Attachment 1 Project Specifications List.pdf
PDF 88 KB Posted
- Solicitation number
- 1240BJ27Q0009
- Issued by
-
Department of Agriculture Forest Service
About this file
This document is a specification listing for the FP-14 Cripple Creek Vegetation Management Roads Reconstruction contract. It provides a comprehensive index of applicable technical specifications and their revision dates, establishing the standards that govern all work performed under this contract.
The specifications cover standard construction requirements organized by section number, including general terms and definitions (Section 101), scope and control of work (Sections 103-104), material control and work acceptance (Sections 105-106), legal and safety requirements (Section 107), measurement and payment procedures (Section 109), mobilization and quality control (Sections 151-153), soil erosion and sediment control (Section 157), and detailed construction specifications for clearing and grubbing, excavation and backfill, aggregate courses, and pavement materials (Sections 201-703). Notable specifications include the replacement of Section 212 with Section 249 for low volume road construction (effective 3/9/2020), replacement of Section 625 (effective 5/4/2022), and various deletions and modifications to standard sections, with revision dates ranging from 11/9/2016 to 6/28/2026. The document explicitly states that all specifications referenced by listed specifications are applicable, and that Sections 100 through 149 of the Standard Specifications along with all supplemental specifications shown in the listing are incorporated into the contract requirements.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Spec Title Revised Preface 6/28/2026
101 Terms, Format, and Definitions FP14
101.01 Meaning of Terms 11/9/2016
101.03 Abbreviations 11/9/2016
101.04 Definitions 1/22/2020
102 Delete Section 102 11/9/2016 103 Scope of Work FP14
Deletion Subsections 103.02, 103.03, 103.04, 103.05 11/9/2016 104 Control of Work FP14
Delete Subsections 104.01, 104.02 104.04 11/9/2016
104.06 Use of Roads by Contractor 11/9/2016
105 Control of Material FP14
105.05 Use of Material in the Work 6/29/2020
106 Acceptance of Work FP14
106.01 Conformity with Contract Requirements 7/18/2017
106.02 Visual Inspection 11/9/2016
107 Legal Regulations and Responsibility to the Public FP14
Delete Subsection 107.05 7/18/2017 108 Delete Section 108 11/9/2016 109 Measurement and Payment FP14
Delete Subsections 109.06, 109.07, 109.08, 109.09 11/9/2016
109.02 Measurement Terms and Definitions 11/9/2016
151 Mobilization FP14 153 Contractor Quality Control FP14
153.02 Qualifications 11/1/2016
153.07 Records and Control Charts 11/1/2016
155 Delete Section 155 11/9/2016 157 Soil Erosion and Sediment Control FP14
157.04 General 11/1/2016
201 Clearing and Grubbing FP14
201.06 Disposal 2/22/2018
203 Removal of Structures and Obstructions FP14 204 Delete Section 204 11/4/2016 209 Structure Excavation and Backfill FP14
209.1 Compacting 7/17/2017
212 Replace 212 with 249 Low Volume Road Construction 3/9/2020 301 Untreated Aggregate Courses FP14
301.03 General 7/17/2017
302 Minor Crushed Aggregate FP14
302.04 Placing Crushed Aggregate 7/18/2017
302.05 Compacting and Finishing Crushed Aggregate 6/11/2020
625 Replace 625 5/4/2022 703 Aggregate FP14 70305 Subbase, Base, Surface Course, and Screened Aggregate 3/17/2021
FP-14 SPECIFICATIONS FOR CRIPPLE CREEK VEGETATION MANAGEMENT ROADS
RECONSTRUCTION
All specifications not included in the specifications listing, but referenced by listed specifications, are applicable. The supplemental specifications shown on the specification list are physically attached. Section 100 through 149 of the Standard Specifications and all other Standard or supplemental specifications shown in the specification listing are applicable to this contract.
Sheet1
File details come from the government source that posted it. Updated .