(x)
1240BH21Q0059
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
40BH
PORTLAND OR 97204-2829
STE 310
1220 SW 3RD AVE
USDA-FS CSA NORTHWEST 6
103560409/14/2021
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
09/02/2021
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
STEVONNE FULLER
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Amendment 01 is to provide answers to Contractor questions. The solicitation has not been extended and closes 09/17/2021 0900 PST. E-mail offers to stevonne.fuller@usda.gov.
Delivery Location Code: 04P5
USDA FOREST SERVICE
FREMONT-WINEMA NF HQ
1301 SOUTH G STREET
LAKEVIEW OR 97630 US
Period of Performance: 09/23/2021 to 11/26/2021
Continued ...
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
TEL: EMAIL: 360-891-5085 stevonne.fuller@usda.gov
1240BH21Q0059 Forestwide Excavation and Demolition Amendment 01 Questions and Answers
Q1: The SF-1442 cover page states that there is no performance or payment bond required.
However, on page 32 of the solicitation, under 52.228-13 Alternative Payment Protections, payment bond is listed as an alternate payment protection. The number of the days to submit an alternate payment protection is blank.
A1: Thank you for your question. To provide clarification performance and payment bonds are required when the construction estimate is $150,000 and above. Because the construction estimate for this project is between $25,000 and $100,000, a payment bond is not required.
However, as the Contractor you can choose to use a payment bond as an alternative payment protection. Since it’s optional, it is not checked on the cover page. The number of days to submit your alternate payment protection is 10 days.
Q2: Who is responsible for installing the vault prior to the building installation?
A2: The Contractor who will be awarded this contract will be responsible for the installation.
Each restroom is a 3-piece precast structure that includes both the vault and the building.
Q3: Will the COR locate the exact building location after the previous building has been removed ?
A3: Yes
Q4: The solicitation did not include a " return packet" for download. Can you please identify the pages you need returned to you and let me know?
A4: Please reference Section L.2 Quote Preparation Instructions on page 43 of the solicitation.
File details come from the government source that posted it. Updated .