AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT CONTRACT ID CODE PAGE OF PAGES

2 AMENDMENT/MODIFICATION NO.

3. EFFECTIVE DATE

09/20/2021

4. REQUISITION/PUCHASE REQ. NO. 5. PROJECT NO.(IF APPLICABLE)

6. ISSUE BY CODE 7.ADMINISTERED BY (if other than item 6) CODE

NW Zone, Contract Service Area 3 Wallowa-Whitman National Forest, Pine Office 38470 Pine Town Lane Halfway, OR 97834

8.NAME AND ADDRESS OF CONTRACTOR(No., street, county, State and ZIP Code) 9A.Amend Solicitation. 1240BE21Q0120

* 9B.Dated 09/10/2021

* 10A.Mod Contract/Order #

* 10B.Dated (see Item 13) code facility code

11. THIS ITEM APPLIES ONLY TO AMENDMENT OF SOLICITATION

[ X ] The above numbered solicitation is amended as set forth in the item 14. The hour and date specified for receipt of Offers [ ] is extended [X ] is not extended. Offerors must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15 and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted, or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegam or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting and Appropriation Data (if required)

13. THIS ITEM APPLIES ONLY TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. This change order is issued pursuant to; (specifiy authority) The changes set forth in item 14 are made in the Contract/Order # in item 10A.

B. The above numbered Contract/Order is modified to reflect the administrative changes (such as changes in paying office, appropriation date, etc.) set forth in item 14, pursuant to the authority of FAR 43.103(b).

C. This supplemental agreement is entered into pu rsuant to authority of:

D Other: (Specify type of modification and authority):

E. IMPORTANT: Contractor [ ] is not [ ] is required to sign this document and return _ Original to the issuing office.:

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible)

HCNRA Trails Deffered Maintenance Call Order – Wallowa Whitman National Forest

1. This amendment adds the attached documents to the solicitation package to become part of the awarded contract. Standard Trail Maintenance Specifications, 13 pages.

By signature in Block 15B Contractor releases the Government from all claims relating to this modification. This settlement is complete accord and satisfaction. Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A.NAME AND TITLE OF SIGNER (Type or print) 16A.NAME AND TITLE OF CONTRACTING OFFICER

Andrea Pollock, Contracting Officer

15B.CONTRACTOR/OFFEROR

By ______________________________ (Signature of person authorized to sign)

15C.DATE SIGNED 16B.UNITED STATES OF AMERICA

By____________________________ (Signature of Contracting Officer)

16C.DATE SIGNED

09/10/2021

Standard Form 30 Prescribed by GSA FAR (48CFR) 53.243

TECHNICAL SPECIFICATIONS

Trail Opening (See Exhibit 1 for Trail Terms}

The trail opening dimensions are as follows: (see Exhibits 2 & 3).

(a) Clearing Limit - An area 8 feet wide by IO feet high.

(b) Trail Treads - A 24 inch width.

The widths are measured from the trail centerline. Where the trail is an old road, the centerline is measured from the centerline of the existing travelway, not necessarily the centerline of the old road bed.

(a) Clearing limit width is that area 4 feet on each side of the trail centerline;

(b) Trail tread width is that area 12 inches on either side of centerline.

Trail Maintenance

Section 982 - Logging Out

Description

982.01 Work. This work consists of removing logs, down trees and woody debris from , the clearing limits. The work described below applies to all trees, or portion of trees, that maybe in the clearing limits or trail tread. Trees are defined as the following species but not limited to - Sub Alpine Fir, Larch, Ponderosa Pine, Lodgepole Pine, Douglas Fir, Grand Fir, Cedar, Whitebark Pine, Maple, Chokecherry and Alder which are over 3 inches in diameter at the base.

Requirements

982.02 Clearing Out. Cut and remove all logs or portion of downed trees that extends across or into the clearing limits (see Exhibits 2, 3, 4, & 5). The portions of cut logs that remain on the upper side of the trail shall be either firmly anchored to prevent sliding or rolling onto the trail way or moved across the trail to the lower side and scattered outside the clearing limits. Any limbs from downed trees or logs that extend into the clearing.

limits shall be cut flush.

Fell all trees over 4 inches in diameter at the base that are leaning into the clearing limits and that are within IO feet above the trail bed. Stump height of leaning trees that are cut outside the clearing limits shall not exceed three (3) inches as measured on the uphill side of the stump.

Remove roots and stumps from trees within the trail way that have been uprooted.

Stumps requiring blasting for removal shall be left and the COR notified of the problem.

Contractor shall not reroute the trail around windfalls, uprooted trees, or other obstacles.

Ramp or reroute sections of the trail tread that have been damaged by uprooted stumps as necessary to provide safe passage on the trail.

Remove sticks or wood chunks exceeding 1 inch in diameter and 18 inches in length that have fallen on to the trail bed.

Scatter the down trees on the lower side of the trail way outside the clearing limits. Do not place such materials in stream channels, drainage ways, ditches, culvert catch basins, or other locations where they would prevent the free flow of water away from the trail bed.

Section 983 - Danger Tree Removal

Description

983.01 Work. This work consists of felling, bucking, and limbing trees and scattering slash.

Requirements

983.02 Danger Trees. Remove trees and snags that are in a leaning, unstable position over the trail way (see Exhibit 5). If any portion of such tree is within 10 feet over the trail tread, the entire tree shall be cut at the root collar and removed from the clearing limits. Cut danger trees so that stump heights do not exceed three (3) inches as measured on the uphill side of the stump. Do not leave felled trees parallel with the trail unless there are sufficient barriers to keep them from rolling or sliding onto the trail. Lop limbs to reduce slash concentration and scatter the clearing debris outside and below the clearing limits. If the trunk, or a portion thereof, falls within the trail way, remove that portion within 4 feet of either side of the trail centerline and scatter a minimum distance of 4 feet beyond and below the trail centerline.

Section 984 - Loose Rock Removal

Description

984.01 Work. This work consists ofremoval and disposal of loose rock from the trail tread

Requirements

984.02 General. Remove loose rocks that are larger than four (4) inches at their greatest dimension from the trail bed. Remove any loose rock in drainage dips or ditches that may impede water flow off the trail. Loose rocks are rocks that are not firmly embedded in the trail and can be removed by hand. Where the trail bed consists predominantly of rock with little or no soil present, remove all loose rock larger than 4 inches.

Fill any holes remaining from rock removal with suitable material and compact. If the rock removed is not needed for other items of maintenance work, scatter the rock by side casting to the lower side of trail way beyond the clearing limits, and distribute rock to ensure that no blockage of drainage or creation of a windrow occurs. Do not dispose of waste materials in watercourses.

The COR shall be notified of any large rocks left for blasting.

Section 987 - Slide Maintenance Description

987.02 Work. Work consists of the removal and disposal of slide material from the trailbed and the restoration of all sections of trail that have been damaged. All soil and debris slides less than 12 inches in height at the trail centerline and covering less than 6 lineal feet of trail tread shall be removed. The location of any slides exceeding these dimensions shall be brought to the attention of the COR as soon as practical. This work does not apply to those sections of trail where the trail tread shoulder has been washed out or has slipped.

If slides exceed an average of 18 lineal feet per mile per trail, notify the COR or Inspector. For example, Butte Creek- 6.7 miles. So 6.7 X 18 = 122.4 (122 feet).

Requirements 987 .02 General. Conserve and use suitable material from the slide on the trailbed for tread surfacing. Spread this material at a maximum depth of 3 inches for a distance not exceeding SO feet in each direction from the site of the slide.

Place all excess and unsuitable material beyond the downslope edge of the trailbed.

Uniformly spread unsuitable material to a depth not exceeding 4 inches and do not obstruct drainage. In the vicinity of water courses, deposit material outside the high water area.

Reshape the backslope that contributed to the slide to reduce future sloughing and to conform to adjacent undamaged sections.

Regrade sections of trail bed that have been damaged to a width and finish that conform to adjacent undamaged sections.

Section 991 - Drainage Maintenance

Description

991.01 Work. This work consists of cleaning culverts, waterbars, drainage dips, ditches, rock spillways, stream fords and gully crossings� directing water from the trail where washing of the trailbed is or has been occurring; and draining low spots in the trailbed that tend to hold water.

Requirements

991.03 General. Where trail drainage facilities have been plugged and the water has been diverted from the intended channel, remove the debris causing the diversion and return the drainage to the channel. Divert water off and away from the trailbed. If washing or ponding of water has been or is occurring, dig a shallow ditch sloped 2 percent to 5 percent to the downstream side of the trail and 3 inch minimum depth and 12 inches wide across the trail at the point where water enters the trail.

Clean ditches to pennit the free flow of water into culverts and away from the trail.

Scatter all unusable or unneeded material that is cleared from the drainage structures 3 feet or more beyond and below the trail or drainage facility and out of high water area of water courses.

991.04 Culverts. Remove debris and soil from catch basins and inlet and outlet ditches and inside culverts to permit the unobstructed flow of water into, through, and away from the culvert. Replace any missing or loose rocks or logs in the culvert headwalls.

991.05 Waterbars. Clean the upgrade side of all existing waterbars and maintain them.

(see Exhibit 6 & 7). Remove material accumulated against rubber belting waterbars. Use and compact suitable material removed from the upgrade side of all waterbars to bring the trail tread flush with the top of those waterbars on the downgrade side. Remove all debris from the lead-off area of all waterbars that restricts the free flow of water away from the trail.

"Armored" waterbars (see Exhibit 6) shall be cleaned as if they were grade or drivable dips. They are not to be cleaned up to the waterbar, otherwise the upgrade catch basin shall be cleaned in accordance with the standard waterbar cleaning specifications.

l

991.06 Drainage Dips. Clean deposited material and restore drainage dip. Remove all debris from the lead-off area of dips that restricts the free flow of water away from the trail. Use suitable material obtained by cleaning dips for fill on the downgrade side, removing rock more than 4 inches at its greatest dimension. Compact all material placed in the trail tread.

991.07 Rock Spillways. Maintain rock spillways. Clean all material from the spillway that restricts the flow of water away from the trail.

991.08 Stream Fords and Gully Crossings. Maintain stream fords and gully crossings.

Remove debris and loose rocks over 4 inches from existing stream crossings to provide the tread width. Notify COR or inspector of missing or rotted log or rock barriers that form the dam at fords and gully crossings.

Do not perform stream ford maintenance when redds or spawning fish are present.

Contact Inspector/COR with location that was not maintained.

Amd001.pdf
AMD001_Standard Trail Specs
AMD001_Standard Trail Specs Description
AMD001_Standard Trail Specs Description 2
2021-09-20T13:28:08-0700
ANDREA POLLOCK

File details come from the government source that posted it. Updated .