This document is a Request for Information (RFI) related to a federal contract opportunity for the USDA ARS to move a 100Kw generator and reroute the electrical service at the Dale Bumpers National Rice Research Center in Arkansas.

The key details are:

  • The contractor will be required to provide all labor, supervision, tools, and materials to move the generator approximately 75 feet and reroute the associated electrical service.
  • A site visit is scheduled for August 27, 2024, and quotes must be submitted by September 4, 2024.
  • The estimated magnitude of the construction project is between $25,000 and $100,000.
  • The contractor is required to provide a detailed price breakdown with various cost elements.
  • Several clarification questions were addressed in the RFI response, including confirmation that there is no chiller involved, the rebar layout, pouring a new slab on top of the existing slab, and the rerouting of the electrical and gas service.
  • The solicitation indicates past performance and corporate experience requirements, which the government is willing to revise from 3/5 years to 7 years.
  • A bid bond is not required, and no permits are known to be needed for this project.

View the file

Other files for this federal contract opportunity

Other files attached to Move 100Kw Generator, newest first.
File Type Posted
SAM.gov_DBA Wage Determinations.pdf PDF
SOW 100 KW generator move for DBNRRC.pdf PDF
SF-1442_12405B24Q0505.pdf PDF
Sol_12405B24Q0505.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

12405B24Q0505- RFI

1. Page 2 of the SOW states “The contractor shall include all services and field labor, equipment necessary to remove and install new chiller.” Will the government confirm if there is a chiller involved in this project?

That was a mistake, there is no chiller involved in this project.

2. Will the government provide a drawing for the rebar reinforcement layout required for the slab?

The rebar needs to be on 12” centers.

3. Is it the government’s intention to have the contractor pour the new slab on top of the existing slab?

Yes, the new slab will be poured on top and attached(pinned) to the existing slab.

4. Is it the government’s intention to have the contractor demo and dispose of slab in old location?

Yes.

5. Is the contractor supposed to match the existing overhead supports and elevations that are now supporting the electrical conduit and gas pipe on the same support?

No. The electrical and gas service will be rerouted through the attic and ran inside the fence with the other utilities.

6. Page 42 of the Solicitation indicates that Corporate Experience must be within 5 years to be considered recent. Will the government revise this requirement to allow Corporate Experience to be within 7 years instead of 5 years to be considered recent? Past performance can be submitted but may not all be considered relevant to solicitation.

7. Page 42 of the Solicitation indicates Past Performance must be within the past 3 years. Will the government revise this requirement to allow Past Performance to be within 7 years instead of 3 years? Past performance can be submitted but may not all be considered relevant to solicitation.

8. Will the government provide a drawing of the fence to be removed and the new fence location?

9. If we use a crane to relocate the generator will fence removal be necessary?

No.

10. Can you provide additional information for what is being requested/ required for the removal and install of a new chiller listed on the SOW attachment on page 2. The contractor shall include all services and field labor, equipment necessary to remove and install new chiller.

11. Can you confirm if a Bid Bond is required? A bid bond is not required.

12. Can you provide any pictures of the existing generator being relocated?

13. Can you confirm if an SSHO (site safety and health officer) is required for this project? No.

14. Can you clarify if permits are required to be filed for this project? We are not aware of any permits required for this job.

image1.jpeg image2.jpeg