This document is a SF30 - Amendment 1 to a contract for Metal Pallet Racks for the Bessey Nursery at the Nebraska National Forest.
The key details are:
- This is an amendment that includes questions and answers regarding the solicitation.
- The period of performance is 09/01/2024 to 09/30/2024.
- There is no brand name requirement, but the racks must be similar or equal to the specified design characteristics.
- The racks must be able to hold 2,500 lbs per unit. Vendors may visit the site to take measurements of the existing racks.
- A design submittal is required but does not need to be signed off by an engineer. The agency will review and approve the design before accepting the proposal.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Nursery pallet racks-Model Design Sheet.pdf | ||
| 1240LP24Q0066 Solicitation Metal Pallet Racks.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
1240LP24Q0066
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
40LP
OGDEN UT 84401-2310
324 25TH ST
USDA-FS CSA INTERMOUNTAIN 4
06/26/20240001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
06/26/2024
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Metal Pallet Racks
P0001 - Amendment 1 - Questions and Answers Document
SF30 will need to be signed and submitted with proposal.
Period of Performance: 09/01/2024 to 09/30/2024
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
CURTIS R. LANDRETH
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
1240LP24Q0071 - Amendment 0001 – Questions and Answers
# 1 & #2 both call out characteristics that are specific to a specific brand name. Is this the ONLY brand acceptable?
No this was to help with the description. It is equal to.
# 14 is a call out for the crossmembers that directly contradicts the callout in #1 & #2 – meaning the BASE B4 option of Load Nester Design #3 – does NOT come with 2” x 4” cross member tubes. Can you please specify if there is a brand name requirement – or which of these requirements is priority over the other.
No there is no brand name requirement. It is similar or equal to. These are to reference the style of racks.
No matter what the racks must be made to work with the other racks. The parties can come take measurements now if they want a better idea of exact measurements. Whomever is the successful bidder will be given a rack to make sure that they work together.
There are several places requesting design submittals. But if a current rack is being sent to us after award and we must fabricate to fit existing design / setup – would this even apply? Was this left on the drawing from previous bid before a design was secured? Is the drawing provided by GOVT not already the exact design required? I assume if we deviate from that- it would not fit existing hardware. Can you please clarify.
The design sheet is to get the basis of what is needed and then the final step is to make sure they fit with the previous pallet racks.
Is the 2500 lb load limit for one unit? Thus, if stacking requirement is 5x – then the load requirement is really 12,500 lb for each unit? Since we must assume the bottom unit is holding 4x fully loaded racks above it. Is this correct?
The bottom rack only must hold the 2500 pounds. Our boxes weigh about (60 pounds X 8) + 110 pallet = 590 X 4 pallets =2,360 pounds on the bottom pallet. This is why we require them to hold 2500 pounds.
If design submittal IS required – are drawings required also? Is it required to have approved engineering sign offs?
We do not need a signed design sheet however the pallets must be able to hold the weight and the weight requirements. We do need to have a design sheet and we will need to approve it before we accept the proposal. There will be of course small potential changes as the pallet racks need to work with the ones we have.
Vendors are welcome to stop out and take measurements off the existing racks.
File details come from the government source that posted it. Updated .