SF 30 AMENDMENT 0001 SOLICITATION 12405B22Q0141.pdf

PDF 94 KB Posted

Attached to
Amendment 0001/Separate Discharge at SNFRU Greenhouse Facility #4 Federal contract opportunity
Solicitation number
12405B22Q0141
Issued by
Department of Agriculture Agricultural Research Service Field Research Implementation and Information Delivery

View the file

Other files for this federal contract opportunity

Other files attached to Amendment 0001/Separate Discharge at SNFRU Greenhouse Facility #4, newest first.
File Type Posted
QUESTIONS RECEIVED Solicitation 12405B22Q0141 Separate Discharges.docx DOCX document
Attachement 4 Wage Grade Determination DBA SC20220040.pdf PDF
Attachment 5 Experience Modification Rate EMR Insurance Contractor Certification.docx DOCX document
Attachment 1 SOLICITATION 12405B22Q0141.pdf PDF
Attachment 2 Specifications Solicitation 12405B22Q0141.pdf PDF
Attachment 3 Drawings Solicitation 12405B22Q0141.pdf PDF
Attachment 6 Pre-Award Survey Form.doc DOC document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

12405B22Q0141 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

ARS-12405B

STONEVILLE MS 38776

141 EXPERIMENT STATION ROAD

USDA ARS SEA AAO ACQ/PER PROP

12405B22Q014106/17/20220001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

06/08/2022

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Amendment 0001 issued to provide answers to questions submitted by interested contractor

Q1. The A/C unit that sits on a stand is currently on a portion of the asphalt that is called to be demolished and replaced. Will the A/C unit need to be disconnected and moved to allow the asphalt paving to occur. This would leave the building without cooling for an extended period of time. Should the existing asphalt under the unit remain if sewer work will allow?

A1. Considering the drain line running beneath the AC rack is planned to be left in place and there are no new drainpipe connections planned beneath the rack & the new drain planned is West of the existing rack, leaving the rack in place is an option. If left in place, the existing asphalt can remain. I¿m ok with the new and old asphalt not matching as long as the asphalt is sawcut prior to removal & we¿re not left with a jagged border. If it is

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

VICTOR H. MCCOY

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 2

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

12405B22Q0141/0001 discovered during construction that leaving the rack and AC in place is absolutely not an option, I¿ll take care of moving the rack and AC unit. It is understood this will leave the area with no cooling.

Q2. The basement floor cleanout shown in Photo #3 on sheet C-103 of the drawings is partially under an existing partition wall. Please confirm we are to demo a portion of this wall and replace.

Please also confirm this is a non-load bearing wall.

A2. If the wall needs to be partially removed to facilitate work, it is ok to do so. To my knowledge, it is not bearing any weight. Another option is to move the location of the new drain away from the wall (out towards center of room however far necessary), angle new drain & trap towards existing drainpipe to make the connection. The drain under the wall can then be filled w/ grout/concrete and covered w/ flooring.

Q3. One of the basement floor drains is under a permanent metal rack. Please confirm the owner will move/demo the conflicting portion of the rack prior to the start of work.

A3. We¿ll move the conflicting portion of the rack but will need to be advised on how much space you¿ll need.

Q4. Please confirm that the owner will move all tables/boxes/tools/furniture that will obstruct the work prior to the start of work.

A4. USDA will move these items.

Q5. Please confirm the storage shed located on a portion of the asphalt to be demolished will be moved by the owner prior to the start of work.

A5. It will be either demolished or moved by USDA.

Period of Performance: 07/21/2022 to 09/19/2022

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

File details come from the government source that posted it. Updated .