This document contains a justification for a sole source contract and a related special notice federal contract opportunity. The justification is for awarding a contract on a sole source basis to Interface Engineering in Portland, Oregon to provide architectural, engineering, and technical design services during the construction phase of renovating the boilers at Timberline Lodge on the Mount Hood National Forest. Interface Engineering developed the original design and construction drawings and specifications as the designer of record, making them the only firm that can sign or affix their seal to any related plans, drawings, documents, specifications or reports under Oregon regulations. The special notice provides additional details on the services required and invites any firms that believe they can meet the requirements to submit capabilities information by May 15th, 2021. The contract will be for a base and three option items mirroring the four phases of the related construction contract's period of performance from July 15th, 2021.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
phase of the construction funds via the Great American Outdoors Act. This requirement is to procure Design Services During Construction from the original designer during the project’s construction.
The contractor is very familiar with the project as they developed the design and prepared the drawings and specifications. They are the designer of record, have the project records and basis of design documentation. Having engineering responsibility for the accepted design, it is unreasonable to pursue this support to a different firm that has no responsibility or authority around the original design.
Oregon Admistrative Rules, in relation to registered architects, stipulates that the orginal designer is the only one that can sign or affix their seal to any plans, drawings, documents, specifications or reports.
https://oregon.public.law/rules/oar 806-010-0045
6. Description of efforts made to ensure offers are solicited from as many potential sources as is practicable.
N/A
7. Description of the market research conducted and the results or a statement of the reason Market Research was not conducted.
A Special Notice was placed on beta.sam on 28 April 2021, notifying the public of the Government’s intention to pursue a sole source contract with Interface Engineering, and inviting any firm that believed they could meet the Government’s requirements to submit a capabilities statement.
8. Any other facts supporting the use of other than full and open competition.
N/A
9. Listing of the sources, if any, that expressed a written interest in the acquisition.
N/A
10. Statement of actions, if any, the agency may take to remove or overcome any barriers to competition if subsequent acquisitions are anticipated.
No subsequent acquisitons are planned or anticipated.
11. Determination by the Contracting Officer that the anticipated cost to the Government will be fair and reasonable.
Proposed pricing will be compared against the Government estimate, pricing obtained on previous projects, and pricing submitted on the Region 6/10 A-E Services MATOC contract.