Amendment 03 (Signed By CO).pdf

PDF 5 MB Posted

Attached to
Rock Crushing, Indian Springs Pit Development
Solicitation number
1240BD26Q0074
Issued by

About this file

This is Amendment 03 to a Request for Quotation (RFQ) for rock crushing and Indian Springs Pit Development, issued by the USDA Forest Service Field Procurement Operations (FPO), CSA #2. The amendment was issued on August 3, 2026, with an effective date of August 3, 2026, and amends the original solicitation RFQ No. 1240BD26Q0074 dated July 16, 2026. The amendment's sole purpose is to provide Questions & Answers Round #2, which includes additional information and photographs to supplement Questions & Answers Round #1. All other terms and conditions of the original solicitation remain unchanged, and no extension to the solicitation deadline is indicated.

The Questions & Answers Round #2 addresses ten vendor inquiries regarding site conditions and project requirements. Key clarifications include: the pit is horseshoe-shaped with gradual but potentially vertical faces, averages 20 feet in depth, contains basalt rock of unknown average size, appears loose but may have hard surfaces, and requires no drilling and blasting history is available. Road access is 12 to 14 feet wide on average with some tight corners and switchbacks; vendors must verify equipment ingress/egress capability. No water source is available on-site, but crew camping is permitted with required Camping Permit approval from the local District Ranger. For measurement and payment, vendors must refer to the contract's Measurement & Payment sections. The amendment includes photographs showing the general pit view and surface rock size. The Contracting Officer is Brian A. Johnson, USDA Forest Service, contactable at (509) 423-2223 or Brian.Johnson3@usda.gov.

View the file

Other files

File Type Posted
Amendment 05 (Signed By CO).pdf PDF
Amendment 04 (Signed By CO).pdf PDF
Amendment 02 (Signed By CO).pdf PDF
Amendment 01 (Signed By CO).pdf PDF
RFQ No 1240BD26Q0074.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

Brian A. Johnson, CO

"ROCK CRUSHING, INDIAN SPRINGS PIT DEVELOPMENT"

1. The purpose of Amendment 03 is to issue Questions & Answers Round #2, which only includes additional information & photos to accommodate Questions & Answers Round #1.

2. All other terms and conditions of the solicitation remain unchanged.

USDA Forest Service Field Procurement Operations (FPO), CSA #2 Attn: Brian A. Johnson, Contracting Officer Telephone: (509) 423-2223 E-mail: Brian.Johnson3@usda.gov

Same as Block 6

1240BD26Q0074

1 3

08/03/2026

07/16/2026

8/3/2026

Rock Crushing, Indian Springs Pit Development RFQ No 1240BD26Q0074

Amendment 03

Yellow Highlight = Updated Answers From Amendment 01

Questions & Answers Round #2

CO Call-Out: According to provision 52.237-1 Site Visit (Page 99 of RFQ), “Offerors or quoters are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award.”

Vendor Question #1: The pit appears to be reclaimed, so does it have smooth sides and no vertical face?

Forest Service Answer #1: The pit is horseshoe shaped. The faces are gradual, but it is expected that vertical face(s) may be uncovered? The faces vary in slope with some areas more vertical than others (refer to “CO Call- Out” above).

Vendor Question #2: How tall from the bottom of the pit floor to the top of the bank?

Forest Service Answer #2: This varies depending on where you stand (refer to “CO Call-Out” above). An average of 20’.

Vendor Question #3: It appears to be basalt rock? What would you say the average size of the rock is?

Forest Service Answer #3: Unknown (refer to “CO Call-Out” above). See attached photo.

Vendor Question #4: Does the pit require drilling and blasting? Was it drilled and blasted previously? Curious if it is a hard solid mass or if it is loose and can be dug.

Forest Service Answer #4: Appears loose, but hard surfaces may be uncovered. There is no drilling/crushing history available. It is anticipated that hard rock faces may be uncovered.

Vendor Question #5: How wide is the road going to the pit? Would it accommodate a 56-foot trailer plus truck?

Are there any tight corners or switchbacks?

Forest Service Answer #5: Road(s) are 12' to 14' on average; there are some corners/switchbacks that may be tight depending on the equipment. Offerors are urged and expected to travel project roads to ensure proposed equipment ingress/egress is possible.

Vendor Question #6: Is there a water source?

Forest Service Answer #6: No.

Vendor Question #7: Can a crew camp on site?

Forest Service Answer #7: Yes. The contract awardee is required to submit a Camping Permit to the Contracting Officer’s Representative (COR) for local District Ranger approval.

Vendor Question #8: Do you know when the last time rock was crushed there?

Forest Service Answer #8: No history is available.

Vendor Question #9: Has there been any test holes dug or drilled? Are there pictures or data?

Forest Service Answer #9: No test holes/drill samples. Refer to pictures/data included in the solicitation as well as attached photos to this amendment.

Vendor Question #10: What is an acceptable form of measurement? Belt scale? Other?

Forest Service Answer #10: Refer to the Measurement & Payment section(s) of the contract.

G en er al

V ie w o f P it:

Su rf ac e

R oc k Si ze

End of Amendment 03