high

" 20103 Begin Clearing and Grubbing 0.63 Miles

" 20401 Begin Flattening Slope 140 CY Begin Slope Flattening to 2:1, Right. Dispose Excavated

Material at Burgess Pit

0.69 20401 End Flattening Slope End Slope Flattening, Right " 61908 Install Cattleguard Wings 2 Each Install Wings on Existing Cattleguard " 63306(b) Install U-posts 2 Each Install 2 U-posts " 63307 Install Object Markers 4 Each Install 4 Object Markers

1.10 63306(b) Begin U-post Installation 30 Each Begin U-post Installation at Before N. Fk. Tongue River Site " 63308 Begin Delineator Installation 40 Each Install Delineator Signs

1.17 31201 End Magnesium Chloride End Magnesium Chloride Application " 63306(b) End U-post Installation End U-post Installation " 63308 End Delineator Installation End Delineator Signs Installation,

1.25 Existing Bridge on North Fork Tongue

20103 End Clearing and Grubbing

1.38 63306(b) Begin U-post Installation 28 Each Begin U-post Installation, Site 1 " 63308 Begin Delineator Installation 36 Each Install Delineator Signs

1.44 63306(b) End U-post Installation End U-post Installation, Site 1 " 63308 End Delineator Installation End Delineator Signs Installation

1.74 63306(a) Install New Post 1 Each Install New Wood Post, Left " Reattach Existing Curve Sign " Sign Installation indirect payment to Item 63306(a) " Jct 163 Right

2.01 Jct 164 Left

2.16 20424 Begin Ditch Reconstruction 2640 LF Reconstruct Ditch

2.66 20424 End Ditch Reconstruction End Reconstructing Ditch " 63306(b) Install U-posts 2 Each Install 2 U-posts " 63307 Install Object Markers 4 Each Install 4 Object Markers " Existing Cattleguard " Clean Cattlegaurd 1 Each Indirect payment to Item 30315

3.49 Jct 167 Right

3.53 30115 End Aggregate Surface Course End ASC

3.69 20103 Begin Clearing & Grubbing 1.76 Miles Begin Clearing & Grubbing

4.33 31403 Produce Aggregate 1 LS Produce 30,000 Ton of Grade F " Jct 536 Right, Burgess Pit

5.03 63306(b) Begin U-post Installation 38 Each Begin U-post Installation for Delineators, Site 2 " 63306(b) Install U-posts 2 Each Install 2 U-posts for Object Markers " 63307 Install Object Markers 4 Each Install 4 Object Markers " 63308 Begin Delineator Installation 50 Each Install Delineator Signs, Site 2 " Existing Cattleguard " Clean Cattleguard indirect payment to Item 30315

5.09 63306(b) End U-post Installation End U-post Installation, Site 2 63308 End Delineator Installation End Delineator Signs Installation

5.39 63306(b) Begin U-post Installation 42 Each Begin U-post Installation, Site 3 " 63308 Begin Delineator Installation 56 Each Install Delineator Signs

5.45 20103 End Clearing & Grubbing End Clearing & Grubbing

5.46 63306(b) End U-post Installation End U-post Installation, Site 3 " 63308 End Delineator Installation End Delineator Signs Installation

5.63 63301 Install Sign 1 Each Install Hairpin Curve Left Sign

5.67 20401 Begin Flattening Slope 140 CY Begin Slope Flattening, Left " Disposal Site is Burgess Pit " 63306(b) Begin U-post Installation 50 Each Begin U-post Installation, Site 4 " 63308 Begin Delineator Installation 70 Each Install Delineator Signs

5.70 Jct 168, Right

5.73 20401 End Flattening Slope End Slope Flattening, Left

5.76 63306(b) End U-post Installation End U-post Installation, Site 4 " 63308 End Delineator Installation End Delineator Signs Installation

5.78 63301 Install Sign 1 Each Install Hairpin Curve Right Sign

ROAD NO. 15

Mile Post Item Number Description Quantity Unit Remarks

7.41 30115 Aggregate Surface Course 120 CY Place 4" ASC +/-200'

7.83 30115 Aggregate Surface Course 60 CY Place 4" ASC +/-100'

8.47 30115 Aggregate Surface Course 60 CY Place 4" ASC +/-100' " Jct 179 Right

8.85 Existing Cattleguard

" 20103 Begin Clearing & Grubbing 4.6 Miles Begin Clearing & Grubbing " 63306(b) Install U-posts 2 Each Install 2 U-posts " 63307 Install Object Markers 4 Each Install 4 Object Markers

11.76 30115 Aggregate Surface Course 60 CY Place 4" ASC +/-100'

12.11 30115 Begin Aggregate Surface Course 535 CY Place 4" ASC

12.45 30115 End Aggregate Surface Course End 4" ASC " 61908 Install Cattleguard Wings 2 Each Replace 2 Wings on Existing Cattleguard " 63306(b) Install U-posts 2 Each Install 2 U-posts " 63307 Install Object Markers 4 Each Install 4 Object Markers

13.48 20103 End Clearing & Grubbing End Clearing & Grubbing " 30115 Begin Aggregate Surface Course 1835 CY Place 4" ASC

13.59 63301 Install Signs 1 Each Replace Curve Left Sign

13.62 Existing Curve Right Sign, Right

13.78 20103 Begin Clearing & Grubbing 0.87 Miles Begin Clearing & Grubbing " 63301 Install Signs 1 Each Replace Curve Left Sign " 63306(b) Begin U-post Installation 20 Each Begin U-post Installation, Site 5 " 63308 Begin Delineator Installation 24 Each Install Delineator Signs

13.81 63306(b) End U-post Installation End U-post Installation, Site 5 " 63308 End Delineator Installation End Delineator Signs Installation

13.90 63306(b) Begin U-post Installation 24 Each Begin U-post Installation, Site 6 " 63308 Begin Delineator Installation 28 Each Install Delineator Signs

13.94 63306(b) End U-post Installation End U-post Installation, Site 6 " 63308 End Delineator Installation End Delineator Signs Installation

13.97 63306(b) Begin U-post Installation 24 Each Begin U-post Installation, Site 7 " 63308 Begin Delineator Installation 28 Each Install Delineator Signs

14.01 63306(b) End U-post Installation End U-post Installation, Site 7 " 63308 End Delineator Installation End Delineator Signs Installation

14.65 30115 End Aggregate Surface Course End 4" ASC

15.02 63306(b) Begin U-post Installation 38 Each Begin U-post Installation, Site 8 " 63308 Begin Delineator Installation 50 Each Install Delineator Signs

15.08 63301 Install Sign 1 Each Replace Hairpin Curve Sign with Hairpin Curve Right " 63306(b) End U-post Installation End U-post Installation, Site 8 " 63308 End Delineator Installation End Delineator Signs Installation

15.14 63306(b) Begin U-post Installation 34 Each Begin U-post Installation, Site 9 " 63308 Begin Delineator Installation 44 Each Install Delineator Signs

15.19 63306(b) End U-post Installation End U-post Installation, Site 9 " 63308 End Delineator Installation End Delineator Signs Installation

15.24 Existing Cattleguard

" 63307 Install Object Markers 4 Each Install 4 Object Markers on Existing U-posts

15.28 63301 Install Sign 1 Each Install Hairpin Curve Left Sign " 63306(b) Begin U-post Installation 34 Each Begin U-post Installation, Site 10 " 63308 Begin Delineator Installation 44 Each Install Delineator Signs

15.33 63306(b) End U-post Installation End U-post Installation, Site 10 " 63308 End Delineator Installation End Delineator Signs Installation

15.40 Jct 144 Right, 143 Left

16.10 Existing Cattleguard

" 63307 Install Object Markers 4 Each Install 4 Object Markers on Existing U-posts

18.17 20103 Begin Clearing & Grubbing 0.36 Miles Begin Clearing & Grubbing

18.53 20103 End Clearing & Grubbing End Clearing & Grubbing

18.64 Jct 145 Right

18.96 20103 Begin Clearing & Grubbing 2.4 Miles Begin Clearing & Grubbing " Jct with Access Road to Dayton Gulch Pit, Left

20.08 Existing Cattleguard

" 63306(b) Install U-posts 2 Each Install 2 U-posts " 63307 Install Object Markers 4 Each Install 4 Object Markers

20.20 20401 Begin Flattening Slope 160 CY Begin Slope Flattening, Left " Disposal Site is Dayton Gulch Pit " 63306(b) Begin U-post Installation 30 Each Begin U-post Installation " 63308 Begin Delineator Installation 38 Each Install Delineator Signs, Site 11

ROAD NO. 15

Mile Post Item Number Description Quantity Unit Remarks

20.24 63306(b) End U-post Installation End U-post Installation, Site 11 " 63308 End Delineator Installation End Delineator Signs Installation

20.26 20401 End Flattening Slope End Slope Flattening, Left

20.29 63306(b) Begin U-post Installation 34 Each Begin U-post Installation, Site 12 " 63308 Begin Delineator Installation 44 Each Install Delineator Signs

20.34 63306(b) End U-post Installation End U-post Installation, Site 12 " 63308 End Delineator Installation End Delineator Signs Installation

NA

21.92 63306(b) Begin U-post Installation 26 Each Begin U-post Installation, Site 13

" 63308 Begin Delineator Installation 32 Each Install Delineator Signs

21.97 63306(b) End U-post Installation End U-post Installation, Site 13 " 63308 End Delineator Installation End Delineator Signs Installation

23.75 20103 End Clearing & Grubbing End Clearing & Grubbing " 30115 Begin Aggregate Surface Course 3600 CY Place 4" ASC " Existing Bridge over Little Horn Creek

24.76 20103 Begin Clearing & Grubbing 0.59 Miles Begin Clearing & Grubbing

24.87 63306(b) Begin U-post Installation 30 Each Begin U-post Installation, Site 14 " 63308 Begin Delineator Installation 38 Each Install Delineator Signs

24.91 63306(b) End U-post Installation End U-post Installation, Site 14 " 63308 End Delineator Installation End Delineator Signs Installation

25.35 ` End Clearing & Grubbing End Clearing & Grubbing

26.05 30115 End Aggregate Surface Course End 4" ASC " 30315 End Road Reconditioning End Road Reconditioning " End Project Jct Hwy14A