Questions and Answers for 12405B22Q0265.docx
DOCX document 14 KB Posted
- Attached to
- Bldg. 28 Canopy & Slab- Stoneville, MS
- Solicitation number
- 12405B22Q0265
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions and Answers for 12405B22Q0265.docx | DOCX document | |
| 12405B22Q0265.pdf | ||
| sam.gov_Wage Determinations_DBA_Washington County.pdf | ||
| SOW - Cotton Gin Bldg. 28 - Canopy 2022.pdf | ||
| Q0265 Construction Clauses and Provisions.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers for 12405B22Q0265
1. Will the submittals for the canopy structure require to be sealed by a licensed professional engineer?
No, the Contractor shall provide shop drawings to USDA from the supplier/manufacturer to meet the wind load and conceptual drawing requirements.
2. Please verify the specifications: Base: Page 4 of the SOW: undercut soil 6" below natural ground, refill with 6" crushed limestone; 12" new concrete slab (intent is to be 6" above natural ground) this does not add up? This will place slab 12" above and above the finish floor of the existing building?
The new slab top elevation shall be 2” below existing Bldg. #28 finish floor elevation slab. The new slab shall be 12” thick. There shall be 6” undercut at the new slab location and re-fill with 6” compacted limestone at the new slab location. The overall slab size shall be 14’x16’.