1240lLR24Q0074 Attachment 2 SOW Fish Passage Culvert Supplies SWNF.docx
DOCX document 24 KB Posted
- Solicitation number
- 1240LR24Q074
- Issued by
-
Department of Agriculture Forest Service
About this file
This document is a Statement of Work (SOW) for the supply of aluminum box culvert structures and precast concrete footings to support the culverts for two fish passage projects on the Sawtooth National Forest.
The SOW requires the contractor to furnish and fabricate new aluminum structural plate box culvert structures, including plates, ribs, and appurtenant items, as well as new precast concrete footings to support the box culverts. The delivery locations are the Stanley Creek AOP Culvert Replacement Project Site and the Shake Creek Guard Station Site, both located in Idaho. The required delivery date is on or before September 25, 2024, and the contractor must commence work within 10 calendar days of receiving the purchase order. Inspection and acceptance of the delivered materials will be conducted by the Contracting Officer's Representative, and any non-compliant materials must be replaced at no additional cost to the government.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION C – DESCRIPTION / SPECIFICATIONS / STATEMENT OF WORK
Aluminum Box Culvert & Concrete Footing Material Supply
I. GENERAL REQUIREMENTS
A. Description of Work Furnish and fabricate new aluminum structural plate box culvert structures including plates and ribs, and furnish/form/cast new precast concrete footings to support both sides of these box culverts, including all required culvert connecting hardware, concrete reinforcement, connecting weld plates and lap splices, and all other appurtenant items necessary to render a complete aluminum structural plate box culvert structure supported by precast concrete footings meeting the required design criteria.
B. Delivery Location Deliver required aluminum structural plate box culverts, including plate and rib components, precast concrete footing units, and all other appurtenant items, to each respective project site as follows:
1. Stanley Creek AOP Culvert Replacement Project Site located on the Sawtooth National Recreation Area near Stanley, Idaho.
2. Shake Creek Guard Station Site located on the Fairfield Ranger District near Featherville, Idaho.
Coordinate material delivery with Braidy K. Richins at 208.731.0176 or by email at braidy.richins@usda.gov a minimum of 48 hours prior to delivery. Thursday and Friday deliveries are not permitted.
| Stanley Creek AOP Site: 44.269661N, -114.943431W |
| Shake Creek Guard Station: 43.616312N, -115.164689W |
C. Required Delivery Date
On or before September 25, 2024.
D. Contract Time The Contractor shall (a) commence work under this contract within 10 calendar days after the date the Contractor receives the purchase order (b) prosecute the work diligently; and (c) supply all aluminum box culverts, precast concrete footing materials, and all required appurtenance items by the above noted “required delivery date”.
E. Inspection and Acceptance
Inspection of the delivered material will be made by the Contracting Officer’s Representative. Materials not completed in accordance with the Contract Documents shall be replaced without additional compensation to the Supplier.