USDA ARS Ft. Lauderdale AHUs - Final Turnover Drawings (Revised 04-29-21).pdf
PDF 20 MB Posted
- Attached to
- Fire alarm system upgrade Federal contract opportunity
- Solicitation number
- 12405b23q0680
About this file
This file contains final drawings related to upgrading the fire alarm system at a USDA Agricultural Research Service facility in Fort Lauderdale, Florida. The drawings are revised as of April 29, 2021 for the solicitation numbered 12405b23q0680 seeking offers to upgrade the fire alarm system. The Department of Agriculture Agricultural Research Service Field Research Implementation and Information Delivery is the contracting agency. The opportunity type is a solicitation and the required products and services include upgrading the existing fire alarm system with revised drawings provided. A response is expected by interested contractors to perform the work by the specified due date.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Life Safety Plan - Bldg 17.pdf | ||
| Bldg17 HVAC Drawings 2005 construction.pdf | ||
| Serviceclauses.pdf | ||
| Sol_12405B23Q0680FIRE.pdf | ||
| 15-4535scafl.txt | TXT text file |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
G0.01
COVER SHEET
DRAWING NUMBER
DRAWING TITLE:
DRAWN BY:
GES PROJECT NO.:
DATE:
REGISTRATION:
REVISIONS:
PROJECT:
04/23/2021
F20-39
SUBMISSIONS:
UPGRADE AHU-1
& AHU-2
HOT/COLD DECK
MODULES
AGRICULTURAL RESEARCH SERVICES
PLAINS AREA
3225 College Avenue
Fort Lauderdale, FL 33314
USDA PROJECT NO.: AG-32SD-C-15-0044
ENGINEERING
PROGRAM MANAGEMENT
CONSTRUCTION MANAGEMENT
6700A ROCKLEDGE DRIVE SUITE 301
BETHESDA, MARYLAND 20817
T: 301.216.2871 (F) 301-216-9671 www.SalasObrien.com
AR EPM: VE
SOF
1. 95% CD SUBMISSION 10/30/20
2001742
KYLE J. CARTIER, P.E. 53269
GARY A. WILKERSON, P.E. 43167
JEFF A. KIRKMAN, P.E. 65629
ADAM S. LEVINE, P.E. 77010
expect a difference
SALAS O'BRIEN
3501 Quadrangle Boulevard, Suite 100
Orlando, Florida 32817
(407) 380-0400
CERT. OF AUTH. NO. 6106
THIS ITEM HAS BEEN ELECTRONICALLY SIGNED AND SEALED BY KYLE J. CARTIER, PE ON DATE
INDICATED IN DIGITAL SIGNATURE USING A DIGITAL SIGNATURE.
PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND SEALED AND THE
SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES.
2. FINAL TURNOVER 04/23/21
U.S. DEPARTMENT OF AGRICULTURE
AGRICULTURAL RESEARCH SERVICE PLAINS AREA
UPGRADE AHU-1 AND AHU-2
HOT/COLD DECK MODULES
FORT LAUDERDALE, FLORIDA
FINAL TURNOVER
APRIL 23, 2021
ENGINEERING
PROGRAM MANAGEMENT
CONSTRUCTION MANAGEMENT
6700A ROCKLEDGE DRIVE, SUITE 301
BETHESDA, MARYLAND 20817
(T) 301-216-2871 (F) 301-216-9671 www.SalasObrien.com
KEY PLANVICINITY MAP - FORT LAUDERDALE, FL
N
N
N
DRAWING INDEX
N
AutoCAD SHX Text
PROJECT SITE
AutoCAD SHX Text
PROJECT SITE
AutoCAD SHX Text
DWG
AutoCAD SHX Text
TITLE
AutoCAD SHX Text
SHEET
AutoCAD SHX Text G0.01
AutoCAD SHX Text
COVER SHEET
AutoCAD SHX Text
AutoCAD SHX Text A1.1
AutoCAD SHX Text
MECHANICAL PENTHOUSE
AutoCAD SHX Text
AutoCAD SHX Text M0.1
AutoCAD SHX Text
SYMBOL LEGEND AND GENERAL NOTES - MECHANICAL
AutoCAD SHX Text
AutoCAD SHX Text M2.1
AutoCAD SHX Text
DEMO AND NEW FLOOR PLANS - MECHANICAL
AutoCAD SHX Text
AutoCAD SHX Text M2.2
AutoCAD SHX Text
PHASE 1- DEMO PENTHOUSE FLOOR PLAN - MECHANICAL
AutoCAD SHX Text
AutoCAD SHX Text M2.3
AutoCAD SHX Text
PHASE 2 - DEMO PENTHOUSE FLOOR PLAN - MECHANICAL
AutoCAD SHX Text
AutoCAD SHX Text M3.2
AutoCAD SHX Text
PHASE 1- NEW PENTHOUSE FLOOR PLAN - MECHANICAL
AutoCAD SHX Text
AutoCAD SHX Text M3.3
AutoCAD SHX Text
PHASE 2- NEW PENTHOUSE FLOOR PLAN - MECHANICAL
AutoCAD SHX Text
AutoCAD SHX Text M6.1
AutoCAD SHX Text
SCHEDULES - MECHANICAL
AutoCAD SHX Text
AutoCAD SHX Text M7.1
AutoCAD SHX Text
CONTROLS - MECHANICAL
AutoCAD SHX Text
AutoCAD SHX Text M7.2
AutoCAD SHX Text
CONTROLS - MECHANICAL
AutoCAD SHX Text
AutoCAD SHX Text M8.1
AutoCAD SHX Text
DETAILS - MECHANICAL
AutoCAD SHX Text
AutoCAD SHX Text M8.2
AutoCAD SHX Text
DETAILS - MECHANICAL
AutoCAD SHX Text
AutoCAD SHX Text E0.1
AutoCAD SHX Text
SYMBOL LEGEND AND GENERAL NOTES - ELECTRICAL
AutoCAD SHX Text
AutoCAD SHX Text E2.1
AutoCAD SHX Text
PHASE 1 - DEMOLITION PENTHOUSE FLOOR PLAN - ELECTRICAL
AutoCAD SHX Text
AutoCAD SHX Text E2.2
AutoCAD SHX Text
PHASE 2 - DEMOLITION PENTHOUSE FLOOR PLAN - ELECTRICAL
AutoCAD SHX Text
AutoCAD SHX Text E3.1
AutoCAD SHX Text
PHASE 1 - NEW FLOOR PLAN - ELECTRICAL
AutoCAD SHX Text
AutoCAD SHX Text E3.2
AutoCAD SHX Text
PHASE 1 - NEW PENTHOUSE FLOOR PLAN - ELECTRICAL
AutoCAD SHX Text
AutoCAD SHX Text E3.3
AutoCAD SHX Text
PHASE 2 - NEW PENTHOUSE FLOOR PLAN - ELECTRICAL
AutoCAD SHX Text
AutoCAD SHX Text E4.1
AutoCAD SHX Text
PHASE 1 - RISER DIAGRAM AND FEEDER SCHEDULE - ELECTRICAL
AutoCAD SHX Text
AutoCAD SHX Text E6.1
AutoCAD SHX Text
PHASE 1 - SCHEDULES - ELECTRICAL
AutoCAD SHX Text
AutoCAD SHX Text E6.2
AutoCAD SHX Text
PHASE 1 - SCHEDULES - ELECTRICAL
AutoCAD SHX Text
AutoCAD SHX Text E6.3
AutoCAD SHX Text
PHASE 2 - SCHEDULES - ELECTRICAL
AutoCAD SHX Text
AutoCAD SHX Text
AREA OF WORK
A1.1A1.1
TEST
CORES
ASSUMED ROOF COMPOSITION TO BE
INSULATED LIGHTWEIGHT CONCRETE ON
METAL DECK FOR R-14
MAIN ROOF
0"
PENTHOUSE ROOF
10' - 0"
A1.1 A1.1
A1.1 A1.1
2'
0" 5
A1.1A1.1
PHASE 2 - BASE BID IS TO BE 6"
OF MINERAL WOOL ATTACHED
TO UNDERSIDE OF ENTIRE
MECHANICAL PENTHOUSE
ROOF DECK. ADD ALTERNATE IS
TO PROVIDE PRICE TO ADD 1"
MINERAL WOOL BEYOND BASE
BID OF 6". DETAIL 1/A1.1 SIM.
PHASE 1: REMOVE EXISTING LOUVER. FILL IN HOLE WITH NEW CFMF
FRAMED WALL. NEW WALL TO BE FRAMED AS TO BE REMOVABLE
SHOULD LARGE PIECES OF EQUIPMENT NEED TO BE INSTALLED IN
MECHANICAL PENTHOUSE IN THE FUTURE.
PHASE 2: REMOVE 6'-0"x7'-4" INFILL WALL AND REPLACE
6'-0"x7'-4" NEW INFILL WALL.
SEE M-6.1 FOR NEW LOUVER.TO BE INSTALLED IN UPPER
PORTION OF EXISITNG OPENING. FOLLOW ALL
MANUFACTURER'S INSTALLATION AND NOA CRITERIA.PHASE 1: NEW INFILL WALL TO
BOTTOM OF NEW LOUVER
PHASE 2: NEW INFILL WALL TO
BOTTOM OF EXISTING LOUVER
8/ A1.1
PENTHOUSE ROOF
10' - 0"
ASSUMED ROOF COMPOSITION TO BE INSULATED LIGHT WEIGHT
CONCRETE R VALUE OF 14. REPORT SHOULD VERIFY THICKNESS AND
R-VALUE OF EXISTING ROOF INSULATION
PHASE 2 - VERIFY ROOF INSULATION THICKNESS AND TYPE MAKING TWO CORE HOLES
THROUGH MEMBRANE STOPPING AT THE METAL DECK AT THE HIGH AND LOW POINTS. AFTER
VERIFICATION, REINSTALL AND REPAIR MEMBRANE IN KEEPING WITH WARRANTY GUIDLINES.
(REF. 2/A1.1 FOR LOCATIONS.) ISSUE REPORT TO ARCHITECT. THE ARCHITECT WILL REVIEW TO
DETERMINE IF ADDITIONAL INSULATION IS REQUIRED. IF THE REPORT REVEALS LESS
INSULATION (I.E. R-VALUE), ADD MINERAL WOOL PER NOTES ON REFLECTED CEILING PLAN. R-38
IS THE OBJECTIVE. PROVIDE PRICING FOR 6" APPLICATION AND SEPARATE PRICING PER 1"
MOUNTED TO UNDERSIDE OF ROOF DECK ACROSS THE ENTIRE ROOM AFTER THE INITIAL 6".
PHASE 2 - REFER TO 6/A1.1 FOR BASE PIN
AND 7/A1.1 FOR MINERAL WOOL
SPECIFICATIONS. **
MAIN ROOF
0"
EXISITNG CMU WALL
EXISITING HEAD FLASHING
REUSE OR REPLACE
LIKE FOR LIKE.
NEW 12" TALL LOUVER. SEE
MECHANICAL SCHEDULE ON
M6.1
NEW 3" EIFS SYSTEM TO
MATCH
EXISTING ON NEW WALL
COVERING GAP LEFT
AFTER REMOVING LOUVER
WEATHER BARRIER
COMPATIBLE WITH
EXISTING.
3-5/8" COLD FORMED METAL
FRAMING TO MEET LOCAL
WIND LOAD CRITERIA
BY DELEGATED ENGINEER
PHASE 1: REMOVE EXISTING
LOUVER.
FILL IN HOLE WITH NEW
CFMF FRAMED WALL. NEW WALL
TO BE FRAMED AS TO BE
REMOVABLE.
PHASE 2:
AFTER INSTALLATION OF AHU2,
INFILL WALL IN SAME MANNER
AS PHASE 1 INFILL.
BACKER ROD AND
SEALANT
ALL SIDES OF INFILL
WALL PANEL.
INSIDE AND OUTSIDE
TOP, BOTTOM ,
LEFT AND RIGHT
PROTECT EXISTING
S/S FLASHING FOR
REUSE WITH INFILL
WALL
EXISTING ROOF
MEMBRANE
PROTECT FROM
DAMAGE
WHILE DOING NEW
WORK.
EXISTING EIFS SYSTEM
BEYOND. MATCH IN ALL
WAYS, THICKNESS, TEXTURE
COLOR AND PATTERN
RECESS NEW INFILL WALL
2" MINIMUM TO FACILITATE
REMOVAL AND
REPLACEMENT
IN THE FUTURE
EXTERIOR SHEATHING
BOTH SIDES WITH
LIQUID
APPLIED WEATHER
BARRIER
ON THE EXTERIOR
FACE.
3/4" EXTERIOR
GRADE PLYWOOD
ON INSIDE FACE
PAINTED TO
MATCH INTERIOR
COLOR OF
MECHANICAL
PENTHOUSE
3/4" EXTERIOR GRADE
PLYWOOD
ON INSIDE FACE
PAINTED TO
MATCH INTERIOR
COLOR OF
MECHANICAL
PENTHOUSE
EXTERIOR SHEATHING
BOTH SIDES WITH
LIQUID
APPLIED WEATHER
BARRIER
ON THE EXTERIOR
FACE.
BACKER ROD AND
SEALANT
ALL SIDES OF NEW
LOUVER
INSIDE AND OUTSIDE
TOP, BOTTOM ,
LEFT AND RIGHT
NEW SILL FLASHING
UNDER NEW LOUVER
BUG SCREEN
ATTACH DUCT TO INSIDE
EDGE
SET IN SEALANT
NEW C8X11.5 HEADER
3/4" X 5 1/2" EMBED TITEN
HD SCREW ANCHOR BY SIMPSON
STRONG TIE CENTERED IN EACH CELL
MAIN ROOF
0"
A1.1A1.1
PHASE 1 NOTES:
1. PRIOR TO CUTTING
EXISTING CMU WALL TO
ENLARGE OPENING:
2. NEW GROUT SHALL
BE FULLY INSTALLED AND
REACH DESIGN STRENGTH
3. NEW STEEL LINTEL
AND ALL ANCHORS SHALL BE
FULLY INSTALLED
PHASE 2 NOTES:
REMOVE 6'-0"x7'-4" INFILL WALL AND REPLACE 6'-0"x7'-4"
NEW INFILL
EXISTING GROUTED CELL AT JAMB
OPENING. VERIFY IN FIELD
INFILL EXISTING OPENING
NEW 88" X 12 LOUVER
EXISTING GROUTED HEADER
OVER OPENING
FIELD VERIFY
3/4"DIA X 5 1/2" EMBED TITEN HD
SCREW
ANCHORS BY SIMPSON STRONG TIE
CENTERED
IN EACH CELL
NEW GROUT IN TWO FULL
EXISTING CELLS AT JAMB
OPENING. PROVIDE GROUT
FROM TOP OF FLOOR TO
UNDERSIDE OF EXISTING
BOND BEAM(f'c=3000psi MIN)
7' - 4"
NEW C8X11.5 HEADER
E X
IS
T
IN
G
O P
E N
IN
G
6'
EXISTING OPENING
6' - 0"
16" MAX WIDENED OPENING
PROJECT:
UPGRADE AHU-1 &
AHU-2
HOT/COLD DECK
MODULES
AGRICULTURAL RESEARCH SERVICES
PLAINS AREA
3225 College Avenue
Fort Lauderdale, FL 33314
ENGINEERING
PROGRAM MANAGEMENT
CONSTRUCTION MANAGEMENT
6700A ROCKLEDGE DRIVE SUITE 301
BETHESDA, MARYLAND 20817
T: 301.216.2871 F:301-216-9671 www.SalasObrien.com
DRAWING NUMBER
DRAWING TITLE:
DRAWN BY:
GES PROJECT NO.:
DATE:
REGISTRATION:
REVISIONS:
04/23/2021
F20-39
SUBMISSIONS:
USDA PROJECT NO.: AG-32SD-C-15-0044
AR EPM: VE
1. 95% CD SUBMISSION 10/30/20
2. FINAL TURNOVER 04/23/21
LE/RR
A1.1
MECHANICAL
PENTHOUSE
111 N. MAGNOLIA AVENUE SUITE 1600 ORLANDO, FL 32801 T: 407.839.0414
1/8" = 1'-0"
PENTHOUSE ROOF
1/8" = 1'-0"
BUILDING SECTION - PENTHOUSE
1/8" = 1'-0"
REFLECTED CEILING PLAN - MAIN ROOF LEVEL
NTS
SPECIFICATION - MINERAL WOOL
1 1/2" = 1'-0"
ROOF DETAIL
NTS
SPECIFICATION - BASE PINS
1 1/2" = 1'-0"
INFILL DETAIL
**NOTE:
EXISTING ROOF APPEARS TO BE APPROXIMATELY R-14 AS INSTALLED.
VERIFY THICKNESS AND TYPE OF EXISTING INSULATION PER DETAIL 3/A1.1 PROVIDE REPORT TO
ARCHITECT FOR EVALUATION. REPORT SHOULD INCLUDE R-VALUE, THICKNESS, AND TYPE OF
INSULATION EXISTING ON ROOF .
BASE BID IS TO BE 6" OF MINERAL WOOL ATTACHED TO UNDERSIDE OF ENTIRE MECHANICAL
PENTHOUSE ROOF DECK. ADD ALTERNATE IS TO PROVIDE PRICE TO ADD 1" MINERAL WOOL BEYOND
BASE BID OF 6". DETAIL 1/A1.1 SIM.
SPRINKLER HEADS WILL NEED TO BE LOWERED BY THE SAME DISTANCE TO MAINTAIN THE REQUIRED
CLEARANCE FROM SPRINKLER HEAD TO SURFACE ABOVE.
PER 2020 FBC, ENERGY CODE TABLE C402.1.3, ROOF R-VALUE = R-35.
1/2" = 1'-0"
INTERIOR ELEVATION - NEW LOUVER
PHASING SUMMARY:
Phase 1 will replace AHU 1 and include all associated work. The wall opening that allows removal and replacement of large equipment work will also be completed in this phase.
Phase 2 will replace AHU-2 (and all associated work) and will include the air conditioning and insulation of the penthouse.
1. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR REQUIRED TO INSTALL COMPLETE AND
OPERABLE HEATING, VENTILATION, AND AIR CONDITIONING (HVAC) SYSTEMS.
2. REFER TO TYPICAL DETAILS FOR ADDITIONAL INFORMATION REGARDING THE INSTALLATION OF DUCTWORK, PIPING, AND EQUIPMENT.
3. THE CONTRACTOR IS EXPECTED TO ORDER MATERIALS IN SUFFICIENT TIME TO AVOID DELAYING THE
COMPLETION OF THE PROJECT. DELAY IN DELIVERIES WILL NOT BE CONSIDERED A JUSTIFIABLE REASON FOR
SUBSTITUTION OF MATERIALS.
4. THE CONTRACTOR SHALL COMPLY WITH THE 2017 FLORIDA BUILDING CODE AND ALL OTHER APPLICABLE CODES
AND STANDARDS.
5. ALL REQUESTS FOR INFORMATION (RFI'S) SUBMITTED BY THE CONTRACTOR SHALL INCLUDE A PROPOSED
SOLUTION.
6. INSTALLATION OF EQUIPMENT SHALL COMPLY WITH EQUIPMENT MANUFACTURER'S INSTALLATION AND
CLEARANCE REQUIREMENTS. THE CONTRACTOR SHALL VERIFY INSTALLATION CLEARANCES WILL BE MAINTAINED
AND DISCREPANCIES SHALL BE REPORTED TO THE ENGINEER PRIOR TO THE ACQUISITION OF EQUIPMENT.
7. THE GENERAL CONTRACTOR SHALL COORDINATE THE WORK OF THE DIFFERENT TRADES SO THAT
INTERFERENCE BETWEEN HVAC, PIPING, EQUIPMENT, STRUCTURAL, AND ELECTRICAL WORK WILL BE AVOIDED.
ALL NECESSARY OFFSETS IN DUCTWORK, PIPING, AND FITTINGS REQUIRED TO INSTALL THE WORK PROPERLY
SHALL BE PROVIDED COMPLETE IN PLACE AT NO ADDITIONAL COST TO THE OWNER.
8. THE CONTRACTOR IS RESPONSIBLE TO REPAIR, AT HIS COST, ANY DAMAGED ITEMS DUE TO WORK PERFORMED.
DAMAGED ITEMS SHALL BE BROUGHT BACK TO LIKE-NEW CONDITION OR REPLACED WITH ORIGINAL.
9. DUCTWORK, PIPING, AND EQUIPMENT LOCATIONS SHOWN ARE SCHEMATIC. PRIOR TO EXCAVATION, LAYOUT AND
CONSTRUCTION OF THE MECHANICAL SYSTEMS, THE CONTRACTOR SHALL SUBMIT LAYOUT AND FABRICATION
SHOP DRAWINGS FOR APPROVAL. CONTRACTOR SHALL NOT COMMENCE WORK WITHOUT APPROVED SHOP
DRAWINGS ON THE CONSTRUCTION SITE.
10. INSULATE ALL SURFACES SUBJECT TO CONDENSATION.
11. REFER TO ARCHITECTURAL AND/OR STRUCTURAL SHEETS FOR LOUVER MOUNTING HEIGHTS.
12. ALL DUCTWORK DIMENSIONS SHOWN ON THE DRAWINGS ARE THE INTERNAL CLEAR DIMENSIONS.
13. INSIDE AREAS OF DUCTWORK VISIBLE THROUGH DIFFUSERS, REGISTERS, GRILLES, AND LOUVERS SHALL BE
PAINTED FLAT BLACK.
14. INSULATE ALL LOUVER PLENUMS AND BLANK-OFFS TO PREVENT CONDENSATION.
15. ALL NEW DUCTWORK SHALL BE GALVANIZED STEEL, EXTERNALLY INSULATED WITH 3.0 INCH THICK, 3/4 POUND
DENSITY FIBERGLASS DUCTWRAP WITH VAPOR BARRIER. INSTALLED R VALUE SHALL BE A MINIMUM OF 8.0. SEAL
ALL JOINTS AND SEAMS WITH GLASS FABRIC AND MASTIC MEETING UL 181.
16. PROVIDE COLD GALVANIZED PAINT ON ALL FIELD CUTS/WELDS OF GALVANIZED STEEL SUPPORTS AND THREADED
RODS.
17. ROUTE CONDENSATE TO FLOOR DRAIN AND TERMINATE INDIRECTLY.
18. THE REFRIGERANT PIPING SIZING AND ROUTING DESIGN SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.
THE CONTRACTOR SHALL TAKE INTO ACCOUNT LENGTH OF RUN, ELEVATION CHANGES, AND FIELD CONDITIONS.
PROVIDE ALL ACCESSORIES REQUIRED FOR "LONG-LINE" APPLICATIONS. CONTRACTOR SHALL SUBMIT
CALCULATIONS IN ACCORDANCE WITH THE RECOMMENDATIONS OF THE MANUFACTURER.
19. THE BUILDING HAS A FIRE ALARM SYSTEM. PROVIDE A DUCT-MOUNTED SMOKE DETECTOR IN THE SUPPLY OF THE
AIR HANDLING UNIT. THE UNIT SHALL SHUT DOWN UPON ACTIVATION OF THE DEVICE. THE DUCT SMOKE
DETECTORS SHALL BE INSTALLED BY THE MECHANICAL CONTRACTOR. THE DUCT SMOKE DETECTORS SHALL BE
PROVIDED, WIRED, AND INTERFACED WITH THE FIRE ALARM SYSTEM BY THE ELECTRICAL CONTRACTOR.
20. ALL TEMPERATURE SENSORS/CONTROLS SHALL BE LOCATED TO ALLOW THE PARALLEL APPROACH BY A PERSON
IN A WHEELCHAIR AND MOUNTED 54" AFF. WHERE ONLY FORWARD APPROACH IS POSSIBLE, SENSORS/CONTROLS
SHALL BE MOUNTED 48" AFF.
21. THE CONTRACTOR SHALL PERFORM A COMPLETE CERTIFIED TEST AND BALANCE OF EACH MECHANICAL SYSTEM
IN ACCORDANCE WITH A NATIONAL STANDARD. SEE SPECIFICATIONS FOR DETAILS AND PROVIDE THREE (3)
WRITTEN COPIES OF THE COMPLETED TEST AND BALANCE REPORT TO THE OWNER AND ENGINEER FOR REVIEW
AND APPROVAL.
GENERAL NOTES
1. THIS PROJECT OCCURS IN AN EXISTING FACILITY THAT SHALL REMAIN IN OPERATION DURING CONSTRUCTION.
COORDINATION OF ALL WORK WITH THE OWNER SHALL BE REQUIRED. SCOPE OF WORK SHALL BE PERFORMED IN
PHASES. OUTAGES OF SHORT DURATION WILL BE ALLOWED AT THE SOLE DIRECTION OF THE OWNER.
2. THE CONTRACTOR SHALL VISIT THE SITE TO FAMILIARIZE HIMSELF WITH ALL EXISTING CONDITIONS.
3. THE WORK SHALL BE DONE COMPLETED IN TWO (2) PHASES. CONTRACTOR SHALL PROVIDE A SCHEDULE
INDICATING THE START DATE AND DURATION OF EACH PHASE OF CONSTRUCTION. THE SCHEDULE SHALL BE
REVIEWED BY THE OWNER AND DIRECTION GIVEN ON EACH UNIT REPLACEMENT.
4. IN GENERAL, THE MECHANICAL SCOPE OF PHASE 1 IS AS FOLLOWS:
a. EXISTING PENTHOUSE VENTILATION LOUVERS ARE TO BE REMOVED TO FACILITATE INSTALLATION OF
EQUIPMENT.
b. MULTI-ZONE AIR HANDLING UNIT AHU-1 SHALL BE REMOVED AND REPLACED WITH A UNIT OF EQUIVALENT OR
GREATER PERFORMANCE. INCLUDES MODIFICATIONS TO EQUIPMENT HOUSEKEEPING PAD, CHILLED WATER
CONNECTIONS, AND DUCTWORK CONNECTIONS.
c. PENTHOUSE DUCTWORK ASSOCIATED WITH AHU-1 SHALL BE DEMOLISHED AND REPLACED WITH NEW.
d. DUCT HEATERS DH 1-1, 1-2, 1-3, 1-4, 1-5 AND DUCT HUMIDIFIERS HUM 1-1, 1-2, 1-3, AND 1-4 INSTALLED IN ZONE
SUPPLY DUCTWORK WITHIN PENTHOUSE.
e. EXISTING OUTSIDE AIR INTAKE DUCTWORK DEMOLISHED AND NEW DUCTWORK CONNECTED TO AHU-1 AND
EXISTING OUTSIDE AIR INTAKE ROOF CAP.
f. NEW PRESSURIZATION CONTROL DUCTWORK AND FAN PRF 1-1 PROVIDED AND CONNECTED TO EXISTING
DISCHARGE LOUVER.
g. UPDATE CONTROLS AND SEQUENCES FOR THE INTEGRATION OF REPLACEMENT EQUIPMENT.
5. IN GENERAL, THE MECHANICAL SCOPE OF PHASE 1 IS AS FOLLOWS:
a. EXISTING PENTHOUSE VENTILATION LOUVERS ARE TO BE REMOVED TO FACILITATE INSTALLATION OF
EQUIPMENT.
b. MULTI-ZONE AIR HANDLING UNIT AHU-1 SHALL BE REMOVED AND REPLACED WITH A UNIT OF EQUIVALENT OR
GREATER PERFORMANCE. INCLUDES MODIFICATIONS TO EQUIPMENT HOUSEKEEPING PAD, CHILLED WATER
CONNECTIONS, AND DUCTWORK CONNECTIONS.
c. PENTHOUSE DUCTWORK ASSOCIATED WITH AHU-1 SHALL BE DEMOLISHED AND REPLACED WITH NEW.
d. DUCT HEATERS DH 1-1, 1-2, 1-3, 1-4, 1-5 AND DUCT HUMIDIFIERS HUM 1-1, 1-2, 1-3, AND 1-4 INSTALLED IN ZONE
SUPPLY DUCTWORK WITHIN PENTHOUSE.
e. EXISTING OUTSIDE AIR INTAKE DUCTWORK DEMOLISHED AND NEW DUCTWORK CONNECTED TO AHU-1 AND
EXISTING OUTSIDE AIR INTAKE ROOF CAP.
f. NEW PRESSURIZATION CONTROL DUCTWORK AND FAN PRF 1-1 CONNECTED TO EXISTING LOUVER.
g. UPDATE CONTROLS AND SEQUENCES FOR THE INTEGRATION OF REPLACEMENT EQUIPMENT.
6. THE FIELD PERSONNEL AT THE SITE WILL NEED SUFFICIENT TIME TO RELOCATE EXPERIMENTS AND TRANSITION
TO OTHER AREAS OF THE BUILDING PRIOR TO EACH AIR HANDING UNIT REPLACEMENT. IT WILL NOT BE POSSIBLE
FOR THE UNITS TO BE REPLACED AT THE SAME TIME AND THERE COULD BE A SIGNIFICANT TIME GAP BETWEEN
WHEN THE REPLACEMENT OF ONE UNIT IS COMPLETED AND THE SECOND UNIT REPLACEMENT BEGINS.
7. AREAS SERVED BY THE HVAC SYSTEMS MODIFIED IN THIS PROJECT INCLUDE SPACES RATED AS BIOHAZARD
SAFETY LEVELS 2 AND 3 (BSL-2 AND BSL-3). FIELD PERSONNEL MUST COORDINATE ANY ENTRY INTO THE
BSL-RATED SPACES WITH THE OWNER AND FOLLOW ALL SAFETY PROTOCOLS AS DIRECTED BY THE OWNER. ANY
PENETRATIONS IN AND OUT OF THE BSL-RATED SPACES MUST BE PROPERLY SEALED BY THE CONTRACTOR AND
THE FIELD PERSONNEL HAVE INDICATED THEY NEED TO BE PRESENT WHEN ANY OF THIS TYPE OF WORK IS BEING
PERFORMED IN ORDER TO APPROVE THE INSTALLATION/SEALING.
GENERAL PHASING NOTES
NOTES
1. THIS IS A GENERAL COMPILATION OF SYMBOLS AND NOT ALL SYMBOLS SHOWN MAY BE USED ON THE CONTRACT DRAWINGS.
2. SCREENED SYMBOLS OR TEXT (EXAMPLE: AHU) INDICATE EXISTING EQUIPMENT OR CONDITIONS.
3. SCREENED AND DASHED AND LINES INDICATE LINES HIDDEN IN VIEW.
DUCT SMOKE DETECTOR
THERMOSTAT
TEMPERATURE SENSOR
PIPING
MECHANICAL LEGEND
DESCRIPTION
GENERAL
SYMBOL DESCRIPTIONSYMBOL
EQUIPMENT NUMBER
SECTION NUMBER
TYPE OF EQUIPMENT
DETAIL NUMBER
REFERENCE NOTE
AIR FLOW AMOUNT (CFM)
UNDER CUT DOOR
AIR DEVICE TAG
SHEET SECTION APPEARS
SHEET DETAIL APPEARS
X
X
X
X-X
X
X-X
UC
POINT OF DISCONNECTION
POINT OF CONNECTION
HVAC
DESCRIPTIONSYMBOL
BELL MOUTH TAP W/MVD
SQUARE TO ROUND DUCT TRANSITION
DUCT RISE OR DROP IN DIRECTION OF FLOW
RETURN INLET (SEE AIR DEVICE SCHEDULE)
EXHAUST INLET (SEE AIR DEVICE SCHEDULE)
SUPPLY OUTLET (SEE AIR DEVICE SCHEDULE)
MVD HAS REMOTE CONTROL IN RIGID CEILING
SUPPLY DUCT DOWN
EXHAUST DUCT DOWN
RETURN DUCT DOWN
DUCT CONTINUES
FIRE DAMPER (HORIZONTAL)
DUCT ACCESS DOOR - TOP
MANUAL VOLUME DAMPER
SUPPLY DUCT RISER
RETURN DUCT RISER
EXHAUST DUCT RISER
FLEXIBLE DUCT
SINGLE LINE DUCTWORK
TERMINAL UNIT
MOTORIZED DAMPER
CROSS HATCHED AREA = MINIMUM CLEARANCE
FOR HEATER ACCESS. MAINTAIN CLEARANCE.
FIRE DAMPER (VERTICAL)
BACKDRAFT DAMPER
BDD
MVD
FD
FD
LINEAR DIFFUSER
ELBOW W/TURNING VANES
HUMIDISTAT
REFRIGERANT SENSOR
CARBON DIOXIDE SENSOR
CARBON MONOXIDE SENSOR
NITROGEN OXIDE SENSOR
SMOKE DAMPER (HORIZONTAL)SD
SD SMOKE DAMPER (VERTICAL)
COMBINATION FIRE/SMOKE DAMPER (HORIZONTAL)F/SD
F/SD COMBINATION FIRE/SMOKE DAMPER (VERTICAL)
ROTATING BEACON LIGHT
PIPE CONTINUATION
PIPE ELBOW DOWN
PIPE ELBOW UP
BLIND FLANGE
CAPPED LINE
HOSE END CONNECTION
DIRECTION OF FLOW IN PIPE
PIPE TEE DOWN
PIPE TEE UP
UNION
BALL VALVE
BUTTERFLY VALVE (MANUAL)
BUTTERFLY VALVE (MOTORIZED)
GATE VALVE
GLOBE VALVE
TRIPLE DUTY VALVE
PLUG VALVE
2-WAY DDC CONTROL VALVE
3-WAY DDC CONTROL VALVE
BALANCING VALVE WITH PRESSURE TAPS
PRESSURE REDUCING VALVE
PRESSURE RELIEF VALVE
FLOW BALANCING VALVE
MANUAL AIR RELIEF VENT
AUTOMATIC AIR RELIEF VENT
FLEXIBLE CONNECTION
CHECK VALVE
Y-STRAINER
PRESSURE/TEMPERATURE TEST PORT
PRESSURE GAUGE
THERMOMETER
PUMP
BASKET STRAINER W/ CLAMPED COVER
SUCTION DIFFUSER
DUCT-MOUNTED SMOKE DETECTOR
DUCT ACCESS DOOR - BOTTOM
DUCT ACCESS DOOR - SIDE
24x12
24x12Ø
24Ø ROUND DUCT, DIAMETER SHOWN (IN INCHES)
RECTANGULAR DUCT, FIRST FIGURE IS
DIMENSION OF SIDE SHOWN (IN INCHES)
FLAT OVAL DUCT, FIRST FIGURE IS
DIMENSION OF SIDE SHOWN (IN INCHES)
SMOKE DETECTOR A/V ANNUNCIATOR
OS&Y GATE VALVE
BALANCING VALVE
FLOW METER
CS-A
100 CFM
MARK - TYPE OR (INxIN)
AIRFLOW (CFM)
1 D1
OR
SS/12X6
100 CFM
OR
CO
AN
CO
NO
H
SD
R
T
TS
SD
M
M
M
M
S
SOLENOID CONTROL VALVE
HVAC DESIGN DATA
LOCATION
0.75
21.0
15.8
SUMMER WINTER
FORT LAUDERDALE, FLORIDA
OUTDOOR AIR
DESIGN
CONDITIONS
91 4778
DB
(DEG F)
WB
(DEG F)
DB
(DEG F)
SUMMER WINTERINDOOR AIR
DESIGN
CONDITIONS
(TYPICAL/MAX)
70/95 75/9550%/90%
DB
(DEG F)
RELATIVE
HUMIDITY
DB
(DEG F)
ALL UNITS
WALL R-VALUE
ROOF R-VALUE
WINDOW S.C. 0.40
BUILDING CONSTRUCTION
WINDOW U-FACTOR
NOTES
THIS IS AN EXISTING BUILDING AND THE VALUES LISTED ARE ESTIMATES
BASED ON THE EXISTING CONSTRUCTION AND HAVE NOT BEEN FIELD
VERIFIED.
SOME OF THE CONDITIONED ENVIRONMENTS OF THIS BUILDING ARE
INSECTORIES CONTROLLED TO HIGH TEMPERATURE AND/OR HIGH
HUMIDITY CONDITIONS FOR THE PURPOSES OF SIMULATING OUTDOOR
ENVIRONMENTS. TYPICAL VALUES ARE DESCRIPTIVE OF HUMAN
OCCUPANCY SPACES AND MAXIMUM VALUES ARE REPRESENTATIVE OF
THE HIGHEST LIMIT OF SPACE DESIGN CONDITIONS.
ABBREVIATIONS
ci = CONTINUOUS INSULATION
LS = LINEAR SYSTEM
CLIMATE ZONE 1A
EXISTING AIR DEVICE TAGX
M0.1
SYMBOL LEGEND
AND GENERAL
NOTES -
MECHANICAL
DRAWING NUMBER
DRAWING TITLE:
DRAWN BY:
GES PROJECT NO.:
DATE:
REGISTRATION:
REVISIONS:
PROJECT:
04/23/2021
F20-39
SUBMISSIONS:
UPGRADE AHU-1
& AHU-2
HOT/COLD DECK
MODULES
AGRICULTURAL RESEARCH SERVICES
PLAINS AREA
3225 College Avenue
Fort Lauderdale, FL 33314
USDA PROJECT NO.: AG-32SD-C-15-0044
ENGINEERING
PROGRAM MANAGEMENT
CONSTRUCTION MANAGEMENT
6700A ROCKLEDGE DRIVE SUITE 301
BETHESDA, MARYLAND 20817
T: 301.216.2871 (F) 301-216-9671 www.SalasObrien.com
AR EPM: VE
SOF
1. 95% CD SUBMISSION 10/30/20
2001742
KYLE J. CARTIER, P.E. 53269
GARY A. WILKERSON, P.E. 43167
JEFF A. KIRKMAN, P.E. 65629
ADAM S. LEVINE, P.E. 77010
expect a difference
SALAS O'BRIEN
3501 Quadrangle Boulevard, Suite 100
Orlando, Florida 32817
(407) 380-0400
CERT. OF AUTH. NO. 6106
THIS ITEM HAS BEEN ELECTRONICALLY SIGNED AND SEALED BY KYLE J. CARTIER, PE ON DATE
INDICATED IN DIGITAL SIGNATURE USING A DIGITAL SIGNATURE.
PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND SEALED AND THE
SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES.
2. FINAL TURNOVER 04/23/21
AutoCAD SHX Text
DROP
AutoCAD SHX Text
RISE
M2.1
DEMOLITION AND NEW FLOOR PLAN - MECHANICAL
1/8"=1'-0"
FF
FF
FF
FF
FF
EF
TU
TU
TU
TT
T
T
T
TU
X
130 CFM
X
110 CFM
X
50 CFM
X
260 CFM
X
345 CFM
X
345 CFM
X
320 CFM
6" CHR
6" CHS
X
100 CFM
X
40 CFM
X
520 CFM
X
100 CFM
X
100 CFM
X
190 CFM
EF
X
110 CFM
X
100 CFM
X
50 CFM
X
650 CFM
X
700 CFM
(TYP 6)
X
485 CFM
(TYP 6)
X
485 CFM
(TYP 6)
X
485 CFM
(TYP 6)
X
570 CFM
(TYP 6)
X
420 CFM
X
420 CFM
X
420 CFM
X
260 CFM
X
510 CFM
X
90 CFM
X
150 CFM
X
390 CFM
X
250 CFM
X
230 CFM
X
100 CFM
X
160 CFM
X
300 CFM
X
400 CFM
X
120 CFM
X
150 CFM
X
90 CFM
X
60 CFM
X
60 CFM
X
50 CFM
X
400 CFM
X
400 CFM
X
400 CFM
X
400 CFM
FF
FF
T
H
T
H
T
H
T
H
T H
T
T
2 2 2 2 2
X
X
X700 CFM
X
2960 CFM
X
2960 CFM
X
2960 CFM
X
3470 CFM
X
260 CFM
X
50 CFM
X
50 CFM
MQ5 Q13 Q12 Q11 Q10
Q15
Q16
Q7
Q5
Q14
Q4
Q3
Q6
Q2
Q1
Q8
MQ3
MQ9
MQ4
MQ1
MQ6
MQ8
MQ7
MQ2
PHASE 2
PHASE 1
GENERAL NOTES
1. WORK OCCURRING IN EITHER PHASE 1 OR PHASE 2 IS INDICATED
ON THE PLAN AND THE AREA IN WHICH EACH PHASE OF WORK
OCCURS IS DEMARCATED.
2. BALANCE AIR DEVICES SERVED BY NEW AIR HANDLING UNIT
SYSTEMS TO AIRFLOW VALUES INDICATED.
3. DUCT SYSTEMS SHOWN ON THIS PLAN ARE NOT TO BE MODIFIED
AS PART OF THIS PROJECT EXCEPT FOR THE POSITIONING OF AIR
BALANCING DEVICES TO ACHIEVE AIRFLOW VALUES AS INDICATED.
4. COORDINATE INSTALLATION OF NEW CONTROL CONDUIT WITH
BUILDING MANAGEMENT AND SEAL ALL PENETRATIONS TO MEET
OWNER REQUIREMENTS IN ORDER TO MAINTAIN EXISTING
BIOHAZARD SAFETY LEVEL ENVELOPE SEALING REQUIREMENTS.
REFERENCE NOTES
DEMOLISH EXISTING THERMOSTAT. PROVIDE NEW ZONE
TEMPERATURE SENSOR AND RELATIVE HUMIDITY SENSOR IN
APPROXIMATELY THE SAME LOCATION.
EXISTING TO REMAIN RETURN AIR FILTER RACK.
EXISTING TO REMAIN AND BE RE-USED WI-FI ENABLED REMOTE
TEMPERATURE AND HUMIDITY SENSOR. SENSOR IS MOBILE AND
FREE TO BE LOCATED THROUGHOUT SPACE AS REQUIRED BY
USER.
M2.1
DEMO AND NEW
FLOOR PLANS -
MECHANICAL
DRAWING NUMBER
DRAWING TITLE:
DRAWN BY:
GES PROJECT NO.:
DATE:
REGISTRATION:
REVISIONS:
PROJECT:
04/23/2021
F20-39
SUBMISSIONS:
UPGRADE AHU-1
& AHU-2
HOT/COLD DECK
MODULES
AGRICULTURAL RESEARCH SERVICES
PLAINS AREA
3225 College Avenue
Fort Lauderdale, FL 33314
USDA PROJECT NO.: AG-32SD-C-15-0044
ENGINEERING
PROGRAM MANAGEMENT
CONSTRUCTION MANAGEMENT
6700A ROCKLEDGE DRIVE SUITE 301
BETHESDA, MARYLAND 20817
T: 301.216.2871 (F) 301-216-9671 www.SalasObrien.com
AR EPM: VE
SOF
1. 95% CD SUBMISSION 10/30/20
2001742
KYLE J. CARTIER, P.E. 53269
GARY A. WILKERSON, P.E. 43167
JEFF A. KIRKMAN, P.E. 65629
ADAM S. LEVINE, P.E. 77010
expect a difference
SALAS O'BRIEN
3501 Quadrangle Boulevard, Suite 100
Orlando, Florida 32817
(407) 380-0400
CERT. OF AUTH. NO. 6106
THIS ITEM HAS BEEN ELECTRONICALLY SIGNED AND SEALED BY KYLE J. CARTIER, PE ON DATE
INDICATED IN DIGITAL SIGNATURE USING A DIGITAL SIGNATURE.
PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND SEALED AND THE
SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES.
2. FINAL TURNOVER 04/23/21
M2.2
PHASE 1 - DEMO PENTHOUSE FLOOR PLAN - MECHANICAL
1/4"=1'-0"
FROM
FF-2
AH
AH
DN
DN
DN
DN
DN
DN
EF
FF
FF
x x
Ø
26x18
38x22
Ø
Ø
30x36
44x36
22x22 x x
58x36
DN
MVD
MVD
MVD
MVD
Ø x
24x22
24x22
24x22
34x22
18x14
8x26
22"Ø
12x12
16x14
TO FF-1
38x22
12x12 x
DN
TO EF-1
AND EF-2
40x22
Ø x
COLD ROOM
CONDENSING UNIT
AH
GROWTH CHAMBER
CONDENSING UNITS
FOG SYSTEM
PUMPS 1 & 2
CONTROL PANELS
FOG CONTROLLER
FOG VALVE BOARD
TEF-5
C H
S
C H
R
4" CHS
4" CHR
2"
2"
4"
3" CHS
3" CHR
3"
3"
1/2"
3/8" FOG LINE TO MQ5
3/8" FOG LINE TO Q10
3/8" FOG LINE TO Q11
3/8" FOG LINE TO Q12
3/8" FOG LINE TO Q13
26x1826x1826x18
3/8" FOG LINE (TYP)
12x12
ROOF
INTAKE
12x12
ROOF
INTAKE
LV
X-2
LV
X-1
D1
D2
D3
(TYP)
D4
D5
D6
D6
3/4"DOMESTIC WATER
D3
LV
X
D9
LV
X
D9
D8
REFERENCE NOTES - DEMOLITION
REMOVE AIR HANDLING UNIT AND ASSOCIATED INERTIA PAD.
DEMOLISH PORTIONS OF EXISTING HOUSEKEEPING PAD TO MODIFY
IT IN PREPARATION OF INSTALLATION OF NEW AIR HANDLING UNIT
AND INERTIA PAD.
DEMOLISH EXISTING SUPPLY, RETURN, RELIEF AND OUTSIDE AIR
DUCTWORK, ACCESSORIES, HANGERS, SUPPORTS AND SENSORS
UP TO INDICATED POINTS OF DISCONNECTION. TEMPORARILY CAP
REMAINING DUCTWORK. COORDINATE WITH OWNER TO PROVIDE
APPROPRIATE SEALING OF DUCTWORK, PIPING AND CONDUIT
SYSTEMS THAT SERVE THE BIOHAZARD SAFETY RATED ZONES. DO
NOT DEMOLISH OR MODIFY EXISTING FILTERS OR FILTER FRAMES.
ISOLATE BRANCH CHILLED WATER PIPING SERVING UNIT AHU-1
FROM MAIN. DEMOLISH BRANCH AND COIL PIPING, SENSORS,
APPURTENANCES, AND SUPPORTS BACK TO ISOLATION VALVES.
DEMOLISH EXISTING CONDENSATE PIPING FROM UNIT AHU-1.
FLOOR DRAINS ARE EXISTING TO REMAIN.
DEMOLISH DUCTWORK CONNECTED TO LOUVER AND GRAVITY
VENTILATOR. LOUVER AND GRAVITY VENTILATOR ARE EXISTING TO
REMAIN AND BE REUSED.
DEMOLISH EXISTING FOG SYSTEM, INCLUDING CONTROLS, PUMPS,
PIPING AND SUPPORTS. DEMOLISH PIPING UP TO WALL
PENETRATION, THEN FILL WALL OPENING AND CAP AND SEAL PER
OWNER REQUIREMENTS.
DISCONNECT AND REMOVE CONTROLS CONNECTIONS FOR
DEVICES ASSOCIATED WITH AHU-1 FROM EXISTING TRANCE UNIT
CONTROLLERS AND BUILDING MANAGEMENT SYSTEM. CONTROL
PANELS ARE TO REMAIN AND BE RE-USED.
DEMOLISH EXISTING LOUVER. OPENING TO BE MODIFIED AND USED
FOR TRANSPORTING OF EQUIPMENT INTO SPACE DURING
CONSTRUCTION ACTIVITIES. REFER TO PHASE 2 - NEW PENTHOUSE
FLOOR PLAN 1 ON SHEET M3.3 AND ARCHITECTURAL PLANS FOR
NEW LOUVER AND WALL MODIFICATION INFORMATION.
D1
D2
D3
D4
D5
D6
D7
D8
D9
GENERAL NOTES
1. IN GENERAL, THE MECHANICAL SCOPE OF PHASE 1 IS AS
FOLLOWS:
a. EXISTING PENTHOUSE VENTILATION LOUVERS ARE TO BE
REMOVED TO FACILITATE INSTALLATION OF EQUIPMENT.
b. MULTI-ZONE AIR HANDLING UNIT AHU-1 SHALL BE REMOVED
AND REPLACED WITH A UNIT OF EQUIVALENT OR GREATER
PERFORMANCE. INCLUDES MODIFICATIONS TO EQUIPMENT
HOUSEKEEPING PAD, CHILLED WATER CONNECTIONS, AND
DUCTWORK CONNECTIONS.
c. PENTHOUSE DUCTWORK ASSOCIATED WITH AHU-1 SHALL BE
DEMOLISHED AND REPLACED WITH NEW.
d. DUCT HEATERS DH 1-1, 1-2, 1-3, 1-4, 1-5 AND DUCT HUMIDIFIERS
HUM 1-1, 1-2, 1-3, AND 1-4 INSTALLED IN ZONE SUPPLY
DUCTWORK WITHIN PENTHOUSE.
e. EXISTING OUTSIDE AIR INTAKE DUCTWORK DEMOLISHED AND
NEW DUCTWORK CONNECTED TO AHU-1 AND EXISTING
OUTSIDE AIR INTAKE ROOF CAP.
f. NEW PRESSURIZATION CONTROL DUCTWORK AND FAN PRF 1-1
PROVIDED AND CONNECTED TO EXISTING DISCHARGE LOUVER.
g. UPDATE CONTROLS AND SEQUENCES FOR THE INTEGRATION
OF REPLACEMENT EQUIPMENT.
2. SYSTEM COMPONENTS LOCATED OUTSIDE OF THE PENTHOUSE
SPACE ARE NOT INCLUDED IN THE PROJECT UNLESS
SPECIFICALLY NOTED ON SHEET M2.1 AND SHALL NOT BE
MODIFIED. THIS INCLUDES, BUT IS NOT LIMITED TO THE CHILLERS ,
PUMPS, CHEMICAL TREATMENT AND BUILDING CHILLED WATER
DISTRIBUTION PIPING, ZONE FILTER RACKS, AND ZONE SUPPLY
AND RETURN DUCTWORK LOCATED OUTSIDE THE PENTHOUSE.
M2.2
PHASE 1- DEMO
PENTHOUSE FLOOR
PLAN -
MECHANICAL
DRAWING NUMBER
DRAWING TITLE:
DRAWN BY:
GES PROJECT NO.:
DATE:
REGISTRATION:
REVISIONS:
PROJECT:
04/23/2021
F20-39
SUBMISSIONS:
UPGRADE AHU-1
& AHU-2
HOT/COLD DECK
MODULES
AGRICULTURAL RESEARCH SERVICES
PLAINS AREA
3225 College Avenue
Fort Lauderdale, FL 33314
USDA PROJECT NO.: AG-32SD-C-15-0044
ENGINEERING
PROGRAM MANAGEMENT
CONSTRUCTION MANAGEMENT
6700A ROCKLEDGE DRIVE SUITE 301
BETHESDA, MARYLAND 20817
T: 301.216.2871 (F) 301-216-9671 www.SalasObrien.com
AR EPM: VE
SOF
1. 95% CD SUBMISSION 10/30/20
2001742
KYLE J. CARTIER, P.E. 53269
GARY A. WILKERSON, P.E. 43167
JEFF A. KIRKMAN, P.E. 65629
ADAM S. LEVINE, P.E. 77010
expect a difference
SALAS O'BRIEN
3501 Quadrangle Boulevard, Suite 100
Orlando, Florida 32817
(407) 380-0400
CERT. OF AUTH. NO. 6106
THIS ITEM HAS BEEN ELECTRONICALLY SIGNED AND SEALED BY KYLE J. CARTIER, PE ON DATE
INDICATED IN DIGITAL SIGNATURE USING A DIGITAL SIGNATURE.
PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND SEALED AND THE
M2.2
PHASE 1 - DEMO PENTHOUSE FLOOR PLAN - MECHANICAL
1/4"=1'-0"
FROM
FF-2
AH
DN
EF
FF
FF
26x18
38x22
30x36
44x36
DN
MVD
MVD
12x12
16x14
TO FF-1
38x22 x
DN
TO EF-1
AND EF-2
40x22
Ø x
COLD ROOM
CONDENSING UNIT
AH
GROWTH CHAMBER
CONDENSING UNITS
FOG SYSTEM
PUMPS 1 & 2
CONTROL PANELS
FOG CONTROLLER
FOG VALVE BOARD
TEF-5
C H
S
C H
R
4" CHS
4" CHR
2"
2"
4"
3" CHS
3" CHR
3"
3"
1/2"
3/8" FOG LINE (TYP)
12x12
ROOF
INTAKE
LV
X-2
LV
X-1
D1
D2
D3
(TYP)
D4
D5
D6
D6
D7
D7
D7
D7
D7
D7
D7
3/4"DOMESTIC WATER
D6
D8
D10
M2.3
PHASE 2 - DEMO PENTHOUSE FLOOR PLAN - MECHANICAL
1/4"=1'-0"
D9 D9
D5
FROM
FF-2
AH
DN
EF
FF
FF
26x18
38x22
30x36
44x36
DN
MVD
MVD
12x12
16x14
TO FF-1
38x22 x
DN
TO EF-1
AND EF-2
40x22
Ø x
COLD ROOM
CONDENSING UNIT
AH
GROWTH CHAMBER
CONDENSING UNITS
FOG SYSTEM
PUMPS 1 & 2
CONTROL PANELS
FOG CONTROLLER
FOG VALVE BOARD
TEF-5
C H
S
C H
R
4" CHS
4" CHR
2"
2"
4"
3" CHS
3" CHR
3"
3"
1/2"
3/8" FOG LINE (TYP)
12x12
ROOF
INTAKE
LV
X-2
LV
X-1
D1
D2
D3
(TYP)
D4
D5
D6
D6
D7
D7
D7
D7
D7
D7
D7
3/4"DOMESTIC WATER
D6
D8
D10
D9 D9
D5 x x
Ø
Ø
Ø x x
26x1826x1826x18
AHU
HUM
1-3
HUM
1-2
HUM
1-4
HUM
1-1
DH
1-4
DH
1-2
DH
1-3
DH
1-5
DH
1-1
38x18
Ø
24x22 x
16x16 x x
18x30
18x30
18x30
22x22
34x70
16x16
1-1/4" CD
SD
SD
SD
SD
SD
PRF
1-1 AFMS
16x16
1/2"Ø DOM. WATER
1/2"Ø DOM. WATER (TYP 3)
3/4"Ø CD
3/4"Ø CD
4"
VFD FOR PRF 1-1
REFERENCE NOTES - DEMOLITION
REMOVE AIR HANDLING UNIT AND ASSOCIATED INERTIA PAD.
DEMOLISH PORTIONS OF EXISTING HOUSEKEEPING PAD TO MODIFY
IT IN PREPARATION OF INSTALLATION OF NEW AIR HANDLING UNIT
AND INERTIA PAD.
DEMOLISH EXISTING SUPPLY, RETURN, RELIEF AND OUTSIDE AIR
DUCTWORK, ACCESSORIES, HANGERS, SUPPORTS AND SENSORS
UP TO INDICATED POINTS OF DISCONNECTION. TEMPORARILY CAP
REMAINING DUCTWORK. COORDINATE WITH OWNER TO PROVIDE
APPROPRIATE SEALING OF DUCTWORK, PIPING AND CONDUIT
SYSTEMS THAT SERVE THE BIOHAZARD SAFETY RATED ZONES. DO
NOT DEMOLISH OR MODIFY EXISTING FILTERS OR FILTER FRAMES.
ISOLATE BRANCH CHILLED WATER PIPING SERVING UNIT AHU-2
FROM MAIN. DEMOLISH BRANCH AND COIL PIPING, SENSORS,
APPURTENANCES, AND SUPPORTS BACK TO ISOLATION VALVES.
DEMOLISH EXISTING CONDENSATE PIPING FROM UNIT AHU-2.
FLOOR DRAINS ARE EXISTING TO REMAIN.
DEMOLISH DUCTWORK CONNECTED TO LOUVER AND GRAVITY
VENTILATOR. LOUVER AND GRAVITY VENTILATOR ARE EXISTING TO
REMAIN AND BE REUSED.
DEMOLISH EXISTING FOG SYSTEM, INCLUDING CONTROLS, PUMPS,
PIPING AND SUPPORTS. DEMOLISH PIPING UP TO WALL
PENETRATION, THEN FILL WALL OPENING AND CAP AND SEAL PER
OWNER REQUIREMENTS.
DEMOLISH EXISTING ROOF-MOUNTED EXHAUST FAN AND CAP
CURB. CURB CAP SHALL BE CONSTRUCTED OF SHEETMETAL AND
INSULATED TO A SUFFICIENT THICKNESS TO PREVENT
CONDENSATION (MINIMUM OF 2-INCHES OF INSULATION).
EXISTING MODIFIED WALL OPENING CREATED IN PHASE 1 TO BE
USED FOR TRANSPORTING OF EQUIPMENT INTO SPACE DURING
CONSTRUCTION ACTIVITIES. REFER TO PHASE 2 - NEW PENTHOUSE
FLOOR PLAN 1 ON SHEET M3.3 AND ARCHITECTURAL PLANS FOR
WALL MODIFICATION INFORMATION.
DISCONNECT AND REMOVE CONTROLS CONNECTIONS FOR
DEVICES ASSOCIATED WITH AHU-2 FROM EXISTING TRANCE UNIT
CONTROLLERS AND BUILDING MANAGEMENT SYSTEM. CONTROL
PANELS ARE TO REMAIN AND BE RE-USED.
D1
D2
D3
D4
D5
D6
D7
D8
D9
D10
GENERAL NOTES
1. IN GENERAL, THE MECHANICAL SCOPE OF PHASE 2 IS AS
FOLLOWS:
a. NEW OUTDOOR AIR INTAKE LOUVER LV-1 INSTALLED IN THE
MODIFIED WALL OPENING CREATED BY DEMOLITION OF
PENTHOUSE VENTILATION LOUVER IN PHASE 1.
b. MULTI-ZONE AIR HANDLING UNIT AHU-2 SHALL BE REMOVED
AND REPLACED WITH A UNIT OF EQUIVALENT OR GREATER
PERFORMANCE. INCLUDES MODIFICATIONS TO EQUIPMENT
HOUSEKEEPING PAD, CHILLED WATER CONNECTIONS, AND
DUCTWORK CONNECTIONS.
c. PENTHOUSE DUCTWORK ASSOCIATED WITH AHU-2 SHALL BE
DEMOLISHED AND REPLACED WITH NEW.
d. DUCT HEATERS DH 2-1 AND 2-2 AND DUCT HUMIDIFIER HUM 2-1
INSTALLED IN ZONE SUPPLY DUCTWORK WITHIN PENTHOUSE.
e. EXISTING OUTSIDE AIR INTAKE DUCTWORK DEMOLISHED AND
NEW DUCTWORK CONNECTED TO AHU-2 AND EXISTING
OUTSIDE AIR INTAKE ROOF CAP.
f. NEW PRESSURIZATION CONTROL DUCTWORK AND FAN PRF 2-1
CONNECTED TO EXISTING DISCHARGE LOUVER.
g. UPDATE CONTROLS AND SEQUENCES FOR THE INTEGRATION
OF REPLACEMENT EQUIPMENT.
h. PROVIDE NEW MINI-SPLIT AIR CONDITIONING SYSTEMS
AC-1/CU-1, AC-2/CU-2 AND THEIR ASSOCIATED DUCTWORK,
CONTROL DAMPERS, REFRIGERANT PIPING AND CONDENSATE
PIPING TO PROVIDE CONDITIONED AIR TO THE PENTHOUSE
SPACE. EXHAUST FAN EF-5 REMOVED AND REPLACED WITH
NEW ROOF MOUNTED FAN IN ALTERNATE LOCATION TO
PROVIDE VENTILATION TO CONDITIONED PENTHOUSE.
i. EXISTING FOG SYSTEM AND PIPING REMOVED. PIPES ROUTED
OUTSIDE PENTHOUSE TO BE ABANDONED IN PLACE AND
SEALED AIRTIGHT.
2. SYSTEM COMPONENTS LOCATED OUTSIDE OF THE PENTHOUSE
SPACE ARE NOT INCLUDED IN THE PROJECT UNLESS
SPECIFICALLY NOTED ON SHEET M2.1 AND SHALL NOT BE
MODIFIED. THIS INCLUDES, BUT IS NOT LIMITED TO THE CHILLERS ,
PUMPS, CHEMICAL TREATMENT AND BUILDING CHILLED WATER
DISTRIBUTION PIPING, ZONE FILTER RACKS, AND ZONE SUPPLY
AND RETURN DUCTWORK LOCATED OUTSIDE THE PENTHOUSE.
M2.3
PHASE 2 - DEMO
PENTHOUSE FLOOR
PLAN -
MECHANICAL
DRAWING NUMBER
DRAWING TITLE:
DRAWN BY:
GES PROJECT NO.:
DATE:
REGISTRATION:
REVISIONS:
PROJECT:
04/23/2021
F20-39
SUBMISSIONS:
UPGRADE AHU-1
& AHU-2
HOT/COLD DECK
MODULES
AGRICULTURAL RESEARCH SERVICES
PLAINS AREA
3225 College Avenue
Fort Lauderdale, FL 33314
USDA PROJECT NO.: AG-32SD-C-15-0044
ENGINEERING
PROGRAM MANAGEMENT
CONSTRUCTION MANAGEMENT
6700A ROCKLEDGE DRIVE SUITE 301
BETHESDA, MARYLAND 20817
T: 301.216.2871 (F) 301-216-9671 www.SalasObrien.com
AR EPM: VE
SOF
1. 95% CD SUBMISSION 10/30/20
2001742
KYLE J. CARTIER, P.E. 53269
GARY A. WILKERSON, P.E. 43167
JEFF A. KIRKMAN, P.E. 65629
ADAM S. LEVINE, P.E. 77010
expect a difference
SALAS O'BRIEN
3501 Quadrangle Boulevard, Suite 100
Orlando, Florida 32817
(407) 380-0400
CERT. OF AUTH. NO. 6106
THIS ITEM HAS BEEN ELECTRONICALLY SIGNED AND SEALED BY KYLE J. CARTIER, PE ON DATE
INDICATED IN DIGITAL SIGNATURE USING A DIGITAL SIGNATURE.
PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND SEALED AND THE
M3.2
PHASE 1 - NEW PENTHOUSE FLOOR PLAN - MECHANICAL
1/4"=1'-0"
FROM
FF-2
FF
FF
26x18
30x36
44x36
DN
TO FF-1
x
DN
TO EF-1
AND EF-2
40x22
Ø x
COLD ROOM
CONDENSING UNIT
AH
GROWTH CHAMBER
CONDENSING UNITS
CONTROL PANELS
TEF-5
C H
S
C H
R
4" CHS
4" CHR
2"
2"
4"
3" CHS
3" CHR
3"
3"
1/2"
LV
X-2
LV
X-1
3/4"DOMESTIC WATER
x x
Ø
Ø
Ø x x
26x1826x1826x18
AHU
HUM
1-3
HUM
1-2
HUM
1-4
HUM
1-1
DH
1-4
DH
1-2
DH
1-3
DH
1-5
DH
1-1
6 6
38x18
Ø
24x22 x
16x16 x x
18x30
18x30
18x30
22x22
34x70
16x16
1-1/4" CD
4" CHWS/R
SD
SD
SD
SD
SD
PRF
1-1
AFMS
16x16
1/2"Ø DOM. WATER
1/2"Ø DOM. WATER (TYP 3)
3/4"Ø CD
3/4"Ø CD
4"
VFD FOR PRF 1-1
INSTALL NEW AIR HANDLING UNIT WITH INTEGRAL RAIL ON
VIBRATION ISOLATION PADS ON EXISTING HOUSEKEEPING PAD.
PROVIDE NEW SUPPLY AND RETURN CHILLED WATER BRANCH
PIPING CONNECTING CHILLED WATER SUPPLY AND RETURN MAINS
TO NEW AIR HANDLING UNIT AHU-1. PROVIDE SHUT OFF VALVES IN
ACCESSIBLE AREA AND SENSORS AND APPURTENANCES AS
INDICATED ON CONTROLS SHEET AND DETAILS.
PROVIDE NEW CONDENSATE PIPING FROM UNIT DRAIN
CONNECTION AND ROUTE TO FLOOR DRAIN AND TERMINATE
INDIRECTLY.
UNIT MOUNTED CONTROL PANEL AND VFD PANEL WITH INTEGRAL
DISCONNECT AND SINGLE POINT POWER CONNECTION FOR FAN
ARRAY.
CONNECT TO EXISTING DOMESTIC WATER PIPING AND ROUTE 3/4"
PIPING HIGH IN SPACE TO STEAM GENERATORS HUM 1-1, 1-2, 1-3
AND 1-4 AND CONNECT. PROVIDE BRANCH CONNECTION WITH
ISOLATION VALVE FOR PHASE 2 INSTALLATION OF BRANCH PIPING
TO HUM 2-1.
INSTALL NEW DUCT HEATER IN STRAIGHT RUN OF ZONE SUPPLY
DUCT 48" DOWNSTREAM OF ANY OTHER ACCESSORIES OR DUCT
TRANSITIONS, 48" UPSTREAM OF ANY HUMIDIFIER STEAM
MANIFOLDS AND 24" UPSTREAM OF ANY DUCT TRANSITIONS OR
ELBOWS. PROVIDE 36" OF MAINTENANCE CLEARANCE IN FRONT OF
DUCT HEATER CONTROL PANEL.
INSTALL STEAM GENERATOR ON WALL OR RACK. PROVIDE 36" OF
FRONT ACCESS CLEARANCE AND AT MINIMUM OF 24" OF
CLEARANCE ABOVE GENERATOR. PROVIDE 1-3/4 STEAM PIPING
AND ROUTE FROM TOP CONNECTION OF GENERATOR TO
ASSOCIATED DUCT-MOUNTED STEAM MANIFOLD. ROUTE PIPING
TIGHT TO BOTTOM OF STRUCTURE TO MAXIMIZE CLEARANCE.
ROUTE INSULATED STEAM PIPING FROM STEAM GENERATOR TO
DUCT-MOUNTED STEAM INJECTOR. ROUTE STEAM INJECTOR
CONDENSATE DRAIN PIPING BACK TO STEAM GENERATOR AND
CONNECT. ROUTE HORIZONTALLY AND VERTICALLY AS PER DETAIL
4 ON SHEET M8.1.
CONNECT NEW DUCTWORK TO EXISTING. PROVIDE DUCT
TRANSITIONS AS REQUIRED TO ACHIEVE CONNECTION.
COORDINATE WORK WITH OWNER TO ENSURE CONTAINMENT
PROTOCOLS ARE MET WHILE DUCTWORK SERVING THE BIOHAZARD
SAFETY ZONES IS BEING MODIFIED.
OPENING TO BE MODIFIED TO ALLOW TRANSPORT OF AIR
HANDLING UNIT SECTIONS FROM ROOF INTO PENTHOUSE SPACE
FOR INSTALLATION. REFER TO ARCHITECTURAL SHEET FOR MORE
INFORMATION.
TAP RETURN DUCT WITH 16x16 RELIEF AIR DUCT, ROUTE
VERTICALLY THEN TURN HORIZONTAL AND CONNECT TO
PRESSURE RELIEF FAN. ROUTE FROM DISCHARGE OF PRESSURE
RELIEF FAN TO DISCHARGE LOUVER AT WALL. PROVIDE A
MOTORIZED DAMPER, AIRFLOW MONITORING STATION, MANUAL
BALANCING DAMPER AND ALL DUCT TRANSITIONS REQUIRED FOR
ROUTING AND CONNECTIONS TO EQUIPMENT.
CONNECT NEW AHU-1 CONTROL DEVICES TO EXISTING TRANE UNIT
CONTROL PANELS AND BUILDING MANAGEMENT SYSTEM.
INSTALL NEW SUPPLY DUCTWORK AND ACCESSORIES TIGHT TO
BOTTOM OF STRUCTURE. COORDINATE HEIGHT AND LOCATION OF
NEW DUCTWORK WITH PHASE 2. DEMOLITION AND NEW
CONSTRUCTION WORK IN PHASE 2 SHALL NOT REQUIRE THE
DISABLING OR REMOVAL OF PHASE 1 WORK.
REFERENCE NOTES - NEW
GENERAL NOTES
1. IN GENERAL, THE MECHANICAL SCOPE OF PHASE 1 IS AS
FOLLOWS:
a. EXISTING PENTHOUSE VENTILATION LOUVERS ARE TO BE
REMOVED TO FACILITATE INSTALLATION OF EQUIPMENT.
b. MULTI-ZONE AIR HANDLING UNIT AHU-1 SHALL BE REMOVED
AND REPLACED WITH A UNIT OF EQUIVALENT OR GREATER
PERFORMANCE. INCLUDES MODIFICATIONS TO EQUIPMENT
HOUSEKEEPING PAD, CHILLED WATER CONNECTIONS, AND
DUCTWORK CONNECTIONS.
c. PENTHOUSE DUCTWORK ASSOCIATED WITH AHU-1 SHALL BE
DEMOLISHED AND REPLACED WITH NEW.
d. DUCT HEATERS DH 1-1, 1-2, 1-3, 1-4, 1-5 AND DUCT HUMIDIFIERS
HUM 1-1, 1-2, 1-3, AND 1-4 INSTALLED IN ZONE SUPPLY
DUCTWORK WITHIN PENTHOUSE.
e. EXISTING OUTSIDE AIR INTAKE DUCTWORK DEMOLISHED AND
NEW DUCTWORK CONNECTED TO AHU-1 AND EXISTING
OUTSIDE AIR INTAKE ROOF CAP.
f. NEW PRESSURIZATION CONTROL DUCTWORK AND FAN PRF 1-1
CONNECTED TO EXISTING LOUVER.
g. UPDATE CONTROLS AND SEQUENCES FOR THE INTEGRATION
OF REPLACEMENT EQUIPMENT.
2. SYSTEM COMPONENTS LOCATED OUTSIDE OF THE PENTHOUSE
SPACE ARE NOT INCLUDED IN THE PROJECT UNLESS
SPECIFICALLY NOTED ON SHEET M2.1 AND SHALL NOT BE
MODIFIED. THIS INCLUDES, BUT IS NOT LIMITED TO THE CHILLERS ,
PUMPS, CHEMICAL TREATMENT AND BUILDING CHILLED WATER
DISTRIBUTION PIPING, ZONE FILTER RACKS, AND ZONE SUPPLY
AND RETURN DUCTWORK LOCATED OUTSIDE THE PENTHOUSE.
M3.2
PHASE 1- NEW
PENTHOUSE FLOOR
PLAN -
MECHANICAL
DRAWING NUMBER
DRAWING TITLE:
DRAWN BY:
GES PROJECT NO.:
DATE:
REGISTRATION:
REVISIONS:
PROJECT:
04/23/2021
F20-39
SUBMISSIONS:
UPGRADE AHU-1
& AHU-2
HOT/COLD DECK
MODULES
AGRICULTURAL RESEARCH SERVICES
PLAINS AREA
3225 College Avenue
Fort Lauderdale, FL 33314
USDA PROJECT NO.: AG-32SD-C-15-0044
ENGINEERING
PROGRAM MANAGEMENT
CONSTRUCTION MANAGEMENT
6700A ROCKLEDGE DRIVE SUITE 301
BETHESDA, MARYLAND 20817
T: 301.216.2871 (F) 301-216-9671 www.SalasObrien.com
AR EPM: VE
SOF
1. 95% CD SUBMISSION 10/30/20
2001742
KYLE J. CARTIER, P.E. 53269
GARY A. WILKERSON, P.E. 43167
JEFF A. KIRKMAN, P.E. 65629
ADAM S. LEVINE, P.E. 77010
expect a difference
SALAS O'BRIEN
3501 Quadrangle Boulevard, Suite 100
Orlando, Florida 32817
(407) 380-0400
CERT. OF AUTH. NO. 6106
THIS ITEM HAS BEEN ELECTRONICALLY SIGNED AND SEALED BY KYLE J. CARTIER, PE ON DATE
INDICATED IN DIGITAL SIGNATURE USING A DIGITAL SIGNATURE.
PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND SEALED AND THE
FROM
FF-2
FF
FF
26x18
30x36
44x36
DN
TO FF-1
x
DN
TO EF-1
AND EF-2
40x22
Ø x
COLD ROOM
CONDENSING UNIT
AH
GROWTH CHAMBER
CONDENSING UNITS
CONTROL PANELS
C H
S
C H
R
4" CHS
4" CHR
2"
2"
4"
3" CHS
3" CHR
3"
3"
1/2"
LV
X-2
LV
X-1
3/4"DOMESTIC WATER
x x
Ø
Ø
Ø x x
26x1826x1826x18
AHU
AHU
DH
2-2
DH
2-1
HUM
2-1
HUM
1-3
HUM
1-2
HUM
1-4
HUM
1-1
DH
1-4
DH
1-2
DH
1-3
DH
1-5
DH
1-1 x
22x26
38x18
44x22 x
16x16
Ø
24x22 x
16x16 x x
18x30
18x30
18x30
22x22
34x70
16x16
1-1/4" CD
1-1/4" CD
2-1/2" CHWS/R
16x14
SD
SD
SD
SD
SD
SD
SD
PRF
1-1
PRF
2-1
AFMS
AFMS
16x16
16x16
3/4"Ø DOM. WATER
1/2"Ø DOM. WATER
1/2"Ø DOM. WATER
1/2"Ø CD
1/2"Ø DOM. WATER (TYP 3)
3/4"Ø CD
3/4"Ø CD
4"
VFD FOR PRF 1-1
VFD FOR PRF 2-1
AC
AC
CU
CU
EF
12x10 x
8x6
8x6
8x6
54x8 54x8
LV
R
R
RRR
R
R
R
M
3/4"Ø CD
3/4"Ø CD
TS
T T
M
M3.3
PHASE 2 - NEW PENTHOUSE FLOOR PLAN - MECHANICAL
1/4"=1'-0"
INSTALL NEW AIR HANDLING UNIT WITH INTEGRAL RAIL ON
VIBRATION ISOLATION PADS ON EXISTING HOUSEKEEPING PAD.
PROVIDE NEW SUPPLY AND RETURN CHILLED WATER BRANCH
PIPING CONNECTING CHILLED WATER SUPPLY AND RETURN MAINS
TO NEW AIR HANDLING UNIT. PROVIDE SHUT OFF VALVES IN
ACCESSIBLE AREA AND SENSORS AND APPURTENANCES AS
INDICATED ON CONTROLS SHEET AND DETAILS.
PROVIDE NEW CONDENSATE PIPING FROM UNIT DRAIN
CONNECTION AND ROUTE TO FLOOR DRAIN AND TERMINATE
INDIRECTLY. FOR CONDENSATE PIPING ASSOCIATED WITH AC-1
AND AC-2 ROUTE PIPING UP HIGH WITHIN PENTHOUSE TO AVOID
TRIPPING HAZARDS. ROUTE TO PROXIMITY OF FLOOR DRAIN, THEN
ROUTE DOWN TO FLOOR AND TERMINATE INDIRECTLY INTO FLOOR
DRAIN.
UNIT MOUNTED CONTROL PANEL AND VFD PANEL WITH INTEGRAL
DISCONNECT AND SINGLE POINT POWER CONNECTION FOR FAN
ARRAY.
CONNECT TO EXISTING DOMESTIC WATER PIPING BRANCH AT
ISOLATION VALVE PROVIDED IN PHASE 1 AND ROUTE 3/4" PIPING
HIGH IN SPACE TO STEAM GENERATOR HUM 2-1 AND CONNECT.
INSTALL NEW DUCT HEATER IN STRAIGHT RUN OF ZONE SUPPLY
DUCT 48" DOWNSTREAM OF ANY OTHER ACCESSORIES OR DUCT
TRANSITIONS, 48" UPSTREAM OF ANY HUMIDIFIER STEAM
MANIFOLDS AND 24" UPSTREAM OF ANY DUCT TRANSITIONS OR
ELBOWS. PROVIDE 36" OF MAINTENANCE CLEARANCE IN FRONT OF
DUCT HEATER CONTROL PANEL.
INSTALL STEAM GENERATOR ON WALL OR RACK. PROVIDE 36" OF
FRONT ACCESS CLEARANCE AND AT MINIMUM OF 24" OF
CLEARANCE ABOVE GENERATOR. PROVIDE 1-3/4 STEAM PIPING
AND ROUTE FROM TOP CONNECTION OF GENERATOR TO
ASSOCIATED DUCT-MOUNTED STEAM MANIFOLD. ROUTE PIPING
TIGHT TO BOTTOM OF STRUCTURE TO MAXIMIZE CLEARANCE.
ROUTE INSULATED STEAM PIPING FROM STEAM GENERATOR TO
DUCT-MOUNTED STEAM INJECTOR. ROUTE STEAM INJECTOR
CONDENSATE DRAIN PIPING BACK TO STEAM GENERATOR AND
CONNECT. ROUTE HORIZONTALLY AND VERTICALLY AS PER DETAIL
4 ON SHEET M8.1.
CONNECT NEW DUCTWORK TO EXISTING. PROVIDE DUCT
TRANSITIONS AS REQUIRED TO ACHIEVE CONNECTION.
COORDINATE WORK WITH OWNER TO ENSURE CONTAINMENT
PROTOCOLS ARE MET WHILE DUCTWORK SERVING THE BIOHAZARD
SAFETY ZONES IS BEING MODIFIED.
OPENING WAS CREATED AND MODIFIED IN PHASE 1 TO ALLOW
TRANSPORT OF AIR HANDLING UNIT SECTIONS FROM ADJACENT
ROOF INTO PENTHOUSE SPACE FOR INSTALLATION. INSTALL NEW
LOUVER LV-1 AT MAXIMUM HEIGHT WITHIN OPENING. REFER TO
ARCHITECTURAL DRAWINGS AND SPECIFICATIONS FOR WALL
MODIFICATIONS AND NEW WALL INFILL DETAILS.
TAP RETURN DUCT WITH 16x16 RELIEF AIR DUCT, ROUTE
VERTICALLY THEN TURN HORIZONTAL AND CONNECT TO
PRESSURE RELIEF FAN. ROUTE FROM DISCHARGE OF PRESSURE
RELIEF FAN TO DISCHARGE LOUVER AT WALL. PROVIDE A
MOTORIZED DAMPER, AIRFLOW MONITORING STATION, MANUAL
BALANCING DAMPER AND ALL DUCT TRANSITIONS REQUIRED FOR
ROUTING AND CONNECTIONS TO EQUIPMENT.
PROVIDE LOUVER BACK-PAN FULL SIZE OF OUTSIDE AIR INTAKE
LOUVER LV-1. TAP OUTSIDE AIR DUCTWORK FROM BACKPAN AND
ROUTE TIGHT TO BOTTOM OF STRUCTURE FOR DISTRIBUTION TO
MINI-SPLIT AIR HANDLING UNITS AC-1 AND AC-2.
INSTALL NEW HORIZONTAL MINI-SPLIT AIR CONDITIONERS TIGHT TO
BOTTOM OF STRUCTURE AND IN LOCATION FREE OF
INTERFERENCE OF MANUFACTURER RECOMMENDED CLEARANCES.
PROVIDE SHORT SECTION OF RETURN AIR DUCT FULL SIZE OF UNIT
INTAKE CONNECTION. CONNECT OUTSIDE AIR DUCTWORK TO
RETURN AIR DUCTWORK. PROVIDE WELDED WIRE MESH ON
RETURN DUCT INLET AND UNIT DISCHARGE. MOUNT UNIT
THERMOSTAT TO INDOOR UNIT CASING OR RETURN AIR
DUCTWORK IN ACCESSIBLE LOCATION.
ROUTE REFRIGERANT PIPING TIGHT TO BOTTOM OF STRUCTURE
FROM MINI-SPLIT AIR CONDITIONER TO EXTERIOR WALL.
PENETRATE WALL TO EXTERIOR AND ROUTE REFRIGERANT PIPING
DOWN WALL AND ACROSS ROOF TO RACK-MOUNTED CONDENSING
UNIT AND CONNECT. PRIME AND PAINT JACKET TO MATCH WALL
COLOR. PROVIDE HANGERS AND/OR SUPPORTS FOR REFRIGERANT
PIPING EVERY 5 FEET OF HORIZONTAL SPAN, EVERY 5 FEET OF
VERTICAL RISE, AND EVERY 5 FEET ACROSS THE ROOF WITH MIRO
INDUSTRIES MODEL 1.5 PIPE SUPPORTS OR EQUIVALENT. SEAL
WALL PENETRATION AIR AND WATER TIGHT. PROVIDE ALUMINUM
WEATHERPROOF JACKET ON EXTERIOR REFRIGERANT PIPING.
NEW MINI-SPLIT AIR CONDITIONING SYSTEM CONDENSING UNIT
MOUNTED ON EQUIPMENT ROOF-RACK. SEE DETAIL 4 ON SHEET
M8.2 FOR MORE INFORMATION. MAINTAIN MANUFACTURER'S
RECOMMENDED CLEARANCES BETWEEN CONDENSING UNIT AND
AND OTHER ROOF MOUNTED EQUIPMENT.
PROVIDE NEW ROOF-MOUNTED DOWNBLAST EXHAUST FAN
INSTALLED ON ROOF CURB. CONNECT GALVANIZED STEEL
EXHAUST DUCT TO INLET OF EXHAUST FAN FULL SIZE OF
CONNECTION AND EXTEND DUCTWORK VERTICALLY INTO SPACE
TO 12 INCHES BELOW DECK AND LEAVE OPEN TO SPACE. PROVIDE
WELDED WIRE MESH ON DUCT INLET.
WALL-MOUNTED TEMPERATURE SENSOR FOR REPORTING OF
PENTHOUSE TEMPERATURE TO BMS.
PROVIDE MANUAL BALANCING DAMPER AND 2-POSITION
MOTORIZED CONTROL DAMPER IN OUTSIDE AIR BRANCH DUCT
CONNECTED TO EACH AIR CONDITIONING UNIT (AC-1 AND AC-2).
ADJUST MANUAL BALANCING DAMPER TO PROVIDE SCHEDULED
OUTSIDE AIRFLOW PER UNIT SCHEDULE. REFER TO CONTROLS
SEQUENCE FOR OPERATION OF MOTORIZED CONTROL DAMPER.
OPENING TO BE FILLED BY ARCHITECTURAL INSULATED IN-FILL
WALL. REFER TO ARCHITECTURAL SHEET FOR ADDITIONAL
INFORMATION.
CONNECT NEW AHU-2 CONTROL DEVICES TO EXISTING TRANE UNIT
CONTROL PANELS AND BUILDING MANAGEMENT SYSTEM.
CONNECT NEW 1/2" DIA. DOMESTIC WATER LINE TO EXISTING
PHASE 1 BRANCH ISOLATION VALVE AND ROUTE TO STEAM
GENERATOR HUM 2-1.
REFERENCE NOTES - NEW
GENERAL NOTES
1. IN GENERAL, THE MECHANICAL SCOPE OF PHASE 2 IS AS FOLLOWS:
a. NEW OUTDOOR AIR INTAKE LOUVER LV-1 INSTALLED IN THE MODIFIED WALL OPENING
CREATED BY DEMOLITION OF PENTHOUSE VENTILATION LOUVER IN PHASE 1.
b. MULTI-ZONE AIR HANDLING UNIT AHU-2 SHALL BE REMOVED AND REPLACED WITH A
UNIT OF EQUIVALENT OR GREATER PERFORMANCE. INCLUDES MODIFICATIONS TO
EQUIPMENT HOUSEKEEPING PAD, CHILLED WATER CONNECTIONS, AND DUCTWORK
CONNECTIONS.
c. PENTHOUSE DUCTWORK ASSOCIATED WITH AHU-2 SHALL BE DEMOLISHED AND
REPLACED WITH NEW.
d. DUCT HEATERS DH 2-1 AND 2-2 AND DUCT HUMIDIFIER HUM 2-1 INSTALLED IN ZONE
SUPPLY DUCTWORK WITHIN PENTHOUSE.
e. EXISTING OUTSIDE AIR INTAKE DUCTWORK DEMOLISHED AND NEW DUCTWORK
CONNECTED TO AHU-2 AND EXISTING OUTSIDE AIR INTAKE ROOF CAP.
f. NEW PRESSURIZATION CONTROL DUCTWORK AND FAN PRF 2-1 CONNECTED TO
EXISTING DISCHARGE LOUVER.
g. UPDATE CONTROLS AND SEQUENCES FOR THE INTEGRATION OF REPLACEMENT
EQUIPMENT.
h. PROVIDE NEW MINI-SPLIT AIR CONDITIONING SYSTEMS AC-1/CU-1, AC-2/CU-2 AND
THEIR ASSOCIATED DUCTWORK, CONTROL DAMPERS, REFRIGERANT PIPING AND
CONDENSATE PIPING TO PROVIDE CONDITIONED AIR TO THE PENTHOUSE SPACE.
EXHAUST FAN EF-5 REMOVED AND REPLACED WITH NEW ROOF MOUNTED FAN IN
ALTERNATE LOCATION TO PROVIDE VENTILATION TO CONDITIONED PENTHOUSE.
i. EXISTING FOG SYSTEM AND PIPING REMOVED. PIPES ROUTED OUTSIDE PENTHOUSE
TO BE ABANDONED IN PLACE AND SEALED AIRTIGHT.
2. SYSTEM COMPONENTS LOCATED OUTSIDE OF THE PENTHOUSE SPACE ARE NOT
INCLUDED IN THE PROJECT UNLESS SPECIFICALLY NOTED ON SHEET M2.1 AND SHALL
NOT BE MODIFIED. THIS INCLUDES, BUT IS NOT LIMITED TO THE CHILLERS , PUMPS,
CHEMICAL TREATMENT AND BUILDING CHILLED WATER DISTRIBUTION PIPING, ZONE
FILTER RACKS, AND ZONE SUPPLY AND RETURN DUCTWORK LOCATED OUTSIDE THE
PENTHOUSE.
M3.3
PHASE 2- NEW
PENTHOUSE FLOOR
PLAN -
MECHANICAL
DRAWING NUMBER
DRAWING TITLE:
DRAWN BY:
GES PROJECT NO.:
DATE:
REGISTRATION:
REVISIONS:
PROJECT:
04/23/2021
F20-39
SUBMISSIONS:
UPGRADE AHU-1
& AHU-2
HOT/COLD DECK
MODULES
AGRICULTURAL RESEARCH SERVICES
PLAINS AREA
3225 College Avenue
Fort Lauderdale, FL 33314
USDA PROJECT NO.: AG-32SD-C-15-0044
ENGINEERING
PROGRAM MANAGEMENT
CONSTRUCTION MANAGEMENT
6700A ROCKLEDGE DRIVE SUITE 301
BETHESDA, MARYLAND 20817
T: 301.216.2871 (F) 301-216-9671 www.SalasObrien.com
AR EPM: VE
SOF
1. 95% CD SUBMISSION 10/30/20
2001742
KYLE J. CARTIER, P.E. 53269
GARY A. WILKERSON, P.E. 43167
JEFF A. KIRKMAN, P.E. 65629
ADAM S. LEVINE, P.E. 77010
expect a difference
SALAS O'BRIEN
3501 Quadrangle Boulevard, Suite 100
Orlando, Florida 32817
(407) 380-0400
CERT. OF AUTH. NO. 6106
THIS ITEM HAS BEEN ELECTRONICALLY SIGNED AND SEALED BY KYLE J. CARTIER, PE ON DATE
INDICATED IN DIGITAL SIGNATURE USING A DIGITAL SIGNATURE.
PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND SEALED AND THE
MODEL
MANUFACTURER
TYPE
ELECTRIC DUCT HEATER SCHEDULE
MARK
LOCATION
AMPS
HEATER
VOLTS/PHASE/HZ
CAPACITY (KW)
STAGES
GENERAL
ACCESSORIES
NOTES
ACCESSORIES (PROVIDE THE FOLLOWING)
1. AUTOMATIC RESET THERMAL CUTOUT
2. DIFFERENTIAL PRESSURE AIRFLOW SWITCH
3. DE-ENERGIZING MAGNETIC CONTACTORS
4. CONTROL TRANSFORMER
5. INTEGRAL DISCONNECT SWITCH
NOTES
1. FLANGED DUCT CONNECTION
INDEECO
2,910
DUCT HEATER
DH-1-1
ZONE SUPPLY DUCT
26.0
208/3/60
72.3
1-5
AIR FLOW (CFM)
STATIC PRESSURE (IN.W.G.)
HP OR WATTS
DRIVE/TYPE
VOLTAGE/PHASE/HZ
UNIT REQUIREMENTS
OPERATING WEIGHT (LBS)
ACCESSORIES
NOTES
ACCESSORIES (PROVIDE THE FOLLOWING)
NOTES
MARK
MODEL
MANUFACTURER
FAN
FAN SCHEDULE
LOCATION
APPLICATION
1. ONE VARIABLE FREQUENCY DRIVE WITH INTEGRAL DISCONNECT AND BYPASS. VFD
SHALL BE MOUNTED ON WALL OR RACK AND NOT ON THE UNIT.
2. BACKDRAFT DAMPER
3. FLEXIBLE DUCT CONNECTIONS
4. VIBRATION ISOLATORS
5. INTEGRAL DISCONNECT SWITCH
1. FAN IS CONTROLLED BY BMS TO RELIEVE PRESSURE IN ASSOCIATED AIR HANDLING
UNIT SYSTEM.
2. INTERLOCK FAN WITH OPERATION OF CONDENSING UNITS CU-1 AND CU-2
COMPRESSORS. UPON ACTIVATION OF EITHER OR BOTH UNITS, FAN SHALL ENERGIZE
AND SHALL RUN. ONCE BOTH CU-1 AND CU-2 ARE OFF, EXHAUST FAN EF-5 SHALL STOP.
MAXIMUM SONES
0.15
115/1/60
50 W
DIRECT/CENT.
1-5
PRF-1-1
GREENHECK
SQ-95-D
PENTHOUSE
RELIEF
5.6
MULTI-ZONE AIR HANDLING UNITS
LOCATION
COOLING COIL
FAN SIZE AND TYPE
HP/RPM PER FAN
TOTAL AIR FLOW (CFM)
OUTSIDE AIR FLOW (CFM)
ENT AIR TEMP (DB/WB)
SENSIBLE/TOTAL CAPACITY (MBH)
ESP/TSP (IN.W.G.)
MANUFACTURER
MODEL
FAN
MARK
ENT/LVG WATER TEMP (DEG F)
FILTERS
WATER FLOW (GPM)
UNIT REQUIREMENTS
AREA (SF)
NOTES
FILTER EFFICIENCY
MIN FACE AREA (SF)
1. ONE VARIABLE FREQUENCY DRIVE PER FAN MOTOR. VFDS SHALL BE MOUNTED IN ENCLOSURE ON UNIT WITH COMMON
ENCLOSURE WITH INTEGRAL DISCONNECT AND BYPASS.
2. PREMIUM EFFICIENCY OPEN DRIP PROOF FAN MOTORS RATED FOR VFD OPERATION.
3. GROUNDED SHAFT FOR MOTORS POWERED BY VFD.
4. DOUBLE WALL INSULATED SECTIONS.
5. STAINLESS STEEL…