This document is a set of Questions and Answers related to the Solicitation for the Yearns Dam Spillway Improvements project. The key details are:

The project requires reconstructing portions of the Yearns Dam Spillway, including earthwork, road base, riprap, grouted riprap, and concrete work on the water side and top side of the dam. The solicitation specifies that pumps capable of 100+ CFS are required to lower the reservoir elevation and match the inflow to hold that level. Debris must be hauled to a location within 1/4 mile of the reservoir, likely within 300 yards along the main road. A site visit is scheduled for August 26, 2024 at 11:00 a.m. MST. The project is being solicited by the Department of Agriculture Forest Service.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 5 – Q&As 1240LS24Q0095 – Yearns Dam Spillway Improvements

1. What is the CFS measurement of the pump for the reservoir?

Answer: Pumps should be capable of 100+ CFS to drop the elevation of the reservoir and then be able to match the inflow to hold that level.

The size of the reservoir is 3.5 acres.

2. It is mentioned that debris stays on site, is there a location/GPS Coordinates where we can haul the debris/grub material?

Answer: The exact location will be marked after award, but it will be within ¼ mile of the reservoir along the main road. (more than likely within 300 yards of the reservoir).