1240BF23Q0057 Scedule of Items Offer Sheet.xlsx

XLSX spreadsheet 358 KB Posted

Attached to
Bridge Parts, Seward Alaska
Solicitation number
1240BF23Q0057
Issued by

About this file

This bid summary sheet requests pricing for bridge parts to be delivered to the Kenai Lake Trail Park in Seward, Alaska. The solicitation number is 1240BF23Q0057 and was issued by the Department of Agriculture Forest Service for the supply of bridge parts including glulam stringers and diaphragms, decking, rail posts, rail caps, rails, running planks, and other components. Bidders are asked to provide unit pricing for each line item as well as an overall grand total with and without expedited shipping. The period of performance is 11 months.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID SUMMARY SHEET

ONLY FILL OUT THE YELLOW HIGHLIGHTED CELLS THROUGHOUT THIS BID SHEET

TITLE OF PROCUREMENT

SOLICITATION:
Company Name:
Point of Contact (POC):
CAGE Code:
UEI Number:
Address:
Phone:
E-mail:
Fax
Item NumberDescriptionQuantityUnit of IssueUnit PriceTotal
0001Glulam Stringers and Glulam Diaphragms for Vagt Creek Trail Bridge

Glulams - APA Combination 20F-13

Alaska Yellow Cedar1LS$0.00
0002Entire Bridge Package

(excluding footings) for Spencer Bench Trail Bridge Glulams - APA Combination 20F-13

Alaska Yellow Cedar1LS$0.00
0003Shipping*1LS$0.00
0004Expedited Shipping*1LS$0.00
Grand Total:(without Expidited)$0.00
Grand Total: w/Expidited$0.00
*All bridge materials shall be delivered to Forest Service property at the Kenai Lake Trail Park, approximately 0.3 miles from the Seward Highway on Rock Ptarmigan Road, which intersects the Seward Highway at milepost 23.3 (beginning at Seward, AK). Exact unloading location will be coordinated by the COR at the time of delivery.

Parts Breakdown

PARTS LIST REQUIRED FOR VAGT AND SPENCER TRAIL BRIDGE SUPPLY
Vagt Creek Bridge
STRINGERS *PREDRILL DIAPHRAGM AND STRINGERS PER PLANS
CS20F-V13
SpeciesAC/AC
b5.125in
d27in
Length40ft
Qty2
DIAPHRAGMS-GLULAM *PREDRILL DIAPHRAGM AND STRINGERS PER PLANS
Diaphragm Width5.125in
Diaphragm Depth18in
Diaphragm Length42.875in
Diaphragm Qty3Qty
Diaphragm All Thread Qty6QtyHot-Dip Galvanized
Diaphragm All Thread Dia0.75in
Diaphragm All Thread Length56.125in
Diaphragm All Thread Nut Qty12QtyHot-Dip Galvanized
Diaphragm All Thread Washer TypeMalleable IronHot-Dip Galvanized
Diaphragm All Thread Washer Qty12Qty
SPENCER BENCH BRIDGE
STRINGERS *PREDRILL DIAPHRAGM AND STRINGERS PER PLANS
CS20F-V13
SpeciesAC/AC
b5.125in
d28.5in
Length25ft
Qty2
DIAPHRAGMS-GLULAM *PREDRILL DIAPHRAGM AND STRINGERS PER PLANS
Diaphragm Width5.125in
Diaphragm Depth25.5in
Diaphragm Length42.875in
Diaphragm Qty3Qty
Diaphragm All Thread Qty6QtyHot-Dip Galvanized
Diaphragm All Thread Dia0.75in
Diaphragm All Thread Length56.125in
Diaphragm All Thread Nut Qty12QtyHot-Dip Galvanized
Diaphragm All Thread Washer TypeMalleable IronHot-Dip Galvanized
Diaphragm All Thread Washer Qty12Qty
DECKING
Decking Thickness3in
Decking Width12in
Decking Length60.125in
Decking Total Pieces26Qty
Decking Fastener Length6in
Decking Fastener TypeSS or Coated Flathead Structural Screw such as Flatlok by Fastenmaster
Decking Fastener Quantity104Qty
RAIL POSTS
Rail Post Thickness3.5in
Rail Post Width5.5in
Rail Post Length5.083ft
Rail Post Qty12
Rail Post Blocking Length1.167ft
Rail Post Blocking Qty12
Rail Post Bolt Length14in
Rail Post Bolt Diameter0.625in
Rail Post Bolt Qty24Qty
Rail Post Nut Qty24Qty
Rail Post Washer Qty48Qty
RAIL CAP
Rail Cap Thickness1.5in
Rail Cap Width7.25in
Rail Cap Total Length50ft
Rail Cap Fastener Dia#10
Rail Cap Fastener Length4in
Rail Cap Fastener TypeCoated Wood Screw
Rail Cap Fastener Qty76Qty
RAILS
Rail Thickness1.5in
Rail Width5.5in
Rail Total Length150ft
Rail Fastener Diameter#10
Rail Fastener Length4in
Rail Fastener TypeCoated Wood Screw
Rail Fastener Qty48Qty
RUNNING PLANKS
Running Thickness2in
Running Width12in
Running Assumed Length10ft
Running Total Pieces12Qty
Running Fastener Length4.5in
Running Fastener TypeSS or Coated Flathead Structural Screw such as Flatlok by Fastenmaster
Running Fastener Quantity120Qty
RAIL ENDS
Rail End Thickness1.5in
Rail Post End Width5.5in
Rail Post End Length4.5ft
Rail Post End Qty4Qty
Rail Post End Fastener Qty24QtyCoated Wood Screws
Rail Post End Fastener Diameter#10
Rail Post End Fastener Length4in
Rail Post Lag Screw Qty8QtyCoated Wood Screws
Rail Post Lag Screw Dia0.375in
Rail Post Lag Screw Length3.5in
BACKING PLANK
Backing Plank Thickness3in
Backing Plank Width12in
Backing Plank Length10ft
Backing Plank Qty6Qty
Backing Plank Nails Qty50Qty
Backing Plank Nails Length6in
Backing Plank Nails TypeSS or Coated Flathead Structural Screw such as Flatlok by Fastenmaster
BACKING PLANK STIFFENER
Backing Plank Stiffener Thickness3in
Backing Plank Stiffener Width6in
Backing Plank Stiffener Length4ft
Backing Plank Stiffener Qty4Qty
Backing Plank Stiffener Bolt Qty24Qty
Backing Plank Stiffener Bolt Dia0.5in
Backing Plank Stiffener Bolt Length7in
Backing Plank Stiffener Washer Qty48Qty
Backing Plank Stiffener Washer TypeMalleable Iron
Backing Plank Stiffener Nut Qty24Qty
BEARING SHOE
Bearing Shoe Qty4Qty
Bearing Shoe TypeBearing Shoe Detail on Sheet -04 Hot Dip Galvanized Finish
Bearing Shoe Bolt Dia0.75in
Bearing Shoe Bolt Length8in
Bearing Shoe Bolt Qty4Qty
Bearing Shoe Washer Qty8Qty
Bearing Shoe Nut Qty4Qty
CONCRETE SILL HARDWARE
Concrete Sill Bolt Diameter0.75in
Concrete Sill Bolt Length9in
Concrete Sill Bolt TypeLong Heavy Hex Structural BoltHot-Dip Galvanized
Concrete Sill Bolt Qty8Qty
Concrete Sill Nut Type3/4" Hex NutHot-Dip Galvanized
Concrete Sill Nut Qty8Qty
Concrete Sill Washer Type3/4" Plain WasherHot-Dip Galvanized
Concrete Sill Washer Qty8Qty

Sheet1

BASE YEAR
CLIN #DESCRIPTIONQTYUNITUNIT PRICETOTAL COST
0002Category I Administrative Buildings
The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated.
Period of Performance: 11 months (Base Year)
QTYUNITUNIT PRICETOTAL COST
0002AACategory I Administrative Buildings Rest Room Cleans2,620,889sq. ft$ 0.0408$ 106,932.25*55,026x47.63= 2,620,888.58 SF (11month period)55026.0041990342522,861,352.22
The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. The quantity represents the square footage to be cleaned over an 11 month period.0520.00
Period of Performance: 11 months (Base Year)0520.00
QTYUNITUNIT PRICETOTAL COSTERROR:#VALUE!52ERROR:#VALUE!
0002ABCategory I Administrative Buildings Hard Floor Cleans6,586,752sq. ft$ 0.0231$ 152,153.97*94,515x47.63= 4,501,749.45 SF138289.986773042527,191,079.31
The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. The quantity represents the square footage to be cleaned over an 11 month period.0520.00
Period of Performance: 11 months (Base Year)0520.00
QTYUNITUNIT PRICETOTAL COSTERROR:#VALUE!52ERROR:#VALUE!
0002ACCategory I Administrative Buildings Carpet Floor Cleans1,204,420sq. ft$ 0.0192$ 23,124.87*19,831x47.63= 944,550.53 SF25287.0098677304521,314,924.51
The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. The quantity represents the square footage to be cleaned over an 11 month period.$ 282,211.100520.00
Period of Performance: 11 months (Base Year)0520.00
0520.00
CLIN #DESCRIPTIONQTYUNITUNIT PRICETOTAL COST520.00
0003Category II Child Development Facilities520.00
The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated.52
Period of Performance: 11 months (Base Year).
QTYUNITUNIT PRICETOTAL COST
0003AACategory II Child Development Facilities Hard Floor Cleans11,485,212sq. ft$ 0.0252$ 289,427.35*390,060x238.15weeks = 9,302,139 SFTOTAL: 11,485,212.42 SF
The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. The quantity represents the square footage to be cleaned over an 11 month period.*7,639x285.78 weeks = 2,183,073 SF
Period of Performance: 11 months (Base Year)
QTYUNITUNIT PRICETOTAL COST
0003ABCategory II Child Development Facilities Carpet Floor Cleans685,729sq. ft$ 0.0194$ 13,303.14*1113x238.15 weeks = 265,060.95 SFTOTAL: 685,729.11
The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. The quantity represents the square footage to be cleaned over an 11 month period.*1472x285.78 weeks = 420,668.16 SF
Period of Performance: 11 months (Base Year)$ 302,730.50
CLIN #DESCRIPTIONQTYUNITUNIT PRICETOTAL COST
0004Category III Physical Fitness Centers
The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated.
Period of Performance: 11 months (Base Year).
QTYUNITUNIT PRICETOTAL COST
0004AACategory III Physical Fitness Centers Hard Floor Cleans3,010,146sq. ft$ 0.0344$ 103,549.02Bldg 3452(6W) 1,330,305.90 SF1W*Hockey 1,323x17.32 = 22,914.36 SF1,330,305.90
The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. The quantity represents the square footage to be cleaned over an 11 month period.Bldg 3709 (7W) 1,416,325.68 SF6W*Hockey 1,323x30.31= 240,600.00 SF1,416,325.68
Period of Performance: 11 months (Base Year).22,914.36
QTYUNITUNIT PRICETOTAL COST240,600.00
0004ABCategory III Continuous Cleaning Physical Fitness Center Bldg 370911monthly$ 4,322.26$ 47,544.86Total Hours 1,657.05Provide locker room cleaning from 13:00-15:30 daily 1Male/1Female 2-1/2 hours each.3,010,145.94
The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated.
Period of Performance: 11 months (Base Year).
CLIN #DESCRIPTIONQTYUNITUNIT PRICETOTAL COST
0005Special /Emergency/Bio-Hazard Cleans
The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated.
Period of Performance: 11 months (Base Year).
QTYUNITUNIT PRICETOTAL COST
0005AASpecial Cleaning40,538per sq. ft$ 0.28$ 11,472.25
The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. The quantity of square footage reserved for the Special Cleaning CLIN represents 20% of the total square footage for the contract.
Period of Performance: 11 months (Base Year).
QTYUNITUNIT PRICETOTAL COST
0005ABEmergency Cleaning22,296per sq. ft$ 0.38$ 8,405.59
The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. The quantity of square footage reserved for the Emergency Cleaning CLIN represents 11% of the total square footage for the contract.
Period of Performance: 11 months (Base Year).
QTYUNITUNIT PRICETOTAL COST
0005ACBio-Hazard Cleaning10,134per sq. ft$ 1.13$ 11,471.69
The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. The quantity of square footage reserved for the Special Cleaning CLIN represents 5% of the total square footage for the contract.
Period of Performance: 11 months (Base Year).
CLIN #DESCRIPTIONQTYUNITUNIT PRICETOTAL COST
0006CONTRACT MANPOWER REPORTING1EA$ 100.0000$ 100.0000
Contractor Manpower Reporting Costs: 1 May 2016 to 30 March 2017. The Contractor Manpower Reporting requirement is associated with the Office of the Assistant Secretary of the Army (Manpower and Reserve Affairs) requirement to obtain better visibility of the Contractor service workforce.
The Contractor is required to enter data into the Contractor Manpower Reporting Application (CMRA) system as outlined in local information titled Contractor Manpower Reporting located with the clauses incorporated into the contract. Reporting period will be the period of performance not to exceed 12 months ending 30 September of each Government fiscal year and must be reported by 31 October of each calendar year. Data must be accurate and complete and entered into CMRA during the data gathering period of every year, or part of a year, for which the contract is in force. NOTE: If the reporting of Manpower Equivalents is not separately priced, insert “NSP in the blank shown.
BASE YEAR TOTAL COST:$ 767,485.01