1240BJ21B0001Section J.pdf
PDF 6 MB Posted
- Solicitation number
- 1240BJ21B0001
About this file
This document provides details for a federal contract opportunity to complete road and trail improvements projects on the Hoonah Ranger District of the Tongass National Forest in Alaska. The contract includes a base item and five option items for work such as clearing and grubbing, blasting exposed bedrock, placing borrow material, installing and replacing culverts, reconditioning roads, and constructing recreational facilities. The base item involves reconstructing approximately 3.2 miles of road and has a start date after August 1st. The total value of the contract is estimated between $500,000 and $1,000,000. The solicitation will be released on August 16th, closing on September 15th, with an anticipated award date of September 22nd. The work is a 100% HUBZone small business set aside under NAICS code 237310. Responses to the pre-solicitation notice do not constitute offers or bind the government.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1240BJ21B0001_Wukuklook final.pdf | ||
| Presolicitation maps.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0 0.25 0.5 0.75 10.125 Miles
Wukuklook Road & Trail Improvements 8530 Road & Wukuklook Trail Map
Legend Project_Roads³Note: Background immage is FS Topo Map Sitka D-3
Wukuklook Road & Trail Improvements 8576 Road Improvements Map
Legend Project_Roads³Note: Background immage is FS Topo Map Sitka D-5
Wukuklook Road & Trail Improvements Bear Paw Lake Picnic Area
³Note: Background immage is FS Topo Map Sitka D-4
EE
EE
EE
EECC
CC
CC
CC
CC
C C
C C C
CC
CC
CCC
CCC
CCC
CC
CC
CC
CCC
CCC
CCC
CC
CC
CC
CC
CC
CC
CC
CCCCCC
CCCCCC
CCCCCC
CCCCCC
CC
CC
CC
CC
CC
CC
CC
CC
CC
CC
CC
CC
CC
CC
CC
CC
C C
C C
CC
CC
CC
CC
CC
CCC
CCC
CCC
CCC
CCC
CCC
C C
C C
CC
CC
CC
CC
CC
CC
CC
CC
CC
C C
H
HHH
HH
H H H
HH
H H
HH
H H
HH
H
HH
H
HH
HH
HH
HH
HH
HH
HH
HHHH
H H
HH
H
H
H
H
H H
H
H
H
H
H
H H H
H H
H
H
H
H
H
H H H
H
H
H
H H
H H
H
H
H
H
H
H
H
H
H H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H H
H H
H
H
H
H
H
H
H
H
H H
H
H
H
H
H H
H H
H H
H H
H H
H H
H H
H H
H H
H H
H H
H H
H H
H H
H H
H H
H
ÄQ
ÄQ
ÄQ
ÄQ
ÄQ
ÄQ
ÄQ
ÄQ
ÄQ
ÄQ
ÄQ
R
R
R
R
R
R
R
R
R
R R
R
R
R
R
R
R R
R
O
O
O
O
O
O
O
O O
O
O
O
O
O
O
O
O
O
O
O
O
O
O ã ã ã ã ã ã ã
6 5
C reek Tidal Flat
Mess 2
Cube Point
Square Cove
W heeler
5 4 3
Creek
Quest 2
NATIONA L
14 13 18
Iyouk tug
Fa lse
Ba y
Wuk uk look
Creek
25 30 29
323136
Cabin
No 2
FERRY
C H A T H A M
LTF Logging Camp
Cube C ov e
33 34
Arm 2
Point Hepburn
4 Pea nu t
L a ke
Jew 2
J im s C ov e
Creek
11 Tidal Flat(Aband) 12
Flints Point
Gyp sum
Iyoukeen C ove
Wa rd
Tax 2
I y o u k e e n
P e n i n s u l a
Bar 2 North Passage Point
F R E S H W A T E R
B A Y
561Tid al Fla t
Fishery Point
DI
ST
RI
CT
Sad 2
28 Fishe ry
RA
NG
ER
SI
TK
A
Light
Herb
A R E A B D Y Harv
South Passage Point30
FERRY
A N D B O R O U G H O F SIT K AC IT Y
R A N G E R R A N G E R
D IS T R IC T
D IS T R IC T
H O O N A H
SIT K A
11 7 East Point
Aid 2
Outer Point
Wach usett Cove
DISTRICT
HOONAH
S T R A I T
MONUM
ENT
RANGER
AND
W
ILDERNESS
BOUNDARY
Creek
T 46 S T 47 S
Lak e F lorence
C re ek
34 35
M G M T
T O N G A S S
N A T I O N A L F O R E S T
T 46 S T 45 S
R
E R
E
R
E R
E
T 46 S T 45 S
G yp su m
R
E R
E
LIG H TH O U S E
R E SE RV E
LakeK ath leen
C H I C H A G O F
I S L A N D
Sonyakay
Ridge
T E N A K E E I N L E T
Chicagof Island
TR A P B AY L U D II
M A N A G E M E N T A R E A
C h i c a g o f I s l a n d
A D
M I
R A
L T
Y
I S
L A
N D
N
A T
I O
N
L
M O
N U
M E
N T
K O
O T
Z N
O O
W
W
L D
E R
N E
S S
A D
M I
R A
L
Y
S
L A
N D
32706
328513
COVE TRAIL
WASCHUSSETTS
LAKE
FLORENCE TR
135°00'00"
135°00'00" 58°00'00" 58°00'00"
134°40'00"
134°40'00" 57°45'00"57°45'00"
6415000m N6415000m N
500 510 515
500 510 515505000m E
505000m E
50'00"
55'00"
50'00"
55'00"
55'00" 50'00" 45'00"
55'00" 50'00" 45'00"
85381
85132
ADJOINING QUADRANGLES
1:63 360 SE R IE S (T O P O G R A PH IC )
SITK A D -3 Q UA D RAN G LE
A L A SK A
SITK A D -3, AK
Sitk a C -4
S itk a C -2
Ju n ea u A -2
S itk a D -3
S itk a D -4
Ju n ea u A -3
S itk a C -3
Ju n ea u A -4
S itk a D -2
Alaska
NK
Grid Zone Designation 8V
U.S. National Grid 100,000 - m Square ID
This is not a lega l docum ent. P ublic lands are sub ject to change and leasing, and may have access restrictions. Not all roads and trails on this m ap are open to motor vehicle use. Check w ith appropria te officials and obta in appropria te regulatory m aps and inform ation. O btain perm ission before entering priva te lands.
This m ap product uses the m ost current data available in the U SD A F orest Service cartographic da tabase. M odifications, updates, and corrections m ay be made at any tim e.
Print quality is determ ined by the output device used w hen producing a hardcopy product.
Non-National F orest System lands w ithin the National F orest as of Inholdings m ay exist in other N ationa l or State reservations.
North Am erican D atum of 1983 (N AD 83).
Produced by the U SD A Forest Serv ice.
Projection and 1,000-m eter tics : U niversa l Transverse M ercator, zone 08.
2016Full Revision of Forest S ervice lands Updates to Transportation Updates to Boundaries
2016.
ÙGN
MN
0°8´
2 MILS
18°53´
336 MILS
UTM GRID AND 2019 MAGNETIC NORTH
DECLINATION AT CENTER OF SHEET
U nited States D epartm ent of A griculture
Forest Service
M O TO R V E H IC LE U SE M A P (M V U M )
The M VU M is a legal enforceable docum ent that identifies the roads, trails, and areas w here m otor vehicle use is allow ed in a F orest Service adm inistrative unit or ranger district. M VU M s are reissued each year. It is the responsibility of m otor vehicle users to acquire the current M VU M .
M VU M s are available F REE at Forest Service offices and at ww w.fs.fed .us/recrea tion /program s/ohv/ohv_m aps.shtm l U SD A is an equal opportunity provider, em ployer, and lender
This product generated and dow nloaded on 2/5 /2020
State National F orest, suitable for passenger cars National F orest, suitable for high clearance vehicles National F orest Trail
H ighway
Unim proved
Road, G ravel Road, P aved Road, U nspecified ......... ........ ......... .....¼
H IG H WAYS A N D R O AD S
Check with local F orest Service unit for current travel conditions and restrictions k°105 60
Road, D irt
Gate; Barrier........ ......... ........ ......... ..... o J
Trail Road, C losed
EEEE
EEEE
EEEE
CC
CC
CC
CC
CC
CC
CC
CCCCC
CCCCC
CCCCC
CCCCC
CC
CC
CCC
CCC
CC
CCC
CCC
CC
CC
CCCC
CCCC
CCCC
CC
CC
CC
CC
CC
CCC
CCC
CC
CC
CC
CC
CC
CCC
CCC
CCCC
CCCC
CCCC
CC
CC
CC
CCCC
CCCC
CCCC
CCC
CCC
CCC
CCC
CCC
CCC
CCC
CCC
CCC
CCC
CCC
CCC
CCCCC
CCCCC
CCCCC
CC
CC
CC
CC
CCC
CCC
CCC
CCCC
CCC
CCC
CCC
C C
CCCC
CCCC
CCCC
CCCC
CCC
CCC
CCC
CC
CC
C C
CCC
CCC
CC
CC
C
CC
CC
C
C C
CC
20002500
HHH
H
H
HHH
HH
HH
HHHHHH
HH
H H
HH
HH
HH
HH
H
HH
H
HHH
HH
HH
HH
HHH
HHHHH
HHHHHH
HHH
H
HH H
HH
HH
HHHHH
HHHHHHH
H H
HHHH
H
HH
HHHH
HHH
HH
H H
H
H
H
H
H
H
H H H
H
H H
H
H
H
H
H H H
H
H
H
X
ÄQÄQ
ÄQ
ÄQ
ÄQ
ÄQ
ÄQ
ÄQ
ÄQ
ÄQ
ÄQ
ÄQ
ÄQÄQÄQ
ÄQ
ÄQ
ÄQ
ÄQ
ÄQÄQ
ÄQ
ÄQ
R
R
R
R
R R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
88888 p p g g
O O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O O
O O
O
O
O
O
UU UU U
U
U
U U
U ã ã ã ã ã ã ã ã ã ã ã ã ã ã ã ã ã ã ã ã ã ã ã ã ã ã ã ã ã ã ã ã ã ã ã ã ã ãã ãã ã ã ã ãã ãã ã ã ãã ã ã ã ã ã ã ãã ã ãã ã ã ã ã ã ã ã ã ãã ã ã ã ã ã ã ã ã ã ã ã ã ã ã ã ã ã ã ã ã ã ã ã ã ã ã ã ã ã
GG FF
17 16
In d ia n R i v e r
Cabins
Cannery Ruins
T 46 S T 45 S
Sp a s sk i
2330 156
2562240
250620
545 1996
R
E
2 1 6
71211
C re ek
5 4 3 2
Sea l
1 6 45
8 1110
Iyou k tu g
C re ek9
Wuk uk lo ok C re ek
1815 13
1923 C re ek
1618 17
14 13
26 25 30
C reek
F reshw a te r 3135
32 33
Tidal Flat
BEAR PAW LAKE
PICNIC AREA
Rainier Island
26 25 30
LTF
G yp s u m
4 3
Heidi Rock 14
Redcliff Islands
West Redcliff Island
East Redcliff Island
Cabin
4 3
LTF
Logging Camp
Dump
2 6 5
11 712
C re ek K e n n e l
212019
P av lo f
15 14 13
2124 Cabin Cedar Island
C ed ar C ov e
Little Cedar Island
Fish Ladder
(FS)
R iv e r
P a v lo f L a k e Fish Ladder
(FS)
F a lls
Pav lof
H a rb o r
Wach u sett C ov e
34 36
32 33
SITK A
HO ON AH
26 25
Whip
R
E R
E
Kee
D ISTR IC T
R A N G E R R A N G E R
DISTR IC T
10 11
1 6
FS Weather Station
C r ee k
Cabin
Cabin Ruins
16 15 14
Cannery Point
Don
Norm
C offee C ov e
FERRY
Hill Point
H a rl ey
S u n s h in e C o v e LTF Cabin
FERRY
Columbia Point
EditBar Can
Sunny Point
Cabin
Cabins
13 181517 16
WT
Cem
Cem
Cem
Tenakee
Day Beacon
Ten a k ee Sp rin g s Helispot
Grave Island
Lt Tidal Flat
Cabins18
C IT Y O F
FooLazy
31 3 43332
Art
T R A P B AY L U D II M A N A G E M E N T A R E A
B A Y
B O U N D A R YF in C oveS IT K AB O R O U G HA N D
L IG H T H O U S E R E S E R V E
Light 11
Tenakee Reef
C IT Y O F T E N A K E E SP R IN G S
3048 Mount Parish
R
E R
E
T 46 S T 47 S
30 29
T 47 S T 46 S
T 45 S T 46 S
C ree k
F R E S H W A T E R
C re ek
Fre sh w ate r
Fo rk
N o rth
R
E R
E
R
E R
E
Communication Site
(FS)
T E N A K E E I N L E T M G M T
A R E A
C H I C H A G O F I S L A N D
S o n y a k a y R i d g e
Ferry Terminal
3285193
KENNEL
CR
EE
K
C
TR
AIL
3285093
POWDER
CREEK
TRAIL
INDIAN
RIVER
ROAD
TRAIL
317500
317500
3285512
T O N G A S S
N A T I O N A L F O R E S T
135°20'00"
135°20'00" 58°00'00" 58°00'00"
135°00'00"
135°00'00" 57°45'00"57°45'00"
6415000m N6415000m N
485 495 500
485 495 500490000m E
490000m E
50'00"
55'00"
50'00"
55'00"
15'00" 10'00" 05'00"
15'00" 10'00" 05'00"
85083
85101
85082
85092
85093
85091
86101
85191
85290
85151
85132
86105
85085
851911
85131
86102
75004
86104
850831
75005
85351
85141
85123
850841
85181
75006
75011
75012
85122
75002
85352
85081
ADJOINING QUADRANGLES
1 :6 3 3 60 S E R IE S (T O P O G R A P H IC )
SIT K A D -4 Q U A D R A N G L E
A L A S K A
SIT K A D -4 , A K
S itk a C -4
Ju n ea u A -5
S itk a D -5
S itk a C -5
S itk a D -3
S itk a D -4
Ju n ea u A -3
S itk a C -3
Ju n ea u A -4
Alaska
MK
Grid Zone Designation 8V
U.S. National Grid 100,000 - m Square ID
Th is is no t a lega l d ocu m en t. P u blic lan ds are sub ject to ch a ng e an d leasing , a nd m a y ha ve access restriction s. N ot a ll road s an d trails on th is m ap are open to m otor v eh icle u se. C h eck w ith ap p rop ria te offic ia ls a nd obta in ap p rop ria te reg u latory m ap s an d in form ation . O btain p erm iss ion be fore en terin g p riva te lan d s.
Th is m ap p rod u ct u ses th e m ost cu rren t d ata av ailable in the U SD A F orest Serv ice ca rtogra ph ic da taba se . M od ificat ion s, u p d ates, an d correction s m a y be m a d e at an y tim e .
Prin t qu ality is d e term in ed by the ou tp u t d evice u sed w h en p rodu cin g a h a rd cop y p rod uct .
N on -N a tion al F orest Sy stem lan d s w ithin th e N a tion al F orest as of In h o ld in gs m ay exist in oth er N ationa l o r State reserva tion s.
N orth A m erican D atu m of 19 83 (N A D 83).
P rod u ced b y th e U S D A F orest S erv ice .
Pro jection an d 1 ,0 00-m eter t ics : U niversa l Tran sv erse M ercator, zon e 08 .
2016Fu ll R ev is ion o f Forest S erv ice la nd s U p d ates to Tra n sp ortation U p d ates to B oun d aries
2016.
ÙGN
MN
0°8´
2 MILS
18°51´
335 MILS
UTM GRID AND 2019 MAGNETIC NORTH
DECLINATION AT CENTER OF SHEET
U n ited S ta tes D ep artm en t o f A gr icu ltu re
F ores t Service
M O T O R V E H IC L E U S E M A P (M V U M )
Th e M V U M is a leg al en forcea ble d ocu m en t th a t id ent ifie s the road s, tra ils, a nd area s w h ere m otor veh icle u se is a llow ed in a F orest Service a dm inistrativ e u nit o r ra n ger d istrict. M V U M s a re re issu ed each y ear. It is th e resp ons ibi lity of m otor veh icle u sers to acqu ire th e cu rren t M V U M .
M V U M s are av ailable F R E E at Forest Service o ffices an d at w w w.fs.fed .u s/recrea tion /p rog ram s/oh v /ohv _m ap s.sh tm l U S D A is an eq u a l op portu n ity p rov id er, em ployer, an d len d er
Th is prod u ct g en erated an d d ow n load ed on 2 /4 /2020
Sta te N a tion al F orest , suitable fo r p asseng er cars N a tion al F orest , suitable fo r high clearan ce v eh icles N a tion al F orest Trail
H ig h w a y
U n im p roved
R oad , G rav e l R oad , P av ed R oad , U n specified ......... ........ ......... .....¼
H IG H WAY S A N D R O A D S
C heck w ith lo cal F orest Serv ice u n it for cu rren t trav el con d ition s an d res trict ions k°105 60
R oad , D irt
G ate; B arrie r........ ......... ........ ......... ..... o J
Trail R oad , C losed
CCCCCCCC
CCCCCCCC
CCCCCCCC
CCCCCCCC
CCCCCCCC
CCCCCCCC
C C C
CCC
CCC
CCC
CCCC
CCCC
CCCC
CCCC
CCCC
CCCC
CCCC
CC
CC
CC
CC
CCCCCC
CCCCCC
CCCCCC
CCCCCC
CCCCCC
CCCCCC
CCCCCC
CCCCC
CCCCC
CCCCC
CCCC
CCCC
CC
CC
CCC
CCC
CCC
CCC
CCCC
CCCC
CCCC
CCCC
C C
CC
CC
CC
CC
CC
CCCCC
CCCCC
CCCCC
CCCCC
CC
CC
CC
CC
CC
CC
CC
CC
CC
CC
CC
CC
CC
CCC
CCC
CC
CCCC
CCCC
CCCC
CC
CC
CC
CCC
CCC
CCCCC
CCCCC
CCCCC
CCCCC
CCCCC
1500 2500
001500
2500 1000
002000
H
H
H
H
HH
H
H
H
H
H
ÄQ
ÄQ
ÄQ
ÄQ
ÄQ
ÄQ
ÄQ
ÄQ
ÄQ
ÄQ
ÄQ
ÄQ
ÄQ
ÄQ
ÄQ
ÄQ
ÄQ
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R R
R
R
R
R
R
R
R
R
R
R R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R R
R
R
R
R
R
R
R R
R
R
R
R
R
R
R
O
O
O
O
O
O
O
O
O
O
O
O ã ã ã ã ã
2240 3025
2365 2517
2308 2084
2203317
352495
2011 1564
998 1824
2 5 4 6R
E R
E
5 4 3 2
N F k F r e s h w a t e r C r
12 7
119 Seagu l l
Midway Island
Gull
7 812
Rick
Der
T H E N A R R O W S
LTF
15 14
19242322
Tidal FlatSalt Lake Bay
Cabin (FS)
Sa lt C h u c k
20 21
17 15 14 13
242322C re ek
C re e k 18 16
212019 22
29 2728
3432 33
26 25 30
3135 36
RAN G ER
RAN G ER
32 33 34
272826 25 30
10 11
Spoke
Rim
Zip
Hub
6 5 4
Cabin
Gravel
3 2
F re s h w a te r C re e k
5 4 3 2
18 15
22212019
14 13
Swim
T E N A K E E Sand
C IT Y
AN D
B O R O U G H Wheel
O'Toole
Tidal Flat
25 30 29 28
Tidal Flat
O F
S IT K A
Beth
3High
Emma
1 63 2
10 11
5 4
98712
22 1611
14 13
17 16 15
222120
14 13 18
192423
17 16
Cabin
Tidal Flat B ay
S altery
29 28 27
343332
Cloud
26 25 30
313635
29 28 27
343332
L IS IA N S K I R IV E R /U P P E R H O O N A H S O U N D
L U D II M A N A G E M E N T A R E A
25 30
I N L E T
R
E R
E
M G M T
A R E A B D Y
R
E R
E
LTF (aband)
T 47 S T 46 S
Dot
Sea l
B a y
T 46 S T 47 S
T 45 S T 46 S
D IS T R IC T
D IS T R IC T
T 46 S T 45 S
H O O N A H
SIT K A
R
E R
E
Game R
E R
E
Salt Lake
B ay
L on g B ay C H I C H A G O F I S L A N D
T O N G A S S
N A T I O N A L F O R E S T
3285785
3285786
3285784
3285781
MILE
ROAD
135°40'00"
135°40'00" 58°00'00" 58°00'00"
135°20'00"
135°20'00" 57°45'00"57°45'00"
6415000m N 6415000m N
465 470 480
465 470 480475000m E
475000m E
50'00"
55'00"
50'00"
55'00"
35'00" 30'00" 25'00"
35'00" 30'00" 25'00"
85029
85765
85764
85087
85026
85791
85761
85089
85782
85783
857611
85764
75021
850261
85765
ADJOINING QUADRANGLES
1 :6 3 3 60 S E R IE S (T O P O G R A P H IC )
SIT K A D -5 Q U A D R A N G L E
A L A S K A
SIT K A D -5 , A K
S itk a D -6
S itk a C -6
S itk a C -4
Ju n ea u A -5
S itk a D -5
S itk a C -5
S itk a D -4
Ju n ea u A -6
Ju n ea u A -4
Alaska
MK
Grid Zone Designation 8V
U.S. National Grid 100,000 - m Square ID
T h is is no t a le ga l d ocu m e n t. P u blic lan ds are sub je ct to ch a ng e an d le asing , a nd m a y ha ve acce ss re strictio n s. N o t a ll ro ad s an d tra ils o n th is m ap are o pe n to m o to r v eh icle u se. C h eck w ith ap p rop ria te offic ia ls a nd o bta in ap p rop ria te re g u lato ry m ap s an d in fo rm ation . O bta in p e rm iss io n be fo re en te rin g p riva te lan d s.
T h is m ap p rod u ct u ses th e m ost cu rre n t d ata av a ilab le in the U SD A F ore s t Se rv ice ca rto gra ph ic da taba se . M od ificat io n s, u p d ate s, an d corre ctio n s m a y be m a d e at an y tim e .
P rin t qu ality is d e te rm in ed by the o u tp u t d e vice u sed w h en p ro du cin g a h a rd co p y p ro d uct .
N o n -N a tio n al F ore st Sy s tem lan d s w ithin th e N a tio n al F ore st as of In h o ld in gs m ay e xist in oth er N at io na l o r S tate rese rva tio n s.
N o rth A m e rican D atu m of 19 83 (N A D 83).
P rod u ced b y th e U S D A F orest S erv ice .
P ro je ctio n an d 1 ,0 00-m eter t ics : U nive rsa l Tran sv e rse M e rcator, zon e 08 .
2016F u ll R e v is ion o f F o res t S erv ice la nd s U p d ate s to Tra n sp o rtation U p d ate s to B o un d arie s
2016 .
ÙGN
MN
0°25´
7 MILS
18°49´
335 MILS
UTM GRID AND 2019 MAGNETIC NORTH
DECLINATION AT CENTER OF SHEET
U n ited S ta tes D ep artm en t o f A gr icu ltu re
F ores t S erv ice
M O T O R V E H IC L E U S E M A P (M V U M )
T h e M V U M is a le g a l e n fo rcea ble d ocu m e n t th a t id e nt ifie s the ro ad s, tra ils, a nd area s w h ere m o to r ve h icle u se is a llow e d in a F ore st Se rvice a dm inistrativ e u nit o r ra n ge r d istr ict. M V U M s a re re is su e d e ach y e ar. It is th e re sp o ns ib i lity of m o to r ve h icle u se rs to acqu ire th e cu rren t M V U M .
M V U M s are av a i lab le F R E E at F o re st Se rvice o ffice s an d at w w w.fs. fe d .u s/re crea tio n /p rog ram s /oh v /o hv _ m ap s.sh tm l U S D A is a n eq u a l op portu n ity p rov id er, em ployer, an d len d er
T h is pro d u ct g en e rated an d d ow n lo ad ed o n 2 /4 /2020
Sta te N a tio n al F ore st , suitab le fo r p asse ng e r cars N a tio n al F ore st , suitab le fo r high c le aran ce v eh icles N a tio n al F ore st Tra il
H ig h w a y
U n im p ro ve d
R oad , G rav e l R oad , P av e d R oad , U n spe cifie d ......... ........ ......... .....¼
H IG H WAY S A N D R O A D S
C he ck w ith lo ca l F ore st Se rv ice u n it for cu rre n t trav el con d ition s an d res trict io ns k°105 60
R oad , D irt
G ate; B arrie r........ ......... ........ ......... ..... o J
Trai l R oad , C lose d
Preface Preface_wo_03_05_2021
Delete all but the first paragraph and add the following:
The Forest Service, US Department of Agriculture has adopted FP-14 for construction of National Forest System Roads.
101 – Terms, Format, and Definitions 101.01_National_9_15_2016
Add the following paragraph to Subsection 101.01:
101.01 Meaning of Terms.
Delete all references to the TAR (Transportation Acquisition Regulations) in the specifications.
101.03_National_4_7_2015
Add the following to Subsection 101.03:
101.03 Abbreviations.
(a) Acronyms.
AGAR — Agriculture Acquisition Regulations
AFPA — American Forest and Paper Association
FSAR — Forest Service Acquisition Regulations
MSHA — Mine Safety and Health Administration
NESC — National Electrical Safety Code
WCLIB — West Coast Lumber Inspection Bureau
(f) Miscellaneous unit abbreviations.
MP — milepost location ppm — parts per million volume
STA station location
101.04_National_9_5_2018
Make the following changes to Subsection 101.04:
101.04 Definitions.
Delete these definitions and replace the following:
Bid Schedule — The Schedule of Items.
Bridge — A structure, including supports, erected over a depression or an obstruction such as water along a road, a trail, or a railway and having a deck for carrying traffic or other loads.
Contractor — The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “Purchaser”.
Culvert — Any structure with a bottom, regardless of fill depth, depth of invert burial, or presence of horizontal driving surface, or any bottomless (natural channel) structure with footings that will not have wheel loads in direct contact with the top of the structure.
Drawings — Design sheets or fabrication, erection, or construction details submitted to the CO by the Contractor according to FAR Clause 52.236-21 Specifications and Drawings for Construction. Also refers to submissions and submittals.
Notice to Proceed — Written notice to the Contractor to begin the contract work.
Right-of-Way — A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.
Solicitation— The complete assembly of documents (whether attached or incorporated by reference) furnished to prospective bidders.
Add the following definitions:
Adjustment in Contract Price — “Equitable adjustment,” as used in the Federal Acquisition Regulations, or “construction cost adjustment,” as used in the Timber Sale Contract, as applicable.
Change — “Change” means “change order” as used in the Federal Acquisition Regulations, or “design change” as used in the Timber Sale Contract.
Forest Service — The United States of America, acting through the Forest Service, U.S. Department of Agriculture.
Neat Line — A line defining the proposed or specified limits of an excavation or structure.
Pioneer Road — Temporary construction access built along the route of the project.
Purchaser — The individual, partnership, joint venture, or corporation contracting with the Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.
Protected Streamcourse — A drainage shown on the plans or timber sale area map that requires designated mitigation measures.
Road Order — An order affecting and controlling traffic on roads under Forest Service jurisdiction.
Road Orders are issued by a designated Forest Officer under the authorities of 36 CFR, part 260.
Utilization Standards — The minimum size and percent soundness of trees described in Public Works contract specifications or Timber Sale and IRTC contract provisions to determine merchantable timber.
Add Figure 101-1—Illustration of road structure terms:
Figure 101-1—Illustration of road structure terms.
102 – Bid, Award, and Execution of Contract 102.00_National_9_15_2016
Delete Section 102 in its entirety.
Delete Section 102.
103 - Scope of Work 103.00_National_9_15_2016
Delete all of Section 103 except Subsection 103.01 Intent of Contract.
Delete Subsections 103.02, 103.03, 103.04, 103.05.
104 - Control of Work 104.00_National_9_15_2016
Delete Subsections 104.01, 104.02, and 104.04.
Delete Subsections 104.01, 104.02, 104.04.
104.06_National_9_16_2016
Add the following to Subsection 104.06:
104.06 Use of Roads by Contractor.
The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.
105 - Control of Material 105.05_National_6_29_2020
105.05 Use of Material Found in the Work.
Delete 105.05 (a) and (b) and the last sentence of the second paragraph and substitute the following:
Materials produced or processed from Government lands in excess of the quantities required for performance of this contract are the property of the Government. Place excess material safely at government-approved location, at no additional cost to government.
106 - Acceptance of Work 106.01_National_7_18_2017
Delete Subsection 106.01 and replace with the following:
106.01 Conformity with Contract Requirements.
Follow the requirements of FAR Clause 52.246-12 Inspection of Construction.
References to standard test methods of AASHTO, ASTM, GSA, and other recognized standard authorities refer to the methods in effect on the date of solicitation for bids.
Perform all work to the lines, grades, cross-sections, dimensions, and processes or material requirements shown on the plans or specified in the contract.
Incorporate manufactured materials into the work according to the manufacturer’s recommendations or to these specifications, whichever is more strict.
Plan dimensions and contract specification values are the values to be strived for and complied with as the design values from which any deviations are allowed. Perform work and provide material that is uniform in character and reasonably close to the prescribed value or within the specified tolerance range.
The purpose of a tolerance range is to accommodate occasional minor variations from the median zone that are unavoidable for practical reasons.
When standard manufactured items are specified (such as fence, wire, plates, rolled shapes, pipe conduits, etc., that are identified by gauge, unit mass, section dimensions, etc.), the identification will be considered to be nominal masses or dimensions. Unless specific contract tolerances are noted, established manufacturing tolerances will be accepted.
The Government may inspect, sample, or test all work at any time before final acceptance of the project.
When the Government tests work, copies of test reports are furnished to the Contractor upon request.
Government tests may or may not be performed at the work site. If Contractor testing and inspection is verified by the Government, the Contractor’s results may be used by the Government to evaluate work for acceptance. Do not rely on the availability of Government test results for process control.
Acceptable work conforming to the contract will be paid for at the contract unit bid price. Four methods of determining conformity and accepting work are described in Subsections 106.02 to 106.05 inclusive.
The primary method of acceptance is specified in each Section of work. However, work may be rejected at any time it is found by any of the methods not to comply with the contract.
Remove, repair, or replace work that does not conform to the contract, or to prevailing industry standards where no specific contract requirements are noted. Removing, repairing, or replacing work;
providing temporary traffic control; and any other related work to accomplish conformity will be at no cost to the Government.
(a) Disputing Government test results. If the accuracy of Government test results is disputed, promptly inform the CO. If the dispute is unresolved after reasonable steps are taken to resolve the dispute, further evaluation may be obtained by written request. Include a narrative describing the dispute and a proposed resolution protocol that addresses the following:
1. Sampling method;
2. Number of samples;
3. Sample transport;
4. Test procedures;
5. Testing laboratories;
6. Reporting;
7. Estimated time and costs; and
8. Validation process.
If the evaluation requires additional sampling or testing be performed, mutually agree with the Government on witnessing procedures and on sampling and testing by a third party laboratory. Use a third party laboratory accredited by the AASHTO accreditation program. Provide proof of the laboratory’s accreditation for the test procedures to be used. Do not use the same laboratory that produced the disputed Government test results or that produced the test results used as a basis for the dispute.
The CO will review the proposed resolution protocol and may modify it before final approval and execution.
The Government will use the approved resolution protocol test results to determine the validity of the disputed testing. If the Government test results are validated, the Contractor will be responsible for all costs associated with developing and performing the resolution protocol. If the Government test results are not validated, the Government will be responsible for all costs associated with developing and performing the resolution protocol. If the validity of the Government test results cannot be determined, the Contractor and Government will equally share all costs associated with developing and carrying out the resolution protocol.
(b) Alternatives to removing and replacing non-conforming work. As an alternative to removal and replacement, the Contractor may submit a written request to:
1. Have the work accepted at a reduced price; or
2. Be given permission to perform corrective measures to bring the work into conformity.
The request must contain supporting rationale and documentation. Include references or data justifying the proposal based on an evaluation of test results, effect on service life, value of material or work, quality, aesthetics, and other tangible engineering basis. The CO will determine disposition of the nonconforming work.
106.02_National_10_23_2016
Delete Subsection 106.02 and replace with the following:
106.02 Visual Inspection.
Acceptance is based on visual inspection of the work for compliance with the specific contract requirements. Use prevailing industry standards in the absence of specific contract requirements or tolerances.
107 - Legal Relations and Responsibility to the Public 107.05_National_7_18_2017
Delete Subsection 107.05.
Delete Subsection 107.05.
108 - Prosecution and Progress 108.00_National_9_16_2016
Delete Section 108 in its entirety.
Delete Section 108.
109 - Measurement and Payment 109.00_National_9_16_2016
Delete Subsections 109.06, 109.07, 109.08, and 109.09:
Delete Subsections 109.06, 109.07, 109.08, 109.09.
109.01_National_2_22_2019
Delete the third paragraph and Table 109-1 of Subsection 109.01 and replace with the following:
109.01 Measurement of Work.
Take measurements as described in Subsection 109.02 unless otherwise modified by the Measurement Subsection of the section controlling the work being performed. Table 109-1 indicates the accuracy required for quantities of the various pay units used in the Schedule of Items. Use this guide to determine the decimal placement in the final payment.
Table 109-1
Decimal Accuracy of Quantities for Final Payment
Pay Item Level of Precision Linear Foot 1 Station 0.1 Mile 0.01 Square Foot 0.1 Square Yard 0.1
Each 1 Acre 0.01 Gallon 1 M-Gals. 0.1 Cubic Yard 1
Exception--Structure Excavation; Sheathing Materials; Bedding, Bed Course, and Backfill Materials; Gabions;
0.1
Pound 1 Ton 0.1
Exception--Calcium Chloride;
Sodium Chloride; Hydrated Lime;
Bed Course Materials
0.01
Hour 0.1
MFBM 0.01
Station Yard 1 Cubic Yard Mile 1 Ton Mile 1
109.02_National_9_16_2016
Add the following sentence to Subsection 109.02(b):
109.02 Measurement Terms and Definitions.
(b) Contract quantity.
Contract quantities will be adjusted only when there are errors in the original design of 15% or more.
153 - Contractor Quality Control 153.02_National_9_15_2016
Delete Subsection 153.02 and replace with the following:
153.02 Qualifications.
Submit the following for approval with the quality control plan:
(a) Quality control manager (QCM). Furnish a QCM who has at least 2 years’ experience in construction, inspector, quality control and material testing on construction projects of similar type and scope.
(b) Testers. Provide testers with at least one year experience in the type of sampling and testing required, and with one of the following for the type of sampling and testing performed:
(1) NICET Level II certification in highway material or equivalent state or industry certification;
(2) Certification by a regional certification program (such as Western Alliance for Quality Transportation Construction (WAQTC), Northeast Transportation Technician Certification Program (NETTCP), Southeast Task Force for Technician Training and Qualification (STFTTQ), or Multi Regional Training and Certification (M-TRAC)); or
(3) At least one year employment by an AASHTO accredited laboratory performing equivalent sampling and testing.
153.07_National_9_15_2016
Delete Subsection 153.07 and replace with the following:
153.07 Records and control charts.
Maintain complete testing and inspection records by pay item number and make them accessible to the
CO.
155 - Schedules for Construction Contracts 155.00_National_9_14_2016
Delete Section 155 in its entirety.
Delete Section 155.
156 - Public Traffic 156.00_National_9_14_2016
Delete Section 156 in its entirety and replace with the following:
Section 156. – PUBLIC TRAFFIC Description
156.01 This work consists of controlling and protecting public traffic adjacent to and within the project.
Material
156.02 Conform to the MUTCD and the following Sections and Subsections:
Permanent Traffic Control 633
Traffic Signing and Marking Material 718
Concrete Barriers and Precast Guardwalls 618
Temporary plastic fence 710.11
Construction Requirements
156.03 General. Accommodate traffic according to MUTCD, approved traffic control plan and this section. Perform work in a manner that ensures safety and convenience of the public. Unless otherwise provided for in Table 156-1, keep existing roads open to all traffic during road improvement work, and maintain them in a condition that will adequately accommodate traffic. Delays may not exceed < 60 > minutes at any one time followed by an open period of no less than < 10 > minutes except when blasting. Close the road when actively loading holes. Reopen the road within 2 hours after blasting. Accommodate public traffic on roads adjacent to and within the project until the project is accepted according to Subsection 106.07(b).
Submit traffic control plan at least 3 days prior to intended use. Perform no work that interferes or conflicts with traffic or existing access to the roadway surface until a traffic control plan has been approved.
Post construction signs and traffic control devices in conformance with MUTCD and Forest Service EM 7100-15. All required signs will be in place and approved prior to beginning work on project.
If the Contractor agrees in writing to allow public traffic to use a new road being constructed prior to completion, it will be considered an existing road for traffic control purposes.
156.04 Temporary Traffic Control. Install and maintain temporary traffic control devices adjacent to and within the project as required by the approved traffic control plan and the MUTCD. Install and maintain traffic control devices as follows:
(a) Furnish and install traffic control devices before the start of construction operations.
(b) All detours outside of clearing limits will be approved in writing by the Contracting Officer as part of the traffic control plan.
(c) Install only those traffic control devices needed for each stage or phase.
(d) Relocate temporary traffic control devices as necessary.
(e) Remove devices that no longer apply to the existing conditions.
(f) Immediately replace any device that is lost, stolen, destroyed, or inoperative.
(g) Keep temporary traffic control devices clean.
(h) Remove all temporary traffic control devices upon contract completion or when approved.
(i) When required, use flaggers certified by the American Traffic Safety Services Association, the National Safety Council, the International Municipal Signal Association, a state agency, or other acceptable organization. Perform the work described under MUTCD Part 6. Use type III, VII, VIII, or IX retroreflective sheeting on flagger paddles. Do not use flags. Flaggers must wear high visibility safety apparel as required by MUTCD 6E.02.
156.05 Temporary Closures. Road segments may be closed as shown in Table 156-1. The maximum consecutive days of closure shall be followed by a minimum number of consecutive days open to traffic as shown. Maintain traffic control devices during closure period(s). Appropriate barricades and signs will be erected and maintained as shown in the traffic control plan or as otherwise designated.
Prior to closing roads during construction, give written notice to the Contracting Officer at least 3 days in advance.
Table 156-1 Temporary Road Closures
Road Number
From Terminus
To Terminus
Maximum Consecutive Days of Closure
Minimum Consecutive Days Open
8530 22 26 0 0
156.06 Acceptance. Public traffic work will be evaluated under Subsection 106.02.
Measurement and Payment
156.07 Do not measure Public Traffic for payment. Payment for contract work is provided indirectly.
See Subsection 109.05.
201 - Clearing and Grubbing 201.00_Forest_5_3_2018
Delete Section 201 in its entirety and replace with the following.
Section 201. — CLEARING AND GRUBBING Description
201.01 This work consists of clearing and grubbing within the clearing limits designated in the plans.
Material
201.02 Conform to the following Subsection:
Backfill material 704.03
Construction Requirements
201.03 General. Construct erosion control measures according to Section 157. Perform work within designated limits.
Do not damage vegetation designated to remain. If damage occurs, repair or replace the vegetation in an acceptable manner. Where possible, preserve vegetation adjacent to bodies of water. Treat cuts or scarred surfaces of trees and shrubs with tree wound dressing.
201.04 Clearing. Within the clearing limits clear trees, brush, and other vegetation as follows:
(a) Cut trees so they fall within the clearing limits;
(b) In areas of cut slope rounding, cut stumps flush with or below the finished ground line;
(c) In areas outside the excavation, embankment, and slope rounding limits, cut stumps to within 6 inches of the ground; and
(d) Trim tree branches that extend over the road surface and shoulders to attain a clear height of 14 feet. Trim tree limbs as near flush with the trunk as practicable.
201.05 Grubbing. Grub deep enough to remove stumps, roots, buried logs, moss, turf, or other vegetative matter as follows:
(a) Grub areas to be excavated, accept for cut slope rounding areas;
(b) Grub embankment areas. Undisturbed stumps less than 24 inches in diameter may be left in place if they protrude less than 6 inches above the original ground and will be covered with more than 48 inches of embankment. Remove all other stumps;
(c) Grub pits, channel changes, and ditches only to the depth necessary for the excavation;
(d) Backfill stump holes and other grubbing holes with backfill material to the level of the surrounding ground according to Subsection 209.09. Compact backfill according to Subsection 209.10; and
(e) Utilization standards for merchantable timber are listed below. Fall and buck merchantable material into lengths not to exceed 40 feet. Pieces (logs) meet utilization standards when such pieces would have met Utilization Standards if bucking lengths were varied to include such material.
Minimum Utilization Standards
Length = 16 feet.
Diameter (Inside Bark) at small end = 7 inches
33-1/3 Net Scale in % Gross for Sawlog
201.06 Disposal. Merchantable timber is Government property. Dispose of clearing and grubbing debris according to Subsection 203.05.
201.07 Acceptance. Clearing and grubbing will be evaluated under Subsection 106.02.
Material for tree wound dressing will be evaluated under Subsection 106.03.
Backfilling and compacting of stumps and grubbing holes will be evaluated under Section 209.
Measurement
201.08 Measure the Section 201 pay items listed in the bid schedule according to Subsection 109.02 and the following as applicable:
Do not make deductions from the area computation unless excluded areas are shown on the plans.
Do not measure clearing and grubbing of borrow sources.
Payment
201.09 The accepted quantities will be paid at the contract price per unit of measurement for the Section 201 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.
203 - Removal of Structures and Obstructions 203.00_Forest_5_4_2018
Delete Section 203 in its entirety and replace with the following.
Section 203. — REMOVAL OF STRUCTURES AND OBSTRUCTIONS Description
203.01 This work consists of salvaging, removing, and disposing of bridges, structures, culverts, and other obstructions.
Material
203.02 Conform to the following Subsection:
Backfill material 704.03
Construction Requirements
203.03 Salvaging Material. Salvage with reasonable care material designated to be salvaged. Salvage in readily transportable sections or pieces. Replace or repair members, pins, nuts, plates, and related hardware damaged, lost, or destroyed during the salvage operation. Securely attach parts to adjacent members or pack them in sturdy boxes with the contents clearly marked.
Match mark members of salvaged structures. Submit one set of drawings according to Section 104 identifying the members and their respective match marks.
Stockpile salvaged material at a designated area on the project.
203.04 Removing Material.
(a) Submittals. N/A
(b) General. Saw cut sidewalks, curbs, pavements, and structures when partial removal is required.
Do not allow debris to enter waterways, travel lanes open to public traffic, or areas designated not to be disturbed.
Raze and remove foundations, pavements, culverts, sidewalks, curbs, structures, and other obstructions interfering with the work and not designated to remain.
Remove structures and obstructions in the roadbed to 12 inches below subgrade elevation.
Remove structures and obstructions outside the roadbed to 12 inches below finished ground or to the natural stream bottom.
Except in excavation areas, backfill and compact cavities left by structure removal with backfill material to the lines and grades of the finished ground. Backfill excavated areas according to Subsection 209.09. Compact backfill according to Subsection 209.10.
203.05 Disposing of Material. Dispose of debris, unsuitable material, and excess material as follows:
(a) Remove from project. Recycle or dispose of material legally off the project;
(b) Scattering. Scatter construction slash in designated areas without damaging trees. Place stumps and logs away from trees, positioned so they will not roll, and are not on top of one another.
Scatter construction slash to reduce slash concentrations. When scattering for erosion control, place construction slash as flat as practical on the completed slope;
(c) Debris Mat. Use tree limbs, tops, cull logs, split stumps, wood chunks, and other debris to form a mat upon which construction equipment is operated. Place stumps upside down and blend stumps into the mat;
(d) Decking. Deck logs so that logs are piled parallel to one another; can be removed by standard log loading equipment; will not damage standing trees; will not interfere with drainage; and will not roll;
(e) Removal to designated locations. Remove construction slash and debris to designated locations; and
(f) Piling. Pile construction slash in designated areas.
203.06 Acceptance. Removal of structures and obstructions will be evaluated under Subsection 106.02.
Backfilling and compacting of cavities left by structures will be evaluated under Section 209.
Measurement
203.07 Measure the Section 203 pay items listed in the bid schedule according to Subsection 109.02.
Payment
203.08 The accepted quantities will be paid at the contract price per unit of measurement for the Section 203 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this
204 - Excavation and Embankment 204.00_Forest_10_31_2017
Delete Section 204 in its entirety and replace with the following.
Section 204. — EXCAVATION AND EMBANKMENT Description
204.01 This work consists of excavating material and constructing embankments. This work also includes furnishing, hauling, stockpiling, placing, disposing, sloping, shaping, compacting, and finishing earthen and rocky material.
204.02 Definitions.
(a) Excavation. Excavation consists of the following:
(1) Roadway excavation. Material excavated from within the right-of-way or easement areas, except subexcavation covered in Subsection 204.02(a)(2) and structure excavation covered in Sections 208 and 209. Roadway excavation includes all material encountered regardless of its nature or characteristics.
(2) Subexcavation. Material excavated from below subgrade elevation in cut sections or from below the original ground-line in embankment sections. Subexcavation excludes the work required by Subsection 204.05 or 204.06.
(3) Borrow excavation. Material used for embankment construction that is obtained from outside the roadway prism. Borrow excavation includes unclassified borrow, and topping.
(b) Embankment construction. Embankment construction consists of placing and compacting roadway or borrow excavation. This work includes:
(1) Preparing foundation for embankment;
(2) Constructing roadway embankments;
(3) Benching for side-hill embankments;
(4) Constructing dikes, ramps, mounds, and berms; and
(5) Backfilling subexcavated areas, holes, pits, and other depressions.
(c) Conserved topsoil. Excavated material conserved from the roadway excavation and embankment foundation areas that is suitable for growth of grass, cover crops, or native vegetation.
(d) Waste. Excess and unsuitable roadway excavation and subexcavation that cannot be used.
Material
204.03 Conform to the following Subsections:
Topping 704.05
Unclassified borrow 704.06
Water 725.01(c)
204.04 Preparation for Roadway Excavation and Embankment Construction. Clear the area of vegetation and obstructions according to Sections 201 and 203.
Road pioneering, slash disposal, and grubbing of stumps may proceed concurrently with excavation and embankment. Maintain drainage during pioneering operations.
204.05 Conserved Topsoil. When designated, conserve topsoil from roadway excavation and embankment foundation areas. Stockpile conserved topsoil in low windrows immediately beyond the rounding limits of cut and embankment slopes or in other approved locations. Separate conserved topsoil from other excavated material. When designated, place conserved topsoil on completed slopes according to Section 624.
204.06 Roadway Excavation. Excavate as follows:
(a) Rock cuts. Blast rock according to Section 205. Excavate rock cuts to 6 inches below subgrade within the roadbed limits. Backfill to subgrade with topping or other suitable material. Compact the material according to Subsection 204.11.
(b) Earth cuts. Scarify earth cuts to 6 inches below subgrade within the roadbed limits. Compact the scarified material according to Subsection 204.11.
(c) Pioneer Roads. Conduct excavation and placement operations so material to be treated under Section 201 will not be incorporated into the roadway unless specified in the slash treatment method.
Maintain drainage during pioneering operations.
Road pioneering, slash disposal, and grubbing of stumps may proceed concurrently with excavation.
Remove snow and ice in advance of the work and deposit beyond the roadway limits in a manner that will not waste material or generate sediment. Do not incorporate snow and ice into embankments. Place snow or ice in a manner to prevent resource damage.
During pioneering operations prevent undercutting of final excavation slopes.
(d) Drainage Feature. Drainage feature includes construction of all ditches, minor channel changes, drainage dips, catch basins, surface water deflectors, and other minor drainage structures.
Compact the material according to Subsection 204.11. Excavate on a uniform grade between control points.
Do not disturb material and vegetation outside the construction limits. Retrieve material deposited outside the construction limits. Dispose of unsuitable or excess excavation material according to Subsection
204.14. Replace shortage of suitable material caused by premature disposal of roadway excavation.
Shape to drain and compact the work area to a uniform cross-section at the end of each day's operations.
204.07 Subexcavation. Excavate material to the required limits. Dispose of unsuitable material according to Subsection 204.14. Take cross-sections according to Section 152. Backfill subexcavated area with suitable material in horizontal layers not exceeding 12 inches in compacted thickness and compact according to Subsection 204.11. Prevent unsuitable material from mixing with suitable backfill material.
204.08 Borrow Excavation. Use suitable roadway excavation in embankment construction. Do not use borrow excavation when it results in excess roadway excavation. Deduct excess borrow excavation from the total borrow excavation quantity.
Obtain borrow source approval according to Subsection 105.02. Develop and restore borrow sources according to Subsections 105.03 and 105.06. Do not excavate beyond the established limits. When applicable, shape the borrow source to permit accurate measurements when excavation is complete.
204.09 Preparing Foundation for Embankment Construction. Prepare foundation for embankment construction as follows:
(a) Embankment over natural ground. Remove topsoil and break up the ground surface to a minimum depth of 6 inches by plowing or scarifying. Compact the ground surface according to Subsection 204.11.
(b) Embankments over an existing asphalt, concrete, or gravel road surface. Scarify gravel roads to a minimum depth of 6 inches. Scarify or pulverize asphalt and concrete roads to 6 inches below the pavement. Reduce particles to a maximum size of 6 inches and produce a uniform material. Compact the surface according to Subsection 204.11.
(c) Embankment across ground not capable of supporting equipment. Dump successive loads of embankment material in a uniformly distributed layer to construct the lower portion of the embankment. Limit the layer thickness to the minimum depth necessary to support the equipment.
(d) Embankment on an existing slope steeper than 1V:3H. Cut horizontal steps in the existing slope to a sufficient width to accommodate placement and compaction operations and equipment. Step the slope as the embankment is placed and compacted in layers. Begin each step at the intersection of the original ground and the vertical cut of the previous step.
204.10 Embankment Construction. Incorporate only suitable roadway excavation material into the embankment. When the supply of suitable roadway excavation is exhausted, furnish unclassified borrow to complete the embankment. Obtain written approval before beginning construction of embankments over 6 feet high at subgrade centerline. Construct embankments as follows:
(a) General. At the end of each day's operations, shape to drain and compact the embankment surface to a uniform cross-section. Eliminate ruts and low spots that could hold water.
During all stages of construction, route and distribute hauling and leveling equipment over the width and length of each layer of material.
Compact embankment side slopes with a tamping foot roller, by walking with a dozer, or by over-building the fill and then removing excess material to the final slope line. For slopes 1V:1¾H or steeper, compact the slopes as embankment construction progresses.
Operate spreading equipment and loaded hauling equipment over the entire surface of embankment.
(b) Embankment within the roadway prism. Place embankment material in horizontal layers not exceeding 12 inches in compacted thickness. Incorporate oversize boulders or rock fragments into the
12-inch layers by reducing them in size or placing them individually as required below. Compact each layer according to Subsection 204.11 before placing the next layer.
Material composed predominately of boulders or rock fragments too large for 12-inch layers may be placed in layers up to 24 inches thick. Incorporate oversize boulders or rock fragments into the 24-inch layer by reducing them in size or placing individual rock fragments and boulders greater than 24 inches in diameter as follows:
(1) Distribute rock within the embankment to prevent nesting;
(2) Place layers of embankment material around each rock to a depth not greater than that permitted above. Fill voids between rocks; and
(3) Compact each layer according to Subsection 204.11(a) before placing the next layer.
(c) Embankment outside of roadway prism. When placing embankment outside the staked roadway prism, place material in horizontal layers not exceeding 24 inches in compacted thickness. Compact each layer according to Subsection 204.11.
204.11 Compaction. Compact the embankment using one of the following methods as specified.
(a) Placement Method 1. Use AASHTO T 27 to determine the quantity of material retained on a No.
4 sieve. Compact as follows:
(1) More than 80 percent retained on a No. 4 sieve. Adjust the moisture content to a level suitable for compaction. Fill the interstices around rock with earth or other fine material as practical. Use compression-type rollers at speeds less than 6 feet per second and vibratory rollers at speeds less than 3 feet per second. Compact each layer of material full width with one of the following and until there is no visible evidence of further consolidation:
(a) Four roller passes of a vibratory roller having a minimum dynamic force of 40,000 pounds impact per vibration and a minimum frequency of 1000 vibrations per minute;
(b) Eight roller passes of a 20-ton compression-type roller; or
(c) Eight roller passes of a vibratory roller having a minimum dynamic force of 30,000 pounds impact per vibration and a minimum frequency of 1000 vibrations per minute.
Increase the compactive effort for layers deeper than 12 inches as follows:
• For each additional 6 inches or fraction thereof, increase the number of roller passes in Subsection…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .