Red Sandstone Creek Pre-Bid QA.pdf
PDF 84 KB Posted
- Attached to
- Red Sandstone Creek Culvert Replacement Federal contract opportunity
- Solicitation number
- 1240LT21Q0082
- Issued by
- Department of Agriculture Forest Service
About this file
This document summarizes a pre-bid meeting for a federal culvert replacement contract. The meeting addressed the White River National Forest's solicitation for the replacement of the Red Sandstone Creek culvert located on National Forest System Road 700 in Minturn, Colorado. Key details discussed include a project timeframe of September 26 through October 14, 2022 to coincide with low stream flows and fisheries work windows, the utilization of a Nationwide 3(a) Army Corps of Engineers permit, confirmation that Davis-Bacon prevailing wage rates apply, placement locations for road closure barricades, and allowed contractor camping and work hours. Attendees were provided clarification that the SF-1442 was omitted from the solicitation by mistake and will be added to SAM.gov along with the questions and answers from the pre-bid meeting.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF1449 1240LT21Q0082.pdf | ||
| Rev1 Red Sandstone Statement of Work.doc | DOC document | |
| Rev1 SectionCFSSSAllRed Sandstone07282021.docx | DOCX document | |
| CO20210013LaborRates.pdf | ||
| Red Sadstone B-M Clauses.doc | DOC document | |
| Updated Drawings 042621.pdf | ||
| Red Sadstone B-M Clauses.doc | DOC document | |
| SectionCFSSSAllRed Sandstone.docx | DOCX document | |
| DOL Wage Determination.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
August 17, 2021, 10am Red Sandstone Creek Culvert Replacement Pre-Bid Meeting – Minturn, CO
Name Company/Affiliation Erica Borum White River National Forest –
Civil Engineer
Glen Stout Colorado West Contracting, Inc
Roby Forsyth RPM Construction
Seth Murrell Iron Woman Construction
Ron Urie Rain for Rent
Q&A What is the project timeframe?
To fit within the fisheries work window and per the District’s request, the road closure timeframe is September 26 – October 14, 2022, which also coincides with low stream flow. Staging and cleanup can occur on either end of the road closure.
Is an Army Corps 404 permit required? Other permits?
This work follows under a Nationwide 3(a) for which no Preconstruction Notification is required. The Army Corps has been notified of this project. No other permits are required.
The SF 1442 is missing from the solicitation, why?
This was an oversight and will be added to sam.gov as will the questions and answers from this pre-bid meeting.
Will the selected contractor have permission to purchase the structure and be reimbursed for the cost after award?
This will be decided and negotiated with the selected contractor after the award.
Is the stream gage operational just upstream?
Not currently. The gage was operation from 1996 – 2008. The 100-year storm and the 2-year storm are on the plans.
What is the drainage basin area?
The drainage basin at the crossing is approximately 7.3 square miles.
Where are the road closure barricades to be placed?
The barricades are to be placed at: 1) the intersection of NFSR 700 & 786 (Lost Lake Road) and 2) on NFSR 700 at Indian Creek where there is room for a vehicle to turn around.
Is camping permitted?
Yes, the contract includes a camping provision in Section H.
How often with the Forest Service be onsite?
As often as necessary. Typically, a Forest Service representative will be onsite during critical phases such as checking grade prior to structure placement, installation of the streambed, and any other critical times.
What are the permitted construction hours?
The contract does not contain construction hour limitations; however, any time spent over 40 hours per week require overtime pay.
Is the work on this contract require Davis-Bacon wages?
Yes.
Is the pre-bid meeting mandatory for award?
No
| Q&A |
| What is the project timeframe? |
| Is an Army Corps 404 permit required? Other permits? |
| The SF 1442 is missing from the solicitation, why? |
| Will the selected contractor have permission to purchase the structure and be reimbursed for the cost after award? |
| Is the stream gage operational just upstream? |
| What is the drainage basin area? |
| Where are the road closure barricades to be placed? |
| Is camping permitted? |
| How often with the Forest Service be onsite? |
| What are the permitted construction hours? |
| Is the work on this contract require Davis-Bacon wages? |
| Is the pre-bid meeting mandatory for award? |
File details come from the government source that posted it. Updated .