Question Answer 1.pdf

PDF 184 KB Posted

Attached to
2021 PCT Knowles Head - Cordova RD Federal contract opportunity
Solicitation number
1240BF21Q0043
Issued by
Department of Agriculture Forest Service

View the file

Other files for this federal contract opportunity

Other files attached to 2021 PCT Knowles Head - Cordova RD, newest first.
File Type Posted
attach4 Knowles Head PWS.pdf PDF
attach3 2021 Knowles Head Deliverables Checklist and NSP CLIN.pdf PDF
1240bf21q0043 Knowles Head 2021.pdf PDF
attach1 Knowles Head Thinning QASP.pdf PDF
attach2 SCA WD 1996-0372 R44 3.15.2021.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1240BF21Q0043 - Knowles Head PCT Question/Answer #1 Page 1 of 1

Do you need to have a Farm Labor certificate, even if your employees are Alaska residents? Yes, a farm labor certificate is required if the employees are not able to return to their homes at the end of each work-day. Residency in a particular state or country does not matter; workers are considered migrant/seasonal if they have to live in housing other than their normal residences.

For question on MSPA and Farm Labor certificate please contact DOL:

ADRIANA V. IGLESIAS, Program Manager US Department of Labor, Wage and Hour Division National FLC Certificate Processing 90 7th Street, Rm. 11-100 San Francisco, CA 94103 Direct Line 415-241-3514 MSPA Processing 415-241-3505 mspaflc@dol.gov

Are there land access permits applicable to this work? No, there are no land access permits required for the completion of this work. Although, there are some access points that are owned by the Native Village of Tatitlek or other private party that would need to be contacted before using.

Do inspections need to occur before November 1? Yes, all inspections need to occur before November 1st as indicated in Attachment#4 Knowles Head PWS.

F.1 Winter Shutdown: It is assumed that adverse weather and/or ground conditions may prevent access to or satisfactory performance on the project during the winter period and which is defined as the period from November 1 through March 31. Therefore, no count of contract time will be made during this period. Work may continue at the Contractor’s option, however, the Government shall not be obligated to make progress payments or inspections during this period. – page 20 of solicitation

What are the requirements for the work schedule and inspection deliverable? Your plan must show that you have a process in place to self inspection.

Is a site-visit required to submit a proposal? No a site-visit is not needed.

Clarification of site: The beaches tend to be rocky and makes camping difficult. All units on this solicitation are less than one (1) mile from the beach. The available roads inside each unit are good for walking, however they are not feasible for motorized access due to water crossing not being available. Unit boundaries are listed by natural landmarks, there are no markings or flagging. The COR can provide flagging if necessary. All units tend to have conditions typical to SE Alaska (topography, island access, wildlife, etc.)