_A0001.pdf
PDF 142 KB Posted
- Solicitation number
- 1240LP25Q0084
About this file
This document is a Standard Form 30 Amendment of Solicitation/Modification of Contract for a SSNF Reforestation Survey contract. The amendment (Amendment 1) addresses two key issues: (1) Technical Capability section correction, removing an errantly included artifact definition and replacing it with a focus on Technical Expertise, and (2) Performance Work Statement period correction. The contract period of performance is now specified as 09/01/2025 to 08/31/2026, issued by USDA-FS CSA Intermountain 4 in Ogden, UT. The solicitation number is 1240LP25Q0084, and the amendment requires contractors to review updated documents including the contract and Performance Work Statement. The amendment provides clarification on required submissions such as Proposed Operation Plan, Key Personnel, and Quality Control Plan, with references to minimum qualifications in sections 4.0 and 7.0 of the Performance Work Statement.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| _1240LP25Q0084r.pdf | ||
| PWS_SHO_Reforestation_Surveys.docx | DOCX document | |
| Map1.pdf | ||
| WD 2015-5407 r26.pdf | ||
| Map3.pdf | ||
| Past Performance Data Sheet.pdf | ||
| Map5.pdf | ||
| SHO_StockingSurveys_List_of_Sustainable_Products.docx | DOCX document | |
| _1240LP25Q0084.pdf | ||
| Map4.pdf | ||
| Map2.pdf | ||
| Vicinity.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
1240LP25Q0084
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
40LP
OGDEN UT 84401-2310
324 25TH ST
USDA-FS CSA INTERMOUNTAIN 4
08/18/20250001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
08/11/2025
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
STEPHEN D. HOLLY
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
1240LP25Q0084 SSNF Reforestation Survey Amendment 1:
The documents "1240LP25Q0084" and "PWS_SHO_Reforestation_Surveys" have been updated as related to the questions below. Please see the latest versions.
Questions / Answers:
Q1- Technical Capability: what information was supposed to be included in this section?
A1- There was an artifact definition from a previous solicitation that was errantly included in that section. That section will now be amended to:
Technical capability will be-
1. Technical Expertise Continued ...
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
1240LP25Q0084/0001
a. Proposed Operation Plan
b. Key Personnel
c. Quality Control Plan Refer to section 4.0 Deliverable/Schedule of the
Performance Work Statement and section 7.0
Contractor's Key Personnel of the Performance
Work Statement for minimum qualifications.
Q2- Performance Work Statement errantly showed an irrelevant performance period that was proposed before the solicitation could be issued.
A2- The Correct performance period for this contract will be 09/01/2025 to 08/31/2026.
Period of Performance: 09/01/2025 to 08/31/2026
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
File details come from the government source that posted it. Updated .