Summary: Combined Synopsis/Solicitation for Mark Twain NF Greer Springs Trailhead Vault Toilet Replacement
This is a Combined Synopsis/Solicitation (RFQ 12363N26Q4148) issued by the USDA Forest Service for the replacement of a vault toilet facility at Falling Springs Recreation Area near Alton, Missouri. The solicitation is set aside for small businesses under NAICS code 238990 (All Other Specialty Trade Contractors) with a $19 million size standard. Quotes are due by May 25, 2026, at 11:00 AM CST, with a contract performance period from June 1, 2026, through February 28, 2027. The award will be made on a firm fixed-price basis to the responsible offeror offering the best value.
The scope includes two line items: (1) delivery and installation of a single vault ADA-accessible toilet meeting specific design requirements (Cascadian CXT or equivalent with board and batt upper walls, lap-sided lower walls, cedar shake roof, all in Java Brown color), and (2) removal of the existing toilet facility and site preparation for the new structure. The contractor must be manufacturer-certified to install the product and must complete all work including excavation, backfill, grading, seeding, vault cleanup by a licensed pumper, and debris removal. Evaluation criteria include technical approach (schedule compliance, understanding of requirements), relevant past performance (minimum 3 references), experience/qualifications, and cost/price reasonableness. Proposals must include separate technical and price components with evidence of past performance; proposals lacking both components will not be considered. Payment will be made electronically through the Invoice Processing Platform (IPP).
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. GENERAL INFORMATION
Document Type: Combined Synopsis/Solicitation Solicitation Number: 12363N26Q4148 Posted Date: 05/11/2026 Original Response Date: 05/25/2026 Current Response Date: N/A Product or Service Code: S222 Set Aside: Small Business NAICS Code: 238990 – $19M All Other Specialty Trade Contractors
Contracting Office Address
USDA Forest Service Procurement and Property Services National Stewardship Contracting Branch 1400 Independence Ave. SW, MS-1138 Washington DC 20250-1138
This is a combined synopsis/solicitation for commercial services prepared in accordance with FAR 12. This announcement constitutes the only solicitation; offers are being requested, and a separate written solicitation will not be issued.
Solicitation number 12363N26Q4148 has been issued as a Request for Quotes (RFQ) for the Mark Twain NF Greer Springs Trailhead Vault Toilet Replacement.
This solicitation incorporates provisions and clauses by reference. The full text of provisions and clauses may be accessed electronically at www.acquisition.gov.
The associated North American Industrial Classification System (NAICS) code for this procurement is 238990 – All Other Specialty Trade Contractors, with a small business size standard of $19 Million. The product service code is S222. The government intends to award a Firm Fixed Price contract resulting from this combined synopsis/solicitation to the responsible offeror whose offer, conforming to the synopsis/solicitation, will be most advantageous to the government (as determined by the solicitation evaluation criteria). All responsible sources may submit a quotation which will be considered by the agency, and proposals shall be valid for 60 days after the date of receipt for the solicitation.
Points of Contact
Thomas Tran, Contracting Officer, thomas.tran2@usda.gov No organized site visit is scheduled for this project. Interested vendors are encouraged to visit the project area to familiarize themselves with the requirements.
Offerors shall quote in accordance with the SOW. Please provide your price and technical proposal separately.
Proposals that do not have a technical proposal and past performance, may not be considered.
Quotes shall be valid for a minimum of 60 calendar days after submission.
Please label file name by format below:
Company name, price or technical proposal or both and name of project Ex. USDA Price/Technical Proposal Solicitation #
12363N26Q4148 Mark Twain NF Greer Springs Trailhead Vault Toilet Page 1 of 78 https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-12 http://www.acquisition.gov/ mailto:thomas.tran2@usda.gov
Payment will be made via EFT. Invoice using IPP.Gov Set Aside For: Large Small
Woman- Owned SDVOSB Hubzone 8(a)
(Please check all that apply) x
**MUST HAVE ALL INFO BELOW**
Company Name:
Vendor Rep:
Phone:
Email:
Mailing Address:
UEI SAM #
Estimated Period of Performance 06/01/2026 – 02/28/2027
Contractor Signature: ______________________________________
Contractor Parent BPA/IDIQ #: ______________________________________
**QUOTES ARE DUE BY: 05/25/2026 by 11:00AM CST** Questions due 05/18/2026 by COB
12363N26Q4148 Mark Twain NF Greer Springs Trailhead Vault Toilet Page 2 of 78
SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION
a. NAME
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
CALL:
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
5. REQUISITION/PURCHASE REQUEST NO.
1168199
USDA-FS STEWARDSHIP CONTRACTING BR
1400 INDEPENDENCE AVE SW
MS-1138
WASHINGTON DC 20250-1138
363N
THOMAS TRAN
b. EMAIL thomas.tran2@usda.gov
5/11/2026
1. SOLICITATION NO.
12363N26Q4148
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
11. The Contractor shall begin performance upon receipt of notice to proceed and shall be completed no later than February 28, 2027.
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
negotiable. (See FAR Clause 52.211-10)
13. ADDITIONAL SOLICITATION REQUIREMENTS
a. Offers to perform the work specified in Item 10 shall be submitted by 11:00 am CDT, May 25, 2026. If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing bid bonds shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due.
is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.) 10
NSN 7540-01-155-3212
mandatory
30 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected .
STANDARD FORM 1442 (Rev. 4-85)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
USDA-FS STEWARDSHIP CONTRACTING BR
1400 INDEPENDENCE AVE SW
MS-1138
WASHINGTON DC 20250-1138
SOLICITATION FOR PRICING AND TECHNICAL PROPOSALS
1168199 R9 MO Mark Twain NF Greer Springs Trailhead Vault Toilet Replacement
See Schedule of Items, specific work description, supplemental specifications/terms and conditions, and attachments that apply to the work. These terms supplement the base IDIQ terms and conditions.
**ALL DOCUMENTS, INCLUDING A SCANNED COPY OF THE FULLY EXECUTED BID BOND IF REQUIRED, SHALL BE SUBMITTED ELECTRONICALLY TO THOMAS TRAN AT thomas.tran2@usda.gov AND
RECEIVED BY THE DEADLINE IN BLOCK 13.
xThis performance period is x x (If total price exceeds $150,000 - see page 5) x
12363N26Q4148 Mark Twain NF Greer Springs Trailhead Vault Toilet Page 3 of 78
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document and return (Contractor is not required to sign this document.)
Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.
No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
See schedule
USDA-FS STEWARDSHIP CONTRACTING BR
1400 INDEPENDENCE AVE SW
MS-1138
WASHINGTON DC 20250-1138
363N
INVOICE PROCESSING PLATFORM IPP
ALL INVOICES MUST BE SUBMITTED
ELECTRONICALLY THROUGH THE
INVOICE PROCESSING PLATFORM IPP
VIA WWW IPP GOV
THOMAS T. TRAN
28. NEGOTIATED AGREEMENT 29. AWARD
Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.)
10 U.S.C. 2304(c) 41 U.S.C. 3304(a)x x
STANDARD FORM 1442 (REV. 8/2014) BACK
Continued...
12363N26Q4148 Mark Twain NF Greer Springs Trailhead Vault Toilet Page 4 of 78
SCHEDULE OF ITEMS
Item No.
Description Unit Price Quantity Total Price
Single vault ADA accessible toilet/delivery/installation
Removal of existing toilet facility/prep for placement of new toilet structure in footprint
TOTAL
Double toilet and facility removal will be located at Falling Spring Recreation Area outside of Alton, MO 65606 (see attached vendor site description and map for further delivery instructions)
12363N26Q4148 Mark Twain NF Greer Springs Trailhead Vault Toilet Page 5 of 78
EVALUATION CRITERIA:
TECHNICAL PROPOSAL INSTRUCTIONS
General Proposals shall be submitted in two parts: a technical proposal and a price proposal. Each part shall be separate and complete in itself so that evaluation of one may be accomplished independently of the other. The price proposal shall be submitted with the solicitation forms.
Offerors are cautioned that sufficient and detailed information must be presented in their proposals to enable the Government to evaluate their proposals fully in accordance with the evaluation and award criteria contained herein. The Government is not obligated to ask for additional information and in the absence of appropriate information, the proposal will be rated deficient.
Price Proposal A completed schedule of items with pricing information completes this requirement.
Technical Proposal Offerors shall submit technical information for their firm and any proposed major subcontractors. Please submit your past performance with the technical information. Also, the offeror shall submit information that illustrates a technical understanding of the work to be performed.
1) Relevant Past Performance:
Relevant Past Performance shall be obtained from previous work with the Federal Government and utilized for evaluation on this contract. Please provide at least 3 past performances with references.
2) Technical Approach:
All offerors should show a high level of understanding of the work to be performed. This can be accomplished by submitting with the proposal the following information:
1. Description of how the work will be performed
2. Schedule (accomplishing work while meeting weather conditions)
3. Key Personnel
4. List of equipment to be used
3) Experience/Qualification:
The Offeror will be evaluated on the experience and qualifications of their company and personnel.
12363N26Q4148 Mark Twain NF Greer Springs Trailhead Vault Toilet Page 6 of 78
Technical Evaluation Criteria Technical proposals will be evaluated and rated by a Technical Evaluation Panel. Proposals shall be prepared in accordance with the proposal preparation instructions. The Government intends to evaluate quotations using a comparative evaluation methodology. This means quotations will be compared against one another to determine which provides the best value to the Government, based on the evaluation factors outlined in this solicitation.
The Government may consider quotations that exceed minimum requirements and offer additional value or benefits, even if they are not the lowest priced.
1) Relevant Past Performance:
a) Relevant Past Performance shall be provided and utilized for evaluation on this contract.
2) Technical Approach:
b) Understanding of Proposed Work: Offeror demonstrates a technical understanding of the proposed work including but not limited to preliminary scheduling, equipment requirements, site conditions and location, project challenges, and material requirements.
3) Experience/Qualification:
Evaluates the company’s history, background, and ability to perform work of similar size, scope, and complexity. Specialized work and accomplishments relative to the scope of work.
4) Acceptability:
An offeror’s documented response to the solicitation will not be deemed acceptable, if not received by the specified closing date and time, and the submitted proposal not clearly demonstrate the offerors understanding the needed work. In such cases the offeror will be viewed as having “failed” this criterion and will not be considered for award.
5) Cost or Price:
Each acceptable offer will be evaluated for reasonableness of proposal price. This criterion will include consideration of cost information provided. It is the Government's intent to assess the unit prices to determine reasonableness and offeror's understanding of the work and ability to perform the contract. The importance of price may become greater as the differences between technical proposals decrease. Where technical proposals are determined to be substantially equal, price may control award.
(b) Award. A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer’s specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.
12363N26Q4148 Mark Twain NF Greer Springs Trailhead Vault Toilet Page 7 of 78
Site Specifications for Eleven Point Ranger District FY2026 Vault Toilet Building Replacement/Addition
Mark Twain National Forest REQUESTING UNIT: Mark Twain National Forest Eleven Point Ranger District #66 Confederate Ridge Road Doniphan, MO 63935
1. INTRODUCTION – The U.S. Forest Service (FS) requires the purchase and installation of (1) single vault toilet on the Mark Twain National Forest.
A. Project Location:
One (1) single vault toilet at Falling Springs, located as follows:
FROM WINONA, MO: Travel MO HWY 19 South from US HWY 60 from city limits of Winona
9.6 mi. to FR 3164 (CR 156)). Turn left onto FR 3164. Stay left at the Y, and continue 2.5 mi.
Site is immediately on your right. Site coordinates N 36 52’ 04”, W 91 17’ 39”.
2. ADMINISTRATIVE REQUIREMENTS
A. Hours of Operation: Monday – Friday, 8am – 5pm unless otherwise approved by COR.
B. Period of Performance: Construction activities shall not begin until after November 15, 2026 and shall be completed by February 28, 2027.
C. Submittals: Manufacturer data sheet for vault toilets.
D. Special Qualifications: Contractor must be certified by the manufacturer to install the product.
E. Safety & Worksite Housekeeping: The Contractor shall take all precautions to maintain a safe work site at all times, in a condition that will prevent damage or injury to person or property, both Government or otherwise. All worksites shall be kept free of litter or other debris and upon completion of work all residual materials shall be removed from the site and the area left clean.
All debris will be lawfully disposed of off-site.
F. As approved by the COR, remove obstructions, grass, and other vegetation as needed. Standing trees will be removed by the Forest Service. Contractor is to alert the Forest Service COR as soon as possible if any tree removal is necessary. The limits of clearing shall be held to a minimum and only if necessary.
3. SCOPE – The Contractor shall furnish all equipment, materials, supplies, and services that are not specified herein as Government-furnished, which are necessary to comply with the requirements of this contract. Ancillary work items not listed below, though necessary to attain the completed project, shall be included in the contract.
12363N26Q4148 Mark Twain NF Greer Springs Trailhead Vault Toilet Page 8 of 78
4. Site Specific Product Information
A. Falling Spring Toilet General Specifications
Site Contact: Anthony Lee, anthony.lee@usda.gov (573) 996 6758 COR Contact: Rachel Uetrecht, Rachel.uetrecht@usda.gov (573) 341 7433
a. Single vault Cascadian CXT toilet or equivalent
b. BOARD and BATT upper exterior walls in JAVA BROWN color
c. Lower exterior wall to be LAP SIDED in JAVA BROWN
d. CEDAR SHAKE textured roof in JAVA BROWN color
e. Painted steel door with heavy duty tamper resistant deadbolt
f. ABA/ADA compliant grab bars
g. ABA/ADA compliant molded one-piece HDPE polyethylene riser
h. Toilet shall be signed “ADA/Unisex” on the exterior.
i. Toilet paper dispenser capable of holding a minimum of three (3) standard rolls of toilet paper
j. Vent anchored into concrete walls. Vent not to be located in doors.
k. Minimum of two (2) Lexan windows in vault toilet building with translucent finish
l. Vault to be polyethylene lined concrete
m. Keyed to “48879” lock set
Special Instructions Existing wooden building and two vaults beneath will need to be removed. Existing vaults are an abandoned concrete vault estimated at 500 gal that has been filled with soil and a 300 gal fiberglass that is currently in use. New structure will be placed onto existing footprint; some excavation is expected as existing footprint is smaller than the dimensions of the new building.
Contractor to visit site prior to bidding to determine requirements for vault toilet delivery. It is possible that the building will need to be offloaded to a shorter truck with trailer or ten wheeled flatbed to access the site.
Request scheduling a site visit at least (1) month in advance of building delivery.
12363N26Q4148 Mark Twain NF Greer Springs Trailhead Vault Toilet Page 9 of 78 mailto:anthony.lee@usda.gov mailto:Rachel.uetrecht@usda.gov
Figure 1. Existing toilet structure to be removed at Falling Springs. New structure will be placed mostly within the footprint of this structure and associated abandoned vault behind.
12363N26Q4148 Mark Twain NF Greer Springs Trailhead Vault Toilet Page 10 of 78
Figure 2. Abandoned vault structure.
12363N26Q4148 Mark Twain NF Greer Springs Trailhead Vault Toilet Page 11 of 78
12363N26Q4148 Mark Twain NF Greer Springs Trailhead Vault Toilet Page 12 of 78
General Specifications for Eleven Point Ranger District FY 2026
Vault Toilet Building Contract
PART 1 – GENERAL 1.
1. Scope:
1.1. Removal of existing vault toilet, associated concrete pad, abandoned vault adjacent, furnishing and installation of a prefabricated precast concrete vault toilet building that meets ADA accessibility standards. Excavation for building placement and filling void areas from demolition. Backfilling of the new building and various other site work as described herein.
1.2. Installation site is on the Eleven Point District of the Mark Twain National Forest in Missouri.
See map attached to “Site Specifications” for location information.
2. Manufacturers:
2.1. Manufacturer shall be CXT Inc., Idaho, Texas and West Virginia - 412-398-4286. The salient characteristics used to determine an “or equal” are listed in Part 2 – Building and Installation Specifications. Appearance shall be consistent with the model identified for bid item.
Appearances that differ from the identified model may be submitted as alternate options. At his/her sole discretion, the Contracting Officer will consider whether those alternate options meet the desired appearance for use at a national forest site.
3. Site Visit:
3.1. Bidders are urged and expected to inspect the site where the work will be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after Contract award.
4. Measurement of Work and Payment:
4.1. Payment will be made according to the items listed on the bid schedule. No other payments will be made.
5. Site Safety:
5.1. Work under this contract is located at a National Forest recreation site. Facilitate all work to ensure the safety of the public and government employees. Provide signage, fencing, barriers, etc. as required to ensure safety.
5.2. The contractor shall have all underground utilities located prior to excavation in accordance with state law.
12363N26Q4148 Mark Twain NF Greer Springs Trailhead Vault Toilet Page 13 of 78
6. Specifications Included by Reference
The Standard Specifications for the Construction of Roads and Bridges on Federal Highway Projects, FP-14, U.S. Customary Units are included by reference. The requirements contained in these specifications are hereby made a part of this solicitation and any resultant contract. The specifications can be obtained from the Federal Highway Administration Home Page on-line at:
http://flh.fhwa.dot.gov/resources/pse/specs/
PART 2 – BUILDING AND INSTALLATION SPECIFICATIONS
1. Vault:
1.1. There shall be one vault and one toilet riser.
1.2. The vault shall have a one-piece, seamless liner, suitable for wastewater applications.
1.2.1. Acrylonitrile/butadiene/styrene copolymers (ABS), 752 virgin plastic, initial sheet thickness 0.375”, and final stamped thickness a minimum 0.25”.
1.2.2. Low Density Polyethylene (LDPE), minimum uniform thickness of 0.25”.
1.2.3. Other materials for vault liners may be submitted to the Contracting Officer for approval.
1.3. Liners shall be attached to the concrete walls and the bottom of the vault. Penetration through the liner to attach to the concrete walls will not be permitted.
1.4. Vault liners shall be provided with a 7-year warranty for water tightness.
1.5. The vault shall have a bottom slope of 1 Inch per ft. from under the toilet riser out to the outside cleanout area so that the waste can be more thoroughly removed.
1.6. Plate for vault cleanout cover lid shall be ¼ inch thick diamond plate steel. Cleanout cover lid shall be hinged and configured so that it can be locked with a padlock and held in the open position when cleaning the vault. The vault cleanout shall have a steel angle frame cast into the concrete and the entire assembly slightly raised to allow water to drain away from the opening.
The hatch and frame shall be primed and painted on the interior and exterior. Provide gasket between frame and cover for water-tight seal. No unsealed penetrations or openings shall be allowed in the cover lid.
1.7. The capacity of the vault shall be 1,000 gallons.
1.8. The depth of the vault shall be no deeper than 5 ft.
2. PCI Certification Requirements:
2.1. Precast concrete manufacturing plant shall be Precast/Prestressed Concrete Institute (PCI)certified. Minimum certification shall be C1A.
2.2. Qualifying manufacturer is listed in Part 1, 2.1.
12363N26Q4148 Mark Twain NF Greer Springs Trailhead Vault Toilet Page 14 of 78 http://flh.fhwa.dot.gov/resources/pse/specs/
3. Building Interior Floor Surface:
3.1. The floor shall be completely sealed to prevent any staining or odor absorption.
3.2. The floor shall have a non-slip surface only in the walkway area.
3.3. The wall to floor surfaces shall have a large radius coving (4 to 6 Inches) and all 90° corners shall be rounded.
3.4. The floor shall evenly join the outside concrete so that there is no lip at the doorway to hinder the individuals with disabilities from entering.
4. Interior Building Walls and Ceiling:
4.1. The walls shall be nonporous.
4.2. The walls shall be light in color to assist in reflecting available light.
4.3. The walls shall be difficult to write on or designed to be easily cleaned.
4.4. The walls shall be free from ledges, angles, and shelves so that less dirt accumulates, and cleaning is easier.
5. Toilet Riser:
5.1. Toilet riser shall be constructed of seamless cross-linked polyethylene, complete with molded plastic heavy-duty open-front seat and cover assembly, designed to fit hole in floor slab.
Finish: Smooth. Color: White or off-White. Top of toilet seat must be 18” above the floor, ± ½”.
Heavy duty seat and cover assembly as manufactured by Romtec, Inc., 18240 N. Bank Road, Roseburg, Ore. 97470, 541-496-3541 or approved equal.
6. Toilet Paper Dispenser:
6.1 Bar-type toilet paper dispenser shall be constructed of stainless steel with satin finish, designed to hold three standard rolls of toilet paper. Holder shall not prevent the free turning of the paper rolls. The dispenser shall be manufactured by Romtec Inc., 18240 N. Bank Road, Roseburg, Oregon 97470, 541-496-3541 or approved equal.
7. Air Vent for the Building:
7.1. The vent in the building, necessary to supply replacement air for the air drawn out of the vault, shall be around 120 sq. inches of free area for a single unit toilet.
7.2. There shall be only one vent opening. The opening shall be placed only on one side of the building. The "side" will be the wall opposite the mounting of the toilet paper dispenser.
7.3. The vent shall be placed as low to the ground as possible and on the side that the wind is most predominant during the use period.
7.4. The vent shall be constructed of a heavy-duty material, such as expanded metal, to prevent vandalism.
12363N26Q4148 Mark Twain NF Greer Springs Trailhead Vault Toilet Page 15 of 78
7.5. There shall be no screen in the vent opening unless the size is 1/4-lnch mesh (least dimension).
8. Air Vent for the Vault:
8.1. The vault shall have its own vent.
8.2. The top of the vent pipe shall be a minimum height of 3 ft. above the highest point of the roof.
8.3. Vault vent pipe shall be polyethylene (PE) plastic pipe, 12” nominal size, 12.75” outside diameter, minimum 0.392” wall thickness, 32.5 standard dimensional ratio (SDR), PE 3408 high density, black color, UV stabilized, Driscopipe 1000 as manufactured by CP Chem Performance Pipe, 800-527-0662 or approved equal.
8.4. If a top cover is provided, it shall be a flat plate placed 12 inches above the top of the pipe and supported by three thin metal rods so as not to interfere with the aspiration aspects of the wind flowing over the open top pipe.
9. Installation:
9.1. Contractor is responsible for the removal of the existing vault toilet, if applicable, clearing and grubbing, excavation and backfill, installation of new vault toilet, and minor site grading around the new vault toilet.
9.2. Excavation shall be a minimum 2 feet wider and longer than the new vault toilet, and to a depth as such that the bottom of the floor slab is at grade with the existing ground surface after the placement of the bedding.
9.3. Compact bottom of excavation with vibratory or plate compactor prior to placement of aggregate base. Make 3 passes minimum with compacting equipment to firm up the subbase.
9.4. Place a minimum 1.0 foot (compacted in place) depth by 2 feet wider and 2 feet longer than the vault of granular bedding material. It shall consist of washed sand or 1” or 1/2”minus crushed or screened aggregate from a private or commercial source. Sand or aggregate shall be used as a leveling course beneath the concrete vault. Place in 6-inch lifts and compact with a vibratory compactor.
9.5. Backfill shall be of a well graded, compactable, mineral soil material free of excess moisture, muck, frozen lumps, roots, sod, or other deleterious material, with maximum particle size of 3 inches.
9.6. Backfill shall be placed evenly around the vault. It shall be placed in eight-inch loose lifts and each lift compacted with a minimum of two passes with a whacker-type mechanical compactor or equivalent.
9.7. Place select topping material free of excess moisture, muck, frozen lumps, roots, sod, or other deleterious material with a 3-inch maximum particle size around the sides and back of the vault toilet up to the top of the floor slab. Grade in such a way that moisture and runoff shall slope away from the vault toilet building once the anticipated backfill settlement has occurred.
12363N26Q4148 Mark Twain NF Greer Springs Trailhead Vault Toilet Page 16 of 78
9.8. Topsoil shall be removed from the area to be excavated and from the area where excavated material shall be piled prior to excavating. Topsoil shall be kept separate from excavated material.
9.9. All surfaces and slopes shall be shaped to blend with the original ground line, mounded over or smoothed off, and raked, and left in a uniform and neat condition. Stockpiled topsoil shall be smoothly distributed over disturbed areas and hand raked to blend with ground line. Final grade shall be flush with top of front slab to provide accessibility. Surface drainage shall be diverted away from the area. All work sites shall be left free of debris.
9.10. Seed all disturbed areas around the new toilet building. Seed mix shall be as listed below in the “Site Specific Specifications” section. Lightly rake the site following the seeding operation to incorporate the seed into the topsoil.
PART 3 – DEMOLITION/REMOVAL OF EXISTING VAULT TOILET BUILDINGS
1. Vault Clean Out:
1.1. The contractor shall have toilet vault pumped by a licensed septic pumper at the contractor’s expense. Upon completion of this pumping the contractor shall secure the buildings so that no further use occurs after pumping. It will be the contractor’s responsibility to re-pump the vault (s) if it is not empty on the day of removal therefore it is important to schedule pumping to be done as near to the time of removal as possible.
1.2. Provide additional rinsing, cleaning and pumping as necessary to properly empty the vault in a manner such that no potentially harmful materials are released onto the ground during the demolition/removal process.
2. Demolition/Removal:
2.1. The existing toilet building and vaults listed for removal shall become the property of the contractor and unless otherwise indicated in the “Site Specifications”, shall be removed from Government property. The contractor may elect to move the entire toilet building from the site in one piece.
2.2. All demolition debris shall be removed from the site prior to completion of the contract.
2.3. Dispose of all demolition debris and any other waste generated as a result of this work in accordance with all federal, state and local requirements.
2.4. Contractor shall provide invoices, photos, and/or other documentation for pumping the vault, disposal of the sewage, and disposal of demolition debris to the Contracting Officer.
12363N26Q4148 Mark Twain NF Greer Springs Trailhead Vault Toilet Page 17 of 78
ADDENDUM TO FAR 52.212-3
EMPLOYMENT OF ELIGIBLE WORKERS
WORKFORCE CERTIFICATION
Contractors are required to provide certification under this solicitation in compliance with the Migrant and Seasonal Agricultural Workers Protection Act (MSPA) and Farm Labor Contractor (FLC) Certificate of Registration requirements describing the workforce they will utilize to fulfill the contract requirements under this solicitation and any resulting contract. If the Contractor will supply workers under the H-2B Program, the Contractor is required to provide a copy of the Temporary Employment Certificate issued by DOL.
Subcontractors are bound by the same requirements for licenses and permits under this contract. If a Prime Contractor identifies a Subcontractor as part of their workforce to accomplish the work under this solicitation, the Prime Contractor shall submit the Subcontractor's signed certification with their response to the solicitation.
H-2B Workers: (http://www.foreignlaborcert.doleta.gov/) [ ] Company certifies it will not be utilizing H2B Workers under any resulting contract of this solicitation.
[ ] Company will be utilizing H2B Workers (under any resulting contract of this solicitation. Provide a copy of Temporary Employment Certificate.)
MSPA Workers: (http://www.dol.gov/whd/mspa/) [ ] Company certifies it will not be utilizing MSPA workers under any resulting contract of this solicitation.
[ ] Certifies has valid FLC certificate of registration. (Attach a copy of current certification.)
Authorization includes:
[ ] Transporting workers [ ] Driving [ ] Housing workers
[ ] Company has applied for certificate of registration on ______________.
Contractors not currently having obtained a certificate (for each partner, if partnership) will be requested to furnish proof of having obtained a certificate prior to award of contract. Partnerships must furnish proof of registration of their assumed business name, if any, with the State of registration.
State of ______________ No.______________
I, on behalf of said Company, certify to the above responses.
(Signature) (Date)
(Printed Name) (Title)
END of ADDENDUM TO FAR 52.212-3
12363N26Q4148 Mark Twain NF Greer Springs Trailhead Vault Toilet Page 18 of 78 http://www.foreignlaborcert.doleta.gov/ http://www.dol.gov/whd/mspa/
MIGRANT AND SEASONAL AGRICULTURAL WORKER PROTECTION ACT
(MSPA)
https://www.dol.gov/agencies/whd/agriculture/mspa
This attachment shall be incorporated into any BPA Call that employs MSPA-protected employees.
Employment of Eligible Workers
1. General
This contract is subject to the Migrant and Seasonal Agricultural Worker Protection Act (MSPA), 29 United States Code (U.S.C) 1801-1872, and to the U.S. Department of Labor (DOL) regulations implementing MSPA 29 Code of Federal Regulations (CFR) Part 500. MSPA eliminates activities detrimental to migrant and seasonal agricultural workers, requires registration of Farm Labor Contractors, and ensures necessary protection for the workers. Information regarding MSPA can be found at: http://www.dol.gov/whd/mspa/index.htm
If workers are hired under the H-2B program, (8 CFR Section 274A provisions of the Immigration and Nationality Act (INA) for the admission of nonimmigrants to the U.S. to perform temporary labor or services) a Temporary Employment Certification issued by the Office of Foreign Labor Certification (OFLC) in the Department of Labor Employment and Training Administration is required.
For further information on the requirements of the H-2B program, visit OFLC's website:
http://www.foreignlaborcert.doleta.gov/
U.S. DOL’s Wage and Hour's website:
https://www.dol.gov/agencies/whd/immigration/h2b/2015-final-rule
Compliance with MSPA and the INA is a material condition of this contract. If the contractor employs any unauthorized worker(s) during the performance of this contract that violates section 274A of the INA, the Government may terminate the contract, in addition to other remedies or penalties prescribed by law.
2. Definitions
a. H-2B worker: as used in this part means a nonimmigrant holding a visa authorizing the individual to legally work in the US to perform temporary labor or services. A worker with an H-2B visa (H-2B worker) may also be considered a migrant agricultural worker under MSPA depending on the type and nature of work performed.
12363N26Q4148 Mark Twain NF Greer Springs Trailhead Vault Toilet Page 19 of 78
b. Migrant Agricultural Worker and Seasonal Agricultural Worker: as used in this part means individuals employed for agricultural (including forestry) work on a seasonal or temporary basis.
A worker, moving from one seasonal activity to another, is employed on a seasonal basis even though the worker may continue to be employed during a major portion of the year.
An overnight absence from the migrant workers permanent place of residence is required.
Members of the contractor's immediate family are not considered migrant or seasonal workers. Immediate family includes:
1. Spouse
2. Children, stepchildren, or foster children
3. Parents, stepparents, or foster parents, or
4. Brothers and sisters
c. Farm Labor Contractor (FLC). As used in this part means a person including an individual, partnership, association, joint stock company or a corporation, who, for any money or other valuable consideration, paid or promised to be paid, performs any recruiting, soliciting, hiring, employing, furnishing, or transporting of any migrant or seasonal agricultural worker.
3. Registration Requirements
a. Any contractor providing or hiring H-2B nonimmigrants for work under this contract shall provide a copy of their Temporary Employment Certificate. General information about the H-2B program can be found on Fact Sheet # 78 at http://www.dol.gov/whd/regs/compliance/whdfs78.htm.
Contractors can apply for the certificate through the US DOL Employment & Training Administration's on line iCERT Visa Portal System at https://www.foreignlaborcert.doleta.gov/h-2b.cfm or by paper application.
b. Any contractor who meets the definition in (2.c.) above providing or hiring migrant or seasonal workers to perform agricultural or manual forestry work shall first obtain a Federal DOL Farm Labor Contractor Certificate of Registration (https://www.dol.gov/agencies/whd/forms/wh530). The contractor shall carry the certificate at all times while engaged in contract performance and shall display it upon request. Any of the contractor's employees who perform any one or more of the activities defined as an FLC in paragraph (2.c.) must have their own FLC Employee Certificate. General information about MSPA can be found on Fact Sheet #49 at DOL Wage and Hour Divisions webpage http://www.dol.gov/whd/regs/compliance/whdfs49.htm.
4. Certifications
The Contractor shall provide applicable H-2B Temporary Employment Certificate and/or Farm Labor Contractor Certificate as part of their representations, certifications, and acknowledgements. Subcontractor(s) meeting the definitions
12363N26Q4148 Mark Twain NF Greer Springs Trailhead Vault Toilet Page 20 of 78 above shall follow the same requirements as the Prime Contractor. It is the Prime Contractor's responsibility to ensure the Subcontractor's information is provided to the Contracting Officer.
5. Worker Protections
a. Worker Information Posters
A contractor who uses the H-2B program to meet its temporary employment needs must post and maintain the H-2B poster (WH- 1505) in a conspicuous location accessible to workers at the job site.
The contractor shall display and maintain the MSPA poster (WH- 1376) on the job site in a conspicuous location accessible to workers during the contract performance period.
b. Personal protective equipment
29 CFR 1910 Subpart I, OSHA's General Industry personal protective equipment (PPE) standard contains the general requirements for the provision of personal protective equipment and requires employers to perform a hazard assessment to select appropriate PPE for hazards that are present or likely to be present in the workplace. OSHA requires that many categories of personal protective equipment meet or be equivalent to standards developed by the American National Standards Institute (ANSI).
Before a worker begins operating equipment, the contractor shall train the workers on the safe operation and use of the equipment
The contractor shall provide the appropriate personal protective equipment for the work required to be performed in the contract, wherever necessary by reason of hazards or processes encountered that may cause injury or impairment in the function of any part of the body. Except for foot protection, all PPE must be provided by the employer at no cost to the employee. Includes:
1. Head Protection
2. Hearing Protection
3. Eye/Face Protection
4. Leg Protection
5. Foot Protection
6. Hand Protection
PPE must be sanitary and in reliable condition. Do not use defective or damaged PPE. PPE must be inspected prior to use on each work shift to ensure it is in serviceable condition.
12363N26Q4148 Mark Twain NF Greer Springs Trailhead Vault Toilet Page 21 of 78
A checklist of applicable PPE guidelines typical for the work performed under this contract is provided. This does not relieve the contractor of the responsibility of performing a risk assessment or providing the necessary PPE for their operations.
Reference https://www.osha.gov/SLTC/personalprotectiveequipment/index.html or OSHA 3151-12R 2003 Personnel Protective Equipment Booklet.
The booklet can be found at:
https://www.osha.gov/Publications/osha3151.pdf
Manual Logging and Forestry Related activities:
https://www.osha.gov/SLTC/etools/logging/manual/logger/personal_e quip.html
General Machine and Vehicles Logging and Forestry Related activities:
https://www.osha.gov/SLTC/etools/logging/mechanical/machines.html
c. Field Sanitation.
OSHA established minimum standards for field sanitation in covered agricultural settings. Refer to Fact Sheet # 51 Field Sanitation Standards under the Occupational Safety and Health Act.
6. Employment Requirements
Fact Sheets with relevant information may be found at:
http://www.dol.gov/WHD/fact-sheets-index.htm
a. Contractors employing workers in forestry related work are required to comply with wage and payroll standards and recordkeeping requirements.
Refer to Fact Sheet #63: Application of Federal Labor Laws to Reforestation found on the DOL Wage and Hour Division webpage.
b. Contractor Employee List. Contractors are required to maintain and provide upon request an active list of all employees performing work on the job site under this contract. The Employee List will identify employees by full name (aliases), supervisory duties if applicable, and appropriate labor Occupation Code for work performed under the Service Contract Act Wage Rates applicable to this contract. If Subcontractors are utilized, all tiers of subcontractor(s) are responsible for providing the same information for their employees to the Prime for submittal to the Contracting Officer.
7. Transportation
a. The contractor shall be registered to transport employees, unless employees provide their own transportation or carpool by their own arrangement in one of their own vehicles. Authorization for each vehicle
12363N26Q4148 Mark Twain NF Greer Springs Trailhead Vault Toilet Page 22 of 78 that will be used to transport employees must appear on the contractor's certificate. If the contractor directs or requests employees to carpool, the registration requirement is applicable. Any driver, who transports workers for a fee or at the direction of the contractor, shall be registered as an FLC or an FLC employee.
b. See Fact Sheet #50: Transportation under the MSPA, for more information about the vehicle safety standards, driver's licensing requirements, and vehicle insurance requirements. Note that separate transportation requirements may apply if there are H-2B workers.
8. Housing
a. The authorization to furnish housing, other than commercial lodging certified by a health authority or other appropriate agency, must appear on the contractor's certificate. Contractors should contact their local Wage and Hour Division of the DOL for further information on the requirements of the Act.
b. Camping Requirements. The Forest Service (FS) has various camping opportunities. Check with local FS unit for camping requirements, camping permits may be required. Verify local fire restriction policies. If camps will be used to house workers subject to MSPA, they are also subject to the temporary labor camp standards at 29 CFR 1910.142. The Forest Service reserves the right to terminate a camping permit at any time. These requirements are in addition to those contained in or provided for under any other applicable clause in this contract. Any violation of these conditions constitutes a breach of contract and may result in revocation of camping approval.
o Every structure used as shelter must provide protection from the elements. Where adequate heat is not provided, make other arrangements to protect workers from the cold. Cut firewood only after a District Firewood Permit is obtained.
o The campsite must not encroach beyond the boundaries designated by the Forest Service. The campsite location must minimize impacts on streams, lakes, and other bodies of water. Camping is not permitted within developed recreational sites or along primary recreational roads.
o The campsite must have a clean appearance at all times. Upon abandonment of any campsite, or termination, revocation, or cancellation of camping privileges, the contractor shall remove, within 10 calendar days, all structures and improvements except those owned by the United States, and shall restore the site, unless otherwise agreed upon in writing or in the camping permit.
Structures or improvements the contractor fails to remove within the 10 calendar day period becomes the property of the United States, however, the contractor remains liable for the cost of the removal and restoration of the site.
12363N26Q4148 Mark Twain NF Greer Springs Trailhead Vault Toilet Page 23 of 78 o Unless otherwise designated by the CO, the use of the area is not exclusive and may be granted to other permittees, contractors, or recreating public. Disorderly conduct is not permitted.
o Damaging or removing any natural feature or other property of the Forest Service is prohibited.
o Servicing of equipment in the campsite is not permissible unless the campsite is within the project area.
o Provide sanitary facilities for storing food. Provide ice chests or coolers, with ice supply made from potable water, and replenish as necessary. Provide sufficient storage for perishable food items.
o Provide an adequate and convenient potable water supply in each camp for drinking and cooking purposes.
o Provide adequate toilet facilities and toilet paper for the capacity of the camp. Service and maintain facilities in a sanitary condition.
o Collect, store, and dispose of garbage in a manner to discourage rodent access, minimize attraction of flies, and prevent scattering by wind o Maintain basic first aid supplies available, which must be under the charge of a person trained to administer first aid.
The basic supplies must include:
Gauze pads (at least 4x4 inches) Two large gauze pads (at least 8x10 inches) Box adhesive bandages (such as band-aids) One package of gauze roller bandage (at least 2-inches in width) Two triangular bandages Scissors At least one blanket Tweezers Adhesive tape Medical gloves, (latex or non-latex equivalent), and Resuscitation device such as resuscitation bag, airway, or pocket mask.
o Wash laundry in such a way that washing and rinsing will not pollute lakes, streams, or other flowing water.
o Dispose waste water away from living and eating areas and in such a way that minimizes pollution to lakes, streams, and other flowing water.
o The contractor shall take all reasonable precautions to prevent and suppress forest fires. Do not dispose of material by burning in open
12363N26Q4148 Mark Twain NF Greer Springs Trailhead Vault Toilet Page 24 of 78 fires during the closed season established by law or regulation without the written permission from the Forest Service.
o If authorized to have an open fire, the Contractor shall comply with the following fire regulations:
1. A shovel, axe or Pulaski, a 10-quart pail, which is full of water for immediate use, and a fire extinguisher with an Underwriters Laboratory (UL) rating of at least 1:A 10:BC is required.
2. All fire rings or outside fireplaces must be approved by the Forest Service representative. The area must be cleared down to mineral soil for a distance of one foot outside of the ring or fireplace, and it must not have any overhanging material. Fire rings must be dismantled and material disposed prior to leaving the site.
3. All generators and other internal combustion engines must be equipped with Forest Service approved spark arrestors and/or factory designed muffler and exhaust system in good working order. They will be located in a cleared area with the same requirements as in described in the previous paragraph.
4. All fuel must be stored in UL approved flammable storage containers and be located at least 50 feet from any open flame or other source of ignition.
End of MSPA attachment.
12363N26Q4148 Mark Twain NF Greer Springs Trailhead Vault Toilet Page 25 of 78
Permits The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses and permits, and for complying with any Federal, State, and municipal laws, codes, and regulations applicable to the performance of the work. The Contractor shall also be responsible for all damages to persons or property that occur as a result of the Contractor’s fault or negligence. The Contractor shall also be responsible for all materials delivered and work performed until completion and acceptance of the entire work, except for any completed unit of work which may have been accepted under the contract.
Note: This does not preclude expected quoter to be supplied any or all known regulatory certifications, permits, etc. to legally conduct stewardship work under this request for quote, should award be made. All expected quoters are encouraged to know the Federal and local prevailing labor laws and inspection standards for stewardship work within the State in which award is to be made. This is to include all known Farm Labor permits and timely submission for H2B-1 and Migrant Seasonal Worker Protection personnel. All posters and mandatory DOL and OSHA inspection criteria to be posted within the public work area for all workers free access may be obtained from DOL and OSHA via online downloads. The Government does not guarantee access nor full distribution of these items to the prospective awarded contractor.
12363N26Q4148 Mark Twain NF Greer Springs Trailhead Vault Toilet Page 26 of 78
This solicitation implements two FAR class deviations to ensure compliance with Executive Orders 14148, 14173, 14168 and 14208, issued since January 20, 2025. These deviations reflect recent policy updates and remove outdated requirements, as outlined below.
The following FAR provisions and clauses are hereby removed in their entirety from the IDIQ/BPA:
• 52.222-21 Prohibition of Segregated Facilities
• 52.222-22 Previous Contracts and Compliance Reports
• 52.222-23 Notice of Requirement for Affirmative Action To Ensure Equal Employment
Opportunity for Construction
• 52.222-24 Preaward On-Site Equal Opportunity Compliance Evaluation
• 52.222-25 Affirmative Action Compliance
• 52.222-26 Equal Opportunity
• 52.222-27 Affirmative Action Compliance Requirements for Construction
•…