1240BJ21B0001Section J.pdf

PDF 6 MB Posted

Attached to
GAOA Hoonah Road Resurfacing & Wukuklook Rec Area
Solicitation number
1240BJ21B0001
Issued by

About this file

This document provides details for a federal contract opportunity to complete road and trail improvements projects on the Hoonah Ranger District of the Tongass National Forest in Alaska. The contract includes a base item and five option items for work such as clearing and grubbing, blasting exposed bedrock, placing borrow material, installing and replacing culverts, reconditioning roads, and constructing recreational facilities. The base item involves reconstructing approximately 3.2 miles of road and has a start date after August 1st. The total value of the contract is estimated between $500,000 and $1,000,000. The solicitation will be released on August 16th, closing on September 15th, with an anticipated award date of September 22nd. The work is a 100% HUBZone small business set aside under NAICS code 237310. Responses to the pre-solicitation notice do not constitute offers or bind the government.

View the file

Other files

File Type Posted
1240BJ21B0001_Wukuklook final.pdf PDF
Presolicitation maps.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

0 0.25 0.5 0.75 10.125 Miles

Wukuklook Road & Trail Improvements 8530 Road & Wukuklook Trail Map

Legend Project_Roads³Note: Background immage is FS Topo Map Sitka D-3

Wukuklook Road & Trail Improvements 8576 Road Improvements Map

Legend Project_Roads³Note: Background immage is FS Topo Map Sitka D-5

Wukuklook Road & Trail Improvements Bear Paw Lake Picnic Area

³Note: Background immage is FS Topo Map Sitka D-4

EE

EE

EE

EECC

CC

CC

CC

CC

C C

C C C

CC

CC

CCC

CCC

CCC

CC

CC

CC

CCC

CCC

CCC

CC

CC

CC

CC

CC

CC

CC

CCCCCC

CCCCCC

CCCCCC

CCCCCC

CC

CC

CC

CC

CC

CC

CC

CC

CC

CC

CC

CC

CC

CC

CC

CC

C C

C C

CC

CC

CC

CC

CC

CCC

CCC

CCC

CCC

CCC

CCC

C C

C C

CC

CC

CC

CC

CC

CC

CC

CC

CC

C C

H

HHH

HH

H H H

HH

H H

HH

H H

HH

H

HH

H

HH

HH

HH

HH

HH

HH

HH

HHHH

H H

HH

H

H

H

H

H H

H

H

H

H

H

H H H

H H

H

H

H

H

H

H H H

H

H

H

H H

H H

H

H

H

H

H

H

H

H

H H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H H

H H

H

H

H

H

H

H

H

H

H H

H

H

H

H

H H

H H

H H

H H

H H

H H

H H

H H

H H

H H

H H

H H

H H

H H

H H

H H

H

ÄQ

ÄQ

ÄQ

ÄQ

ÄQ

ÄQ

ÄQ

ÄQ

ÄQ

ÄQ

ÄQ

R

R

R

R

R

R

R

R

R

R R

R

R

R

R

R

R R

R

O

O

O

O

O

O

O

O O

O

O

O

O

O

O

O

O

O

O

O

O

O

O ã ã ã ã ã ã ã

6 5

C reek Tidal Flat

Mess 2

Cube Point

Square Cove

W heeler

5 4 3

Creek

Quest 2

NATIONA L

14 13 18

Iyouk tug

Fa lse

Ba y

Wuk uk look

Creek

25 30 29

323136

Cabin

No 2

FERRY

C H A T H A M

LTF Logging Camp

Cube C ov e

33 34

Arm 2

Point Hepburn

4 Pea nu t

L a ke

Jew 2

J im s C ov e

Creek

11 Tidal Flat(Aband) 12

Flints Point

Gyp sum

Iyoukeen C ove

Wa rd

Tax 2

I y o u k e e n

P e n i n s u l a

Bar 2 North Passage Point

F R E S H W A T E R

B A Y

561Tid al Fla t

Fishery Point

DI

ST

RI

CT

Sad 2

28 Fishe ry

RA

NG

ER

SI

TK

A

Light

Herb

A R E A B D Y Harv

South Passage Point30

FERRY

A N D B O R O U G H O F SIT K AC IT Y

R A N G E R R A N G E R

D IS T R IC T

D IS T R IC T

H O O N A H

SIT K A

11 7 East Point

Aid 2

Outer Point

Wach usett Cove

DISTRICT

HOONAH

S T R A I T

MONUM

ENT

RANGER

AND

W

ILDERNESS

BOUNDARY

Creek

T 46 S T 47 S

Lak e F lorence

C re ek

34 35

M G M T

T O N G A S S

N A T I O N A L F O R E S T

T 46 S T 45 S

R

E R

E

R

E R

E

T 46 S T 45 S

G yp su m

R

E R

E

LIG H TH O U S E

R E SE RV E

LakeK ath leen

C H I C H A G O F

I S L A N D

Sonyakay

Ridge

T E N A K E E I N L E T

Chicagof Island

TR A P B AY L U D II

M A N A G E M E N T A R E A

C h i c a g o f I s l a n d

A D

M I

R A

L T

Y

I S

L A

N D

N

A T

I O

N

L

M O

N U

M E

N T

K O

O T

Z N

O O

W

W

L D

E R

N E

S S

A D

M I

R A

L

Y

S

L A

N D

32706

328513

COVE TRAIL

WASCHUSSETTS

LAKE

FLORENCE TR

135°00'00"

135°00'00" 58°00'00" 58°00'00"

134°40'00"

134°40'00" 57°45'00"57°45'00"

6415000m N6415000m N

500 510 515

500 510 515505000m E

505000m E

50'00"

55'00"

50'00"

55'00"

55'00" 50'00" 45'00"

55'00" 50'00" 45'00"

85381

85132

ADJOINING QUADRANGLES

1:63 360 SE R IE S (T O P O G R A PH IC )

SITK A D -3 Q UA D RAN G LE

A L A SK A

SITK A D -3, AK

Sitk a C -4

S itk a C -2

Ju n ea u A -2

S itk a D -3

S itk a D -4

Ju n ea u A -3

S itk a C -3

Ju n ea u A -4

S itk a D -2

Alaska

NK

Grid Zone Designation 8V

U.S. National Grid 100,000 - m Square ID

This is not a lega l docum ent. P ublic lands are sub ject to change and leasing, and may have access restrictions. Not all roads and trails on this m ap are open to motor vehicle use. Check w ith appropria te officials and obta in appropria te regulatory m aps and inform ation. O btain perm ission before entering priva te lands.

This m ap product uses the m ost current data available in the U SD A F orest Service cartographic da tabase. M odifications, updates, and corrections m ay be made at any tim e.

Print quality is determ ined by the output device used w hen producing a hardcopy product.

Non-National F orest System lands w ithin the National F orest as of Inholdings m ay exist in other N ationa l or State reservations.

North Am erican D atum of 1983 (N AD 83).

Produced by the U SD A Forest Serv ice.

Projection and 1,000-m eter tics : U niversa l Transverse M ercator, zone 08.

2016Full Revision of Forest S ervice lands Updates to Transportation Updates to Boundaries

2016.

ÙGN

MN

0°8´

2 MILS

18°53´

336 MILS

UTM GRID AND 2019 MAGNETIC NORTH

DECLINATION AT CENTER OF SHEET

U nited States D epartm ent of A griculture

Forest Service

M O TO R V E H IC LE U SE M A P (M V U M )

The M VU M is a legal enforceable docum ent that identifies the roads, trails, and areas w here m otor vehicle use is allow ed in a F orest Service adm inistrative unit or ranger district. M VU M s are reissued each year. It is the responsibility of m otor vehicle users to acquire the current M VU M .

M VU M s are available F REE at Forest Service offices and at ww w.fs.fed .us/recrea tion /program s/ohv/ohv_m aps.shtm l U SD A is an equal opportunity provider, em ployer, and lender

This product generated and dow nloaded on 2/5 /2020

State National F orest, suitable for passenger cars National F orest, suitable for high clearance vehicles National F orest Trail

H ighway

Unim proved

Road, G ravel Road, P aved Road, U nspecified ......... ........ ......... .....¼

H IG H WAYS A N D R O AD S

Check with local F orest Service unit for current travel conditions and restrictions k°105 60

Road, D irt

Gate; Barrier........ ......... ........ ......... ..... o J

Trail Road, C losed

EEEE

EEEE

EEEE

CC

CC

CC

CC

CC

CC

CC

CCCCC

CCCCC

CCCCC

CCCCC

CC

CC

CCC

CCC

CC

CCC

CCC

CC

CC

CCCC

CCCC

CCCC

CC

CC

CC

CC

CC

CCC

CCC

CC

CC

CC

CC

CC

CCC

CCC

CCCC

CCCC

CCCC

CC

CC

CC

CCCC

CCCC

CCCC

CCC

CCC

CCC

CCC

CCC

CCC

CCC

CCC

CCC

CCC

CCC

CCC

CCCCC

CCCCC

CCCCC

CC

CC

CC

CC

CCC

CCC

CCC

CCCC

CCC

CCC

CCC

C C

CCCC

CCCC

CCCC

CCCC

CCC

CCC

CCC

CC

CC

C C

CCC

CCC

CC

CC

C

CC

CC

C

C C

CC

20002500

HHH

H

H

HHH

HH

HH

HHHHHH

HH

H H

HH

HH

HH

HH

H

HH

H

HHH

HH

HH

HH

HHH

HHHHH

HHHHHH

HHH

H

HH H

HH

HH

HHHHH

HHHHHHH

H H

HHHH

H

HH

HHHH

HHH

HH

H H

H

H

H

H

H

H

H H H

H

H H

H

H

H

H

H H H

H

H

H

X

ÄQÄQ

ÄQ

ÄQ

ÄQ

ÄQ

ÄQ

ÄQ

ÄQ

ÄQ

ÄQ

ÄQ

ÄQÄQÄQ

ÄQ

ÄQ

ÄQ

ÄQ

ÄQÄQ

ÄQ

ÄQ

R

R

R

R

R R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

88888 p p g g

O O

O

O

O

O

O

O

O

O

O

O

O

O

O

O

O

O

O

O

O

O

O

O

O

O

O

O O

O O

O

O

O

O

UU UU U

U

U

U U

U ã ã ã ã ã ã ã ã ã ã ã ã ã ã ã ã ã ã ã ã ã ã ã ã ã ã ã ã ã ã ã ã ã ã ã ã ã ãã ãã ã ã ã ãã ãã ã ã ãã ã ã ã ã ã ã ãã ã ãã ã ã ã ã ã ã ã ã ãã ã ã ã ã ã ã ã ã ã ã ã ã ã ã ã ã ã ã ã ã ã ã ã ã ã ã ã ã ã

GG FF

17 16

In d ia n R i v e r

Cabins

Cannery Ruins

T 46 S T 45 S

Sp a s sk i

2330 156

2562240

250620

545 1996

R

E

2 1 6

71211

C re ek

5 4 3 2

Sea l

1 6 45

8 1110

Iyou k tu g

C re ek9

Wuk uk lo ok C re ek

1815 13

1923 C re ek

1618 17

14 13

26 25 30

C reek

F reshw a te r 3135

32 33

Tidal Flat

BEAR PAW LAKE

PICNIC AREA

Rainier Island

26 25 30

LTF

G yp s u m

4 3

Heidi Rock 14

Redcliff Islands

West Redcliff Island

East Redcliff Island

Cabin

4 3

LTF

Logging Camp

Dump

2 6 5

11 712

C re ek K e n n e l

212019

P av lo f

15 14 13

2124 Cabin Cedar Island

C ed ar C ov e

Little Cedar Island

Fish Ladder

(FS)

R iv e r

P a v lo f L a k e Fish Ladder

(FS)

F a lls

Pav lof

H a rb o r

Wach u sett C ov e

34 36

32 33

SITK A

HO ON AH

26 25

Whip

R

E R

E

Kee

D ISTR IC T

R A N G E R R A N G E R

DISTR IC T

10 11

1 6

FS Weather Station

C r ee k

Cabin

Cabin Ruins

16 15 14

Cannery Point

Don

Norm

C offee C ov e

FERRY

Hill Point

H a rl ey

S u n s h in e C o v e LTF Cabin

FERRY

Columbia Point

EditBar Can

Sunny Point

Cabin

Cabins

13 181517 16

WT

Cem

Cem

Cem

Tenakee

Day Beacon

Ten a k ee Sp rin g s Helispot

Grave Island

Lt Tidal Flat

Cabins18

C IT Y O F

FooLazy

31 3 43332

Art

T R A P B AY L U D II M A N A G E M E N T A R E A

B A Y

B O U N D A R YF in C oveS IT K AB O R O U G HA N D

L IG H T H O U S E R E S E R V E

Light 11

Tenakee Reef

C IT Y O F T E N A K E E SP R IN G S

3048 Mount Parish

R

E R

E

T 46 S T 47 S

30 29

T 47 S T 46 S

T 45 S T 46 S

C ree k

F R E S H W A T E R

C re ek

Fre sh w ate r

Fo rk

N o rth

R

E R

E

R

E R

E

Communication Site

(FS)

T E N A K E E I N L E T M G M T

A R E A

C H I C H A G O F I S L A N D

S o n y a k a y R i d g e

Ferry Terminal

3285193

KENNEL

CR

EE

K

C

TR

AIL

3285093

POWDER

CREEK

TRAIL

INDIAN

RIVER

ROAD

TRAIL

317500

317500

3285512

T O N G A S S

N A T I O N A L F O R E S T

135°20'00"

135°20'00" 58°00'00" 58°00'00"

135°00'00"

135°00'00" 57°45'00"57°45'00"

6415000m N6415000m N

485 495 500

485 495 500490000m E

490000m E

50'00"

55'00"

50'00"

55'00"

15'00" 10'00" 05'00"

15'00" 10'00" 05'00"

85083

85101

85082

85092

85093

85091

86101

85191

85290

85151

85132

86105

85085

851911

85131

86102

75004

86104

850831

75005

85351

85141

85123

850841

85181

75006

75011

75012

85122

75002

85352

85081

ADJOINING QUADRANGLES

1 :6 3 3 60 S E R IE S (T O P O G R A P H IC )

SIT K A D -4 Q U A D R A N G L E

A L A S K A

SIT K A D -4 , A K

S itk a C -4

Ju n ea u A -5

S itk a D -5

S itk a C -5

S itk a D -3

S itk a D -4

Ju n ea u A -3

S itk a C -3

Ju n ea u A -4

Alaska

MK

Grid Zone Designation 8V

U.S. National Grid 100,000 - m Square ID

Th is is no t a lega l d ocu m en t. P u blic lan ds are sub ject to ch a ng e an d leasing , a nd m a y ha ve access restriction s. N ot a ll road s an d trails on th is m ap are open to m otor v eh icle u se. C h eck w ith ap p rop ria te offic ia ls a nd obta in ap p rop ria te reg u latory m ap s an d in form ation . O btain p erm iss ion be fore en terin g p riva te lan d s.

Th is m ap p rod u ct u ses th e m ost cu rren t d ata av ailable in the U SD A F orest Serv ice ca rtogra ph ic da taba se . M od ificat ion s, u p d ates, an d correction s m a y be m a d e at an y tim e .

Prin t qu ality is d e term in ed by the ou tp u t d evice u sed w h en p rodu cin g a h a rd cop y p rod uct .

N on -N a tion al F orest Sy stem lan d s w ithin th e N a tion al F orest as of In h o ld in gs m ay exist in oth er N ationa l o r State reserva tion s.

N orth A m erican D atu m of 19 83 (N A D 83).

P rod u ced b y th e U S D A F orest S erv ice .

Pro jection an d 1 ,0 00-m eter t ics : U niversa l Tran sv erse M ercator, zon e 08 .

2016Fu ll R ev is ion o f Forest S erv ice la nd s U p d ates to Tra n sp ortation U p d ates to B oun d aries

2016.

ÙGN

MN

0°8´

2 MILS

18°51´

335 MILS

UTM GRID AND 2019 MAGNETIC NORTH

DECLINATION AT CENTER OF SHEET

U n ited S ta tes D ep artm en t o f A gr icu ltu re

F ores t Service

M O T O R V E H IC L E U S E M A P (M V U M )

Th e M V U M is a leg al en forcea ble d ocu m en t th a t id ent ifie s the road s, tra ils, a nd area s w h ere m otor veh icle u se is a llow ed in a F orest Service a dm inistrativ e u nit o r ra n ger d istrict. M V U M s a re re issu ed each y ear. It is th e resp ons ibi lity of m otor veh icle u sers to acqu ire th e cu rren t M V U M .

M V U M s are av ailable F R E E at Forest Service o ffices an d at w w w.fs.fed .u s/recrea tion /p rog ram s/oh v /ohv _m ap s.sh tm l U S D A is an eq u a l op portu n ity p rov id er, em ployer, an d len d er

Th is prod u ct g en erated an d d ow n load ed on 2 /4 /2020

Sta te N a tion al F orest , suitable fo r p asseng er cars N a tion al F orest , suitable fo r high clearan ce v eh icles N a tion al F orest Trail

H ig h w a y

U n im p roved

R oad , G rav e l R oad , P av ed R oad , U n specified ......... ........ ......... .....¼

H IG H WAY S A N D R O A D S

C heck w ith lo cal F orest Serv ice u n it for cu rren t trav el con d ition s an d res trict ions k°105 60

R oad , D irt

G ate; B arrie r........ ......... ........ ......... ..... o J

Trail R oad , C losed

CCCCCCCC

CCCCCCCC

CCCCCCCC

CCCCCCCC

CCCCCCCC

CCCCCCCC

C C C

CCC

CCC

CCC

CCCC

CCCC

CCCC

CCCC

CCCC

CCCC

CCCC

CC

CC

CC

CC

CCCCCC

CCCCCC

CCCCCC

CCCCCC

CCCCCC

CCCCCC

CCCCCC

CCCCC

CCCCC

CCCCC

CCCC

CCCC

CC

CC

CCC

CCC

CCC

CCC

CCCC

CCCC

CCCC

CCCC

C C

CC

CC

CC

CC

CC

CCCCC

CCCCC

CCCCC

CCCCC

CC

CC

CC

CC

CC

CC

CC

CC

CC

CC

CC

CC

CC

CCC

CCC

CC

CCCC

CCCC

CCCC

CC

CC

CC

CCC

CCC

CCCCC

CCCCC

CCCCC

CCCCC

CCCCC

1500 2500

001500

2500 1000

002000

H

H

H

H

HH

H

H

H

H

H

ÄQ

ÄQ

ÄQ

ÄQ

ÄQ

ÄQ

ÄQ

ÄQ

ÄQ

ÄQ

ÄQ

ÄQ

ÄQ

ÄQ

ÄQ

ÄQ

ÄQ

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R R

R

R

R

R

R

R

R

R

R

R R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R R

R

R

R

R

R

R

R R

R

R

R

R

R

R

R

O

O

O

O

O

O

O

O

O

O

O

O ã ã ã ã ã

2240 3025

2365 2517

2308 2084

2203317

352495

2011 1564

998 1824

2 5 4 6R

E R

E

5 4 3 2

N F k F r e s h w a t e r C r

12 7

119 Seagu l l

Midway Island

Gull

7 812

Rick

Der

T H E N A R R O W S

LTF

15 14

19242322

Tidal FlatSalt Lake Bay

Cabin (FS)

Sa lt C h u c k

20 21

17 15 14 13

242322C re ek

C re e k 18 16

212019 22

29 2728

3432 33

26 25 30

3135 36

RAN G ER

RAN G ER

32 33 34

272826 25 30

10 11

Spoke

Rim

Zip

Hub

6 5 4

Cabin

Gravel

3 2

F re s h w a te r C re e k

5 4 3 2

18 15

22212019

14 13

Swim

T E N A K E E Sand

C IT Y

AN D

B O R O U G H Wheel

O'Toole

Tidal Flat

25 30 29 28

Tidal Flat

O F

S IT K A

Beth

3High

Emma

1 63 2

10 11

5 4

98712

22 1611

14 13

17 16 15

222120

14 13 18

192423

17 16

Cabin

Tidal Flat B ay

S altery

29 28 27

343332

Cloud

26 25 30

313635

29 28 27

343332

L IS IA N S K I R IV E R /U P P E R H O O N A H S O U N D

L U D II M A N A G E M E N T A R E A

25 30

I N L E T

R

E R

E

M G M T

A R E A B D Y

R

E R

E

LTF (aband)

T 47 S T 46 S

Dot

Sea l

B a y

T 46 S T 47 S

T 45 S T 46 S

D IS T R IC T

D IS T R IC T

T 46 S T 45 S

H O O N A H

SIT K A

R

E R

E

Game R

E R

E

Salt Lake

B ay

L on g B ay C H I C H A G O F I S L A N D

T O N G A S S

N A T I O N A L F O R E S T

3285785

3285786

3285784

3285781

MILE

ROAD

135°40'00"

135°40'00" 58°00'00" 58°00'00"

135°20'00"

135°20'00" 57°45'00"57°45'00"

6415000m N 6415000m N

465 470 480

465 470 480475000m E

475000m E

50'00"

55'00"

50'00"

55'00"

35'00" 30'00" 25'00"

35'00" 30'00" 25'00"

85029

85765

85764

85087

85026

85791

85761

85089

85782

85783

857611

85764

75021

850261

85765

ADJOINING QUADRANGLES

1 :6 3 3 60 S E R IE S (T O P O G R A P H IC )

SIT K A D -5 Q U A D R A N G L E

A L A S K A

SIT K A D -5 , A K

S itk a D -6

S itk a C -6

S itk a C -4

Ju n ea u A -5

S itk a D -5

S itk a C -5

S itk a D -4

Ju n ea u A -6

Ju n ea u A -4

Alaska

MK

Grid Zone Designation 8V

U.S. National Grid 100,000 - m Square ID

T h is is no t a le ga l d ocu m e n t. P u blic lan ds are sub je ct to ch a ng e an d le asing , a nd m a y ha ve acce ss re strictio n s. N o t a ll ro ad s an d tra ils o n th is m ap are o pe n to m o to r v eh icle u se. C h eck w ith ap p rop ria te offic ia ls a nd o bta in ap p rop ria te re g u lato ry m ap s an d in fo rm ation . O bta in p e rm iss io n be fo re en te rin g p riva te lan d s.

T h is m ap p rod u ct u ses th e m ost cu rre n t d ata av a ilab le in the U SD A F ore s t Se rv ice ca rto gra ph ic da taba se . M od ificat io n s, u p d ate s, an d corre ctio n s m a y be m a d e at an y tim e .

P rin t qu ality is d e te rm in ed by the o u tp u t d e vice u sed w h en p ro du cin g a h a rd co p y p ro d uct .

N o n -N a tio n al F ore st Sy s tem lan d s w ithin th e N a tio n al F ore st as of In h o ld in gs m ay e xist in oth er N at io na l o r S tate rese rva tio n s.

N o rth A m e rican D atu m of 19 83 (N A D 83).

P rod u ced b y th e U S D A F orest S erv ice .

P ro je ctio n an d 1 ,0 00-m eter t ics : U nive rsa l Tran sv e rse M e rcator, zon e 08 .

2016F u ll R e v is ion o f F o res t S erv ice la nd s U p d ate s to Tra n sp o rtation U p d ate s to B o un d arie s

2016 .

ÙGN

MN

0°25´

7 MILS

18°49´

335 MILS

UTM GRID AND 2019 MAGNETIC NORTH

DECLINATION AT CENTER OF SHEET

U n ited S ta tes D ep artm en t o f A gr icu ltu re

F ores t S erv ice

M O T O R V E H IC L E U S E M A P (M V U M )

T h e M V U M is a le g a l e n fo rcea ble d ocu m e n t th a t id e nt ifie s the ro ad s, tra ils, a nd area s w h ere m o to r ve h icle u se is a llow e d in a F ore st Se rvice a dm inistrativ e u nit o r ra n ge r d istr ict. M V U M s a re re is su e d e ach y e ar. It is th e re sp o ns ib i lity of m o to r ve h icle u se rs to acqu ire th e cu rren t M V U M .

M V U M s are av a i lab le F R E E at F o re st Se rvice o ffice s an d at w w w.fs. fe d .u s/re crea tio n /p rog ram s /oh v /o hv _ m ap s.sh tm l U S D A is a n eq u a l op portu n ity p rov id er, em ployer, an d len d er

T h is pro d u ct g en e rated an d d ow n lo ad ed o n 2 /4 /2020

Sta te N a tio n al F ore st , suitab le fo r p asse ng e r cars N a tio n al F ore st , suitab le fo r high c le aran ce v eh icles N a tio n al F ore st Tra il

H ig h w a y

U n im p ro ve d

R oad , G rav e l R oad , P av e d R oad , U n spe cifie d ......... ........ ......... .....¼

H IG H WAY S A N D R O A D S

C he ck w ith lo ca l F ore st Se rv ice u n it for cu rre n t trav el con d ition s an d res trict io ns k°105 60

R oad , D irt

G ate; B arrie r........ ......... ........ ......... ..... o J

Trai l R oad , C lose d

Preface Preface_wo_03_05_2021

Delete all but the first paragraph and add the following:

The Forest Service, US Department of Agriculture has adopted FP-14 for construction of National Forest System Roads.

101 – Terms, Format, and Definitions 101.01_National_9_15_2016

Add the following paragraph to Subsection 101.01:

101.01 Meaning of Terms.

Delete all references to the TAR (Transportation Acquisition Regulations) in the specifications.

101.03_National_4_7_2015

Add the following to Subsection 101.03:

101.03 Abbreviations.

(a) Acronyms.

AGAR — Agriculture Acquisition Regulations

AFPA — American Forest and Paper Association

FSAR — Forest Service Acquisition Regulations

MSHA — Mine Safety and Health Administration

NESC — National Electrical Safety Code

WCLIB — West Coast Lumber Inspection Bureau

(f) Miscellaneous unit abbreviations.

MP — milepost location ppm — parts per million volume

STA station location

101.04_National_9_5_2018

Make the following changes to Subsection 101.04:

101.04 Definitions.

Delete these definitions and replace the following:

Bid Schedule — The Schedule of Items.

Bridge — A structure, including supports, erected over a depression or an obstruction such as water along a road, a trail, or a railway and having a deck for carrying traffic or other loads.

Contractor — The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “Purchaser”.

Culvert — Any structure with a bottom, regardless of fill depth, depth of invert burial, or presence of horizontal driving surface, or any bottomless (natural channel) structure with footings that will not have wheel loads in direct contact with the top of the structure.

Drawings — Design sheets or fabrication, erection, or construction details submitted to the CO by the Contractor according to FAR Clause 52.236-21 Specifications and Drawings for Construction. Also refers to submissions and submittals.

Notice to Proceed — Written notice to the Contractor to begin the contract work.

Right-of-Way — A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.

Solicitation— The complete assembly of documents (whether attached or incorporated by reference) furnished to prospective bidders.

Add the following definitions:

Adjustment in Contract Price — “Equitable adjustment,” as used in the Federal Acquisition Regulations, or “construction cost adjustment,” as used in the Timber Sale Contract, as applicable.

Change — “Change” means “change order” as used in the Federal Acquisition Regulations, or “design change” as used in the Timber Sale Contract.

Forest Service — The United States of America, acting through the Forest Service, U.S. Department of Agriculture.

Neat Line — A line defining the proposed or specified limits of an excavation or structure.

Pioneer Road — Temporary construction access built along the route of the project.

Purchaser — The individual, partnership, joint venture, or corporation contracting with the Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.

Protected Streamcourse — A drainage shown on the plans or timber sale area map that requires designated mitigation measures.

Road Order — An order affecting and controlling traffic on roads under Forest Service jurisdiction.

Road Orders are issued by a designated Forest Officer under the authorities of 36 CFR, part 260.

Utilization Standards — The minimum size and percent soundness of trees described in Public Works contract specifications or Timber Sale and IRTC contract provisions to determine merchantable timber.

Add Figure 101-1—Illustration of road structure terms:

Figure 101-1—Illustration of road structure terms.

102 – Bid, Award, and Execution of Contract 102.00_National_9_15_2016

Delete Section 102 in its entirety.

Delete Section 102.

103 - Scope of Work 103.00_National_9_15_2016

Delete all of Section 103 except Subsection 103.01 Intent of Contract.

Delete Subsections 103.02, 103.03, 103.04, 103.05.

104 - Control of Work 104.00_National_9_15_2016

Delete Subsections 104.01, 104.02, and 104.04.

Delete Subsections 104.01, 104.02, 104.04.

104.06_National_9_16_2016

Add the following to Subsection 104.06:

104.06 Use of Roads by Contractor.

The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.

105 - Control of Material 105.05_National_6_29_2020

105.05 Use of Material Found in the Work.

Delete 105.05 (a) and (b) and the last sentence of the second paragraph and substitute the following:

Materials produced or processed from Government lands in excess of the quantities required for performance of this contract are the property of the Government. Place excess material safely at government-approved location, at no additional cost to government.

106 - Acceptance of Work 106.01_National_7_18_2017

Delete Subsection 106.01 and replace with the following:

106.01 Conformity with Contract Requirements.

Follow the requirements of FAR Clause 52.246-12 Inspection of Construction.

References to standard test methods of AASHTO, ASTM, GSA, and other recognized standard authorities refer to the methods in effect on the date of solicitation for bids.

Perform all work to the lines, grades, cross-sections, dimensions, and processes or material requirements shown on the plans or specified in the contract.

Incorporate manufactured materials into the work according to the manufacturer’s recommendations or to these specifications, whichever is more strict.

Plan dimensions and contract specification values are the values to be strived for and complied with as the design values from which any deviations are allowed. Perform work and provide material that is uniform in character and reasonably close to the prescribed value or within the specified tolerance range.

The purpose of a tolerance range is to accommodate occasional minor variations from the median zone that are unavoidable for practical reasons.

When standard manufactured items are specified (such as fence, wire, plates, rolled shapes, pipe conduits, etc., that are identified by gauge, unit mass, section dimensions, etc.), the identification will be considered to be nominal masses or dimensions. Unless specific contract tolerances are noted, established manufacturing tolerances will be accepted.

The Government may inspect, sample, or test all work at any time before final acceptance of the project.

When the Government tests work, copies of test reports are furnished to the Contractor upon request.

Government tests may or may not be performed at the work site. If Contractor testing and inspection is verified by the Government, the Contractor’s results may be used by the Government to evaluate work for acceptance. Do not rely on the availability of Government test results for process control.

Acceptable work conforming to the contract will be paid for at the contract unit bid price. Four methods of determining conformity and accepting work are described in Subsections 106.02 to 106.05 inclusive.

The primary method of acceptance is specified in each Section of work. However, work may be rejected at any time it is found by any of the methods not to comply with the contract.

Remove, repair, or replace work that does not conform to the contract, or to prevailing industry standards where no specific contract requirements are noted. Removing, repairing, or replacing work;

providing temporary traffic control; and any other related work to accomplish conformity will be at no cost to the Government.

(a) Disputing Government test results. If the accuracy of Government test results is disputed, promptly inform the CO. If the dispute is unresolved after reasonable steps are taken to resolve the dispute, further evaluation may be obtained by written request. Include a narrative describing the dispute and a proposed resolution protocol that addresses the following:

1. Sampling method;

2. Number of samples;

3. Sample transport;

4. Test procedures;

5. Testing laboratories;

6. Reporting;

7. Estimated time and costs; and

8. Validation process.

If the evaluation requires additional sampling or testing be performed, mutually agree with the Government on witnessing procedures and on sampling and testing by a third party laboratory. Use a third party laboratory accredited by the AASHTO accreditation program. Provide proof of the laboratory’s accreditation for the test procedures to be used. Do not use the same laboratory that produced the disputed Government test results or that produced the test results used as a basis for the dispute.

The CO will review the proposed resolution protocol and may modify it before final approval and execution.

The Government will use the approved resolution protocol test results to determine the validity of the disputed testing. If the Government test results are validated, the Contractor will be responsible for all costs associated with developing and performing the resolution protocol. If the Government test results are not validated, the Government will be responsible for all costs associated with developing and performing the resolution protocol. If the validity of the Government test results cannot be determined, the Contractor and Government will equally share all costs associated with developing and carrying out the resolution protocol.

(b) Alternatives to removing and replacing non-conforming work. As an alternative to removal and replacement, the Contractor may submit a written request to:

1. Have the work accepted at a reduced price; or

2. Be given permission to perform corrective measures to bring the work into conformity.

The request must contain supporting rationale and documentation. Include references or data justifying the proposal based on an evaluation of test results, effect on service life, value of material or work, quality, aesthetics, and other tangible engineering basis. The CO will determine disposition of the nonconforming work.

106.02_National_10_23_2016

Delete Subsection 106.02 and replace with the following:

106.02 Visual Inspection.

Acceptance is based on visual inspection of the work for compliance with the specific contract requirements. Use prevailing industry standards in the absence of specific contract requirements or tolerances.

107 - Legal Relations and Responsibility to the Public 107.05_National_7_18_2017

Delete Subsection 107.05.

Delete Subsection 107.05.

108 - Prosecution and Progress 108.00_National_9_16_2016

Delete Section 108 in its entirety.

Delete Section 108.

109 - Measurement and Payment 109.00_National_9_16_2016

Delete Subsections 109.06, 109.07, 109.08, and 109.09:

Delete Subsections 109.06, 109.07, 109.08, 109.09.

109.01_National_2_22_2019

Delete the third paragraph and Table 109-1 of Subsection 109.01 and replace with the following:

109.01 Measurement of Work.

Take measurements as described in Subsection 109.02 unless otherwise modified by the Measurement Subsection of the section controlling the work being performed. Table 109-1 indicates the accuracy required for quantities of the various pay units used in the Schedule of Items. Use this guide to determine the decimal placement in the final payment.

Table 109-1

Decimal Accuracy of Quantities for Final Payment

Pay Item Level of Precision Linear Foot 1 Station 0.1 Mile 0.01 Square Foot 0.1 Square Yard 0.1

Each 1 Acre 0.01 Gallon 1 M-Gals. 0.1 Cubic Yard 1

Exception--Structure Excavation; Sheathing Materials; Bedding, Bed Course, and Backfill Materials; Gabions;

0.1

Pound 1 Ton 0.1

Exception--Calcium Chloride;

Sodium Chloride; Hydrated Lime;

Bed Course Materials

0.01

Hour 0.1

MFBM 0.01

Station Yard 1 Cubic Yard Mile 1 Ton Mile 1

109.02_National_9_16_2016

Add the following sentence to Subsection 109.02(b):

109.02 Measurement Terms and Definitions.

(b) Contract quantity.

Contract quantities will be adjusted only when there are errors in the original design of 15% or more.

153 - Contractor Quality Control 153.02_National_9_15_2016

Delete Subsection 153.02 and replace with the following:

153.02 Qualifications.

Submit the following for approval with the quality control plan:

(a) Quality control manager (QCM). Furnish a QCM who has at least 2 years’ experience in construction, inspector, quality control and material testing on construction projects of similar type and scope.

(b) Testers. Provide testers with at least one year experience in the type of sampling and testing required, and with one of the following for the type of sampling and testing performed:

(1) NICET Level II certification in highway material or equivalent state or industry certification;

(2) Certification by a regional certification program (such as Western Alliance for Quality Transportation Construction (WAQTC), Northeast Transportation Technician Certification Program (NETTCP), Southeast Task Force for Technician Training and Qualification (STFTTQ), or Multi Regional Training and Certification (M-TRAC)); or

(3) At least one year employment by an AASHTO accredited laboratory performing equivalent sampling and testing.

153.07_National_9_15_2016

Delete Subsection 153.07 and replace with the following:

153.07 Records and control charts.

Maintain complete testing and inspection records by pay item number and make them accessible to the

CO.

155 - Schedules for Construction Contracts 155.00_National_9_14_2016

Delete Section 155 in its entirety.

Delete Section 155.

156 - Public Traffic 156.00_National_9_14_2016

Delete Section 156 in its entirety and replace with the following:

Section 156. – PUBLIC TRAFFIC Description

156.01 This work consists of controlling and protecting public traffic adjacent to and within the project.

Material

156.02 Conform to the MUTCD and the following Sections and Subsections:

Permanent Traffic Control 633

Traffic Signing and Marking Material 718

Concrete Barriers and Precast Guardwalls 618

Temporary plastic fence 710.11

Construction Requirements

156.03 General. Accommodate traffic according to MUTCD, approved traffic control plan and this section. Perform work in a manner that ensures safety and convenience of the public. Unless otherwise provided for in Table 156-1, keep existing roads open to all traffic during road improvement work, and maintain them in a condition that will adequately accommodate traffic. Delays may not exceed < 60 > minutes at any one time followed by an open period of no less than < 10 > minutes except when blasting. Close the road when actively loading holes. Reopen the road within 2 hours after blasting. Accommodate public traffic on roads adjacent to and within the project until the project is accepted according to Subsection 106.07(b).

Submit traffic control plan at least 3 days prior to intended use. Perform no work that interferes or conflicts with traffic or existing access to the roadway surface until a traffic control plan has been approved.

Post construction signs and traffic control devices in conformance with MUTCD and Forest Service EM 7100-15. All required signs will be in place and approved prior to beginning work on project.

If the Contractor agrees in writing to allow public traffic to use a new road being constructed prior to completion, it will be considered an existing road for traffic control purposes.

156.04 Temporary Traffic Control. Install and maintain temporary traffic control devices adjacent to and within the project as required by the approved traffic control plan and the MUTCD. Install and maintain traffic control devices as follows:

(a) Furnish and install traffic control devices before the start of construction operations.

(b) All detours outside of clearing limits will be approved in writing by the Contracting Officer as part of the traffic control plan.

(c) Install only those traffic control devices needed for each stage or phase.

(d) Relocate temporary traffic control devices as necessary.

(e) Remove devices that no longer apply to the existing conditions.

(f) Immediately replace any device that is lost, stolen, destroyed, or inoperative.

(g) Keep temporary traffic control devices clean.

(h) Remove all temporary traffic control devices upon contract completion or when approved.

(i) When required, use flaggers certified by the American Traffic Safety Services Association, the National Safety Council, the International Municipal Signal Association, a state agency, or other acceptable organization. Perform the work described under MUTCD Part 6. Use type III, VII, VIII, or IX retroreflective sheeting on flagger paddles. Do not use flags. Flaggers must wear high visibility safety apparel as required by MUTCD 6E.02.

156.05 Temporary Closures. Road segments may be closed as shown in Table 156-1. The maximum consecutive days of closure shall be followed by a minimum number of consecutive days open to traffic as shown. Maintain traffic control devices during closure period(s). Appropriate barricades and signs will be erected and maintained as shown in the traffic control plan or as otherwise designated.

Prior to closing roads during construction, give written notice to the Contracting Officer at least 3 days in advance.

Table 156-1 Temporary Road Closures

Road Number

From Terminus

To Terminus

Maximum Consecutive Days of Closure

Minimum Consecutive Days Open

8530 22 26 0 0

156.06 Acceptance. Public traffic work will be evaluated under Subsection 106.02.

Measurement and Payment

156.07 Do not measure Public Traffic for payment. Payment for contract work is provided indirectly.

See Subsection 109.05.

201 - Clearing and Grubbing 201.00_Forest_5_3_2018

Delete Section 201 in its entirety and replace with the following.

Section 201. — CLEARING AND GRUBBING Description

201.01 This work consists of clearing and grubbing within the clearing limits designated in the plans.

Material

201.02 Conform to the following Subsection:

Backfill material 704.03

Construction Requirements

201.03 General. Construct erosion control measures according to Section 157. Perform work within designated limits.

Do not damage vegetation designated to remain. If damage occurs, repair or replace the vegetation in an acceptable manner. Where possible, preserve vegetation adjacent to bodies of water. Treat cuts or scarred surfaces of trees and shrubs with tree wound dressing.

201.04 Clearing. Within the clearing limits clear trees, brush, and other vegetation as follows:

(a) Cut trees so they fall within the clearing limits;

(b) In areas of cut slope rounding, cut stumps flush with or below the finished ground line;

(c) In areas outside the excavation, embankment, and slope rounding limits, cut stumps to within 6 inches of the ground; and

(d) Trim tree branches that extend over the road surface and shoulders to attain a clear height of 14 feet. Trim tree limbs as near flush with the trunk as practicable.

201.05 Grubbing. Grub deep enough to remove stumps, roots, buried logs, moss, turf, or other vegetative matter as follows:

(a) Grub areas to be excavated, accept for cut slope rounding areas;

(b) Grub embankment areas. Undisturbed stumps less than 24 inches in diameter may be left in place if they protrude less than 6 inches above the original ground and will be covered with more than 48 inches of embankment. Remove all other stumps;

(c) Grub pits, channel changes, and ditches only to the depth necessary for the excavation;

(d) Backfill stump holes and other grubbing holes with backfill material to the level of the surrounding ground according to Subsection 209.09. Compact backfill according to Subsection 209.10; and

(e) Utilization standards for merchantable timber are listed below. Fall and buck merchantable material into lengths not to exceed 40 feet. Pieces (logs) meet utilization standards when such pieces would have met Utilization Standards if bucking lengths were varied to include such material.

Minimum Utilization Standards

Length = 16 feet.

Diameter (Inside Bark) at small end = 7 inches

33-1/3 Net Scale in % Gross for Sawlog

201.06 Disposal. Merchantable timber is Government property. Dispose of clearing and grubbing debris according to Subsection 203.05.

201.07 Acceptance. Clearing and grubbing will be evaluated under Subsection 106.02.

Material for tree wound dressing will be evaluated under Subsection 106.03.

Backfilling and compacting of stumps and grubbing holes will be evaluated under Section 209.

Measurement

201.08 Measure the Section 201 pay items listed in the bid schedule according to Subsection 109.02 and the following as applicable:

Do not make deductions from the area computation unless excluded areas are shown on the plans.

Do not measure clearing and grubbing of borrow sources.

Payment

201.09 The accepted quantities will be paid at the contract price per unit of measurement for the Section 201 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.

203 - Removal of Structures and Obstructions 203.00_Forest_5_4_2018

Delete Section 203 in its entirety and replace with the following.

Section 203. — REMOVAL OF STRUCTURES AND OBSTRUCTIONS Description

203.01 This work consists of salvaging, removing, and disposing of bridges, structures, culverts, and other obstructions.

Material

203.02 Conform to the following Subsection:

Backfill material 704.03

Construction Requirements

203.03 Salvaging Material. Salvage with reasonable care material designated to be salvaged. Salvage in readily transportable sections or pieces. Replace or repair members, pins, nuts, plates, and related hardware damaged, lost, or destroyed during the salvage operation. Securely attach parts to adjacent members or pack them in sturdy boxes with the contents clearly marked.

Match mark members of salvaged structures. Submit one set of drawings according to Section 104 identifying the members and their respective match marks.

Stockpile salvaged material at a designated area on the project.

203.04 Removing Material.

(a) Submittals. N/A

(b) General. Saw cut sidewalks, curbs, pavements, and structures when partial removal is required.

Do not allow debris to enter waterways, travel lanes open to public traffic, or areas designated not to be disturbed.

Raze and remove foundations, pavements, culverts, sidewalks, curbs, structures, and other obstructions interfering with the work and not designated to remain.

Remove structures and obstructions in the roadbed to 12 inches below subgrade elevation.

Remove structures and obstructions outside the roadbed to 12 inches below finished ground or to the natural stream bottom.

Except in excavation areas, backfill and compact cavities left by structure removal with backfill material to the lines and grades of the finished ground. Backfill excavated areas according to Subsection 209.09. Compact backfill according to Subsection 209.10.

203.05 Disposing of Material. Dispose of debris, unsuitable material, and excess material as follows:

(a) Remove from project. Recycle or dispose of material legally off the project;

(b) Scattering. Scatter construction slash in designated areas without damaging trees. Place stumps and logs away from trees, positioned so they will not roll, and are not on top of one another.

Scatter construction slash to reduce slash concentrations. When scattering for erosion control, place construction slash as flat as practical on the completed slope;

(c) Debris Mat. Use tree limbs, tops, cull logs, split stumps, wood chunks, and other debris to form a mat upon which construction equipment is operated. Place stumps upside down and blend stumps into the mat;

(d) Decking. Deck logs so that logs are piled parallel to one another; can be removed by standard log loading equipment; will not damage standing trees; will not interfere with drainage; and will not roll;

(e) Removal to designated locations. Remove construction slash and debris to designated locations; and

(f) Piling. Pile construction slash in designated areas.

203.06 Acceptance. Removal of structures and obstructions will be evaluated under Subsection 106.02.

Backfilling and compacting of cavities left by structures will be evaluated under Section 209.

Measurement

203.07 Measure the Section 203 pay items listed in the bid schedule according to Subsection 109.02.

Payment

203.08 The accepted quantities will be paid at the contract price per unit of measurement for the Section 203 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this

204 - Excavation and Embankment 204.00_Forest_10_31_2017

Delete Section 204 in its entirety and replace with the following.

Section 204. — EXCAVATION AND EMBANKMENT Description

204.01 This work consists of excavating material and constructing embankments. This work also includes furnishing, hauling, stockpiling, placing, disposing, sloping, shaping, compacting, and finishing earthen and rocky material.

204.02 Definitions.

(a) Excavation. Excavation consists of the following:

(1) Roadway excavation. Material excavated from within the right-of-way or easement areas, except subexcavation covered in Subsection 204.02(a)(2) and structure excavation covered in Sections 208 and 209. Roadway excavation includes all material encountered regardless of its nature or characteristics.

(2) Subexcavation. Material excavated from below subgrade elevation in cut sections or from below the original ground-line in embankment sections. Subexcavation excludes the work required by Subsection 204.05 or 204.06.

(3) Borrow excavation. Material used for embankment construction that is obtained from outside the roadway prism. Borrow excavation includes unclassified borrow, and topping.

(b) Embankment construction. Embankment construction consists of placing and compacting roadway or borrow excavation. This work includes:

(1) Preparing foundation for embankment;

(2) Constructing roadway embankments;

(3) Benching for side-hill embankments;

(4) Constructing dikes, ramps, mounds, and berms; and

(5) Backfilling subexcavated areas, holes, pits, and other depressions.

(c) Conserved topsoil. Excavated material conserved from the roadway excavation and embankment foundation areas that is suitable for growth of grass, cover crops, or native vegetation.

(d) Waste. Excess and unsuitable roadway excavation and subexcavation that cannot be used.

Material

204.03 Conform to the following Subsections:

Topping 704.05

Unclassified borrow 704.06

Water 725.01(c)

204.04 Preparation for Roadway Excavation and Embankment Construction. Clear the area of vegetation and obstructions according to Sections 201 and 203.

Road pioneering, slash disposal, and grubbing of stumps may proceed concurrently with excavation and embankment. Maintain drainage during pioneering operations.

204.05 Conserved Topsoil. When designated, conserve topsoil from roadway excavation and embankment foundation areas. Stockpile conserved topsoil in low windrows immediately beyond the rounding limits of cut and embankment slopes or in other approved locations. Separate conserved topsoil from other excavated material. When designated, place conserved topsoil on completed slopes according to Section 624.

204.06 Roadway Excavation. Excavate as follows:

(a) Rock cuts. Blast rock according to Section 205. Excavate rock cuts to 6 inches below subgrade within the roadbed limits. Backfill to subgrade with topping or other suitable material. Compact the material according to Subsection 204.11.

(b) Earth cuts. Scarify earth cuts to 6 inches below subgrade within the roadbed limits. Compact the scarified material according to Subsection 204.11.

(c) Pioneer Roads. Conduct excavation and placement operations so material to be treated under Section 201 will not be incorporated into the roadway unless specified in the slash treatment method.

Maintain drainage during pioneering operations.

Road pioneering, slash disposal, and grubbing of stumps may proceed concurrently with excavation.

Remove snow and ice in advance of the work and deposit beyond the roadway limits in a manner that will not waste material or generate sediment. Do not incorporate snow and ice into embankments. Place snow or ice in a manner to prevent resource damage.

During pioneering operations prevent undercutting of final excavation slopes.

(d) Drainage Feature. Drainage feature includes construction of all ditches, minor channel changes, drainage dips, catch basins, surface water deflectors, and other minor drainage structures.

Compact the material according to Subsection 204.11. Excavate on a uniform grade between control points.

Do not disturb material and vegetation outside the construction limits. Retrieve material deposited outside the construction limits. Dispose of unsuitable or excess excavation material according to Subsection

204.14. Replace shortage of suitable material caused by premature disposal of roadway excavation.

Shape to drain and compact the work area to a uniform cross-section at the end of each day's operations.

204.07 Subexcavation. Excavate material to the required limits. Dispose of unsuitable material according to Subsection 204.14. Take cross-sections according to Section 152. Backfill subexcavated area with suitable material in horizontal layers not exceeding 12 inches in compacted thickness and compact according to Subsection 204.11. Prevent unsuitable material from mixing with suitable backfill material.

204.08 Borrow Excavation. Use suitable roadway excavation in embankment construction. Do not use borrow excavation when it results in excess roadway excavation. Deduct excess borrow excavation from the total borrow excavation quantity.

Obtain borrow source approval according to Subsection 105.02. Develop and restore borrow sources according to Subsections 105.03 and 105.06. Do not excavate beyond the established limits. When applicable, shape the borrow source to permit accurate measurements when excavation is complete.

204.09 Preparing Foundation for Embankment Construction. Prepare foundation for embankment construction as follows:

(a) Embankment over natural ground. Remove topsoil and break up the ground surface to a minimum depth of 6 inches by plowing or scarifying. Compact the ground surface according to Subsection 204.11.

(b) Embankments over an existing asphalt, concrete, or gravel road surface. Scarify gravel roads to a minimum depth of 6 inches. Scarify or pulverize asphalt and concrete roads to 6 inches below the pavement. Reduce particles to a maximum size of 6 inches and produce a uniform material. Compact the surface according to Subsection 204.11.

(c) Embankment across ground not capable of supporting equipment. Dump successive loads of embankment material in a uniformly distributed layer to construct the lower portion of the embankment. Limit the layer thickness to the minimum depth necessary to support the equipment.

(d) Embankment on an existing slope steeper than 1V:3H. Cut horizontal steps in the existing slope to a sufficient width to accommodate placement and compaction operations and equipment. Step the slope as the embankment is placed and compacted in layers. Begin each step at the intersection of the original ground and the vertical cut of the previous step.

204.10 Embankment Construction. Incorporate only suitable roadway excavation material into the embankment. When the supply of suitable roadway excavation is exhausted, furnish unclassified borrow to complete the embankment. Obtain written approval before beginning construction of embankments over 6 feet high at subgrade centerline. Construct embankments as follows:

(a) General. At the end of each day's operations, shape to drain and compact the embankment surface to a uniform cross-section. Eliminate ruts and low spots that could hold water.

During all stages of construction, route and distribute hauling and leveling equipment over the width and length of each layer of material.

Compact embankment side slopes with a tamping foot roller, by walking with a dozer, or by over-building the fill and then removing excess material to the final slope line. For slopes 1V:1¾H or steeper, compact the slopes as embankment construction progresses.

Operate spreading equipment and loaded hauling equipment over the entire surface of embankment.

(b) Embankment within the roadway prism. Place embankment material in horizontal layers not exceeding 12 inches in compacted thickness. Incorporate oversize boulders or rock fragments into the

12-inch layers by reducing them in size or placing them individually as required below. Compact each layer according to Subsection 204.11 before placing the next layer.

Material composed predominately of boulders or rock fragments too large for 12-inch layers may be placed in layers up to 24 inches thick. Incorporate oversize boulders or rock fragments into the 24-inch layer by reducing them in size or placing individual rock fragments and boulders greater than 24 inches in diameter as follows:

(1) Distribute rock within the embankment to prevent nesting;

(2) Place layers of embankment material around each rock to a depth not greater than that permitted above. Fill voids between rocks; and

(3) Compact each layer according to Subsection 204.11(a) before placing the next layer.

(c) Embankment outside of roadway prism. When placing embankment outside the staked roadway prism, place material in horizontal layers not exceeding 24 inches in compacted thickness. Compact each layer according to Subsection 204.11.

204.11 Compaction. Compact the embankment using one of the following methods as specified.

(a) Placement Method 1. Use AASHTO T 27 to determine the quantity of material retained on a No.

4 sieve. Compact as follows:

(1) More than 80 percent retained on a No. 4 sieve. Adjust the moisture content to a level suitable for compaction. Fill the interstices around rock with earth or other fine material as practical. Use compression-type rollers at speeds less than 6 feet per second and vibratory rollers at speeds less than 3 feet per second. Compact each layer of material full width with one of the following and until there is no visible evidence of further consolidation:

(a) Four roller passes of a vibratory roller having a minimum dynamic force of 40,000 pounds impact per vibration and a minimum frequency of 1000 vibrations per minute;

(b) Eight roller passes of a 20-ton compression-type roller; or

(c) Eight roller passes of a vibratory roller having a minimum dynamic force of 30,000 pounds impact per vibration and a minimum frequency of 1000 vibrations per minute.

Increase the compactive effort for layers deeper than 12 inches as follows:

• For each additional 6 inches or fraction thereof, increase the number of roller passes in Subsection…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .