This solicitation is for repairs to an existing reservoir cover and installation of a filtration system at the USDA Agricultural Research Service U.S. Horticultural Research Laboratory in Fort Pierce, Florida. Key requirements include repairing the existing reservoir cover, installing a new filtration system for an existing pump system, and a site visit scheduled for June 22, 2023. The NAICS code for this project is 237110. The contractor must register for the site visit by June 21. The solicitation number is 12405B23Q0270 and responses are due on July 13, 2023.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
12405B23Q0270 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
ARS-12405B
STONEVILLE MS 38776
141 EXPERIMENT STATION ROAD
USDA ARS SEA AAO ACQ/PER PROP
07/10/20230001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
06/06/2023
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of Amendment 0001 is to post Q&As and extend the RFQ closing date.
LIST OF CHANGES:
Quote due date : 12-JUL-23 changed to 31-JUL-23
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
OSVALDO J. RODRIGUEZ
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Q&As Question 1: What size is the cover? Per the given pictures in the solicitation I am not able to figure out which reservoir on Google Maps (below)?
Answer 1: The exact dimensions of the cover are unknown. Refer to highlighted area below as the reservoir area on Google Maps.
Question 2: Do the Superintendent, SSHO and QC Manager need to be 3 separate individuals?
Answer 2: No
Question 3: Will the period of performance begin after equipment is ordered or after NTP? If equipment lead times exceed the period of performance, can the contractor request a duration change?
Answer 3: The contract award represents a notice to proceed. In the event there are changes to material lead times, the contractor must request a justifiable extension. Based on the circumstances, a modification will be issued to account for the changes.
Question 4: It is stated in the SOW that the project will be completed in two phases. The first phase is to repair the infrastructure and installation of the new filtration system. Phase two will consist of removal and disposal of the damaged reservoir cover and replacement with a new reservoir cover as specified. Just to confirm, the intent is to have phase one completed before starting phase two? I.e. will there be no overlap?
Answer 4: Yes, the intent is for phase one to be completed first.
Question 5: Will we be getting a set of proposed scope drawings or specifications?
Answer 5: No additional information will be provided.
Question 6: Do you have as-built surveys of the existing underground infrastructure?
Answer 6: Yes, please refer to the drawings provided with this amendment.
Question 7: Do you have historical drawings or specs on the existing pump station, electrical transformers and reservoir construction that you could share?
Answer 7: Yes, please refer to the drawings provided with this amendment. No further specifics are available.
Question 8: What is the required PSI for the new concrete slab for the filter station?
Answer 8: 6000 psi with rebar 12” on center and fiber reinforcement , 6” thick
Question 9: What is the depth of the existing concrete slab for the main pump station photographed?
Answer 9: Existing slab should be left in place.
Question 10: Can the new filter system use larger filters to accommodate the flow rate in order to reduce the quantity of filters needed and the overall footprint of the system?
Answer 10: No, construct as specified.
Question 11: Will all the underground piping for the new filter system installation be PVC?
Answer 11: Yes, piping must be PVC.
Question 12: If PVC, will it be SCH80 or SCH40?
Answer 12: PVC will be SCH80
Question 13: The pump skid and decking needs replacing and to do that all the pumps will have to be removed at the same time. The USDA indicated that the pumps could only be removed and replaced one at a time. Will there be a time period when all three pumps can be out of service so the skid and decking can be replaced?
Answer 13: Yes, all three pumps can be removed at the same time. The booster pump and filter station must be online and accepted for use before the main pump station work begins. The warranty period for all components, parts and labor will begin when the entire project is completed.
Question 14: What is the estimated budget for the separate phases of the project (Clin 1 and Clin 2)?
Answer 14: Government estimates or funding allocations are not disclosed. Per the solicitation, the magnitude of this construction project is between $1,000,000 and $5,000,000 (Base plus optional item). CLIN 0001 is between $250,000 and $500,000. Option CLIN 0002 is between $500,000 and $1,000,000.
Question 15: Is the new filter system required to have a shelter erected over it like the existing filter system and pump station has?
Answer 15: No, a shelter is not part of the scope.
Question 16: The demo of the existing cover as well as the installation of new, cannot be completed while the pond is full (even with the USDA draining some as they described). Therefore, the phase 2 work will have to be done by installing an Aqua Dam (or similar) either halfway or at some frequency to be determined, water pumped to the other side while work is done on the drained side. In order to do this, we will need to know the existing volume of water in the pond, how much volume the USDA would like to keep operational, and if there isn’t enough freeboard available on the “full side” to take all the water from the “drained side” where are we to pump the excess water?
Answer 16: The volume of water is unknown as conditions change over time. The USDA understands the need to lower the water level in order to complete the work. Prior coordination with the COR and farm manager is required.
Question 17: Do you have the liner design drawings/plans for this project? Even the old liner plans from the original design would be helpful.
Answer 17: No, there are no design drawings/plans available for the liner.
Question 18: Does the new floating cover have to be 80mil polyethylene liner? Based on the site photos, it appears that the current floating cover is a Skrim reinforced material, mostly like 45 mils in thickness. The skrim reinforced material would be better for this application since the liner can be fabricated into large panels at the factory prior to shipment. The fabricator can also add the sections where the ballast and floats would go.
Answer 18: Yes, 80mil polyethylene is specified, all components and parts in the project must be submitted for approval by the farm manager prior to construction
Question 19: Can the existing perimeter biogas/air collection piping be left in place and reused?
Answer 19: Yes
Question 20: When do you all foresee the installation of the new reservoir cover taking place? Dry season would be preferable.
Answer 20: The cover installation will begin when the contract option is exercised. Prior coordination with the farm manager and COR will be required so as not to impact ongoing research.
Question 21: What is “Becker-Ring and associated equipment”? Can you send us specific specs on this?
Answer 21: Please contact supplier for specific information.
Question 22: Can you tell us what the existing liner is?
Answer 22: Not Germain to the project
Question 23: Based on the site photos we have; it looks like the bottom layer is also damaged in some places and will need repaired. What is the existing bottom liner material?
Answer 23: The bottom liner will not be replaced, and care must be taken not to damage it. Any damage will be the responsibility of the contractor to repair.
Question 24: Can you all share the site visit sign in sheet?
Answer 24: No, the site visit roster is part of the contract file.
Question 25: Can you confirm that there will not be a high concentration of chlorine used in this reservoir? The original cover looks like it is CSPE, so we wanted to verify.
Answer 25: No, there will be no chlorine added to the water in this reservoir.
Question 26: With the amount of detail and welding that needs to be completed on top of the reservoir cover, it will have to be a dry installation for the desired new reservoir cover design to work. We will need the reservoir to be fully dry and cleaned out for a proper floating cover installation to be feasible. Can you confirm that we will be able to do this for the installation of the new reservoir cover?
Answer 26: No, installation must be completed with reservoir partially full.
Question 27: With no engineered drawings provided, we would like to request a two week extension for this project in hopes that we may be able to receive engineered drawings for the reservoir cover, filtration system, and main pump system repairs / electrical. May we have a two week extension?
Answer 27: Please refer to the drawings provided with this amendment of the existing system.
Question 28: Does the USDA have a list of local trades familiar with the site and operating conditions that can be made available to prime contractors?
Answer 28: Yes, please note, the list is not all inclusive and consists of contractors that the Government knowingly has recent record of work completed.
Agri-Services, 772-468-0888 (Filter station/booster pump) AgTronix, 239-657-5519 (Filter station/booster pump) B&B Building Systems, 772-205-4860 (Main Pump station refurbish) Grove Welders, 772-569-2222 (Main Pump station refurbish) R&S Metal Works (Main Pump station refurbish) Applebee Electric, 772-466-7930 (Electrical panels) Matula Electric, 772-461-8328 (Electrical panels) Industrial & Environmental Concepts, (506) 247-0344 (Reservoir cover)
Question 29: Are there any existing plans of the site or as-builts on the existing systems?
Answer 29: Please refer to the drawings provided with this amendment of the existing system.
Question 30: SOW indicates system operating range needs to be 10-4000 gpm. Is the 10 gpm value correct?
Answer 30: Yes
Question 31: There may only be a couple of liner manufacturers that can provide what appears to be a Hypalon cover. Will the USDA accept a polypropylene liner in order to increase the potential number of vendors?
Answer 31: Liner materials have been specified in SOW
NOTES:
CANAL
PROPERTY LINE
CENTER LINE OF FURROW
CENTER LINE OF BED
NORTH
OVERALL IRRIGATION
METRIC SCALE 1 2000:
C PICOS ROADL
TOP OF CANAL BANKC NSLWMD CANAL 46#L
C
S
U N S
H
IN
E
S T
A T E
P
A R
K W
A Y
L
C NSLWMD CANAL 47
L #
C
N O
R T
H
F
A
R
A D
(U
N O P
E
U
IM
P R
O V
E D
L
LEGEND:
050100 50 100
METERS
SURFICIAL WELL
83 MM FLUSH OUT
DISTRIBUTION STATION
ZONE 1 2 3 4 5 6
AREA
PLANTED
OF EMITTERS
TREES = NUMBER
NUMBER OF
RATE FOR ZONE
TOTAL FLOW
(15.0 Acres)
6.1 Hectares
(15.0 Acres)
6.1 Hectares
(11.9 Acres)
4.8 Hectares
(15.3 Acres)
6.2 Hectares
(18.9 Acres)
7.6 Hectares
(15’ x 25’)
7 620 MM
4 570 MM x
(15’ x 25’)
7 620 MM
4 570 MM x
(15’ x 25’)
7 620 MM
4 570 MM x
(5’ x 22.5’)
6 860 MM
1 520 MM x
ROW SPACING
TREE SPACING x
(5’ x 22.5’)
6 860 MM
1 520 MM x
(5’ x 22.5’)
6 860 MM
1 520 MM x
1,740 1,740 1,380 5,925 7,3024,284
EMITTERS
FLOW RATE OF
(6.8 GPH)
PER HOUR
25.7 LITERS
(6.8 GPH)
PER HOUR
25.7 LITERS
(6.8 GPH)
PER HOUR
25.7 LITERS
(21.6 GPH)
PER HOUR
81.8 LITERS
(21.6 GPH)
PER HOUR
81.8 LITERS
(21.6 GPH)
PER HOUR
81.8 LITERS
(626 GPM)
PER MINUTE
2,370 LITERS
(626 GPM)
PER MINUTE
2,370 LITERS
(497 GPM)
PER MINUTE
1,881 LITERS
(671 GPM)
PER MINUTE
2,540 LITERS
(828 GPM)
PER MINUTE
3,133 LITERS
(ADDITIVE ALTERNATE #3)
UNPROGRAMMED FIELD PLOTS
PLAN
SW-1
DS-1
CHANGE IN LATERAL PIPE SIZE
FIELD VALVE (FV-1) VB-1
SURFICIAL WELL
SW-5
SW-4
SW-3
SW-2
SW-1
7 050
7 150
7 500
7 050
7 350
OF SLAB ELEVATION
ESTABLISH TOP
DISTRIBUTION STATION
I WATER FROM RESERVOIR TO PLOTS
W WATER FROM WELL TO RESERVOIR
RESERVOIR
COVERED
P TRANSFER PUMP STATION
(11.1 Acres)
4.5 Hectares
(486 GPM)
PER MINUTE
1,837 LITERS
DS-7
DS-6
DS-5
DS-4
DS-3
DS-2
DS-1
7 450
6 750
6 650
7 050
7 350
7 250
7 350
OF SLAB ELEVATION
ESTABLISH TOP
C-400
C-401 THROUGH C-409 UNLESS NOTED OTHERWISE.
SYSTEM. FOR SPECIFIC INFORMATION REGARDING THE IRRIGATION SYSTEM, SEE DRAWINGS
THE PURPOSE OF THIS DRAWING IS TO SHOW THE OVERALL LAYOUT OF THE IRRIGATION
ALL DIMENSIONS AND UNITS ARE IN MILLIMETERS (MM).
DIAMETER AND SMALLER. AWWA C-905 CLASS 165 DR 25 PVC FOR PIPE 355 mm AND LARGER.
ALL UNDERGROUND PIPE SHALL BE ASTM 2241, CLASS 125, IPS PLASTIC PIPE FOR PIPE 305 MM
PROVIDE OVERHEAD IRRIGATION SYSTEM FOR NURSERY AREA. FOR DETAILS, SEE SHEETS C-410.
FOR WELL AND IRRIGATION DETAILS SEE DWG C-410 TO C-416.
ALL POLYTUBING SHALL BE 25.4mm (1 inch) (HARDEE BLUE STRIPE OR APPROVED EQUAL).
INCLUDED IN THIS CONTRACT.
MATERIALS. ALL OTHER EMITTER ASSEMBLIES AND POLYTUBING ARE NOT
DIRECTED BY THE CONTRACTING OFFICER. USDA TO INSTALL THESE
POLYTUBING. CONTRACTOR SHALL STORE THESE MATERIALS ONSITE AS
1000 EMITTER ASSEMBLIES (25.7 LPH), 10,700 METERS OF 25 mm
BASE BID SHALL INCLUDE PURCHASE OF 2000 EMITTER ASSEMBLIES (81.8 LPH),
CONTRACTOR SHALL PROVIDE FITTINGS AS REQUIRED WHEN NOT INDICATED ON PLANS.
SHOWN ON PLANS FOR CLARITY.
THE IMMEDIATELY UPSTREAM PIPE. LENGTHS OF LESS THAN 5 METERS ARE NOT
IS NOT IDENTIFIED BY THE PLANS, THE CONTRACTOR SHALL USE THE SAME SIZE AS
ALL PIPE LENGTHS SHOWN ARE HORIZONTAL IN PLACE LENGTHS. WHEN PIPE SIZE
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
LOCATION WITH FIELD OVERRIDES. SEE SPECIFICATIONS SECTION 02668 FOR DETAILS.
STATION AND DISTRIBUTION STATIONS SHALL ALL BE REMOTE CONTROLLED FROM THIS
AT THE FARM SITE. THE PUMPS, CERTAIN VALVES, THE FILTER STATION, TRANSFER PUMP
THE CONTROLLER FOR THE SYSTEM WILL BE COMPUTER DRIVEN AND CENTRALLY LOCATED
K E Y P L A N
C-407
C-408
C-409 C-406
C-405
C-404 C-401
C-402
C-403
C
ZONE VALVE BOX
ASSOCIATED LATERAL PIPING. SEE SHEETS C-403 AND C-406 FOR FURTHER INFORMATION.
ELECTRICAL EQUIPMENT. ALSO INCLUDED WILL BE THE EAST 12 ROWS OF ZONE 1 AND THE
(SW-2), PUMPS, DISTRIBUTION STATION (DS-4), VALVES, CONTROLLERS AND ASSOCIATED
IRRIGATION COMPONENT WILL INCLUDE ALL OF ZONE 4, ALONG WITH HEADER PIPING, WELL
UNPROGRAMMED FIELD PLOTS (6.10 HECTARES)
ADDITIVE ALTERNATE #3
AS-BUILT
L
IM
E R
O
K
A D
L
IM
E R
O
A D
L
IM
E R
O
A D
LIMEROCK ROAD
L
IM
E R
O
A D
L
IM
E R
O
A D
3 000 WIDE RIP-RAP
TO TOE OF SLOPE
T R
A
IL
E R
T R
A
IL
E R
TRAILER TRAILER TRAILER
x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x xxxxxxxxxxxxxxxxxxx
ZONE 1
ZONE 2
ZONE 3
ZONE 5
ZONE 6
ZONE 4
NURSERY
ww wwwww
WW
WW W
w
W
S W -5
D S -6
S W -2D
S -4
S W -1D S -1
D S -2
S W -3
S W -4
D S -5
DS-7
w
D S -3
W W
W W
I I I I I I I I I I I I I
I
W I
W I
W I
W I
I I I I I W
I I I
FV-8
FV-1
FV-4 FV-5
FV-2 FV-6
FV-7
FV-11FV-10
FV-3
VB-4
VB-1
VB-2
VB-3 VB-6
VB-5
VB-7
P
FILTER STATION
FV-13
FV-14
W W
W W
I I
I
I
I
W w
FV-12
FV-9
DETENTION POND "A"
S
D
A
A-E FIRM USDA
PROJECT MANAGER EPM
PPMDESIGNER
CHECKED BY REAL PROPERTY PROJECT NO.
DATE
SHEET
BY DESCRIPTIONDATENO.
Service
Research
Agricultural
REVISIONS
Jacksonville, Florida
Reynolds, Smith and Hills Inc.
Architecture, Engineering and Planning
D. CLAYTON
6951448000
A/E PROJ. NO.
E. REILLY
R. MAYER
J. YANKLE
53-3K15-4-8121B. COLLIER
20770-1433
GREENBELT, MARYLAND
6303 IVY LANE
FACILITIES DIVISION
G.S.SEIDEL
DEC. 9, 1996 409OF
NORTH
C-403
:METRIC SCALE 1 500
IRRIGATION PLAN
MATCH LINE SEE DWG C-402
M A
T
H
L
IN
D W
G
-4
NOTES:
1. FOR NOTES SEE DWG C-400.
METERS
100510
PIPE DIA
(INCHES)
PIPE DIA
(MM)
NOMINAL INSIDE
21 400 of 305 mm DIP
DISCHARGE PIPE
FOR DETAILS.
BANK SEE C-416
SAND MEDIA FILTER
SHT. C-412
SEE DETAIL
PUMP STA.
TRANSFER
38 213
508 DIA.
INTAKE PIPE
FOR CONTIUATION SEE DWG C-406
F
N T
IU
A T
IO
N
S
G
-4
N O
R T
H
:METRIC SCALE 1 500
METERS
100510
E 257354.961
N 343978.170
E 257355.643
N 343971.241
E 257354.166
N 343963.497
E 257350.681
N 343968.500
E 257369.456
N 343953.231
FV-13
FV-14
FV-12
E 257357.376
N 343987.454
E 257357.376
N 343995.074
FOR DETAILS.
SEE SHEETS C-412 to C-414
(50,325 CUBIC METER)
COVERED RESERVOIR
AS-BUILT
x x x x
C
S
U N S
H
IN
E
S T
A T E
P
A R
K W
A Y
L
W O V
IR
E
F E
N C E
S
°5 '18
" E
(D
O T
S
°10 '2
" E
(M
S
°5 '4 " E
LEGEND:
CANAL
PROPERTY LINE
CENTER LINE OF FURROW
CENTER LINE OF BED
DISTRIBUTION STATION
SURFICIAL WELL
83 MM FLUSH OUT
7 ROWS 109 DIA.
208 DIA. 165 650 PIPE DIAMETER (MM) AND LENGTH (MM)
61 030
FIELD VALVE (FV-1)
SW-1
DS-1
VB-1
CHANGE IN LATERAL PIPE SIZE
I WATER FROM RESERVOIR TO PLOTS
W WATER FROM WELL TO RESERVOIR
ZONE VALVE BOX
PIPE DIAMETER (MM) AND LENGTH (MM))
LATERAL PIPE (NUMBER OF ROWS PER
D
A
A-E FIRM USDA
PROJECT MANAGER EPM
PPMDESIGNER
CHECKED BY REAL PROPERTY PROJECT NO.
DATE
SHEET
BY DESCRIPTIONDATENO.
Service
Research
Agricultural
REVISIONS
Jacksonville, Florida
Reynolds, Smith and Hills Inc.
Architecture, Engineering and Planning
D. CLAYTON
6951448000
A/E PROJ. NO.
E. REILLY
R. MAYER
J. YANKLE
53-3K15-4-8121B. COLLIER
20770-1433
GREENBELT, MARYLAND
6303 IVY LANE
FACILITIES DIVISION
G.S.SEIDEL
DEC. 9, 1996 409OF
K E Y P L A N
C-407
C-408
C-409 C-406
C-405
C-404 C-401
C-402
C-403
C
W
I
W
E
.2
N
.7
E
.6
N
.4
E
.4
N
.3
E
.0
N
.5
14 600
17 040
6 0003 600
17 040
14 600 x x x x
T
P
A
N A L
B
A N
K
WOVEN WIRE FENCE
374 794 374 794R = 1807.339(M)L = 204.152(M) = 06°28'19" (M)
R = 1807.339(M) L = 204.152(M)
WOVEN WIRE FENCE
= 06°28'19" (M)
C-412
(NOT TO SCALE)
TOP OF SLOPE
1 200
(min.)(min.)
(m in
(NOT TO SCALE) C
ANCHOR TRENCH DETAIL B
316 S/S CLAMP (2 REQ.)
C-412 C-412
C-412C-412
BOOT
LINER
SOIL
GRANULAR BACKFILL
COMPACTED
PIPE BOOT
LINER
CONCRETE
ANCHOR BOLT
AND NUT
WASHER
EL. 7 620
LINER
CONCRETE SLAB
LINER
LINER
BUTYL TAPE (TYP.)
RESERVOIR DETAILS
GUIDELINES AND DETAILS
AS PER LINER MANF. RECOMMENDED
AND HYDROTITE SEALANT
INSTALL BATTEN STRIP DETAIL
PERIMETER OF WELD
APPLICATION AROUND ENTIRE
PROVIDE MIN. 0 150 WIDTH
WITH CHEMICAL AGENT
WELD BOOT TO LINER
INFLUENT
FINISHED GRADE
0 076 (3") CLR.
0 178 (7") CLR.
0 406 (1'-4")
2 743 (9'-0") SQ.
PLAN
C L
SECTION
N.T.S.
TRANSFER PUMPING STATION
PERPENDICULAR FACE DETAIL
PIPE SUPPORT
WETWELL
INFLUENT 3 000
CL
0 500
COMPACTED
EL. 7 800
7 620
HWL
3 660
LWL
EL. 1 000
STATION, SEE SPECS, SECTION 11214
PREPACKAGED TRANSFER PUMP
NOTE:
SHED
"A" (27,600 kPa) CONCRETE
CONSTRUCTED OF CLASS
TO ASTM C-478 AND BE
WETWELL TO CONFORM
1 8288 (6') I.D. PRECAST
0 250 (MIN)
DIP
0 406
0 203 (8")
BUTYL
WETWELL HATCHES
(OVER PUMPS)
REMOVABLE ROOF PANEL
AT 3 000 SQUARE
CONC. (20 mPa)
PROVIDE REINF.
GROUT (TYP)
NON-SHRINK
GEOMEMBRANE LINER
SUBSTRATE
EACH WAY
#10 M @ 0 600
(75 mm MIN AROUND ENTIRE PERIMETER)
CHEMICAL SPLICING AGENT
FLANGE
PIPE BOOT
PIPE BOOT DETAIL
N.T.S.
PIPE BOOT
PIPE WALL
PIPE CLAMP
BUTYL TAPE
TO GROVE
IRRIGATION
AND WIRE TO CONTROL PANEL
19 mm ELECTRIC CONDUIT
MOUNTING ADAPTER
FLOW SENSOR WITH
EL. 8 000
TRANSFER PUMPING STATION NOTES:
ASTM C478. VAULT DIMENSIONS SHALL BE SHOWN ON DIAGRAMS.
1. PRECAST CONCRETE VAULT SHALL MEET THE REQUIREMENTS OF
PROFESSIONAL REGULATION.
WITH RULE 21H-19.001 (3) OF THE FLORIDA DEPARTMENT OF
THE ENGINEER RESPONSIBLE FOR THE DESIGN, IN ACCORDANCE
SUBMITTED SHALL BEAR THE IMPRESSED SEAL AND SIGNATURE OF
IN THE STATE OF FLORIDA. DRAWINGS AND CALCULATIONS
UNDER THE SUPERVISION OF PROFESSIONAL ENGINEER LICENSED
C. DRAWINGS AND CALCULATIONS SHALL BE PREPARED BY AND
COMPONENTS REQUIRING STRUCTURAL DESIGN.
FOR THE STRUCTURE AND FOR THE MODIFICATIONS AND RELATED
B. PROVIDE ENGINEERING CALCULATIONS SUPPORTING THE DESIGN
MODIFIED TO COMPLY WITH THE REQUIREMENTS OF THIS PROJECT.
THE CONSTRUCTION OF THE STANDARD STRUCTURE USED OR AS
A. LIST LOADING AND OTHER DESIGN CRITERIA; INDICATE IN DETAIL
THE WALL AND THE PIPE, RESULTING IN A WATERTIGHT ARRANGEMENT.
SHRINK GROUT IS PLACED IN THE SPACE BETWEEN THE OPENING IN
2. PIPE PENETRATION SHALL CONSIST OF PENETRATION IN WHICH NON
IRRIGATION
N.T.S.
L.W.L. EL. 3 660
C
C-412C-412
L
INTAKE STRUCTURE DETAIL
4 640 4 640
BASE
CONCRETE
PUMP STATION
TO TRANSFER
MAX. CAPACITY 10,400m /DAY)
"T" INTAKE (NOM. DIA. = 457mm, FLANGED TEE
508mm DIP (COMPACT)
UNIFLANGE CONN.
508mm DIP
P L A N
INTAKE PIT
LIMITS OF
SECTION
C @ EL. 3 000
PIPE BOOT
@0 3048 O.C. EACH DIRECTION
CONCRETE BASE W/#10M REBAR
2 000 X 2 305 X 0 2032 THICK 20685 kPa
(4 EA.)
SUPPORTS
0 300 DIP
508mm DIP
(TYPICAL)
PIPE SUPPORT
2 305
12 500 SQUARE
3 220 SQUARE
4 : 1 SLOPE
S
L O P
E
4 : 1 SLOPE
S
L O P
E
0 610
SUMP AREA 12 500 X 12 500
TOP OF SLAB @ EL. 2 500
(CL 52)
BOTTOM LINER
STOCKPILED SP MATERIAL
OVEREXCAVATE AND REPLACE WITH
0 305 COMPACTED BASE (SP MATERIAL)
ELBOW
102 mm 90°
TEE
102 mm
CONNECT TO UNDERDRAIN
102 mm UNDERDRAIN
CONNECT TO UNDERDRAIN
ELBOW
102 mm 90°
ELBOW
102 mm 90°
TEE
102 mm
ELBOW
102 mm 90°
COLLECTION PIPE
UNDERDRAIN
UNDERDRAIN PIPE
COLLECTION PIPE
UNDERDRAIN
FINAL EQUIPMENT DIMENSIONS AND LOCATIONS
ARE DEPENDENT UPON THE EQUIPMENT MANUFACTURER
CHOSEN
BUILDING FRAME DETAILS.
REFER TO DRAWING A-59 FOR PRE-ENGINEERED
SLAB DETAILS.
REFER TO DRAWING S-30 FOR CONCRETE
NOTES:
1.
2.
3.
AS-BUILT
D
A
A-E FIRM USDA
PROJECT MANAGER EPM
PPMDESIGNER
CHECKED BY REAL PROPERTY PROJECT NO.
DATE
SHEET
BY DESCRIPTIONDATENO.
Service
Research
Agricultural
REVISIONS
Jacksonville, Florida
Reynolds, Smith and Hills Inc.
Architecture, Engineering and Planning
D. CLAYTON
6951448000
A/E PROJ. NO.
E. REILLY
R. MAYER
J. YANKLE
53-3K15-4-8121B. COLLIER
20770-1433
GREENBELT, MARYLAND
6303 IVY LANE
FACILITIES DIVISION
C-413
1 TUBE(TYP)
BALLAST
(TYP)
UNDERDRAIN
PER PLAN
EL. VARIES
184 700
7 500
GEOTEXTILE
TUBE(TYP)
BALLAST
(TYP)
UNDERDRAIN
0 305 COMPACTED BASE
VENT
GEOTEXTILE
'SP' MATERIAL
COMPACTED
UNDERDRAIN DETAIL
CONNECTION DETAIL
COLLECTION PIPE
LINER
TEE
150 mm x 100 mm
100 mm PVC PIPEUNDERDRAIN
100 mm m m
300 mm
PLASTIC CAP
100 mm
300 mm
DETAIL
AIR VENT
COVER
POLYPROPYLENE FLOATING
LINER
POLYPROPYLENE
COVER
POLYPROPYLENE FLOATING
LINER
POLYPROPYLENE
SP MATERIAL.
REPLACE WITH STOCKPILED
OVEREXCAVATE AND
(SP MATERIAL)
0 305 COMPACTED BASE
EL. 3 660 EL. 4 270
POLYPROPYLENE LINER
FILTER FABRIC SOCK.
UNDERDRAIN WITH
100 MM PERFORATED
FILTER FABRIC SOCK.
UNDERDRAIN WITH
100 MM PERFORATED
100 mmTEE
GENERAL NOTES:
AND STRUCTURES IS ESPECIALLY IMPORTANT.
SETTLING. COMPACTION AROUND PIPES
SUBSTRATE IS ADVISABLE TO PREVENT
OTHER FOREIGN MATERIAL. A COMPACTED
SHARP ROCKS, ROOTS, VEGETATION, AND
PLACED MUST BE SMOOTH AND FREE FROM
THE EARTH UPON WHICH THE LINER WILL BE
TO ASSIST IN PLACING THE LINING PANELS.
CONTROL STAKES SHOULD BE LEFT IN PLACE
START OF LINER INSTALLATION. SURVEYOR
CHECK MEASUREMENTS AND GRADES PRIOR TO
LARGER EACH PROJECT.
PROJECTS OF 4000 SQUARE METERS OR
MINIMUM OF FIVE (5) FLOATING COVER
THE MATERIAL INSTALLER SHALL HAVE A
OCCUR DURING THE FALL SEASON.
INSTALLATION OF THE MATERIAL SHALL
1.
2.
3.
4.
5.
6.
6 000 3 600 1 200
7 620
7 920
1 930
OPENING
CLEAR
CC
D
D
MATERIAL
COVER HINGE COVER
FIBERGLASS SS HASP
OPENING
CLEAR
TYPE "E" - 0 914
TOP VIEW - ACCESS HATCH
1. PROVIDE DOUBLE HASP.
SS FLAT WASHER
C-125 TAC TAPE
LAMINATED FIBERGLASS
FIBERGLASS BODY
0 006 SS BOLTS, WELDED
0 005 X 0 038 SS BAR WITH
0 006 SS NUT
0 005 X 0 038 SS ANCHOR BAR
0 005 POLYESTER-SATURATED PLYWOOD
1.0 KG CLOSED CELL P.E. FOAM
0 006 SS BOLT PATTERN, 0 178 C-C
NATURAL GROUND
0 500
6 720
6 0003 6001 200
7 620
7 920
0 500
6 720
1 (MAX)
SODSOD
6 0003 6001 200
7 620
7 920
NATURAL GROUND
0 500
6 720
SOD SOD
VENT
6 000 3 600
7 620
7 920
LIMEROCK ROAD
0 500
6 720
SODSOD
1 200
1 (MAX)1 (MAX)
150 mm
EXTEND THROUGH LINER.
WITH FILTER FABRIC SOCK.
100 MM PERFORATED UNDERDRAIN
7.
WARRANTY FOR ALL MATERIAL.
PROVIDE A MINIMUM 20 YEAR PRO-RATED
100 mm BOOT
LINER
SOD SOD
SECTION
SECTION
SECTION
C
C-415C-415
SECTION
D
C-415C-415
TO ORDERING MATERIALS.
STORMWATER SYSTEM, ETC. FOR REVIEW PRIOR
ON ALL MATERIAL, INSTALLATION, LAYOUT,
CONTRACTOR SHALL SUBMIT SHOP DRAWINGS8.
NATURAL GROUND
1 (MAX)
95 000
DETAILS
IRRIGATION RESERVOIR
15 000 15 000
18 550
VARIES
7 500
REQUIREMENTS.
ACCORDANCE WITH MANUFACTURER'S
BE PROVIDED AND CONSTRUCTED IN
STORMWATER MANAGEMENT SYSTEM SHALL
COVER FLOATATION SYSTEM AND SURFACE
DETAIL BELOW.
PIPE CONNECTION
PIPE. SEE COLLECTION
0 150 PVC COLLECTION
BY BILCO, OR EQUAL.
PIPE EXIT. HATCH SHALL BE AS MANUFACTURED
SUMP (OVER INTAKE SCREENS) AND ONE AT DISCHARGE
2. PROVIDE TWO HATCHES LOCATED ONE AT INTAKE
A
C-414
B
C-414
(TYP)(TYP)
LEVEL)
(HIGH WATER
(LOW WATER LEVEL)
C. GEOTEXTILE - 227 GRAM (8 OZ.)
B. LINER - 32 MIL. THICKNESS;
CONTRACTING OFFICER
COLOR SHALL BE SPECIFIED BY
A. FLOATING COVER - 45 MIL. THICKNESS;
SPECIFICATIONS:
THE MATERIAL SHALL MEET THE FOLLOWING
8.
REGISTERED IN THE STATE OF FLORIDA.
SIGNED AND SEALED BY AN ENGINEER
CALCULATIONS FOR THE BALLAST SYSTEM
SHOP DRAWING SHALL INCLUDE BOUYANCY
1.
2.
RESERVIOR OPERATION
FARM SITE.
CENTRAL COMPUTER SYSTEM LOCATED AT THE
RESERVIOR LEVEL SHALL BE MONITORED BY THE
MARCH 31.
BETWEEN 7 500 AND 7 620 FROM OCTOBER 16 TO
THE RESERVIOR LEVEL SHALL BE MAINTAINED
6 500 AND 7 000 FROM APRIL 1 TO OCTOBER 15.
RESERVIOR LEVEL SHALL BE MAINTAINED BETWEEN
3.
DURING THESE EVENTS.
PUMP WITH A MINIMUM FLOW RATE OF 6 L/S
ELEVATION 6 500. USDA SHALL RENT A MOBILE
DRAINED UNTIL THE RESERVIOR IS REFILLED TO
AND ANY OTHER TIME THAT THE RESERVIOR IS
DURING THE ENTIRE FROST PROTECTION MODE
THE UNDERDRAIN SYSTEM SHALL BE PUMPED
C-413
C-413
NO. 1 3-24-97 GLC SHEET REISSUED BY ADDENDUM #1
ADD-1/
D
A
A-E FIRM USDA
PROJECT MANAGER EPM
PPMDESIGNER
CHECKED BY REAL PROPERTY PROJECT NO.
DATE
SHEET
BY DESCRIPTIONDATENO.
Service
Research
Agricultural
REVISIONS
Jacksonville, Florida
Reynolds, Smith and Hills Inc.
Architecture, Engineering and Planning
D. CLAYTON
6951448000
A/E PROJ. NO.
E. REILLY
R. MAYER
J. YANKLE
53-3K15-4-8121B. COLLIER
20770-1433
GREENBELT, MARYLAND
6303 IVY LANE
FACILITIES DIVISION
C-414
DETAILS
IRRIGATION RESERVOIR
FLOAT AND DRAINAGE PIPE PLAN
SD
SDSDSD
SD SD
S D
174 000 OF 200 PIPE
78 000 OF 200 PIPE
165 000 OF 200 PIPE
LINER
EXPOSED
LIMITS OF
18 550
(TYP)
15 000
7 500
(TYP)
15 000
18 550
200 PIPE
27 000 OF
TOP OF SLOPE
(m in
(NOT TO SCALE)
A
C-414 C-414
SOIL
EL. 7 620
COMPACTED
COVER DRAIN DETAIL
2 000 3 600 2 800
EL. 7 220
PIPE BOOT
OR APPROVED EQUAL
0 150 ADS N-12 PIPE
OR APPROVED EQUAL
0 150 ADS N-12 PIPE
0 150 BEND0 200 x 0 150 WYE
BERM
OR APPROVED EQUAL
0 200 ADS N-12 PIPE
P L A N
P R O F I L E
WELD
TOP LINER
LIMITS OF EXPOSED
1 6
R
(NOT TO SCALE)
C
C-414 C-414
INV. EL. 4 500
INV. EL. 4 500
P E
R
IM
E T
IR
T
A D
(T
Y P
C A
N A L
(T
Y P
INV. EL. 5 000
INV. EL. 5 000
INV. EL. 6 500
INV. EL. 6 500
STORMDRAIN PIPE
CLEANOUT
SD
(NOT TO SCALE)
B
C-414 C-414
CONTAINED LIQUID
SURFACE OF
SEALED TO COVER
DIELECTRICALLY
FLOAT CHAMBER
FLOAT DETAIL
CONTAINED LIQUID
SURFACE OF
SEALED TO COVER
DIELECTRICALLY
FLOAT CHAMBER
L E G E N D
0 100 MIN. FIELD SEAM
FLOAT, 35.2726 kg/m3
POLYETHYLENE FOAM
0 100 x 0 300 CLOSED CELL
FLOAT, 35.2726 kg/m3
POLYETHYLENE FOAM
0 200 x 0 6096 CLOSED CELL
0 100 MIN. FIELD SEAM
A
C-414 C-414
DRAIN-SEE DETAIL
TYPICAL COVER
B
C-414 C-414
SEE DETAIL
FLOAT (TYP)
C
C-414 C-414
SEE DETAIL
SPINE FLOAT (TYP)
FLOAT CHAMBER
.0009144 REINFORCED
FLOAT CHAMBER
.0009144 REINFORCED
UNDERDRAIN COLLECTION PIPE
SPINE FLOAT DETAIL
D
C-414 C-414
SEE DETAIL
UNDERDRAIN COLLECTION PIPE
M
E T
E R
1m
CONCRETE THRUST BLOCK
N.T.S.
UNDERDRAIN PUMP OUT
FROM RESERVOIR
UNDERDRAIN COLLECTOR PIPE
150mm GATE VALVE WITH BOX
M
E T
E R
150mm M.J. ELBOW
150mm D.I.P.
150MM X 100mm DIP ELBOW (FLANGE X FLANGE)
AND COUPLING, OR APPROVED EQUAL.
(TYPE H) AS MANUF. BY DIXON VALVE
(TYPE B, BRASS), WITH 100mm DUST CAP
100mm "BOSS LOCK" CAM AND COUPLER
1.0 METER SQ. CONCRETE PAD X 150mm THICK
6096mm DIA. CONCRETE PAD X 100mm THICK
PUMP OUT
UNDERDRAIN COLLECTION
COVER
COVER
LINER
(NORMALLY OPEN)
WITH VALVE BOX
200mm GATE VALVE
(NORMALLY OPEN)
WITH VALVE BOX
200mm GATE VALVE
D
C-414 C-414
RIPRAP
RIPRAP
150mm PVC PIPE
B
C-414 C-413
B
C-414 C-413
A
C-414 C-413
A
C-414 C-413
D
A
A-E FIRM USDA
PROJECT MANAGER EPM
PPMDESIGNER
CHECKED BY REAL PROPERTY PROJECT NO.
DATE
SHEET
BY DESCRIPTIONDATENO.
Service
Research
Agricultural
REVISIONS
Jacksonville, Florida
Reynolds, Smith and Hills Inc.
Architecture, Engineering and Planning
D. CLAYTON
6951448000
A/E PROJ. NO.
E. REILLY
R. MAYER
J. YANKLE
53-3K15-4-8121B. COLLIER
20770-1433
GREENBELT, MARYLAND
6303 IVY LANE
FACILITIES DIVISION
| Sol_12405B23Q0270_Amd_0001 |
| Q&As |
| Q&As |
| Drawings |
| C400 Farm Overall Irrigation Plan |
| C403 Farm Irrigation |