Attachment 4 - Schedule of Items and Price Sheet (Revised).xlsx
XLSX spreadsheet 42 KB Posted
- Attached to
- YRD Road Maintenance
- Solicitation number
- 1240BF24Q0002
- Issued by
-
Department of Agriculture Forest Service
About this file
This is a combined synopsis and solicitation for road maintenance and snowplowing services on multiple road systems located in Yakutat, Alaska. The Forest Service is seeking a firm-fixed price contract for grading, blading, compaction, spot surfacing, ditching, and snowplowing services. The period of performance is from date of award through 31 October 2028, including a base period and four option periods. Services shall be provided in accordance with the attached performance work statement and applicable laws and regulations. As a total small business set-aside, offers will only be accepted from small businesses with a size standard of $45 million or less in average annual receipts. The associated NAICS code is 237310.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOI-PS (Per Task)
ONLY FILL OUT THE YELLOW HIGHLIGHTED CELLS THROUGHOUT THIS BID SHEET, THEY WILL FEED INTO THE OTHER SECTIONS. DO NOT CHANGE THE FORMULAS IN THIS SHEET.
YRD Road Maintenance and Snowplowing
1240BF24Q0002
| Company Name |
| Point of Contact |
| CAGE Code |
| UEI Number |
| Physical Address |
| Mailing Address |
| Phone Number |
| Fax Number |
| E-Mail Address |
| BASE PERIOD (Date of Award - 31 October 2024) | |||||
| Item Number | Description | Estimated Quantity | Unit of Issue | Unit Price | Total |
| 0001 | Mobilization | 1 | Each | $ - 0 | |
| 0002 | Load, Haul, and Place Material | 10 | Cubic Yard | $ - 0 | |
| 0003 | Road Surface Maintenance (Grading, Blading, and Compaction Method B) | 34 | Mile | $ - 0 | |
| 0004 | Roadway Drainage Maintenance - Sidecast | 2 | Mile | $ - 0 | |
| 0005 | Roadway Drainage Maintenance - End Haul | 10 | Cubic Yard | $ - 0 | |
| 0006 | Snowplowing | 36 | Mile | $ - 0 | |
| 0007 | Over and Above Work | 10 | Job | TBN | $ - 0 |
| Total: | $ - 0 |
| OPTION PERIOD 1 (1 November 2024 - 31 October 2025) | |||||
| Item Number | Description | Estimated Quantity | Unit of Issue | Unit Price | Total |
| 1001 | Mobilization | 1 | Each | $ - 0 | |
| 1002 | Load, Haul, and Place Material | 10 | Cubic Yard | $ - 0 | |
| 1003 | Road Surface Maintenance (Grading, Blading, and Compaction Method B) | 30 | Mile | $ - 0 | |
| 1004 | Roadway Drainage Maintenance - Sidecast | 2 | Mile | $ - 0 | |
| 1005 | Roadway Drainage Maintenance - End Haul | 10 | Cubic Yard | $ - 0 | |
| 1006 | Spot Surfacing | 30 | Cubic Yard | $ - 0 | |
| 1007 | Snowplowing | 36 | Mile | $ - 0 | |
| 1008 | Over and Above Work | 10 | Job | TBN | $ - 0 |
| Total: | $ - 0 |
| OPTION PERIOD 2 (1 November 2025 - 31 October 2026) | |||||
| Item Number | Description | Estimated Quantity | Unit of Issue | Unit Price | Total |
| 2001 | Mobilization | 1 | Each | $ - 0 | |
| 2002 | Load, Haul, and Place Material | 10 | Cubic Yard | $ - 0 | |
| 2003 | Road Surface Maintenance (Grading, Blading, and Compaction Method B) | 30 | Mile | $ - 0 | |
| 2004 | Roadway Drainage Maintenance - Sidecast | 2 | Mile | $ - 0 | |
| 2005 | Roadway Drainage Maintenance - End Haul | 10 | Cubic Yard | $ - 0 | |
| 2006 | Snowplowing | 36 | Mile | $ - 0 | |
| 2007 | Over and Above Work | 10 | Job | TBN | $ - 0 |
| Total: | $ - 0 |
| OPTION PERIOD 3 (1 November 2026 - 31 October 2027) | |||||
| Item Number | Description | Estimated Quantity | Unit of Issue | Unit Price | Total |
| 3001 | Mobilization | 1 | Each | $ - 0 | |
| 3002 | Load, Haul, and Place Material | 10 | Cubic Yard | $ - 0 | |
| 3003 | Road Surface Maintenance (Grading, Blading, and Compaction Method B) | 30 | Mile | $ - 0 | |
| 3004 | Roadway Drainage Maintenance - Sidecast | 2 | Mile | $ - 0 | |
| 3005 | Roadway Drainage Maintenance - End Haul | 10 | Cubic Yard | $ - 0 | |
| 3006 | Spot Surfacing | 40 | Cubic Yard | $ - 0 | |
| 3007 | Snowplowing | 36 | Mile | $ - 0 | |
| 3008 | Over and Above Work | 10 | Job | TBN | $ - 0 |
| Total: | $ - 0 |
| OPTION PERIOD 4 (1 November 2027 - 31 October 2028) | |||||
| Item Number | Description | Estimated Quantity | Unit of Issue | Unit Price | Total |
| 4001 | Mobilization | 1 | Each | $ - 0 | |
| 4002 | Load, Haul, and Place Material | 10 | Cubic Yard | $ - 0 | |
| 4003 | Road Surface Maintenance (Grading, Blading, and Compaction Method B) | 30 | Mile | $ - 0 | |
| 4004 | Roadway Drainage Maintenance - Sidecast | 2 | Mile | $ - 0 | |
| 4005 | Roadway Drainage Maintenance - End Haul | 10 | Cubic Yard | $ - 0 | |
| 4006 | Snowplowing | 36 | Mile | $ - 0 | |
| 4007 | Over and Above Work | 10 | Job | TBN | $ - 0 |
| Total: | $ - 0 |
Grand Total: $ - 0
NOTES: (1) The quantities specified in the Schedule of Items are estimates only and are not guaranteed quantities. The government reserves the right to add, remove, or change the items and quantities to be serviced under this contract, as required. Price adjustments for these changes shall be based on the rates specified in the Schedule of Items for identical or similar items. Changes will only be authorized by a warranted CO. (2) The quantities specified in the Schedule of Items are based on the Government's best estimate.
SOI-PS (Per Road)
ONLY FILL OUT THE YELLOW HIGHLIGHTED CELLS THROUGHOUT THIS BID SHEET, THEY WILL FEED INTO THE OTHER SECTIONS. DO NOT CHANGE THE FORMULAS IN THIS SHEET.
YRD Road Maintenance and Snow Plowing
1240BF24Q0002
| Company Name |
| Point of Contact |
| CAGE Code |
| UEI Number |
| Physical Address |
| Mailing Address |
| Phone Number |
| Fax Number |
| E-Mail Address |
| BASE PERIOD (Date of Award - 31 October 2024) | ||||||
| Item Number | Description | Estimated Quantity | Unit of Issue | Unit Price | Total | |
| 0001 | Road #9946 - Strawberry Point Road | Job | $ - 0 | Estimate how many jobs will be needed to accomplish the work. | ||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | ||||
| Road Surface Maintenance (Grading, Blading, and Compaction Method B) | 1.6 | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - Sidecast | Mile | $ - 0 | ||||
| Roadway Drainage Maintenance - End Haul | Cubic Yard | $ - 0 | ||||
| 0002 | Road #9951 - West Fork Road | Job | $ - 0 | |||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | ||||
| Road Surface Maintenance (Grading, Blading, and Compaction Method B) | Mile | $ - 0 | ||||
| Roadway Drainage Maintenance - Sidecast | Mile | $ - 0 | ||||
| Roadway Drainage Maintenance - End Haul | Cubic Yard | $ - 0 | ||||
| 0003 | Road #99511 - Spur of West Fork Road | Job | $ - 0 | |||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | ||||
| Road Surface Maintenance (Grading, Blading, and Compaction Method B) | Mile | $ - 0 | ||||
| Roadway Drainage Maintenance - Sidecast | Mile | $ - 0 | ||||
| Roadway Drainage Maintenance - End Haul | Cubic Yard | $ - 0 | ||||
| 0004 | Road #99512 - Spur of West Fork Road | Job | $ - 0 | |||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | ||||
| Road Surface Maintenance (Grading, Blading, and Compaction Method B) | Mile | $ - 0 | ||||
| Roadway Drainage Maintenance - Sidecast | Mile | $ - 0 | ||||
| Roadway Drainage Maintenance - End Haul | Cubic Yard | $ - 0 | ||||
| 0005 | Road #99513 - Spur of West Fork Road | Job | $ - 0 | |||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | ||||
| Road Surface Maintenance (Grading, Blading, and Compaction Method B) | Mile | $ - 0 | ||||
| Roadway Drainage Maintenance - Sidecast | Mile | $ - 0 | ||||
| Roadway Drainage Maintenance - End Haul | Cubic Yard | $ - 0 | ||||
| 0006 | Road #9955 - East Gate Road | Job | $ - 0 | |||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | ||||
| Road Surface Maintenance (Grading, Blading, and Compaction Method B) | 2.9 | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - Sidecast | Mile | $ - 0 | ||||
| Roadway Drainage Maintenance - End Haul | Cubic Yard | $ - 0 | ||||
| 0007 | Road #99551 - Spur of East Gate Road | Job | $ - 0 | |||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | ||||
| Road Surface Maintenance (Grading, Blading, and Compaction Method B) | 1.7 | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - Sidecast | Mile | $ - 0 | ||||
| Roadway Drainage Maintenance - End Haul | Cubic Yard | $ - 0 | ||||
| 0008 | Road #9957 - Sawmill Cove Road | Job | $ - 0 | |||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | ||||
| Road Surface Maintenance (Grading, Blading, and Compaction Method B) | 0.8 | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - Sidecast | Mile | $ - 0 | ||||
| Roadway Drainage Maintenance - End Haul | Cubic Yard | $ - 0 | ||||
| 0009 | Road #9963 - Cannon Beach Road | Job | $ - 0 | |||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | ||||
| Road Surface Maintenance (Grading, Blading, and Compaction Method B) | 19.2 | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - Sidecast | Mile | $ - 0 | ||||
| Roadway Drainage Maintenance - End Haul | Cubic Yard | $ - 0 | ||||
| Snowplowing | 28.8 | Mile | $ - 0 | |||
| 0010 | Road #9964 - Administrative Site Cut Off Road | Job | $ - 0 | |||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | ||||
| Road Surface Maintenance (Grading, Blading, and Compaction Method B) | 1.5 | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - Sidecast | Mile | $ - 0 | ||||
| Roadway Drainage Maintenance - End Haul | Cubic Yard | $ - 0 | ||||
| Snowplowing | 6 | Mile | $ - 0 | |||
| 0011 | Road #9968 - East Inner Beach Road | Job | $ - 0 | |||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | ||||
| Road Surface Maintenance (Grading, Blading, and Compaction Method B) | Mile | $ - 0 | ||||
| Roadway Drainage Maintenance - Sidecast | Mile | $ - 0 | ||||
| Roadway Drainage Maintenance - End Haul | Cubic Yard | $ - 0 | ||||
| 0012 | Road #9968 - West Inner Beach Road | Job | $ - 0 | |||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | ||||
| Road Surface Maintenance (Grading, Blading, and Compaction Method B) | Mile | $ - 0 | ||||
| Roadway Drainage Maintenance - Sidecast | Mile | $ - 0 | ||||
| Roadway Drainage Maintenance - End Haul | Cubic Yard | $ - 0 | ||||
| 0013 | Road #9969 - Lower Situk Road | Job | $ - 0 | |||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | ||||
| Road Surface Maintenance (Grading, Blading, and Compaction Method B) | 1.6 | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - Sidecast | Mile | $ - 0 | ||||
| Roadway Drainage Maintenance - End Haul | Cubic Yard | $ - 0 | ||||
| 0014 | Road #99692 - Strawberry Point Access Road | Job | $ - 0 | |||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | ||||
| Road Surface Maintenance (Grading, Blading, and Compaction Method B) | 0.3 | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - Sidecast | Mile | $ - 0 | ||||
| Roadway Drainage Maintenance - End Haul | Cubic Yard | $ - 0 | ||||
| 0015 | Road #9971 - Situk Main Parking/Launch Road | Job | $ - 0 | |||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | ||||
| Road Surface Maintenance (Grading, Blading, and Compaction Method B) | 0.4 | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - Sidecast | Mile | $ - 0 | ||||
| Roadway Drainage Maintenance - End Haul | Cubic Yard | $ - 0 | ||||
| 0016 | Road #9975 - Bear Alley Road | Job | $ - 0 | |||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | ||||
| Road Surface Maintenance (Grading, Blading, and Compaction Method B) | 0.5 | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - Sidecast | Mile | $ - 0 | ||||
| Roadway Drainage Maintenance - End Haul | Cubic Yard | $ - 0 | ||||
| 0017 | Road #9976 - Lost River Road | Job | $ - 0 | |||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | ||||
| Road Surface Maintenance (Grading, Blading, and Compaction Method B) | 2.4 | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - Sidecast | Mile | $ - 0 | ||||
| Roadway Drainage Maintenance - End Haul | Cubic Yard | $ - 0 | ||||
| 0018 | Road #9977 - Compound Entrance Road | Job | $ - 0 | |||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | ||||
| Road Surface Maintenance (Grading, Blading, and Compaction Method B) | 0.3 | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - Sidecast | Mile | $ - 0 | ||||
| Roadway Drainage Maintenance - End Haul | Cubic Yard | $ - 0 | ||||
| Snowplowing | 1.2 | Mile | $ - 0 | |||
| 0019 | Road #9981 - 17-Mile Road | Job | $ - 0 | |||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | ||||
| Road Surface Maintenance (Grading, Blading, and Compaction Method B) | Mile | $ - 0 | ||||
| Roadway Drainage Maintenance - Sidecast | Mile | $ - 0 | ||||
| Roadway Drainage Maintenance - End Haul | Cubic Yard | $ - 0 | ||||
| 0020 | Over and Above Work | 10 | Job | TBN | ||
| Total: | $ - 0 |
| OPTION PERIOD 1 (1 November 2024 - 31 October 2025) | |||||
| Item Number | Description | Estimated Quantity | Unit of Issue | Unit Price | Total |
| 1001 | Road #9946 - Strawberry Point Road | Job | $ - 0 | ||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | |||
| Road Surface Maintenance (Grading, Blading, and Compaction Method B) | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - Sidecast | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - End Haul | Cubic Yard | $ - 0 | |||
| Spot Surfacing | Cubic Yard | $ - 0 | |||
| 1002 | Road #9951 - West Fork Road | Job | $ - 0 | ||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | |||
| Road Surface Maintenance (Grading, Blading, and Compaction Method B) | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - Sidecast | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - End Haul | Cubic Yard | $ - 0 | |||
| Spot Surfacing | Cubic Yard | $ - 0 | |||
| 1003 | Road #99511 - Spur of West Fork Road | Job | $ - 0 | ||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | |||
| Road Surface Maintenance (Grading, Blading, and Compaction Method B) | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - Sidecast | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - End Haul | Cubic Yard | $ - 0 | |||
| Spot Surfacing | Cubic Yard | $ - 0 | |||
| 1004 | Road #99512 - Spur of West Fork Road | Job | $ - 0 | ||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | |||
| Road Surface Maintenance (Grading, Blading, and Compaction Method B) | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - Sidecast | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - End Haul | Cubic Yard | $ - 0 | |||
| Spot Surfacing | Cubic Yard | $ - 0 | |||
| 1005 | Road #99513 - Spur of West Fork Road | Job | $ - 0 | ||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | |||
| Road Surface Maintenance (Grading, Blading, and Compaction Method B) | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - Sidecast | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - End Haul | Cubic Yard | $ - 0 | |||
| Spot Surfacing | Cubic Yard | $ - 0 | |||
| 1006 | Road #9955 - East Gate Road | Job | $ - 0 | ||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | |||
| Road Surface Maintenance (Grading, Blading, and Compaction Method B) | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - Sidecast | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - End Haul | Cubic Yard | $ - 0 | |||
| Spot Surfacing | Cubic Yard | $ - 0 | |||
| 1007 | Road #99551 - Spur of East Gate Road | Job | $ - 0 | ||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | |||
| Road Surface Maintenance (Grading, Blading, and Compaction Method B) | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - Sidecast | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - End Haul | Cubic Yard | $ - 0 | |||
| Spot Surfacing | Cubic Yard | $ - 0 | |||
| 1008 | Road #9957 - Sawmill Cove Road | Job | $ - 0 | ||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | |||
| Road Surface Maintenance (Grading, Blading, and Compaction Method B) | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - Sidecast | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - End Haul | Cubic Yard | $ - 0 | |||
| Spot Surfacing | Cubic Yard | $ - 0 | |||
| 1009 | Road #9963 - Cannon Beach Road | Job | $ - 0 | ||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | |||
| Road Surface Maintenance (Grading, Blading, and Compaction Method B) | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - Sidecast | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - End Haul | Cubic Yard | $ - 0 | |||
| Spot Surfacing | Cubic Yard | $ - 0 | |||
| Snowplowing | 28.8 | Mile | $ - 0 | ||
| 1010 | Road #9964 - Administrative Site Cut Off Road | Job | $ - 0 | ||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | |||
| Road Surface Maintenance (Grading, Blading, and Compaction Method B) | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - Sidecast | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - End Haul | Cubic Yard | $ - 0 | |||
| Spot Surfacing | Cubic Yard | $ - 0 | |||
| Snowplowing | 6 | Mile | $ - 0 | ||
| 1011 | Road #9968 - East Inner Beach Road | Job | $ - 0 | ||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | |||
| Road Surface Maintenance (Grading, Blading, and Compaction Method B) | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - Sidecast | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - End Haul | Cubic Yard | $ - 0 | |||
| Spot Surfacing | Cubic Yard | $ - 0 | |||
| 1012 | Road #9968 - West Inner Beach Road | Job | $ - 0 | ||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | |||
| Road Surface Maintenance (Grading, Blading, and Compaction Method B) | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - Sidecast | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - End Haul | Cubic Yard | $ - 0 | |||
| Spot Surfacing | Cubic Yard | $ - 0 | |||
| 1013 | Road #9969 - Lower Situk Road | Job | $ - 0 | ||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | |||
| Road Surface Maintenance (Grading, Blading, and Compaction Method B) | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - Sidecast | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - End Haul | Cubic Yard | $ - 0 | |||
| Spot Surfacing | Cubic Yard | $ - 0 | |||
| 1014 | Road #99692 - Strawberry Point Access Road | Job | $ - 0 | ||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | |||
| Road Surface Maintenance (Grading, Blading, and Compaction Method B) | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - Sidecast | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - End Haul | Cubic Yard | $ - 0 | |||
| Spot Surfacing | Cubic Yard | $ - 0 | |||
| 1015 | Road #9971 - Situk Main Parking/Launch Road | Job | $ - 0 | ||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | |||
| Road Surface Maintenance (Grading, Blading, and Compaction Method B) | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - Sidecast | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - End Haul | Cubic Yard | $ - 0 | |||
| Spot Surfacing | Cubic Yard | $ - 0 | |||
| 1016 | Road #9975 - Bear Alley Road | Job | $ - 0 | ||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | |||
| Road Surface Maintenance (Grading, Blading, and Compaction Method B) | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - Sidecast | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - End Haul | Cubic Yard | $ - 0 | |||
| Spot Surfacing | Cubic Yard | $ - 0 | |||
| 1017 | Road #9976 - Lost River Road | Job | $ - 0 | ||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | |||
| Road Surface Maintenance (Grading, Blading, and Compaction Method B) | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - Sidecast | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - End Haul | Cubic Yard | $ - 0 | |||
| Spot Surfacing | Cubic Yard | $ - 0 | |||
| 1018 | Road #9977 - Compound Entrance Road | Job | $ - 0 | ||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | |||
| Road Surface Maintenance (Grading, Blading, and Compaction Method B) | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - Sidecast | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - End Haul | Cubic Yard | $ - 0 | |||
| Spot Surfacing | Cubic Yard | $ - 0 | |||
| Snowplowing | 1.2 | Mile | $ - 0 | ||
| 1019 | Road #9981 - 17-Mile Road | Job | $ - 0 | ||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | |||
| Road Surface Maintenance (Grading, Blading, and Compaction Method B) | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - Sidecast | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - End Haul | Cubic Yard | $ - 0 | |||
| Spot Surfacing | Cubic Yard | $ - 0 | |||
| 1020 | Over and Above Work | 10 | Job | TBN | |
| Total: | $ - 0 |
| OPTION PERIOD 2 (1 November 2025 - 31 October 2026) | |||||
| Item Number | Description | Estimated Quantity | Unit of Issue | Unit Price | Total |
| 2001 | Road #9946 - Strawberry Point Road | Job | $ - 0 | ||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | |||
| Road Surface Maintenance (Grading, Blading, and Compaction Method B) | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - Sidecast | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - End Haul | Cubic Yard | $ - 0 | |||
| 2002 | Road #9951 - West Fork Road | Job | $ - 0 | ||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | |||
| Road Surface Maintenance (Grading, Blading, and Compaction Method B) | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - Sidecast | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - End Haul | Cubic Yard | $ - 0 | |||
| 2003 | Road #99511 - Spur of West Fork Road | Job | $ - 0 | ||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | |||
| Road Surface Maintenance (Grading, Blading, and Compaction Method B) | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - Sidecast | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - End Haul | Cubic Yard | $ - 0 | |||
| 2004 | Road #99512 - Spur of West Fork Road | Job | $ - 0 | ||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | |||
| Road Surface Maintenance (Grading, Blading, and Compaction Method B) | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - Sidecast | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - End Haul | Cubic Yard | $ - 0 | |||
| 2005 | Road #99513 - Spur of West Fork Road | Job | $ - 0 | ||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | |||
| Road Surface Maintenance (Grading, Blading, and Compaction Method B) | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - Sidecast | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - End Haul | Cubic Yard | $ - 0 | |||
| 2006 | Road #9955 - East Gate Road | Job | $ - 0 | ||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | |||
| Road Surface Maintenance (Grading, Blading, and Compaction Method B) | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - Sidecast | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - End Haul | Cubic Yard | $ - 0 | |||
| 2007 | Road #99551 - Spur of East Gate Road | Job | $ - 0 | ||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | |||
| Road Surface Maintenance (Grading, Blading, and Compaction Method B) | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - Sidecast | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - End Haul | Cubic Yard | $ - 0 | |||
| 2008 | Road #9957 - Sawmill Cove Road | Job | $ - 0 | ||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | |||
| Road Surface Maintenance (Grading, Blading, and Compaction Method B) | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - Sidecast | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - End Haul | Cubic Yard | $ - 0 | |||
| 2009 | Road #9963 - Cannon Beach Road | Job | $ - 0 | ||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | |||
| Road Surface Maintenance (Grading, Blading, and Compaction Method B) | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - Sidecast | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - End Haul | Cubic Yard | $ - 0 | |||
| Snowplowing | 28.8 | Mile | $ - 0 | ||
| 2010 | Road #9964 - Administrative Site Cut Off Road | Job | $ - 0 | ||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | |||
| Road Surface Maintenance (Grading, Blading, and Compaction Method B) | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - Sidecast | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - End Haul | Cubic Yard | $ - 0 | |||
| Snowplowing | 6 | Mile | $ - 0 | ||
| 2011 | Road #9968 - East Inner Beach Road | Job | $ - 0 | ||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | |||
| Road Surface Maintenance (Grading, Blading, and Compaction Method B) | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - Sidecast | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - End Haul | Cubic Yard | $ - 0 | |||
| 2012 | Road #9968 - West Inner Beach Road | Job | $ - 0 | ||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | |||
| Road Surface Maintenance (Grading, Blading, and Compaction Method B) | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - Sidecast | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - End Haul | Cubic Yard | $ - 0 | |||
| 2013 | Road #9969 - Lower Situk Road | Job | $ - 0 | ||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | |||
| Road Surface Maintenance (Grading, Blading, and Compaction Method B) | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - Sidecast | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - End Haul | Cubic Yard | $ - 0 | |||
| 2014 | Road #99692 - Strawberry Point Access Road | Job | $ - 0 | ||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | |||
| Road Surface Maintenance (Grading, Blading, and Compaction Method B) | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - Sidecast | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - End Haul | Cubic Yard | $ - 0 | |||
| 2015 | Road #9971 - Situk Main Parking/Launch Road | Job | $ - 0 | ||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | |||
| Road Surface Maintenance (Grading, Blading, and Compaction Method B) | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - Sidecast | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - End Haul | Cubic Yard | $ - 0 | |||
| 2016 | Road #9975 - Bear Alley Road | Job | $ - 0 | ||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | |||
| Road Surface Maintenance (Grading, Blading, and Compaction Method B) | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - Sidecast | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - End Haul | Cubic Yard | $ - 0 | |||
| 2017 | Road #9976 - Lost River Road | Job | $ - 0 | ||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | |||
| Road Surface Maintenance (Grading, Blading, and Compaction Method B) | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - Sidecast | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - End Haul | Cubic Yard | $ - 0 | |||
| 2018 | Road #9977 - Compound Entrance Road | Job | $ - 0 | ||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | |||
| Road Surface Maintenance (Grading, Blading, and Compaction Method B) | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - Sidecast | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - End Haul | Cubic Yard | $ - 0 | |||
| Snowplowing | 1.2 | Mile | $ - 0 | ||
| 2019 | Road #9981 - 17-Mile Road | Job | $ - 0 | ||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | |||
| Road Surface Maintenance (Grading, Blading, and Compaction Method B) | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - Sidecast | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - End Haul | Cubic Yard | $ - 0 | |||
| 2020 | Over and Above Work | 10 | Job | TBN | |
| Total: | $ - 0 |
| OPTION PERIOD 3 (1 November 2026 - 31 October 2027) | |||||
| Item Number | Description | Estimated Quantity | Unit of Issue | Unit Price | Total |
| 3001 | Road #9946 - Strawberry Point Road | Job | $ - 0 | ||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | |||
| Road Surface Maintenance (Grading, Blading, and Compaction Method B) | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - Sidecast | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - End Haul | Cubic Yard | $ - 0 | |||
| Spot Surfacing | Cubic Yard | $ - 0 | |||
| 3002 | Road #9951 - West Fork Road | Job | $ - 0 | ||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | |||
| Road Surface Maintenance (Grading, Blading, and Compaction Method B) | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - Sidecast | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - End Haul | Cubic Yard | $ - 0 | |||
| Spot Surfacing | Cubic Yard | $ - 0 | |||
| 3003 | Road #99511 - Spur of West Fork Road | Job | $ - 0 | ||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | |||
| Road Surface Maintenance (Grading, Blading, and Compaction Method B) | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - Sidecast | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - End Haul | Cubic Yard | $ - 0 | |||
| Spot Surfacing | Cubic Yard | $ - 0 | |||
| 3004 | Road #99512 - Spur of West Fork Road | Job | $ - 0 | ||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | |||
| Road Surface Maintenance (Grading, Blading, and Compaction Method B) | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - Sidecast | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - End Haul | Cubic Yard | $ - 0 | |||
| Spot Surfacing | Cubic Yard | $ - 0 | |||
| 3005 | Road #99513 - Spur of West Fork Road | Job | $ - 0 | ||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | |||
| Road Surface Maintenance (Grading, Blading, and Compaction Method B) | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - Sidecast | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - End Haul | Cubic Yard | $ - 0 | |||
| Spot Surfacing | Cubic Yard | $ - 0 | |||
| 3006 | Road #9955 - East Gate Road | Job | $ - 0 | ||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | |||
| Road Surface Maintenance (Grading, Blading, and Compaction Method B) | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - Sidecast | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - End Haul | Cubic Yard | $ - 0 | |||
| Spot Surfacing | Cubic Yard | $ - 0 | |||
| 3007 | Road #99551 - Spur of East Gate Road | Job | $ - 0 | ||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | |||
| Road Surface Maintenance (Grading, Blading, and Compaction Method B) | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - Sidecast | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - End Haul | Cubic Yard | $ - 0 | |||
| Spot Surfacing | Cubic Yard | $ - 0 | |||
| 3008 | Road #9957 - Sawmill Cove Road | Job | $ - 0 | ||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | |||
| Road Surface Maintenance (Grading, Blading, and Compaction Method B) | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - Sidecast | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - End Haul | Cubic Yard | $ - 0 | |||
| Spot Surfacing | Cubic Yard | $ - 0 | |||
| 3009 | Road #9963 - Cannon Beach Road | Job | $ - 0 | ||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | |||
| Road Surface Maintenance (Grading, Blading, and Compaction Method B) | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - Sidecast | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - End Haul | Cubic Yard | $ - 0 | |||
| Spot Surfacing | Cubic Yard | $ - 0 | |||
| Snowplowing | 28.8 | Mile | $ - 0 | ||
| 3010 | Road #9964 - Administrative Site Cut Off Road | Job | $ - 0 | ||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | |||
| Road Surface Maintenance (Grading, Blading, and Compaction Method B) | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - Sidecast | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - End Haul | Cubic Yard | $ - 0 | |||
| Spot Surfacing | Cubic Yard | $ - 0 | |||
| Snowplowing | 6 | Mile | $ - 0 | ||
| 3011 | Road #9968 - East Inner Beach Road | Job | $ - 0 | ||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | |||
| Road Surface Maintenance (Grading, Blading, and Compaction Method B) | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - Sidecast | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - End Haul | Cubic Yard | $ - 0 | |||
| Spot Surfacing | Cubic Yard | $ - 0 | |||
| 3012 | Road #9968 - West Inner Beach Road | Job | $ - 0 | ||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | |||
| Road Surface Maintenance (Grading, Blading, and Compaction Method B) | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - Sidecast | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - End Haul | Cubic Yard | $ - 0 | |||
| Spot Surfacing | Cubic Yard | $ - 0 | |||
| 3013 | Road #9969 - Lower Situk Road | Job | $ - 0 | ||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | |||
| Road Surface Maintenance (Grading, Blading, and Compaction Method B) | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - Sidecast | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - End Haul | Cubic Yard | $ - 0 | |||
| Spot Surfacing | Cubic Yard | $ - 0 | |||
| 3014 | Road #99692 - Strawberry Point Access Road | Job | $ - 0 | ||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | |||
| Road Surface Maintenance (Grading, Blading, and Compaction Method B) | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - Sidecast | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - End Haul | Cubic Yard | $ - 0 | |||
| Spot Surfacing | Cubic Yard | $ - 0 | |||
| 3015 | Road #9971 - Situk Main Parking/Launch Road | Job | $ - 0 | ||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | |||
| Road Surface Maintenance (Grading, Blading, and Compaction Method B) | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - Sidecast | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - End Haul | Cubic Yard | $ - 0 | |||
| Spot Surfacing | Cubic Yard | $ - 0 | |||
| 3016 | Road #9975 - Bear Alley Road | Job | $ - 0 | ||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | |||
| Road Surface Maintenance (Grading, Blading, and Compaction Method B) | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - Sidecast | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - End Haul | Cubic Yard | $ - 0 | |||
| Spot Surfacing | Cubic Yard | $ - 0 | |||
| 3017 | Road #9976 - Lost River Road | Job | $ - 0 | ||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | |||
| Road Surface Maintenance (Grading, Blading, and Compaction Method B) | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - Sidecast | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - End Haul | Cubic Yard | $ - 0 | |||
| Spot Surfacing | Cubic Yard | $ - 0 | |||
| 3018 | Road #9977 - Compound Entrance Road | Job | $ - 0 | ||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | |||
| Road Surface Maintenance (Grading, Blading, and Compaction Method B) | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - Sidecast | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - End Haul | Cubic Yard | $ - 0 | |||
| Spot Surfacing | Cubic Yard | $ - 0 | |||
| Snowplowing | 1.2 | Mile | $ - 0 | ||
| 3019 | Road #9981 - 17-Mile Road | Job | $ - 0 | ||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | |||
| Road Surface Maintenance (Grading, Blading, and Compaction Method B) | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - Sidecast | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - End Haul | Cubic Yard | $ - 0 | |||
| Spot Surfacing | Cubic Yard | $ - 0 | |||
| 3020 | Over and Above Work | 10 | Job | TBN | |
| Total: | $ - 0 |
| OPTION PERIOD 4 (1 November 2027 - 31 October 2028) | |||||
| Item Number | Description | Estimated Quantity | Unit of Issue | Unit Price | Total |
| 4001 | Road #9946 - Strawberry Point Road | Job | $ - 0 | ||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | |||
| Road Surface Maintenance (Grading, Blading, and Compaction Method B) | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - Sidecast | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - End Haul | Cubic Yard | $ - 0 | |||
| 4002 | Road #9951 - West Fork Road | Job | $ - 0 | ||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | |||
| Road Surface Maintenance (Grading, Blading, and Compaction Method B) | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - Sidecast | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - End Haul | Cubic Yard | $ - 0 | |||
| 4003 | Road #99511 - Spur of West Fork Road | Job | $ - 0 | ||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | |||
| Road Surface Maintenance (Grading, Blading, and Compaction Method B) | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - Sidecast | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - End Haul | Cubic Yard | $ - 0 | |||
| 4004 | Road #99512 - Spur of West Fork Road | Job | $ - 0 | ||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | |||
| Road Surface Maintenance (Grading, Blading, and Compaction Method B) | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - Sidecast | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - End Haul | Cubic Yard | $ - 0 | |||
| 4005 | Road #99513 - Spur of West Fork Road | Job | $ - 0 | ||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | |||
| Road Surface Maintenance (Grading, Blading, and Compaction Method B) | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - Sidecast | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - End Haul | Cubic Yard | $ - 0 | |||
| 4006 | Road #9955 - East Gate Road | Job | $ - 0 | ||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | |||
| Road Surface Maintenance (Grading, Blading, and Compaction Method B) | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - Sidecast | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - End Haul | Cubic Yard | $ - 0 | |||
| 4007 | Road #99551 - Spur of East Gate Road | Job | $ - 0 | ||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | |||
| Road Surface Maintenance (Grading, Blading, and Compaction Method B) | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - Sidecast | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - End Haul | Cubic Yard | $ - 0 | |||
| 4008 | Road #9957 - Sawmill Cove Road | Job | $ - 0 | ||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | |||
| Road Surface Maintenance (Grading, Blading, and Compaction Method B) | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - Sidecast | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - End Haul | Cubic Yard | $ - 0 | |||
| 4009 | Road #9963 - Cannon Beach Road | Job | $ - 0 | ||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | |||
| Road Surface Maintenance (Grading, Blading, and Compaction Method B) | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - Sidecast | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - End Haul | Cubic Yard | $ - 0 | |||
| Snowplowing | 28.8 | Mile | $ - 0 | ||
| 4010 | Road #9964 - Administrative Site Cut Off Road | Job | $ - 0 | ||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | |||
| Road Surface Maintenance (Grading, Blading, and Compaction Method B) | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - Sidecast | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - End Haul | Cubic Yard | $ - 0 | |||
| Snowplowing | 6 | Mile | $ - 0 | ||
| 4011 | Road #9968 - East Inner Beach Road | Job | $ - 0 | ||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | |||
| Road Surface Maintenance (Grading, Blading, and Compaction Method B) | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - Sidecast | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - End Haul | Cubic Yard | $ - 0 | |||
| 4012 | Road #9968 - West Inner Beach Road | Job | $ - 0 | ||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | |||
| Road Surface Maintenance (Grading, Blading, and Compaction Method B) | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - Sidecast | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - End Haul | Cubic Yard | $ - 0 | |||
| 4013 | Road #9969 - Lower Situk Road | Job | $ - 0 | ||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | |||
| Road Surface Maintenance (Grading, Blading, and Compaction Method B) | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - Sidecast | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - End Haul | Cubic Yard | $ - 0 | |||
| 4014 | Road #99692 - Strawberry Point Access Road | Job | $ - 0 | ||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | |||
| Road Surface Maintenance (Grading, Blading, and Compaction Method B) | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - Sidecast | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - End Haul | Cubic Yard | $ - 0 | |||
| 4015 | Road #9971 - Situk Main Parking/Launch Road | Job | $ - 0 | ||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | |||
| Road Surface Maintenance (Grading, Blading, and Compaction Method B) | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - Sidecast | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - End Haul | Cubic Yard | $ - 0 | |||
| 4016 | Road #9975 - Bear Alley Road | Job | $ - 0 | ||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | |||
| Road Surface Maintenance (Grading, Blading, and Compaction Method B) | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - Sidecast | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - End Haul | Cubic Yard | $ - 0 | |||
| 4017 | Road #9976 - Lost River Road | Job | $ - 0 | ||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | |||
| Road Surface Maintenance (Grading, Blading, and Compaction Method B) | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - Sidecast | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - End Haul | Cubic Yard | $ - 0 | |||
| 4018 | Road #9977 - Compound Entrance Road | Job | $ - 0 | ||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | |||
| Road Surface Maintenance (Grading, Blading, and Compaction Method B) | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - Sidecast | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - End Haul | Cubic Yard | $ - 0 | |||
| Snowplowing | 1.2 | Mile | $ - 0 | ||
| 4019 | Road #9981 - 17-Mile Road | Job | $ - 0 | ||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | |||
| Road Surface Maintenance (Grading, Blading, and Compaction Method B) | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - Sidecast | Mile | $ - 0 | |||
| Roadway Drainage Maintenance - End Haul | Cubic Yard | $ - 0 | |||
| 4020 | Over and Above Work | 10 | Job | TBN | |
| Total: | $ - 0 |
Grand Total: $ - 0
NOTES: (1) The quantities specified in the Schedule of Items are estimates only and are not guaranteed quantities. The government reserves the right to add, remove, or change the items and quantities to be serviced under this contract, as required. Price adjustments for these changes shall be based on the rates specified in the Schedule of Items for identical or similar items. Changes will only be authorized by a warranted CO. (2) The quantities specified in the Schedule of Items are based on the Government's best estimate.