Attachment 1 Project Specifications List.pdf

PDF 88 KB Posted

Attached to
Cripple Creek Veg Management Roads Reconstruction
Solicitation number
1240BJ27Q0009
Issued by

About this file

This document is a specification listing for the FP-14 Cripple Creek Vegetation Management Roads Reconstruction contract. It provides a comprehensive index of applicable technical specifications and their revision dates, establishing the standards that govern all work performed under this contract.

The specifications cover standard construction requirements organized by section number, including general terms and definitions (Section 101), scope and control of work (Sections 103-104), material control and work acceptance (Sections 105-106), legal and safety requirements (Section 107), measurement and payment procedures (Section 109), mobilization and quality control (Sections 151-153), soil erosion and sediment control (Section 157), and detailed construction specifications for clearing and grubbing, excavation and backfill, aggregate courses, and pavement materials (Sections 201-703). Notable specifications include the replacement of Section 212 with Section 249 for low volume road construction (effective 3/9/2020), replacement of Section 625 (effective 5/4/2022), and various deletions and modifications to standard sections, with revision dates ranging from 11/9/2016 to 6/28/2026. The document explicitly states that all specifications referenced by listed specifications are applicable, and that Sections 100 through 149 of the Standard Specifications along with all supplemental specifications shown in the listing are incorporated into the contract requirements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Spec Title Revised Preface 6/28/2026

101 Terms, Format, and Definitions FP14

101.01 Meaning of Terms 11/9/2016

101.03 Abbreviations 11/9/2016

101.04 Definitions 1/22/2020

102 Delete Section 102 11/9/2016 103 Scope of Work FP14

Deletion Subsections 103.02, 103.03, 103.04, 103.05 11/9/2016 104 Control of Work FP14

Delete Subsections 104.01, 104.02 104.04 11/9/2016

104.06 Use of Roads by Contractor 11/9/2016

105 Control of Material FP14

105.05 Use of Material in the Work 6/29/2020

106 Acceptance of Work FP14

106.01 Conformity with Contract Requirements 7/18/2017

106.02 Visual Inspection 11/9/2016

107 Legal Regulations and Responsibility to the Public FP14

Delete Subsection 107.05 7/18/2017 108 Delete Section 108 11/9/2016 109 Measurement and Payment FP14

Delete Subsections 109.06, 109.07, 109.08, 109.09 11/9/2016

109.02 Measurement Terms and Definitions 11/9/2016

151 Mobilization FP14 153 Contractor Quality Control FP14

153.02 Qualifications 11/1/2016

153.07 Records and Control Charts 11/1/2016

155 Delete Section 155 11/9/2016 157 Soil Erosion and Sediment Control FP14

157.04 General 11/1/2016

201 Clearing and Grubbing FP14

201.06 Disposal 2/22/2018

203 Removal of Structures and Obstructions FP14 204 Delete Section 204 11/4/2016 209 Structure Excavation and Backfill FP14

209.1 Compacting 7/17/2017

212 Replace 212 with 249 Low Volume Road Construction 3/9/2020 301 Untreated Aggregate Courses FP14

301.03 General 7/17/2017

302 Minor Crushed Aggregate FP14

302.04 Placing Crushed Aggregate 7/18/2017

302.05 Compacting and Finishing Crushed Aggregate 6/11/2020

625 Replace 625 5/4/2022 703 Aggregate FP14 70305 Subbase, Base, Surface Course, and Screened Aggregate 3/17/2021

FP-14 SPECIFICATIONS FOR CRIPPLE CREEK VEGETATION MANAGEMENT ROADS

RECONSTRUCTION

All specifications not included in the specifications listing, but referenced by listed specifications, are applicable. The supplemental specifications shown on the specification list are physically attached. Section 100 through 149 of the Standard Specifications and all other Standard or supplemental specifications shown in the specification listing are applicable to this contract.

Sheet1

File details come from the government source that posted it. Updated .