- Building 10 Partition at Canal Point, FL
- Solicitation number
- 1240LN26R0005
- Issued by
-
Department of Agriculture Forest Service
About this file
This is a Solicitation, Offer, and Award form (Standard Form 1442) for a construction contract issued by the USDA Forest Service, Intermountain Region 3, for partition and roll-up door installation at Building 10 of the USDA ARS Sugarcane Field Station in Canal Point, Florida.
Scope of Work and Requirements: The contractor must demolish an existing partition wall and install a new partition with two roll-up doors to enclose the Cane Presentation System and Cane Hydraulic System. The project includes upgrading the electrical distribution system for Building 10 and modifying/adding concrete machinery pads. Specific work components outlined in the Statement of Work include: demolition of existing electrical systems and partition wall; installation of steel-framed partition with metal studs spaced 16 inches on center; installation of two Wayne Dalton Model 926 rolling steel service doors (one at the west opening approximately 16'7" wide by 15'1" tall, and one at the east opening approximately 16'7" wide by 13'6" tall); covering the exterior with R-type metal panels; interior plywood wall; R-19 insulation; and three 120-volt lighting circuits plus four duplex outlet circuits. Electrical work includes replacing the 100-amp circuit breaker with a 200-amp Eaton 35K 3-phase breaker, installing a 200-amp 208-volt 3-phase NEMA 3R panel, and adding new LED lighting fixtures. The contractor must submit two copies of all submittals including manufacturer's installation instructions prior to work commencement. The performance period is 10 calendar days to begin work and 180 calendar days total for completion, including final cleanup.
Contract Terms, Pricing, and Award Criteria: This is a firm fixed-price commercial construction contract awarded as a single award. Proposals are due by 3:00 PM Eastern Time on September 23, 2026, submitted via email to gilbert.chonje@usda.gov. Questions must be submitted by September 21, 2026, at 1:00 PM Eastern Time. Offerors must hold prices firm for 90 calendar days from the offer receipt date. The Government will evaluate technical approach (ability to meet schedule and requirements), price (fair and reasonableness), and past performance (acceptable or neutral rating required). Award will be made to the highest technically rated offeror whose price is fair and reasonable, not necessarily the lowest-priced offeror. Performance and payment bonds are required, with no bid guarantee specified. Construction wage rate requirements apply per Florida wage determination FL20260220 (effective May 18, 2026). The solicitation includes mandatory compliance with federal employment verification (E-Verify), Buy American construction materials requirements, and multiple FAR and AGAR clauses addressing anti-discrimination, DEI compliance, contractor workforce integrity, and security prohibitions. Progress payments are authorized monthly upon submission of certified requests demonstrating compliance with labor standards and contract terms. All invoices should be submitted to USDA-FS CSA Intermountain 3 at 324 25th Street, Ogden, UT 84401-2310, with payment via electronic funds transfer. The contracting officer is Gilbert C. Chonje (931-378-8014).
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION CALL
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
1173393
USDA-FS CSA INTERMOUNTAIN 3
324 25TH ST
OGDEN UT 84401-2310
40LN
GILBERT CHONJE 931-378-8014
1x 09/16/2026
1240LN26R0005
INVITATION FOR BID
REQUEST FOR PROPOSAL
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
Demolish and existing partition wall and then install a new partition and roll up doors to enclose the Cane Presentation System and Cane Hydraulic System. This project will also include the upgrade of the electrical distribution system for
Building 10 as well as the modification and addition of concrete machinery pads.
11. The Contractor shall begin performance within
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
10 180 calendar days and complete it within ________________ ________________ calendar days after receiving
09/23/2026
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________
STANDARD FORM 1442 (Rev. 12/2022)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED STATES CODE AT
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
2PAGE OF
USDA-FS CSA INTERMOUNTAIN 3
324 25TH ST
OGDEN UT 84401-2310
40LN
GILBERT C. CHONJE
28. NEGOTIATED AGREEMENT 29. AWARD
and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations,certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.) Contractor agrees to furnish
10 U.S.C. 3204(a) 41 U.S.C. 3304(a)
STANDARD FORM 1442 (REV. 12/2022) BACK
Continued...
and return
(Contractor is not required to sign this document.) Your offer on this
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
3 48
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
1240LN26R0005
0001 Install Partition and Rollup Doors for Building 1 EA
10 at USDA ARS Sugarcane Field Station
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
Building 10 Partition Schedule of Items
Divisional Cost Breakdown
Material Total Labor Total Cost Cost Division 1 - Gen Cond Totals
Division 3 - Metal Stud Partition Division 4 -Paneling Division 5 - Security Door Division 6 - Painting Division 7 - Overhead Door Division 8 - Electrical Division 9 - Inspection
Totals
Tax and Burden Summary
Material Cost incl 7% tax Labor cost with 47% burden
Total Project Cost L&M
Overhead and Profit Summary PC X 10% overhead PC X 10% Profit
Project Grand Total Total Project Cost
Statement of Work For
Partition and Roll Up Doors for Building 10
Section 1 General
1.1. SCOPE OF WORK. The Contractor shall provide all material, personnel, equipment, tools, fuel, and other items or services necessary to demolish and existing partition wall and then install a new partition and roll up doors to enclose the Cane Presentation System and Cane Hydraulic System. This project will also include the upgrade of the electrical distribution system for Building 10 as well as the modification and addition of concrete machinery pads. This project will be located at the USDA ARS Sugarcane Field Station, 12990 Hwy 441N, Canal Point, FL. The installation procedures are defined in this Statement of Work (SOW), including Exhibit 1. The Contractor is required to submit three copies of all required submittals including the manufacture’s installation instructions for approval.
1.2. PHYSICAL SECURITY. The Contractor shall be responsible for safeguarding all Government property.
Prior to the end of each workday, the Contractor is required to secure their property and leave the site prior to the lockdown of the facility. The Government is not responsible for loss or damage to the Contractors equipment during this contract.
1.3. HOURS OF OPERATION. The normal hours of operation of the Sugarcane Field Station are 7:30 am to 4:00 pm Monday through Friday. The Contractor shall perform these services during the normal hours of operation, unless previously approved by the Maintenance Mechanic.
Section 2 GOVERNMENT-FURNISHED PROPERTY AND SERVICES
2.1 GENERAL. The Government shall provide, without cost, the facilities, equipment, fuel and services listed below.
2.2 Government-furnished utilities will be provided where available.
2.3 SERVICES. The Government shall provide, without cost, the services listed below.
2.4. No Government services will be provided.
Section 3 CONTRACTOR-FURNISHED ITEMS AND SERVICES
3.1 GENERAL. Except for those items or services specifically stated to be Government-furnished in section 2, the contractor shall furnish everything required to perform this Statement of Work. The Contractor is responsible for removing all construction material, debris and abandoned appurtenances.
Exhibit 1
The Contractor shall provide all labor, materials and equipment necessary to install 1 partition and 2 roll up doors in Building 10 of the USDA ARS Sugarcane Field Station. Work will include but is not limited to:
(1) Demolition of; the existing electrical supply conductors, building circuit breaker panel, and indicated electrical circuits. (2) Demolition of existing partition wall. (3) Installing a partition utilizing steel tracks and steel framing studs between two I beam sections of Building 10. (4) Installing one 3070 hollow commercial door frame and door in the partition. (3) Covering the outside of the partition with ribbed metal panels. (5) Installing fiberglass bat insulation between the steel framing studs. (6) Covering the interior portion of the partition with plywood. (7) Installing one roll up door at the West opening of the new bay created by the new partition. (8) Installing one roll up door at the East opening of the new bay.
(9) Install new upgraded supply circuit and conductors. (10) Installing new 200-amp 208-volt 3 phase commercial grade circuit breaker panel (11) Install new circuits for specified machinery. (12) Paint the interior plywood wall of the partition. (12) Install new lighting and lighting circuits for the interior of the newly created room and the open parts of the building. (13) Install new 120-volt convenience outlets for the new room and the open portion of the building. (14) Paint the plywood of the new partition wall and the new personnel door and door frame.
Submittals
Submittals – Two copies of all material listed in this section must be submitted prior to beginning work.
Operational and Maintenance manuals and 11” X 14” as-built drawings are to be submitted when final testing and close-out is accomplished.
The material listed is referenced for performance quality only. Contractor may submit on equal performing material.
1. Structural Steel Framing Material. Galvanized, 6” web, 1 5/8” flange, 18 gauge metal thickness, G60 galvanized thickness. Allsteel & Gypsum Products, Ft. Lauderdale, FL
2. R Metal Panels. Galvanized, 3’ wide, 12” between ribs, 22 gauge metal thicknesses, G90 galvanized thickness.
3. Wayne Dalton Model 926 Rolling Steel Service Door. (Door 1 – Opening is approximately 16’ 7” wide by 13’ 6” tall) (Door 2 – Opening is approximately 16’ 7” wide by 15’ tall) Doors will have manual chain hoist openers.
4. 3070 Steel Commercial Hollow Core Door and Door Frame. CECO Grainger Catalog # 3KY15 door and 3KY75 frame.
5. Door Hardware. Commercial Keyed Lockset. Commercial Hinges. Grainger Catalog# Lockset 33M212 Hinge 38NC92
6. LED Light Fixtures. T8 2 bulb fixtures, A19 bulbs, 4” length Commercial Electric model# 5465414.
7. Paint, Primer Glidden Interior/ Exterior Gripper Model# GPG-0000-01, Paint Glidden Semi- Gloss Latex Exterior Model# GL6811-01.
Definable Features of Work
1. DEMOLITION ELECTRICAL. The Contractor shall Turn off the building’s power and lock out the power circuits during demolition. The Contractor shall remove the building’s electrical feeder circuit to include the following: The electrical feeder circuit breaker, located in the distribution panel at the northwest corner, The electrical feeder wiring and conduits. The Contractor shall remove the buildings circuit breaker panels and circuit breakers. The circuit breaker panels and circuit breakers will be turned over to the USDA Sugarcane Field Station.
The Contractor shall remove all building lighting fixtures, conduits, switches and wiring. The Contractor will salvage the two 4’ LED Fixtures from the enclosed room. The Contractor will leave the exterior pole that the HPS flood light is mounted to for reuse later. The Contractor shall remove all 120 Volt convivence outlets, wiring and conduits. The Contractor will dispose of all demolished materials except what is salvaged for later use and materials returned to the USDA Sugarcane Field Station.
2. DEMOLITION PARTITION WALL. The Contractor shall remove the Metal PRB panels from the partition wall. The Contractor shall remove the plywood sheeting from the partition wall. The Contractor shall remove the insulation from the partition wall.
The Contractor will carefully remove the personnel door and frame. The door and frame will be reused in the new partition wall. The Contractor shall remove the partition wall framing. The Contractor will dispose of all metal panels, plywood and wall framing materials.
3. PARTITION WALL. A new partition wall will be constructed one bay south of the existing enclosed room. When the new wall is completed and the rollup doors are installed the room will measure approximately 34’ X 31’. The Contractor shall construct the partition wall framing from structural steel framing channels and studs. The framing channels shall have the following characteristics: they shall be galvanized to a G60 thickness, they shall have a 6” web and 1 5/8” flange, and the metal thickness shall be 18 gauge. The framing studs shall have the following characteristics: they shall be galvanized to a G60 thickness, they shall have a 6” web and 1 5/8” flange, and the metal thickness shall be 18 gauge.
The partition shall be constructed between the I beam structural steel that forms the Northern two bays of building 10. The partition wall shall be approximately 29’ long.
The West end of the wall will be approximately 13’ 11” tall, from the building floor to the I beam that serves as the rafter frame. The East end of the wall will be approximately 12’ 2” tall, from the building floor to the I beam that serves as the rafter frame. The wall shall be straight in the horizontal and plumb in the vertical directions. The channel or track that will hold the bottom and the top of the framing studs shall be attached to the building’s concrete floor and to the I beam that serves as the rafter frame. The Contractor shall use a fastening means such as Ramset anchors or Tapcons to attach the channel to the concrete floor. Ramset anchors shall be 1 ¼” long and appropriate for use with concrete. Tapcons shall be ¼” by 2”.
Fasteners used to attach the track to the floor shall be spaced 3” between the flanges and every 3’ along the length of the channel. The channel attached to the floor shall be placed on a bed of water-resistant caulk or sealant. The channel shall be attached to the I beam that serves as the rafter frame, using ¼ X 20 bolts, washers and nuts. The ¼ X 20 bolts shall be galvanized grade 5 bolts, 1” long. The flat washers, lock washers and nuts shall be galvanized. The Contractor will drill a holes ¼” diameter but no more than 17/64” diameter through the channel and I beam that serves as the rafter frame. The holes shall be spaced every 3’ along the length of the I beam and channel. Because the web of the I beam will interfere with putting the holes 3” from the flanges of the channel, the Contractor will offset the holes to clear the web.
The metal studs shall be spaced 16” on center in the bottom track and the top track.
Each stud shall be one continuous length from the top track to the bottom. The Contractor will not use pieces to make up studs. The studs shall be attached to the top and bottom channel using galvanized #10 self drilling self taping screws. The Contractor shall install noggins or fire blocks between each of the studs. The Contractor shall install a straight row of noggins 4’ above the floor, 8’ above the floor and 12’ above the floor. (When the plywood is installed, the horizontal seam between the plywood sheets will be on center of the row of noggins.) The noggins shall be cut from the same material used for the studs. The noggins shall be attached using galvanized #10 self drilling self taping screws.
There is an open area between the I beam that serves as the rafter frame and the roofing panels. The Contractor shall fill in this area using the same material and methods used for the larger wall. The Contractor shall not attach any of the material to the roofing panels.
4. PERSONEL DOOR. The Contractor will use the salvaged door frame and door unless the door frame and door are damaged to an extent that they cannot be reused. If the door and door frame cannot be reused, then the Contractor will supply a new door frame and door. The Contractor shall install one 3670 steel security door frame and door. The door will be located in the partition wall. The door will be installed 4’ from the West end of the partition wall. The door shall open out into the unenclosed portion of building 10. The doors hinges shall be on the left. The Contractor shall install the door frame in accordance to the manufactures instructions regarding installation into steel stud construction. The Contractor shall install trim work where the R Type Metal Panels meet the steel door frame. The Contractor shall install a lockset of the type listed in the section labeled Submittals. The Contractor will provide the Sugarcane Field Station six keys for the lockset.
5. R – TYPE METAL PANELS. The Contractor shall install R – Type Metal Panels on the wall that faces the unenclosed portion of building 10. The metal panels shall be continuous sheets from the top of the wall to the bottom. The contractor shall use rubber enclosure strips at the top of the wall and bottom. Screws shall be spaced 12” OC in the horizontal direction and 48” OC in the vertical direction. The Contractor shall use galvanized self drilling screws with a neoprene washer. The screws shall be #12-14 by 1” long. (Grainger # 2DU80) The Contractor shall use the same screws to join the seam where two panels overlap. The screws at the seam shall be spaced 12” in the vertical direction. In the area above the I beam that serves as the rafter frame, the Contractor shall install the same type metal panels. The Contractor will cut the panels to length and use the self drilling screws to fasten the panel sections. Once again, the Contractor shall use rubber enclosure strips at the top and bottom.
6. WALL INSULATION. The Contractor shall install R-19 kraft faced roll insulation in the areas between the metal studs. The insulation will fill the entire cavity with no voids or gaps.
7. INTERIOR PLYWOOD WALL. The interior of the Partition Wall shall be covered with ½” (15/32”) AC plywood. The 8’ dimension shall run in the horizontal direction. The seams between sheets of plywood shall be staggered. The Contractor shall attach the plywood to the studs using flat head, philips, #12, 2 ¼” long self drilling screws. (ITW Buildex #560071 or MSC # 04055679) Screws shall be spaced 32” in the horizontal and 16” in the vertical. In the area above the I beam that serves as the rafter frame, on the interior side, the Contractor shall cut plywood pieces to go in this area. The Contractor shall caulk all seams and around the perimeter of the wall.
8. ROLL UP DOORS. The Contractor will install two rolling steel service doors. One door will be installed at the West opening of the bay. The West opening has these dimensions: 15’ 1” tall by 16’ 7” wide. The other door will be installed at the East opening. The East opening has these dimensions: 13’ 6” tall by 16’ 7” wide. The Sugarcane Field Station wants to maximize the height of the openings and the width of the openings; because this type roll up door is custom made for different applications, maximizing the dimensions should be possible. The minimum acceptable door heights and widths are as follows: West opening height 13’ 8”, width 16’ 6”, East opening height 12’, Width 16’ 6”. When the doors are closed the mechanical parts of the door and the door tracks will not be exposed or visible when viewed from the outside. To accomplish the concealment of these mechanisms the Contractor shall install paneling and trim pieces to achieve the desired look. The paneling and trim pieces will utilize the same type materials used for the exterior of the partition wall and the trim around the security door. The door shall have a manual chain fall opening system. The Contractor shall install a locking mechanism at the bottom corner of the doors.
9. ELECTRICAL. Building 10 is currently fed by a 100 Amp 208 Volt 3 Phase circuit. The expansion of the enclosed area of the building is due to the equipment that will be installed.
To match the power requirements of the additional equipment the electrical feed will be increased to 200 Amps at 208 Volt 3 Phase circuit. The Contractor shall replace the 100 Amp circuit breaker that feeds the building. The Circuit breaker is a 100 Amp Eaton model 35K 3 Phase breaker. The breaker is located in the tall stainless steel distribution cabinet at the northwest corner of Building 10. The breaker is labeled Building 10 Car Shed. The Breaker will be replaced with a 200 Amp Eaton model 35K 3 Phase breaker.
The Contractor shall install a 200 Amp 208 Volt 3 Phase NEMA 3R rated breaker panel on the plywood board located at the interior north wall of Building 10. The Nema 3R panel will have a minimum of 30 spaces and a main circuit breaker. The panel will be fed with a four-wire circuit consisting of 3 Phase conductors, 1 Neutral conductor and 1 ground conductor.
The conductors will be at a minimum 3/0 THHN copper wires. The conduit connecting the distribution panel and the building 10 circuit breaker panel will be 2 ½” Liquid-Tight Flex Metal Conduit. Flexible conduit has been chosen because the building and the distribution panel settle at different rates and rigid conduits have become misaligned and broken.
The Contractor shall install three 120 Volt 20 Amp lighting circuits in building 10. One lighting circuit will serve six LED round High Bay lighting fixtures located in the new enclosed room at the north end of the building. The LED High Bay fixtures shall be spaced to provide even lighting to whole floor area of the room. The lights will be controlled by a single pole switch located by the personnel door that will be in the new partition wall. The switch will be located on the interior side of the wall. The switch will be mounted opposite the hinge side of the door frame, 48” above the floor. The second lighting circuit will serve the lights under the open section of the building. The Contractor will use the two 4” LED fixtures salvaged during demolition. The 4’ LED fixtures will be mounted on the roof supporting “I” beam that runs east to west. The light fixtures will be equally spaced on the “I” beam. The LED fixtures will be controlled by a Photocontrol/photocell switch. The Photocontrol will turn the lights on at sunset and off at sunrise. The third lighting circuit will supply an LED flood light at the northwest corner of the building. Currently a HPS flood light is being used to light the grass parking area to the building’s northwest. The Contractor will supply a new LED flood light fixture. The LED floodlight fixture will be equivalent to a HPS flood light of 400 watts. The light fixture shall use a slip fitter/knuckle yoke/trunnion mount. The light fixture will be controlled by a Photocontrol/photocell switch. The fixture will be mounted on the same pole that the current HPS flood light uses. All lighting circuits will use #12 copper conductors. Conduit will be schedule 40 PVC. The Contractor shall ensure that the conduit is sized correctly for the number of conductors. Conduits will be secured to the buildings framing using steel conduit straps or conduit clamps. Conduits will be strapped or clamped no further than 12” from a joint or termination. All conduit straps and clamps shall be spaced no further than 3’ apart to minimize sagging and bowing.
The Contractor shall install four 120-volt 20-amp circuits for duplex convivence electrical outlets. Each circuit shall support four duplex outlets. The first circuit will be mounted on the interior of the north wall of the building. The outlets shall be equally spaced along the interior of the north wall. The second circuit of outlets will be mounted on the interior of the new partition wall. The third circuit will be attached to the exterior of the partition wall. The fourth circuit will be located on the inward facing part of the vertical “I” beams that support the open covered section of the south portion of the building. Each of the four circuits will be protected by 20-amp 120-volt circuit breakers.
10. PAINTING. The Contractor shall paint the following items: the exterior of both roll up doors, the plywood of the partition wall, and the inside and outside of the security door and frame.
The Contractor shall ensure that all paintable surfaces are clean and dry before painting. The Contractor shall apply a primer coat. The primer coat will be followed by two coats of paint.
The Contractor shall follow the paint manufactures directions and pay close attention to application rates and drying times. Paint shall be applied evenly with no runs or drips. All spills, splashes or overcoats shall be cleaned immediately before the paint has time to dry.
The Sugarcane Field Station will choose the color of the paint tint.
11. Inspections. Testing and Closeout. Inspections will be conducted by the Facility Manager/COR throughout the project. All systems will be operationally tested for proper operation. Submit O&M manuals prior to final testing.
12. Clean-up. When completed with construction, remove all debris and extra material located within the entire site. The site consists of the area around the new partition and roll up doors.
Solicitation Number 1240LN26R0005
52.252-2 Clauses Incorporated by Reference Feb 1998 This solicitation incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also the full text of the clause may be accessed electronically at Internet address https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52
52.212-4 Terms and Conditions—Commercial Products and Commercial Services (Nov 2025) ☒ Alternate I (Nov 2025) of 52.212-4
This is a commercial construction acquisition. FAR 52.212-4 is amended as follows:
(b) Inspection/Acceptance. Inspection and Acceptance will be conducted in accordance with FAR 52.246-12, Inspection of Construction (Aug 1996).
(d) Changes. Changes will be handled in accordance with the following FAR clause(s):
☒ FAR 52.243-4, Changes (Nov 2025) ☒ FAR 52.243-5, Changes and Changed Conditions (Nov 2025)
(o) Warranty. FAR 52.246-21, Warranty of Construction is applicable to this contract.
52.203-17 Contractor Employee Whistleblower Rights (Nov 2023) 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017) 52.222-50 Combating Trafficking in Persons (Nov 2025)
☐ Alternate I (Nov 2025) of 52.222-50 52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving (May 2024) 52.232-39 Unenforceability of Unauthorized Obligations (Jun 2013) 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (Mar 2023) 52.233-3 Protest After Award (Sep 2025) 52.233-4 Applicable Law for Breach of Contract Claim (Sep 2025) 52.240-91 Security Prohibitions and Exclusions (Nov 2025)
☐ Alternate I (Nov 2025) of 52.240-91 52.244-6 Subcontracts for Commercial Products and Commercial Services (Nov 2025)
The following clauses are applicable if checked:
☐ 52.203-6 Restrictions on Subcontractor Sales to the Government (Jun 2020) with Alternate I (Nov 2021) of 52.203-6 ☒ 52.203-13 Contractor Code of Business Ethics and Conduct (Nov 2021) ☒ 52.204-9 Personal Identity Verification of Contractor Personnel Jan 2011 ☒ 52.204-13 System for Award Management—Maintenance (Nov 2025) ☒ 52.204-91 Contractor identification (Nov 2025) https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52
☒ 52.209-6 Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (Sep 2025) ☒ 52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters (Sep 2025) ☐ 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (Sep 2025) ☐ 52.219-4 Notice of Price Evaluation Preference for HUBZone Small Business Concerns (Nov 2025) ☒ 52.219-6 Notice of Total Small Business Aside (Nov 2025)
☐ Alternate I (Mar 2020).
☐ 52.219-8 Utilization of Small Business Concerns (Nov 2025) ☐ 52.219-9 Small Business Subcontracting Plan (Nov 2025)
☐ Alternate III (Nov 2025) of 52.219-9.
☐ Alternate IV (Nov 2025) of 52.219-9
☒ 52.219-14 Limitations on Subcontracting (Nov 2025) ☐ 52.219-16 Liquidated Damages—Subcontracting Plan (Nov 2025) ☐ 52.219-33 Nonmanufacturer Rule (Nov 2025) ☐ 52.222-3 Convict Labor (June 2003) ☐ 52.222-19 Child Labor—Cooperation with Authorities and Remedies (Nov 2025) ☒ 52.222-35 Equal Opportunity for Veterans (Nov 2025)
☐ Alternate I (Jul 2014) of 52.222-35 ☒ 52.222-36 Equal Opportunity for Workers with Disabilities (Nov 2025)
☐ Alternate I (Jul 2014) of 52.222-36 ☐ 52.222-37 Employment Reports on Veterans (Nov 2025) ☐ 52.222-40 Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) ☐ 52.222-41 Service Contract Labor Standards (Aug 2018) ☐ 52.222-42 Statement of Equivalent Rates for Federal Hires (May 2014) ☐ 52.222-43 Fair Labor Standards Act and Service Contract Labor Standards -- Price Adjustment (Multiple Year and Option Contracts) (Aug 2018) ☐ 52.222-44 Fair Labor Standards Act and Service Contract Labor Standards -- Price Adjustment (May 2014) ☐ 52.222-51 Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment-Requirements (May 2014) ☐ 52.222-53 Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services-Requirements (Nov 2025) ☒ 52.222-54 Employment Eligibility Verification (Nov 2025) ☐ 52.222-62 Paid Sick Leave Under Executive Order 13706 (Jan 2022) ☒ 52.222-90 Addressing DEI Discrimination by Federal Contractors (Apr 2026) ☐ 52.223-2 Reporting of Biobased Products Under Service and Construction Contracts (Nov 2025) ☐ 52.223-9 Estimate of Percentage of Recovered Material Content for EPA-Designated Items (May 2008)
☐ Alternate I (May 2008) of 52.223-9
☐ 52.223-11 Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (Nov 2025) ☐ 52.223-12 Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (Nov 2025) ☐ 52.223-23 Sustainable Products and Services (Nov 2025) ☐ 52.224-3 Privacy Training (Jan 2017)
☐ Alternate I (Jan 2017) of 52.224-3 ☐ 52.225-1 Buy American-Supplies (Nov 2025)
☐ Alternate I (Oct 2022) of 52.225-1 ☐ 52.225-3 Buy American--Free Trade Agreements--Israeli Trade Act (Nov 2025)
☐ Alternate II (Nov 2025) of 52.225-3.
☐ Alternate III (Nov 2025) of 52.225-3.
☐ Alternate IV (Oct 2022) of 52.225-3
☐ 52.225-5 Trade Agreements (Nov 2023) ☐ 52.225-19 Contractor Personnel in a Designated Operational Area or Supporting a Diplomatic or Consular Mission outside the United States (May 2020) ☐ 52.225-26 Contractors Performing Private Security Functions Outside the United States (Oct 2016) ☐ 52.226-4 Notice of Disaster or Emergency Area Set-Aside (Nov 2007) ☐ 52.226-5 Restrictions on Subcontracting Outside Disaster or Emergency Area (Aug 2025) ☐ 52.229-12 Tax on Certain Foreign Procurements ☐ 52.232-29 Terms for Financing of Purchases of Commercial Products and Commercial Services (Nov 2021) ☐ 52.232-30 Installment Payments for Commercial Products and Commercial Services (Nov 2021) ☒ 52.232-33 Payment by Electronic Funds Transfer— System for Award Management (Oct 2018) ☐ 52.232-34 Payment by Electronic Funds Transfer—Other Than System for Award Management (Jul 2013) ☐ 52.232-36 Payment by Third Party (Nov 2025) ☐ 52.240-92 Security Requirements (Nov 2025)
☐ Alternate II (Nov 2025) of 52.240-92 ☐ 52.240-93 Basic Safeguarding of Covered Contractor Information Systems (Nov 2025) ☐ 52.242-13 Bankruptcy (July 1995) ☒ 52.246-21 Warranty of Construction (Mar 1994) ☐ 52.247-64 Preference for Privately Owned U.S.-Flag Commercial Vessels (Nov 2025)
☐ Alternate I (Apr 2023) of 52.247-64.
☐ Alternate II (Nov 2021) of 52.247-64
The Contractor shall comply with the following FAR Clauses for Commercial Construction.
52.222-6 Construction Wage Rate Requirements (Nov 2025) 52.222-7 Withholding of Funds (Nov 2025) 52.222-8 Payrolls and Basic Records (Nov 2025) 52.222-9 Apprentices and Trainees (Nov 2025) 52.222-10 Compliance with Copeland Act Requirements (Nov 2025) 52.222-11 Subcontracts (Labor Standards) (Nov 2025) 52.222-12 Contract Termination-Debarment (May 2014) 52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations.
(May 2014) 52.222-14 Disputes Concerning Labor Standards (Nov 2025) 52.222-15 Certificate of Eligibility (May 2014) 52.236-5 Material and Workmanship (Jul 2025)
The following clauses are applicable when checked:
☒ 52.222-30 Construction Wage Rate Requirements-Price Adjustment (None or Separately Specified Pricing Method (Aug 2018) ☐ 52.222-31 Construction Wage Rate Requirements-Price Adjustment (Percentage Method) (Aug 2018) ☐ 52.222-32 Construction Wage Rate Requirements-Price Adjustment (Actual Method) (Nov 2025) ☒ 52.225-9 Buy American-Construction Materials (Nov 2025) ☐ Alternate I (Oct 2022) of 52.25-9 ☐ 52.225-11 Notice of Buy American Requirement-Construction Materials under Trade Agreements (Nov 2025) ☐ Alternate I (Nov 2025) (of 52.225-11 ☐ Alternate II (Oct 2022) of 52.225-11 ☐ 52.228-2 Additional Bond Security (Oct 1997) ☒ 52.228-5 Insurance-Work on Government Installation (Jan 1997) ☐ 52.228-11 Individual Surety-Pledge of Assets (Feb 2021) ☐ 52.228-13 Alternative Payment Protections (Jul 2020) ☐ 52.228-14 Irrevocable Letter of Credit (Nov 2014) ☒ 52.228-15 Performance and Payment Bonds-Construction (Jun 2020) ☐ 52.228-17 Individual Surety-Pledge of Assets (Bid Guarantee) (Feb 2021) ☒ 52.236-2 Differing Site Conditions (Jul 2025) ☒ 52.236-3 Site Investigation and Conditions Affecting the Work (Jul 2025) ☐ 52.236-6 Superintendent by the Contractor (Jul 2025) ☒ 52.236-7 Permits and Responsibilities (Jul 2025) ☐ 52.236-8 Other Contracts (Jul 2025)
☒ 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (Jul 2025) ☐ 52.336-10 Operations and Storage Areas (Jul 2025) ☒ 52.236-11 Use and Possession Prior to Completion (Jul 2025) ☒ 52.236-12 Cleaning Up (Jul 2025) ☒ 52.236-13 Accident Prevention (Jul 2025) ☐ Alternate I (Nov 1991) of 52.236-13 ☐ 52.236-14 Availability and Use of Utility Services (Jul 2025) ☒ 52.236-15 Schedules for Construction Contracts (Jul 2025) ☒ 52.236-16 Quantity Surveys (Jul 2025) ☐ Alternate I (Apr 1984) of 52.236-16 ☐ 52.236-17 Layout of Work (Jul 2025) ☒ 52.236-21 Specifications and Drawings for Construction (Jul 2025) ☐ Alternate I (Apr 1984) of 52.236-21 ☐ Alternate II (Apr 1984) of 52.236-21 ☒ 52.242-14 Suspension of Work (Apr 1984) ☐ 52.248-3 Value Engineering (Oct 2025) ☐ Alternate I (Apr 1984) of 52.248-3
Other Applicable Clauses
52.216-18 Ordering (Aug 2020) 52.216-19 Delivery – Order Limitations (Oct 1995) 52.216-21 Requirements (Nov 2025) ☐ Alternate I (Apr 1984) of 52.216-21 52.216-22 Indefinite Quantity (Nov 2025) 52.217-6 Option for Increased Quantity (Mar 1989) 52.217-7 Option for Increased Quantity - Separately Priced Line Item (Mar 1989) 52.217-8 Option to Extend Services (Nov 1999) 30 calendar days prior to contract expiration 52.217-9 Option to Extend the Term of the Contract (Mar 2000)
(a) 30 Calendar days prior to contract expiration and 60 days
(c) five years and 6 months.
52.232-90 Fast Payment Procedures (Nov 2025) 52.245-1 Government Property (Sep 2021) ☐ Alternate I (Sep 2021) of 52.245-1 52.245-2 Government Property Installation Operation Services (Apr 2012) 52.245-9 Use and Charges (Apr 2012) 52.246-15 Certificate of Conformance (Apr 1984) 52.247-29 F.O.B. Origin (Feb 2006) 52.247-34 F.O.B. Destination (Jan 1991)
AGAR Clauses
452.203-71 Anti-Discrimination and Diversity, Equity, and Inclusion (DEI) Compliance (Dec 2025)
(a) By entering into this contract, the contractor certifies that:
(1) It is compliant with all applicable Federal anti-discrimination laws and the Equal Protection principles of the U.S. Constitution, and it will remain compliant for the duration of the contract.
(2) Neither it nor any subcontractor or teaming partner operates or funds any program, policy, or initiative that promotes DEI in a manner that violates any applicable Federal anti-discrimination laws, including but not limited to Title VI and VII of the Civil Rights Act of 1964, or the Equal Protection principles of the U.S. Constitution, and the contractor and any subcontractor or teaming partner will not do so for the duration of the contract.
(b) If the contractor participates in, facilitates, or funds programs that implicate Title VI of the Civil Rights Act of 1964 or Title IX of the Education Amendments of 1972, as amended, including but not limited to grants to or for schools, colleges, universities, 4-H programs, non-governmental organization (NGO) programs, sports programs, and education-related grants to prisons or other detention facilities, the contractor certifies that it will remain compliant with those laws, including the requirements set forth in Executive Order 14168, Defending Women from Gender Ideology Extremism and Restoring Biological Truth to the Federal Government, and Executive Order 14173, Ending Illegal Discrimination and Restoring Merit-Based Opportunity.
(c) The contractor affirms that the above requirements are conditions of payment that go to the essence of the contract and are therefore material terms of the contract. Payments under the contract are predicated on compliance with the above requirements, and therefore the contractor is not eligible for funding under the contract or to retain any funding under the contract absent compliance with the above requirements.
(d) This certification reflects a change in the Government’s position regarding the materiality of the foregoing requirements and therefore any prior payment of similar claims does not reflect the materiality of the foregoing requirements to this contract.
(e) Submission of a knowing false statement relating to contractor’s compliance with the above requirements and/or eligibility for the contract may subject the contractor to liability under the False Claims Act, 31 U.S.C. § 3729, and/or criminal liability, including under 18 U.S.C. §§ 287 and 1001.
(f) The contractor must include the provisions of this clause in all subcontract solicitations.
(g) Failure on the part of the contractor or its subcontractors to comply with the terms of this clause may be grounds for the Contracting Officer to terminate this contract for default.
(End of Clause)
AGAR 452.203-72 Unenforceable Supplier Terms (MAY 2026)
(a) Definitions.
Supplier terms mean provisions customarily drafted by vendors of supplies or services and intended to create a binding legal obligation on the end user. The term applies:
(1) Regardless of the format or style of the document. For example, supplier terms may appear in standard terms of sale or lease, Terms of Service (TOS), End User License Agreement (EULA), or another similar legal instrument or agreement, and may be presented as part of a proposal or quotation responding to a solicitation for a contract or order or otherwise become effective after the contract date.
(2) Regardless of the media or delivery mechanism used. For example, supplier terms may be presented as one or more paper documents or may appear on a computer or other electronic device screen during a purchase, software installation, other product delivery, registration for a service, or another transaction.
(b) Applicability. When any supply or service acquired under this contract is subject to supplier terms, the supplier terms are deemed part of the contract only to the extent they are consistent with this clause. Supplier terms that conflict with any part of this clause, the contract, or Federal law are void and will not be considered incorporated into a contract, even if they are physically present in a contract documentation or systems. In the event of any inconsistency between supplier terms and this contract, this clause and the terms of the Government contract must govern and supersede any supplier terms in all cases.
(c) Authorization Required. Notwithstanding any other provision, no supplier terms must be binding on the Government unless the term is expressly authorized on the USDA Supplier Terms Authorization Form signed by the Contracting Officer, and the completed Authorization Form has been incorporated into the contract.
(d) Unenforceable Terms. Any supplier terms that impose obligations or restrictions inconsistent with applicable Federal law are unenforceable against the Government and deemed stricken from the agreement. This includes, but is not limited to, any clause that:
(1) Requires the Government to pay future fees, penalties, interest, legal costs, early‑termination fees, cancellation fees, minimum purchase commitments, true‑up payments, seat‑count minimums, usage minimums, continued‑use charges, or any other financial obligation not expressly authorized by the contract.
(2) Requires the Government to indemnify the contractor or any other entity.
(3) Restricts the Government’s ability to obtain similar supplies or services from another source.
(4) Imposes any penalty, financial or otherwise, based on the Government’s decision not to exercise an option.
(5) Subjects the United States Government to the laws of any U.S. state, territory, district, municipality, or foreign nation, except where Federal law expressly permits such application.
(6) Requires dispute resolution in a forum or venue other than one prescribed by applicable Federal law.
(7) Establishes a period of limitations for bringing an action that differs from that provided by applicable Federal law.
(8) Grants the contractor rights to use, mine, access, aggregate, analyze, or otherwise exploit Government data, usage data, or metadata.
(9) Deems the Government to have accepted initial or revised terms based on silence, continued performance, or failure to object.
(10) Grants the supplier the right to audit Government facilities, systems, records, or use of the product or service, except as expressly authorized by the contract and applicable Federal law.
(11) Requires the Government to accept supplier security requirements, network access requirements, monitoring, penetration testing, or other technical or security measures.
(12) Permits the supplier to suspend, degrade, or terminate access to products or services based on alleged non‑payment, alleged breach, automated security triggers.
(13) Limits the Government’s right to use, install, access, test, evaluate, or transfer the licensed product or service in any manner consistent with the contract and Federal law.
(14) Requires the Government to store, process, maintain, or transmit data in a particular geographic location, or permits the supplier to transfer Government data outside the United States, except as expressly authorized by applicable Federal law.
(15) Authorizes the supplier to use the Government’s name, seal, trademark, logo, or any reference to the Government as an end user or customer for marketing, publicity, promotional activities, press releases, or similar purposes.
(16) Incorporates by reference, or requires the Government to accept, terms or conditions imposed by any third party, subcontractor, or upstream service provider, unless such terms are expressly incorporated into the contract by bilateral modification.
(17) Limits, conditions, or negates the contractor’s performance obligations, service levels, or remedies through a supplier‑provided service level agreement (SLA).
(18) Uses Government data, usage data, metadata, prompts, content, or interactions to train, fine‑tune, improve, or derive any artificial intelligence, machine learning, or automated decision‑making model.
(19) Subjects the Government to automated decision‑making, automated risk scoring, automated content moderation, or any algorithmic process that may affect access, performance, or rights under the contract.
(20) Utilizes artificial intelligence or algorithmic tools that produce decisions, recommendations, or outputs affecting contract performance without providing transparency, explainability, auditability, and bias‑mitigation consistent with applicable Federal law and policy.
(21) Profiles, tracks, or analyzes Government user behavior, preferences, communications, or interactions for personalization, marketing, or algorithmic optimization purposes.
(e) Non-binding Actions. Neither the Government nor any Government authorized end user is deemed to have consented to any term, condition, or clause by virtue of its inclusion in the supplier agreement or through the use of clickwrap, browsewrap, “I agree” mechanisms, or similar means.
Execution of such mechanisms does not bind the Government or its authorized end users to any unenforceable terms.
(f) End user. The supplier agreement must bind the ordering activity as the end user to the extent it does not conflict with the terms of this clause, but it must not bind or impose personal liability on any Government employee or any person acting on behalf of the Government in their personal capacity.
(g) Law and disputes. The supplier agreement is governed by Federal law.
(h) Statutory exception. This clause does not apply to indemnification or any other payment by the Government that is expressly authorized by statute and specifically authorized under applicable agency regulations and procedures.
(i) Continued performance. The supplier or licensor must not unilaterally revoke, terminate, or suspend any rights granted to the Government except as allowed by the contract. If the supplier or licensor believes the ordering activity to be in breach of the supplier agreement, it must pursue its rights under the Contract Disputes Act or other applicable Federal statute while proceeding diligently with performance, pending final resolution of any dispute in accordance with the Disputes Clause at FAR 52.212‑4(d) or FAR 52.233‑1, as applicable.
(j) Arbitration. Binding arbitration must not be used unless specifically authorized by agency guidance.
(k) Equitable or injunctive relief. Equitable or injunctive relief, including the award of attorney fees, costs, or interest, may be awarded against the United States Government only when explicitly provided by statute (e.g., the Prompt Payment Act or the Equal Access to Justice Act).
(l) Revisions to supplier agreements. Any revisions to the supplier agreement must be incorporated into the contract using a bilateral modification. Unilateral revisions are not binding on the Government.
(m) No automatic renewals. If any license or service tied to periodic payment is provided under the supplier agreement (e.g., annual software maintenance or annual lease term), such license or service must not renew automatically upon expiration of its current term without prior express written consent from an authorized Government representative.
(n) Indemnification. Any clause of the supplier agreement requiring the supplier or licensor to defend or indemnify the end user is amended to provide that the U.S. Department of Justice has the sole right to represent the United States in any such action, in accordance with 28 U.S.C. 516.
(o) Taxes or surcharges. Any taxes or surcharges which the supplier or licensor seeks to pass along to the Government as end user will be governed by the terms of the associated Government contract or order and must be submitted to the Contracting Officer for a determination of applicability prior to invoicing unless specifically agreed otherwise.
(p) Non‑assignment. The supplier agreement may not be assigned, nor may any rights or obligations thereunder be delegated, without the Government’s prior approval, except as expressly permitted by FAR 52.212-4(b) or FAR 52.232-23, as applicable.
(q) Confidential information. If the supplier agreement includes a confidentiality clause, such clause is amended to state that neither the agreement nor the contract price list, as applicable, must be deemed “confidential information.” Issues regarding release of “unit pricing” will be resolved consistent with the Freedom of Information Act. Notwithstanding anything in the supplier agreement to the contrary, the Government may retain any confidential information as required by law, regulation, or its internal document retention procedures for legal, regulatory, or compliance purposes; provided, however, that all such retained confidential information will continue to be subject to the confidentiality obligations of the supplier agreement.
(r) Conflict with Federal law. If any other language, provision, or clause of the supplier agreement conflicts or is inconsistent with Federal law or the terms and conditions of this contract, such language, provisions, or clauses will be considered null and void and will not be binding on the United States Government.
(End of Clause)
452.204–70 Modification for Contract Closeout (Apr 2026)
(a) If unliquidated funds in the amount of $1000 or less remain on the contract, the Contracting Officer (Contracting Officer) may issue a unilateral modification for deobligation. The contractor will receive a copy of the modification but is not required to provide a signature. The Contracting Officer will immediately proceed with contract closeout upon completion of the period of performance, receipt and acceptance of supplies or services, and final payment.
(b) For commercial contracts not exceeding the simplified acquisition procedure threshold under FAR 12.001(c), if more than $1,000 in unliquidated funds remain at closeout,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .