This document outlines a federal contract opportunity for the Alturas Water System Improvement & Cabin Creek Drainage Restoration project on the Sawtooth National Forest. The project scope involves connecting a new well to the existing water distribution system, modifying connections to the water storage tank and distribution terminus, modifying an existing well for hand pump service, replacing two restrooms with vault toilets, reconfiguring and reconstructing the Alturas Outlet Picnic Area and removing earth barriers. A pre-bid meeting will be held on October 28, 2021 at the project site. Construction is anticipated to begin in early spring 2022 with on-the-ground work starting after Labor Day and concluding by November 11, 2022. The estimated price range for the contract is $250,000 to $500,000. The solicitation is expected to be issued in early 2022.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2_AlturasWater_RestorationImprovements.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION ‘C’ - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
Alturas Water System Improvements & Cabin Creek Drainage Restoration Project
Project Description:
Furnish all labor, equipment and materials necessary to accomplish the work under this contract. This project will reconfigure the existing Alturas Lake Water System to allow for existing fill barriers to be removed in two locations from the former Cabin Creek channel near Alturas Lake. Work will consists of 1) connecting a new well that was drilled in 2020/2021 to the existing water supply distribution mainline including installation of a new pump house utility building; 2) modifying the existing water supply distribution mainline connection to the existing 7,000 gallon water storage tank; 3) modifying the existing water supply distribution mainline terminus at the Alturas Outlet Picnic Area including installation of a new hydrant service; 4) modifying the existing well to accommodate a new hand pump service; 5) removing two existing restrooms (one at the Alturas Outlet Picnic Area and one at the Alturas Tent Campground), including disconnecting from the existing water system, and replacing them with two new precast concrete vault toilets; 6) reconfiguring and reconstructing the existing Alturas Outlet Picnic Area including installation of new site amenities and signage; and removing existing earth barriers from the former Cabin Creek channel; and 7) performing all other miscellaneous improvements as required to complete the necessary project work.
Project Location:
From Stanley, Idaho proceed south approximately 18.5 miles on Idaho State Highway #75 to the junction with Forest Road 70205. Turn right onto Forest Road 70205 and proceed approximately 2.5 miles to the project location.
Use of Premises (Camping):
Camping for contract personnel will be permitted at the Alturas Outlet Picnic Area. If this site is used, then the Contractor shall supply the number of toilet facilities (porta-potty) necessary to serve the personnel who will be camping in at this location. Disturbance to the site shall be minimized, weed-free prevention practices shall be followed, and appropriate camp site cleanliness/etiquette shall be met.
Site Visit Information:
A Pre-Bid MTG for this project will be held on October 28, 2021 at 3:00 PM. Meeting will begin at the Alturas Outlet Picnic Area parking lot near Alturas Lake. Meeting will conclude by 4:30 PM.
Start Date:
June 2, 2022 – anticipated start date for administrative and construction preparation tasks.
September 6, 2022 – anticipated start date for on-the-ground construction.
End Date:
The Project End Date will be November 11, 2022
Estimated Price Range:
$250,000 to $500,000
Specifications:
Standard Specifications (FP-14), attached Forest Service Supplemental Specifications (FSSS), inlcuding “CSI Specs” Supplemental Specificatons, are applicable to this Public Works contract. All applicable FSSS, including “CSI Specs” Supplemental Specifications, are included in full text. All specifications not included in the specification listing but referenced by listed specifications are applicable. Standard Specifications (FP-14) are available in pdf format on-line at https://highways.dot.gov/federal-lands/specs
File details come from the government source that posted it. Updated .