HELENA LEWIS & CLARK NATIONAL FOREST - Double Vault Toilet Installation
Solicitation number
1240LN21Q0048
Issued by

View the file

Other files

File Type Posted
Project Drawings.pdf PDF
Signed Cover Sheet.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1240LN21Q0048

1. REQUEST NO.

5a. ISSUED BY

NAME

a. NAME

c. STREET ADDRESS

d. CITY

10. PLEASE FURNISH QUOTATIONS TO

THE ISSUING OFFICE IN BLOCK 5a ON

OR BEFORE CLOSE OF BUSINESS (Date)

2. DATE ISSUED 3. REQUISITION/PURCHASE REQUEST NO. 4. CERT. FOR NAT. DEF.

UNDER BDSA REG. 2

AND/OR DMS REG.1

RATING

6. DELIVERY BY (Date)

7. DELIVERY

9. DESTINATION

a. NAME OF CONSIGNEE

b. STREET ADDRESS

PAGE OF PAGES

5b. FOR INFORMATION CALL: (No collect calls)

TELEPHONE NUMBER

AREA CODE NUMBER

8. TO:

b. COMPANY

e. STATE f. ZIP CODE

c. CITY

d. STATE e. ZIP CODE

IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotations must be completed by the quoter.

11. SCHEDULE (Include applicable Federal, State and local taxes)

THIS RFQ

REQUEST FOR QUOTATION

(THIS IS NOT AN ORDER)

IS IS NOT A SMALL BUSINESS SET ASIDEX

07/26/2021 1037897

1 52

ATTN DANA BANGART

3710 FALLON STREET SUITE C

BOZEMAN MT 59718

PPS INTERMOUNTAIN CSA 3

08/30/2022

HELENA NATIONAL FOREST

2880 SKYWAY DRIVE

HELENA

MT 59601

406 624-3442DANA BANGART

08/10/2021 1630 MT

FOB DESTINATION

OTHER

(See Schedule)X

ITEM NO.

(a)

SUPPLIES/SERVICES

(b)

QUANTITY

(c)

UNIT

(d)

UNIT PRICE

(e)

AMOUNT

(f)

Period of Performance: 09/01/2021 to 08/30/2022

0001 Double Vault Toilets

Delivery: 08/30/2022 Contractor shall perform work in accordance with the attached specifications, terms and conditions.

There is no formal site visit for this project.

Interested vendors are highly encouraged to visit the site prior to submitting a quote.

For site information please contact Reid Stovall, Facilities Engineer, Helena Lewis & Clark National Forest at 406-390-1701 or Continued ...

12. DISCOUNT FOR PROMPT PAYMENT

a. 10 CALENDAR DAYS (%) b. 20 CALENDAR DAYS (%) c. 30 CALENDAR DAYS (%) d. CALENDAR DAYS

NUMBER PERCENTAGE

NOTE: Additional provisions and representations

13. NAME AND ADDRESS OF QUOTER

b. STREET ADDRESS

c. COUNTY

d. CITY e. STATE f. ZIP CODE

14. SIGNATURE OF PERSON AUTHORIZED TO

SIGN QUOTATION

16. SIGNER

a. NAME (Type or print)

c. TITLE (Type or print)

a. NAME OF QUOTER

AREA CODE

NUMBER

15. DATE OF QUOTATION

b. TELEPHONE are are not attached

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition not usable

STANDARD FORM 18 (REV. 6-95)

Prescribed by GSA - FAR (48 CFR) 53.215-1(a)

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 52

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

1240LN21Q0048

reid.stovall@usda.gov.

For information regarding the solicitation please contact Dana Bangart, Contract Specialist, PPS

Intermountain CSA #3 at 406-624-3442 or dana.bangart@usda.gov.

Please read Section L to understand what is required to be submitted with quote.

Magnitude of Construction Project (per FAR

36.204(b)) - Between $25,000 and $100,000.

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Solicitation No: 1240LN21Q0044 – RFQ Double Vault Toilet Installation Project, Helena and Lincoln Ranger District, Helena Lewis & Clark National Forest

Table of Contents

PART I—THE SCHEDULE

SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS

B.1 SCHEDULE OF ITEMS

B.2 SCHEDULE NOTES

SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

C.1 PROJECT DESCRIPTION AND LOCATION

C.2 SPECIFICATIONS

C.3 GENERAL SPECIFICATIONS

C.4 HAULING AND DISPOSAL OF MATERIALS

C.5 CLEANUP AND DISPOSAL

C.6 EXISTING UTILITIES

C.7 FOOD AND GARBAGE STORAGE

C.7 FIRE CONTROL

C.7 MEASUREMENT AND PAYMENT

SECTION D--PACKAGING AND MARKING

D-1 PACKING AND MARKING

D-2 PROJECT LABELING FOR OFFICIAL COORESPONDENCE

SECTION E--INSPECTION AND ACCEPTANCE

E.1 CLAUSES

SECTION F--DELIVERIES OR PERFORMANCE

F.1 CLAUSES

SECTION G--CONTRACT ADMINISTRATION DATA

G.1 CLAUSES

H.1 NOXIOUS WEED CONTROL

H.2 SECURITY AND PROTECTION

PART II--CONTRACT CLAUSES

SECTION I--CONTRACT CLAUSES

I.1 CLAUSES

PART III--LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

SECTION J--LIST OF ATTACHMENTS

J.1 ATTACHMENTS

Double Vault Toilet Installation Project, Helena and Lincoln Ranger District, Helena Lewis & Clark National Forest

PART IV--REPRESENTATIONS AND INSTRUCTIONS

SECTION K--REPRESENTATIONS, CERTIFICATIONS, AND

OTHER STATEMENTS OF OFFERORS OR RESPONDENTS

K.1 PROVISIONS

SECTION L--INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR

RESPONDENTS

L.1 PROVISIONS

L.2 QUOTE PREPARATION INSTRUCTIONS:

SECTION M--EVALUATION FACTORS FOR AWARD

M.1 EVALUATION CRITERIA FOR AWARD

Double Vault Toilet Installation Project, Helena and Lincoln Ranger District, Helena Lewis & Clark National Forest

DOUBLE VAULT TOILET INSTALLATION PROJECT

HELENA AND LINCOLN RANGER DISTRICTS,

HELENA LEWIS & CLARK NATIONAL FOREST

LEWIS & CLARK COUNTY, MONTANA

PART I—THE SCHEDULE

SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS

B.1 SCHEDULE OF ITEMS

Pay Method of Estimated Pay Unit Item

Item Item Description Meas. Quantity Unit Price Cost

Lincoln Admin Site

• Install New Double SST EA 1

Lump

Sum $ $

Beaver Creek Fishing Access

• Install New Double SST

EA 1

Lump

Sum $ $

Base Total: $

B.2 SCHEDULE NOTES

*Method of Measurement EA – Each LSQ - Lump Sum Quantity

The pay items in the Schedule of Items have suffixes that do not appear on the pay items in the specifications. They pertain only to sizes, classes, and/or types indicated in the item "Descriptions,” and are used by the Government for computer tabulation of bid schedules. For the abbreviations in schedule descriptions see Special Project Specification SPS 101 (7/7/97).

The quoter must quote all items. Round to the nearest cent.

Payment for bond premiums, or any costs associated with irrevocable letters of credit, in accordance with Clause 52.232-5, Payments Under Fixed-Price Contracts, shall not be in addition to the contract price.

Price quotation furnished by:

Name Phone ( )

Address E-mail

DUNS # __________________________

Double Vault Toilet Installation Project, Helena and Lincoln Ranger District, Helena Lewis & Clark National Forest

SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

C.1 PROJECT DESCRIPTION AND LOCATION

a. Description:

This project is for the installation of two (2) double concrete vault toilets at two (2) different sites:

1. Lincoln Ranger District Admin Site:

a. Install new SST

b. Include concrete pad per drawings

2. Beaver Creek Fishing Access:

a. Install new SST

b. Include concrete pad per drawings

Work will include excavation, backfill and bedding materials, concrete pad construction, supply, delivery, and installation of new concrete vault toilets.

Contractor is responsible for all labor, materials, tools, etc. necessary to complete the work. All waste and excess materials generated from construction shall be disposed of off Forest Service lands and in compliance with governing federal, state, and local laws.

b. Location: (See site plans in drawings)

Lincoln Ranger District, 1569 Highway 200, Lincoln, MT Beaver Creek Fishing Access, Helena Ranger District, Lewis and Clark County, MT

c. Contract Time:

Lincoln Ranger District Admin Toilet

Delivery date: August 31, 2022

Beaver Creek Fishing Access Toilet Delivery date: August 31, 2022

Contractor is allowed to begin work on the Admin Toilet in 2021.

Contractor allowed 10 calendar days per site for installation.

d. Site Visit: There is no formal site visit for this project. Interested vendors are highly encouraged to visit the site prior to submitting a quotation.

e. Magnitude of Construction Project (per FAR 36.204(b)): $25,000 - $100,000

C.2 SPECIFICATIONS

SECTION 01 33 00 – SUBMITTAL PROCEDURES

PART 1 – GENERAL

1.01 PROCEDURES FOR SUBMITTALS

A. Reviewing, Certifying, Approving Authority: Contractor shall be responsible for reviewing and certifying that submittals are in compliance with contract requirements.

B. Scheduling: Allow review period, beginning with receipt by approving authority that includes at least 5 working days for submittals for contracting officer approval. Period of review for

Double Vault Toilet Installation Project, Helena and Lincoln Ranger District, Helena Lewis & Clark National Forest submittals with contracting officer approval begins when Government receives submittal from contractor. Period of review for each resubmittal is the same as for initial submittal.

C. Variations: Variations from contract requirements require Government approval pursuant to contract Clause entitled “FAR 52.236-21, Specifications and Drawings for Construction” and will be considered where advantages to government.

D. Submittal Schedule:

SECTION DESCRIPTION SUBMITTED APPROVED

03 30 00-1.02A Concrete Mix Design

33 36 00-1.02A Vault Toilets

END OF SECTION 01 33 00

Double Vault Toilet Installation Project, Helena and Lincoln Ranger District, Helena Lewis & Clark National Forest

SECTION 01 74 00 – SITE CLEAN UP

1.01 CLEAN UP

A. The contractor shall keep the work site free from accumulation of waste materials and rubbish resulting from the work. Clean areas daily as required to maintain a safe working site.

B. The contractor shall minimize disturbance to the area and perform site work necessary to restore natural surface contours impacted from work.

C. Before final acceptance of the project by the Government, the contractor shall remove from the site all excess material, waste, and rubbish resulting from this work.

END OF SECTION 01 74 00

SECTION 03 30 00 – CAST-IN-PLACE AND PRE-CAST CONCRETE

1.01 SUMMARY

A. Work includes the excavation, backfill, compacting, grading, and any site work required for the installation of;

a. Concrete pads to serve the entrance of the new concrete vault toilet installations

1.02 SUBMITTALS

A. Concrete mix design: At least 10 days prior to fabrication, submit concrete mix design with all concrete additives proposed to COR for approval.

PART 2 – PRODUCTS

2.01 CONCRETE MIX DESIGN

A. Concrete shall be supplied by a ready-mix or pre-cast concrete products firm regularly engaged in the business.

B. Cement, aggregate, and water shall be proportioned to obtain concrete with good workability.

C. Mix design shall meet ASTM C33 and meet the following requirements:

a. Maximum Aggregate Size: 1 inch

b. Minimum Compressive Strength: 3,500 psi at 28 days

c. Maximum Water-Cementitious Materials Ratio: 0.45

d. Slump Range: 3 to 6.5 inches

e. Air Content: 4 to 7 percent.

D. Concrete Accessible Parking Pad:

a. Thickness: 4 inches minimum

b. Width: 16 feet

c. Length: 20 feet

d. Reinforcement: No. 4 bars spaced 12 inches each way, steel wire mesh, or fiber reinforced.

2.02 STEEL REINFORCEMENT

A. Reinforcing Bars: ASTM A 615/A 615M, Grade 60, deformed.

Double Vault Toilet Installation Project, Helena and Lincoln Ranger District, Helena Lewis & Clark National Forest

B. Plain-Steel Welded Wire Reinforcement: ASTM A 185/A 185M, plain, fabricated from as-drawn steel wire into flat sheets.

C. Bar Supports: Bolsters, chairs, spacers and other devices for spacing, supporting, and fastening reinforcing bars and welded wire reinforcement in place. Manufacture bar supports from steel wire, plastic, or precast concrete according to CRSI’s ”Manual of Standard Practice”.

2.03 STEEL CARRIER SUPPORTS

A. Provide a minimum of two stainless steel carrier supports to support the sidewalk where it butts up against the toilet entry floor slab.

B. Each steel carrier support shall have the following minimum dimensions:

a. Steel thickness: ¼ inch

b. Width: 12 inches

c. Length: 8 inches

2.04 BEDDING MATERIAL

A. Bedding Course: Bedding material to be 3/4 inch minus crushed or screened aggregate, or other approved gravel bedding material approved by the COR.

PART 3 – EXECUTION

3.01 CONCRETE FORMS

A. Support and brace forms sufficiently to prevent distortion of forms.

B. Contractor shall assume all responsibility for determining when to remove the forms without causing damage to the components. Damaged components will be rejected.

3.02 CONCRETE REINFORCEMENT

A. Steel reinforcement shall be centered in the cross-sectional area of the slab and shall have at least one inch of concrete cover on the under surface.

B. Install No. 4 bars spaced 12 inches each way or Plain-Steel Welded Wire Reinforcement.

3.03 CONCRETE FINISH

A. Apply a broom finish to the concrete surface.

3.04 BEDDING AND COMPACTION

A. Compact the natural ground with a minimum of three passes with a whacker-type mechanical compactor or equivalent approved by the CO.

B. Install a six-inch compacted lift of aggregate bedding material for a leveling and drainage course.

Compact leveling course full width with a whacker-type mechanical compactor or equivalent until there is no visible evidence of further consolidation.

END OF SECTION 03 30 00

Double Vault Toilet Installation Project, Helena and Lincoln Ranger District, Helena Lewis & Clark National Forest

SECTION 33 36 00 – CONCRETE VAULT TOILET

PART 1 – GENERAL

1.01 SUMMARY

A. Work includes the installation of two each unisex double concrete vault toilets.

A. Product Data: For the vault toilets indicated, include construction details, material descriptions, dimensions of individual components and profiles, and finishes.

PART 2 – PRODUCTS

2.01 CONCRETE VAULT TOILET

A. Specifications;

a. Type: Double Vault Toilet

b. Exterior: Barnwood Look

c. Roof: Simulated Wood Shake Roof

d. Color: Dark Brown Concrete

e. Signage: Unisex - ADA

f. Vent Screen: Required – Installed over vent

B. Approved manufacturers and models, or approved equals;

TOILET MANUFACTURER: MODEL:

Missoula Concrete Double Vault Toilet

CXT Tioga

PART 3 – EXECUTION

3.01 INSTALLATION

A. General: Comply with vault toilet manufacturer’s written installation instructions applicable to products and applications indicated unless more stringent requirements apply.

B. Backfill and perform finish grading immediately adjacent to toilet

C. Grades of access route immediately serving the vault toilet shall comply with ADA requirements.

END OF SECTION 33 36 00

Double Vault Toilet Installation Project, Helena and Lincoln Ranger District, Helena Lewis & Clark National Forest

SECTION 33 36 50 – EXCAVATION

PART 1 – GENERAL

1.01 SUMMARY

A. Work includes the excavation, backfill, compacting, grading, and any site work required for vault toilet installation.

A. NA

PART 2 – PRODUCTS

2.01 SOIL MATERIALS

A. SST Bedding Course: Bedding material to be sand or 3/8 inch minus crushed or screened aggregate.

B. ¾” Minus Road Mix: Approved ¾” minus road mix from commercial pit.

2.02 EQUIPMENT

A. General: Contractor shall supply equipment necessary to excavate the hole necessary to receive the new vault toilet, place the toilet, provide finish site grading, and perform all other work associated with the toilet installation.

B. WEED FREE EQUIPMENT: Equipment (to include machinery, trailers, compactors, pickups, etc) shall be washed and inspected prior to entry into the project area.

PART 3 – EXECUTION

3.01 INSTALLATION

A. Excavate new hole at location staked by CO. Excavation shall comply with vault toilet manufactures installation instructions.

3.02 BEDDING AND COMPACTION

A. Compact the natural ground at the bottom of the vault excavation with a minimum of three passes with a whacker-type mechanical compactor or equivalent approved by the CO.

B. Install a four (4) inch loose lift of sand or aggregate bedding material for a leveling and drainage course. Compact leveling course full width with a whacker-type mechanical compactor or equivalent until there is no visible evidence of further consolidation.

C. Set vault in place. Backfill around structure. Use excavation material for backfill except for rocks or clumps larger than six inches.

D. Fill, adjacent to building entry, shall have backfill placed in 8-inch loose lifts and compacted with a minimum of two passes with a whacker-type mechanical compactor or equivalent approved by the CO.

3.03 FINISH GRADING (General)

A. Grade around vault toilet necessary to drain surface water away from the structure. The grade shall fall a minimum of 6 inches within the first 10 feet.

END OF SECTION 33 36 50

Double Vault Toilet Installation Project, Helena and Lincoln Ranger District, Helena Lewis & Clark National Forest

C.3 GENERAL SPECIFICATIONS

a) Existing Facilities. In addition to the requirements of the Use of Premises Clause, AGAR 452.236-70, all existing facilities structures damaged by the Contractor shall be replaced or repaired by the Contractor at no additional cost to the Government. This includes any facilities inside or outside the project limits, including along any access routes.

Do not trim or damage vegetation except with specific Contracting Officers (CO) approval.

b) Pollution and Erosion Control. During all operations under this contract, the

Contractor shall exercise reasonable measures to prevent or minimize soil erosion and pollution of water and other resources. All refuse, including garbage, rubbish, and solid or liquid wastes, from the Contractor's operations, including camps, parking areas, and equipment maintenance areas shall be stored, collected, and disposed of in a sanitary and nuisance-free manner. Refuse shall be disposed of in State-approved landfills unless otherwise approved by the Contracting Officer (CO).

c) Coordination with District Operations. The work will take place in areas critical to daily ranger district operations. The Contractor shall maintain regular contact and coordination with the district representative to assure that district operations are not hindered by the work.

d) Storage and Stockpiling. The Contractor shall confine storage of equipment, materials, and vehicles to within the limits delineated by the Contracting Officer. The Contractor shall be solely responsible for the loss of or damage to materials stored on Forest Service lands or elsewhere.

e) Coordination with Other Contractors. The Contractor shall maintain regular contact and coordination with all other contractors working on the district compounds to assure that the operations of other contractors are not hindered by the work.

f) Worksite Cleanliness and Final Cleanup. Maintain the project work areas in a clean and orderly condition throughout the progress of work under this contract. All refuse, including garbage, rubbish, and solid or liquid wastes from the Contractor's operations shall be stored and collected in a sanitary manner and disposed of off Government property in a legal manner. Maintain strict control of hazardous materials to prevent contamination of the site.

g) Equipment Specifications. Equipment and tools shall be in good mechanical and operating condition, fully capable of performing all phases of the specified work.

h) Weather Conditions. Work will be suspended if, in the opinion of the Contracting

Double Vault Toilet Installation Project, Helena and Lincoln Ranger District, Helena Lewis & Clark National Forest

Officer, weather conditions preclude effective protection of resources, site rehabilitation, or otherwise impact project end results in a significant, negative manner.

i) Sanitary Facilities – No sanitary facilities currently exist on site. Contractor responsible for providing their own sanitary facilities.

j) Notification. Contractor shall notify the C.O. at least two weeks prior to entering a work site.

C.4 HAULING AND DISPOSAL OF MATERIALS

a) All loads shall be completely covered during hauling.

b) All materials removed from the site shall be disposed of in a legal manner off National

Forest System lands. All fees associated with material disposal shall be paid by the

Contractor.

C.5 CLEANUP AND DISPOSAL

The Contractor shall at all times keep the area in an orderly condition. Upon completing the work, the Contractor shall remove from the site and premises any rubbish, tools, equipment, and materials that are not the property of the Forest Service. Upon completing the work, the

Contractor shall leave the work areas in a clean, neat, and orderly condition satisfactory to the

Contracting Officer.

C.6 EXISTING UTILITIES

The Contractor is responsible for location of all utilities prior to beginning work. Damaged utilities shall be repaired at the Contractor’s expense.

C.7 FOOD AND GARBAGE STORAGE

All food, beverages, and scented or flavored toiletries must be stored unavailable to bears at night and when unattended during the day. Attractants include but are not limited to canned food, pop, beer, garbage, grease, processed livestock or pet food, toothpaste, and chap stick. All attractants shall be hung at least 10-feet off the ground and 4-feet from any vertical support, or stored inside a bear resistant container or vehicle. Cars, pick-up cabs, enclosed horse trailers, hard sided campers or camper shells are all considered bear resistant. Food should be stored out of sight in vehicles. Coolers, pop-up campers, backpacks, and tents are not considered bear resistant.

C.7 FIRE CONTROL

(a) Contractor's Responsibility for Contractor-Caused Fires – The Contractor, whether or not directed by the Forest Service, shall immediately extinguish, without expense to the

Government, all fires on or in the vicinity of the project which are caused by Contractor's

Double Vault Toilet Installation Project, Helena and Lincoln Ranger District, Helena Lewis & Clark National Forest employees, whether set directly or indirectly as a result of Contractor operations. The

Contractor may be held liable for all damages and costs of additional labor, subsistence, equipment, supplies, and transportation resulting from fires set or caused by the

Contractor's employees or resulting from contract operations.

(b) Other Fires – For the purpose of fighting forest fires on or in the vicinity of the project, which are not caused by the Contractor or his employees, the Contractor when requested by the Contracting Officer shall place his employees and equipment temporarily at the disposal of the Forest Service. Payment for such services will be made by the

Government at not less than the current rate for fire-fighting services established by the

Forest Service in the area concerned.

Any employees and equipment furnished will be relieved from fire fighting as soon as the

Forest Service finds that it is practicable to employ other labor and equipment adequate for the protection of the area.

An equitable adjustment in contract time may be made for this period.

(c) Fire Plan – At all times during closed fire season period, as specified by State law, the

Contractor shall comply with each of the following provisions to the extent applicable to his operation under the contract.

1. Fire Tools – The Contractor will provide for each employee in the contract area at least one approved hand tool of a type appropriate in the contract area, such as shovel, pulaski, or ax. Tools required and furnished under (2) and (4) below, shall count toward fulfillment of the above requirement. Where additional tools, beyond those required under (2) and (4) below, are to be provided, the Contractor shall seal such tools in one or more boxes painted red and marked "Tools for Fire Only." All tools required herein shall be kept sharp and in good serviceable condition and maintained at locations to be designated by the Forest Service.

2. Fire Extinguishers and Tools on Mobile or Stationary Equipment – Each unit of powered equipment used in connection with this contract, including automobiles, trucks, tractors, etc., shall be equipped with serviceable tools and fire extinguishers as follows:

One - fire extinguisher, dry chemical type of not less than 2-1/2 pound capacity with 4 BC or higher rating.

One - shovel, round point #0 lady or equal.

One - ax, 2 pounds or over, 26-inch minimum length, or one pulaski.

One - water container (at least 1-gallon capacity), not required with stationary equipment.

Double Vault Toilet Installation Project, Helena and Lincoln Ranger District, Helena Lewis & Clark National Forest

3. Blasting – Fuse or prima cord shall not be used unless authorized in writing by the

CO with special precautions stated.

4. Smoking – Smoking shall not be permitted within the contract area except on surfaced or dirt roads, at landings, within closed vehicles, in camps, or at other posted places, and shall never be allowed while working or traveling on foot.

5. Storage of Petroleum and Other Highly Flammable Products – Gasoline, oil, grease, or other highly flammable material will be stored either in a separate building used exclusively for such storage, or at a site where all combustible debris and vegetation is cleared away within a radius of 25 feet. Fire extinguishers and/or sand barrels may be required at such locations specified by the Forest Service when unusually hazardous conditions exist.

6. Precautions for Stoves – Stovepipes on all temporary buildings, trailers, and tents using wood burning stoves, will be equipped with roof jacks and serviceable spark arresters of mesh with openings no larger than 5/8 inch.

All stovepipes, inside and out, will not be closer than 2 feet from any wood or other flammable material or 1 foot if the combustible material is protected by a metal or asbestos shield.

7. Welding – Welding or use of cutting torches will be permitted only in areas that have been cleared or are free of all material capable of carrying fire. Flammable debris and vegetation must be removed from within a minimum of 10 feet radius of all welding and cutting torch operations. A shovel and a 5-gallon standard backpack water container (filled), with hand pump attached, shall be immediately available for use in the event of a fire start.

8. Fire Plan – Prior to initiating work on the contract area, during the closed fire season period, a fire prevention and suppression plan will usually be prepared. The

Contractor and the Forest Service will jointly prepare this plan. Such plan shall include a detailed list of men and equipment at the Contractor's disposal for implementing the plan. The fire plan shall also specify additional measures and/or special requirements, such as Hoot Owl restrictions, necessary during periods of critical fire weather conditions.

When Hoot Owl restrictions are invoked, the Forest Service may curtail or shut down all or portions of a Contractor's operations. The following requirements may be imposed:

a) All high fire risk operations could be terminated at 1300 local time.

b) All burning could be stopped, including debris burning fires.

Double Vault Toilet Installation Project, Helena and Lincoln Ranger District, Helena Lewis & Clark National Forest

c) Patrolman may be required for a period of 2 hours after high fire risk operations and 1 hour after end of work shift. The Contractor shall provide the patrolman unless the contract is for equipment rental, in which case the Government will provide the patrolman.

C.7 MEASUREMENT AND PAYMENT

The method of measurement will be as designated in the SCHEDULE OF ITEMS. The accepted quantity will be paid for at the contract unit price for the Pay Item shown in the SCHEDULE OF

ITEMS. Payment will be for all labor, equipment, transportation, supervision, operating supplies, materials, and incidentals necessary to complete the work as specified.

Double Vault Toilet Installation Project, Helena and Lincoln Ranger District, Helena Lewis & Clark National Forest

SECTION D--PACKAGING AND MARKING

D-1 PACKING AND MARKING

All shipments of materials, equipment and/or supplies shall be addressed to the Contractor and not to the

Government.

D-2 PROJECT LABELING FOR OFFICIAL COORESPONDENCE

The Government singularly identifies each project with a contract number at time of award. The contract number is a unique identifier to purposely and permanently represent an awarded project. The

Government issued contract number is to be referenced on all official communication starting upon notice of award.

SECTION E--INSPECTION AND ACCEPTANCE

E.1 CLAUSES

52.246-12 Inspection of Construction (AUG 1996) 52.246-13 Inspection-Dismantling, Demolition, or Removal of Improvements (AUG 1996)

SECTION F--DELIVERIES OR PERFORMANCE

F.1 CLAUSES

52.211-13 Time Extensions (SEP 2000)

52.242-14 Suspension of Work (APR 1984)

52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984) Alternative I

FAR 52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984)

Alternate I (APR 1984)

The Contractor shall be required to

(a) commence work under this contract within 30 calendar days after the date the Contractor receives the notice to proceed,

(b) complete all work, including move-in and move-out within a 10 day period per site, and

(c) complete all work not later than August 31, 2022 the time specified in the offer.

NOTE: Notify the Contracting Officer (CO) of intent to begin work at least fourteen days in advance.

Double Vault Toilet Installation Project, Helena and Lincoln Ranger District, Helena Lewis & Clark National Forest

SECTION G--CONTRACT ADMINISTRATION DATA

G.1 CLAUSES

452.215-73 Post Award Conference (NOV 1996)

A post award conference with the successful offeror is required. It will be scheduled and held within 30 days after the date of contract award. The conference will be held at a date and time to be determined later.

SECTION H--SPECIAL CONTRACT REQUIREMENTS

H.1 NOXIOUS WEED CONTROL

Prior to mobilizing onto National Forest lands, roads, or trails, the contractor shall sufficiently clean any equipment by removing all visible dirt and plant materials. All subsequent move-outs/move-ins by the same piece of equipment shall be equally cleaned.

Prior to any equipment move-in, the Contractor shall make the equipment available for a Forest

Service inspection at an agreed location.

H.2 SECURITY AND PROTECTION

(a) Security and Protection – Security is the Contractor’s responsibility. Limit access to the construction area to persons involved in the work. Provide secure storage for materials that are stored on site. Secure completed work as required to prevent loss.

Barricades, warning signs and light shall comply with standards and code requirements for erection of structurally adequate barricades. All road warning signs, barricades, and traffic control devices shall conform to MUTCD. Paint with appropriate colors, graphics, and warning signs to inform personnel and the public of the hazard being protected against. Where appropriate and needed, provide lighting, including flashing red or amber lights.

(b) Maintenance of Traffic – The Contractor is authorized to use roads under the jurisdiction of the Forest Service, and open to public travel, for all activities necessary to complete this contract, subject to limitations and authorizations shown on the drawings or specified under this contract when such use will not damage the roads or national forest resources and when traffic can be accommodated safely.

Except as allowed in the contract, trailheads and roads shall remain open throughout the construction project. Perform no work that interferes or conflicts with traffic or existing access to the roadway surface until a plan for satisfactorily handling the traffic has been approved.

Before shutting down operations, take all necessary precautions to prevent damage to the

Double Vault Toilet Installation Project, Helena and Lincoln Ranger District, Helena Lewis & Clark National Forest project, such as temporary detours, approaches, crossings, or intersections; and provide for normal drainage and minimization of erosion. Leave all travel ways in a condition suitable for traffic.

(c) Protection of Improvements – The Contractor shall complete sequences of construction activity in order to prevent damage to equipment, material, and articles incorporated into the work covered by this contract.

Double Vault Toilet Installation Project, Helena and Lincoln Ranger District, Helena Lewis & Clark National Forest

PART II--CONTRACT CLAUSES

SECTION I--CONTRACT CLAUSES

I.1 CLAUSES

52.252-2 Clauses Incorporated by Reference (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

Federal Acquisition Regulation (FAR) Clauses: https://www.acquisition.gov/browse/index/far (FAR clauses begin with 52)

Department of Agriculture Acquisition Regulation (AGAR) Clauses:

https://www.acquisition.gov/agar (AGAR clauses begin with 452) Deviations to clauses may be viewed at:

https://www.dm.usda.gov/procurement/policy/FARClassDeviations.htm

52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements

(JAN 2017)

52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (JUN 2020)

52.204-13 System for Award Management Maintenance (OCT 2018) 52.204-18 Commercial and Government Entity Code Maintenance (AUG 2020)

52.204-19 Incorporation by Reference of Representations and Certifications (DEC 2014)

52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (JUL 2018)

52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance

Services or Equipment (AUG 2020)

52.209-6 Protecting the Government's Interest when Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (JUN 2020)

52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (NOV 2015)

52.215-8 Order of Precedence—Uniform Contract Format (OCT 1997) 52.219-6 Notice of Total Small Business Set-Aside (NOV 2020)

52.219-28 Post Award Small Business Program Rerepresentation (NOV 2020)

52.222-3 Convict Labor (JUN 2003) 52.222-6 Construction Wage Rate Requirement (AUG 2018)

52.222-7 Withholding of Funds (MAY 2014)

52.222-8 Payrolls and Basic Records (AUG 2018)

52.222-9 Apprentices and Trainees (JUL 2005) 52.222-10 Compliance with Copeland Act Requirements (FEB 1988)

52.222-11 Subcontracts (Labor Standards) (MAY 2014)

52.222-12 Contract Termination - Debarment (MAY 2014) 52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations (MAY

2014)

52.222-14 Disputes Concerning Labor Standards (FEB 1988)

52.222-15 Certification of Eligibility (MAY 2014) 52.222-21 Prohibition of Segregated Facilities (APR 2015)

52.222-26 Equal Opportunity (APR 2016)

52.222-27 Affirmative Action Compliance Requirements for Construction (APR 2015) https://www.acquisition.gov/browse/index/far https://www.acquisition.gov/agar

Double Vault Toilet Installation Project, Helena and Lincoln Ranger District, Helena Lewis & Clark National Forest

52.222-50 Combating Trafficking in Persons (OCT 2020) 52.222-55 Minimum Wages under Executive Order 13658 (NOV 2020)

52.222-62 Paid Sick Leave under Executive Order 13706 (Jan 2017)

52.223-2 Affirmative Procurement of Biobased Products under Service and Construction Contracts

(SEP 2013)

52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving (JUN 2020)

52.225-13 Restrictions on Certain Foreign Purchases (FEB 2021)

52.227-4 Patent Indemnity -- Construction Contracts (DEC 2007) 52.228-2 Additional Bond Security (OCT 1997)

52.228-12 Prospective Subcontractor Requests for Bonds (MAY 2014)

52.228-13 Alternative Payment Protections (JUL 2000) 52.228-14 Irrevocable Letter of Credit (NOV 2014)

52.232-5 Payments under Fixed-Price Construction Contracts (MAY 2014)

52.232-23 Assignment of Claims (MAY 2014)

52.232-27 Prompt Payment for Construction Contracts (JAN 2017) 52.232-33 Payment by Electronic Funds Transfer – System for Award Management (OCT 2018)

52.232-39 Unenforceability of Unauthorized Obligations (JUN 2013)

52.233-1 Disputes (MAY 2014) Alt 1 (DEC 1991) 52.233-4 Applicable Law for Breach of Contract Claim (OCT 2004)

52.236-2 Differing Site Conditions (APR 1984)

52.236-3 Site Investigation and Conditions Affecting the Work (APR 1984) 52.236-5 Material and Workmanship (APR 1984)

52.236-6 Superintendence by the Contractor (APR 1984)

52.236-7 Permits and Responsibilities (NOV 1991)

52.236-8 Other Contracts (APR 1984) 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements

(APR 1984)

52.236-10 Operations and Storage Areas (APR 1984) 52.236-11 Use and Possession Prior to Completion (APR 1984)

52.236-12 Cleaning Up (APR 1984)

52.236-13 Accident Prevention (NOV 1991)

52.236-16 Quantity Surveys (APR 1984) 52.236-17 Layout of Work (APR 1984)

52.236-21 Specifications and Drawings for Construction (FEB 1997)

52.243-5 Changes and Changed Conditions (APR 1984) 52.244-6 Subcontracts for Commercial Items (NOV 2020) (DEVIATION APR 2020)

52.246-21 Warranty of Construction (MAR 1994)

52.249-1 Termination for Convenience of the Government (Fixed-Price) (Short Form) (APR 1984) 52.253-1 Computer Generated Forms (JAN 1991)

452.232-70 Reimbursement for Bond Premiums – Fixed-Price Construction Contracts (NOV 1996)

452.236-72 Use of Premises (NOV 1996)

452.236-73 Archeological or Historic Sites (FEB 1988) 452.236-74 Control of Erosion, Sedimentation and Pollution (NOV 1996)

452.236-76 Samples and Certificates (FEB 1988)

452.236-77 Emergency Response (NOV 1996)

52.222-36 Equal Opportunity for Workers with Disabilities (JUN 2020)

(a) Equal opportunity clause. The Contractor shall abide by the requirements of the equal opportunity clause at 41 CFR 60-741.5(a), as of March 24, 2014. This clause prohibits discrimination against

Double Vault Toilet Installation Project, Helena and Lincoln Ranger District, Helena Lewis & Clark National Forest qualified individuals on the basis of disability, and requires affirmative action by the Contractor to employ and advance in employment qualified individuals with disabilities.

(b) Subcontracts. The Contractor shall include the terms of this clause in every subcontract or purchase order in excess of the threshold specified in Federal Acquisition Regulation (FAR) 22.1408(a) on the date of subcontract award, unless exempted by rules, regulations, or orders of the Secretary, so that such provisions will be binding upon each subcontractor or vendor. The Contractor shall act as specified by the Director, Office of Federal Contract Compliance Programs of the U.S. Department of Labor, to enforce the terms, including action for noncompliance. Such necessary changes in language may be made as shall be appropriate to identify properly the parties and their undertakings.

52.225-9 Buy American Act-Construction Materials (FEB 2021)

(a) Definitions. As used in this clause-

Commercially available off-the-shelf (COTS) item-

(1) Means any item of supply (including construction material) that is-

(i) A commercial item (as defined in paragraph (1) of the definition at Federal Acquisition

Regulation (FAR) 2.101);

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.

"Construction material" means an article, material, or supply brought to the construction site by the

Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies.

However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the

Government are supplies, not construction material.

Cost of components means-

(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or

(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this https://www.acquisition.gov/far/part-22#FAR_22_1408

Double Vault Toilet Installation Project, Helena and Lincoln Ranger District, Helena Lewis & Clark National Forest definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.

Domestic construction material means-

(1) For construction material that does not consist wholly or predominantly of iron or steel or a combination of both-

(i) An unmanufactured construction material mined or produced in the United States; or

(ii) A construction material manufactured in the United States, if-

(A) The cost of its components mined, produced, or manufactured in the United States exceeds 55 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic. Components of unknown origin are treated as foreign; or

(B) The construction material is a COTS item; or

(2) For construction material that consists wholly or predominantly of iron or steel or a combination of both, a construction material manufactured in the United States if the cost of foreign iron and steel constitutes less than 5 percent of the cost of all components used in such construction material. The cost of foreign iron and steel includes but is not limited to the cost of foreign iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the construction material and a good faith estimate of the cost of all foreign iron or steel components excluding COTS fasteners. Iron or steel components of unknown origin are treated as foreign. If the construction material contains multiple components, the cost of all the materials used in such construction material is calculated in accordance with the definition of "cost of components".

Fastener means a hardware device that mechanically joins or affixes two or more objects together.

Examples of fasteners are nuts, bolts, pins, rivets, nails, clips, and screws.

Foreign construction material means a construction material other than a domestic construction material.

Foreign iron and steel means iron or steel products not produced in the United States. Produced in the United States means that all manufacturing processes of the iron or steel must take place in the United States, from the initial melting stage through the application of coatings, except metallurgical processes involving refinement of steel additives. The origin of the elements of the iron or steel is not relevant to the determination of whether it is domestic or foreign.

Predominantly of iron or steel or a combination of both means that the cost of the iron and steel content exceeds 50 percent of the total cost of all its components. The cost of iron and steel is the cost of the iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the product and a good faith estimate of the cost of iron or steel components excluding COTS fasteners.

Double Vault Toilet Installation Project, Helena and Lincoln Ranger District, Helena Lewis & Clark National Forest

Steel means an alloy that includes at least 50 percent iron, between 0.02 and 2 percent carbon, and may include other elements.

"United States" means the 50 States, the District of Columbia, and outlying areas.

(b) Domestic preference. (1) This clause implements 41 U.S.C.chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C.

1907, the domestic content test of the Buy American statute is waived for construction material that is a COTS item, except that for construction material that consists wholly or predominantly of iron or steel or a combination of both, the domestic content test is applied only to the iron and steel content of the construction materials, excluding COTS fasteners. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.

(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows:

NONE

(3) The Contracting Officer may add other foreign construction material to the list in paragraph

(b)(2) of this clause if the Government determines that-

(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 20 percent;

(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or

(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.

(c) Request for determination of inapplicability of the Buy American statute. (1) (i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including-

(A) A description of the foreign and domestic construction materials;

(B) Unit of measure;

(C) Quantity;

(D) Price;

(E) Time of delivery or availability;

(F) Location of the construction project;

(G) Name and address of the proposed supplier; and

Double Vault Toilet Installation Project, Helena and Lincoln Ranger District, Helena Lewis & Clark National Forest

(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.

(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.

(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).

(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.

(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.

(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute.

(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:

Foreign and Domestic Construction Materials Price Comparison

Construction Material Description Unit of Measure Quantity Price (dollars)*

Item1:

Foreign construction material _______ _______ _______

Domestic construction material _______ _______ _______

Item2:

Foreign construction material _______ _______ _______

Domestic construction material _______ _______ _______

[* Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued)].

[List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.]

Double Vault Toilet Installation Project, Helena and Lincoln Ranger District, Helena Lewis & Clark National Forest

[Include other applicable supporting information.]

52.228-11 Individual Surety - Pledge of Assets (FEB 2021) (DEVIATION APR 2020)

(a) The Contractor shall obtain from each person acting as an individual surety on a performance bond or a payment bond -

(1)A pledge of assets that meets the eligibility, valuation, and security requirements described in the Federal Acquisition Regulation (FAR) 28.203-1; and

(2) Standard Form 28, Affidavit of Individual Surety, [except that the words “being duly sworn, depose and say” on the Standard Form 28 are replaced with the word “affirm” and the

Standard Form 28 is not required to be sworn and notarized in block 12].

(b)The Contracting Officer may release a portion of the security interest on the individual surety's assets based upon substantial performance of the Contractor's obligations under its performance bond. The security interest in support of a performance bond shall be maintained—

(1) Contracts for the construction, alteration, or repair of any public building or public work of the Federal Government exceeding $150,000 (40 U.S.C. 3131). Until completion of any warranty period, or for 1 year following final payment, whichever is later.

(2) Contracts subject to alternative payment protection (see FAR 28.102-1(b)(1)). For the full contract performance period plus 1 year.

(3) Other contracts not subject to the requirements of paragraph (b)(1) of this clause. Until completion of any warranty period, or for 90 days following final payment, whichever is later.

(c)A surety's assets pledged in support of a…