Suntaheen_RFIs with Answer.pdf

PDF 68 KB Posted

Attached to
SUNTAHEEN FISH PASS INTERPRETIVE SITE REPLACEMENT Federal contract opportunity
Solicitation number
1240BJ22R0018
Issued by
Department of Agriculture Forest Service

About this file

This document contains a federal contract opportunity for maintenance work at the Suntaheen Fish Pass Interpretive Site in Alaska. The solicitation seeks a contractor to construct a new picnic pad and shelter, boardwalk, accessible pathways, precast concrete steps, site furniture, signs, and associated site work. The contract will be awarded by the USDA Forest Service and is valued between $250,000 and $500,000. The contractor must furnish all labor, materials, equipment, transportation and incidentals to complete the work, which is estimated to begin in August 2022. Proposals are due by July 29, 2022 and can be sent to Joseph.Korst@usda.gov. The opportunity is set aside exclusively for small businesses and the NAICS code is 238990 with a $16.5 million size standard.

View the file

Other files for this federal contract opportunity

Other files attached to SUNTAHEEN FISH PASS INTERPRETIVE SITE REPLACEMENT, newest first.
File Type Posted
Amendment 1 to Solicitation 1240BJ22R00018.pdf PDF
FINAL Suntaheen_Phase2b_DWGS_SIGNED (002).pdf PDF
Wage Determination AK20220006 02_25_2022.pdf PDF
Suntaheen Specs.pdf PDF
Solicitation_1240BJ22R0018.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. “type of aggregates and specs for aggregates to be used on the trail construction and the pad?”

Answer: Reference Specification 312300 Part 2.

2. “The second was regarding the concrete steps. It says in the specs for the concrete steps they must be fabricated by a PCI-certified plant, minimum 5 years of experience providing architectural precast concrete products. There are not any local PCI certified plants to my knowledge. Will this be a critical requirement to meet or would a non-PCI certified plant operator with necessary experience producing casted concrete products be sufficient so long as all other specs are met?”

Answer: A concrete casting plant that can show 5 years experience with successful precasting of concrete features that meets all other specification requirements and strength requirements WILL be accepted, include a quality control plan in the submittals along with other required submittals for mix design as required in the specifications and plans.

3. “Can you tell me how long the boardwalk will be?”

Answer: The boardwalk appears to be about 120’ based on using the scale bar in the lower left corner of the drawing.

4. “Can you please ask if we can use Alaskan Yellow Cedar Glulam instead of Solid Sawn AYC? Or Treated Douglas Fir Glulam? “

Answer: Douglas Fir Glulam will not be accepted. The government will accept yellow cedar glulam members suitable for exterior applications that have been manufactured in accordance with APA and ANSI standards that match size and strength requirements of the solid sawn members.