This document is a Statement of Work (SOW) for a roof replacement project on an equipment shed at the USDA, Agricultural Research Service (ARS) Dale Bumpers National Rice Research Center (DBNRRC) in Stuttgart, Arkansas.
The SOW details the scope of work, which includes removing the existing roof, installing new commercial 0.8mm Sunsky corrugated polycarbonate roof panels, a new transparent ridge cap, and fabricated flashing. The new roofing must meet specific requirements for light transmission, temperature range, warranty, snow load capacity, and creating a watertight seal. Contractors are encouraged to conduct a site visit prior to submitting a bid. The contractor will be responsible for providing all labor, equipment, materials, and professional services necessary to complete the project. The work must be performed in a way that minimizes disruption to DBNRRC operations and within a 90-day period from the notice to proceed.
The related federal contract opportunity is a Request for Proposal (RFP) for the roof replacement project, solicitation number 12405B24R0011, with a NAICS code of 236220 and size standard of $45.0M. Contractors must be registered in the System for Award Management (SAM) prior to submitting a proposal.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 12405B24R0011-Amendment 01.pdf | ||
| Davis Bacon Wage Determination AR20240018.pdf | ||
| 12405B24R0011-SF-1442- RFP.pdf | ||
| 12405B24R0011 - Clauses and Provisions.pdf | ||
| SOW DBNRRC equipment shed roof replacement.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
United States Department of Agriculture Agricultural Research Service
STATEMENT OF WORK
Roof Replacement on Equipment Shed
Dale Bumpers National Rice Research Center
(DBNRRC)
2890 Highway 130 E Stuttgart, AR 72160
Prepared by Robert Ideker
March 28 2024
Statement of Work USDA, Agricultural Research Service
Scope Statement
The contractor shall provide all professional services and materials necessary for installation of new roof replacement on the equipment shed (approximately 70’ long x 30’wide) between greenhouses at the USDA, ARS, Dale Bumpers National Rice Research Center (DBNRRC), 2890 AR. HWY 130 East, Stuttgart, AR 72160 and provide a detailed proposal and cost breakdown for the project. Preparation for this work will involve dialog with site personnel to determine the specific requirements.
The proposal will be presented in MS Word format and the cost breakdown/analysis will be presented in MS Excel.
The contractor shall include all services and field labor, equipment, materials, and personal protective equipment necessary to perform the work.
Applicable Codes and Standards apply and are not limited to the following:
ANSI - American National Standards Institute.
ASME - American Society of Mechanical Engineers.
NEC - National Electrical Code, NFPA 72.
OSHA - Occupational Safety and Health Administration ADA – Americans with Disabilities Act
All work must meet ARS 242.1M “ARS Facilities Design Standards” for the defined scope of this project in addition to meeting all Local, State and Federal codes, and latest IBC codes.
The document may be found at https://www.afm.ars.usda.gov/ppweb/pdf/242-01m.pdf.
Project Objectives The project consists of the following elements:
1. Remove and disposal of existing existing roof material.
2. Reskin the roof with commercial 0.8mm Sunsky corrugated polycarbonate roof panels
3. Install a new transparent ridge cap of the same polycarbonate material.
4. Install a fabricated flashing at the open end (south) of the structure to protect the edge of of the polycarbonate sheeting and ridge vent from direct winds .
5. The new roofing material must have high transmission of natural daylight.
6. The new roofing material must have a performance temperature range of (-40F- 212F.
7. New roofing material must have a minimuim 10 year warranty against loss of light transmitting capability and damage due to hail.
8. New roofing material must have a minimum snow load capacity of 20 ponds per square foot.
9. There must be a water tight seal between the new roof and existing building.
Site Visit
Contractors are encouraged to visit the site and be escorted by a government representative to confirm locations, dimensions, and conditions of the project before a bid is submitted. The site visit shall be for the purpose of observing first-hand any conditions relevant to the completion of this project. No consideration will be given to claims based on lack of knowledge of existing conditions, except where Contract Documents make definite provisions for adjustment in cost or extension due to existing conditions not readily foreseeable.
Contractor must be registered in System for Award Management, (SAM), prior to submitting a bid. Registration can be completed at www.sam.gov/portal/public/SAM
Utilization of Bio-Based Products
The contractor shall utilize products and material based from bio- based materials as applicable, (e.g. bio-based greases; bio-based hydraulic fluids, bio-based absorbents), to the maximum extent possible without jeopardizing the intended end use of detracting from the overall quality delivered to the end user. All supplies and materials shall be of a type and quality that conform to the applicable Federal Specifications and Standards. All supplies and materials to be used in the performance of work described herein are subject to the approval of the Contracting Officer Representative (COR). Products can be found at:
www.biopreferred.gov
Safety
The contractor will submit a Site Safety Specific Plan/Accident Prevention Plan in industry recognizable format to the Contracting Officer within 14 days of contract award.
Contractor shall furnish a Site-Specific Safety Plan (SSSP) and the Government shall review the SSSP prior to the start any construction activities. SSSP shall be in typically accepted industry format.
Base Bid
Contractor shall perform the work as specified in the Statement of Work.
All proposals shall be in unlocked MS Word format and all cost proposals shall be detailed and presented in unlocked MS Excel format with formulas working.
All proposals shall be in unlocked MS Word format and all cost proposals shall be detailed and presented in unlocked MS Excel format with formulas working.
Contractor Responsibilities
The project has a base bid to be performed per the following specifications:
1. Contractor will verify all dimensions and existing site conditions prior to beginning work.
2. Contractor shall keep work area clean daily and take measures to control debris while work is being performed.
3. Contractor is required to manage the project and consult with the Government prior to beginning all work phases.
4. Contractor shall perform work in a manner that minimizes the impact of the work on Government operations, research, and functions.
5. All work must be performed in such a manner as to not adversely affect daily operations of the facility and its workers.
6. Contractor will provide daily reports of work performed to the COR.
7. Contractor shall remove and dispose of all construction related materials from all work areas daily and remove these waste materials from the site on a weekly basis.
8. Contractor must have a superintendent on the jobsite when crews are performing the installation work.
9. Contactor will provide their own restroom facility.
10. Contractor to include commissioning of the new system, and controls tie-in to the existing building automation system (BAS).
Material / Submittals:
The material for the entire work shall include but are not limited to those detailed above necessary to successfully complete the project and deliver a functioning system as required. Submittals on all material used on this project shall be submitted to the EPM, Site RL, and Contracting Specialist as noted in this document. Electronic submittals are acceptable otherwise three written submittals are required.
Installation Procedure:
Contractor will verify all dimensions and site conditions prior to beginning work.
Contractor is required to provide labor, specified material, equipment, and other tools required to perform the job fully and completely. No Government equipment will be available for use by the contractor. The contractor shall always be responsible for protecting his work and ensuring the safety of his crew and ARS employees. Upon completion of the project, the contractor shall remove from the premises all accumulated materials and rubbish caused by the project. Premises shall be left in a clean, orderly, and acceptable condition.
Damage to Property:
Any damage to the Government buildings, utilities, etc. caused as the result of the contractor’s activities shall be repaired or replaced to the satisfaction of the Government.
Inspection and Acceptance:
A government representative shall inspect and approve the work performed on this project. The Contractor shall schedule inspection a minimum of 10 days in advance, in writing, to the Contracting Officer.
Project Schedule:
The completion of this project shall not exceed 90 days from date of notice to proceed. A request for time extension must be submitted to the Contracting Specialist in writing.
Each request must include specific and detailed reasons in support of the schedule alteration.
Work Hours:
Contractor work hours shall be Monday through Friday, seven (7) A.M. to four (4) P.M.
with the exception of Government holidays. Any changes to work schedule shall be submitted to Contacting Officer for written approval prior to schedule change.
Project Contacts
RESEARCH LEADER (RL)
Dr. Yulan Jia Phone: 870-672-1078
USDA, ARS, SEA
2955 HWY 130 East Stuttgart, AR, 72160 Email: Adam.Fuller@usda.gov
ADMINSTRATIVE OFFICER (AO)
Raeann Braithwaite Phone: 870-672-8254
USDA, ARS, SEA
2955 Highway 130 East Stuttgart, AR 72160 Email: Raeann.braithwaite@usda.gov
CONTRACTING OFFICER (CO)
Robert Ideker Phone: 870-672-8266
USDA, ARS, SEA
2955 HWY 130 East Stuttgart AR 73160 Email: Robert.ideker@usda.gov
ENGINEERING PROJECT MANAGER (EPM) & (CO)
Everett Wilson Phone: 720-618-0703 USDA, ARS, SEA Facilities 3550 Main Street, #5121 Houston TX 77002 Email: everett.wilson@usda.gov
AREA SAFETY AND HEALTH MANAGER (ASHM)
Joel Ledbetter (SNARC) Phone: 870-672-8255
USDA, ARS, SEA
2890 HWY 130 East Stuttgart, AR 72160-0287 Email: joel.ledbetter@usda.gov