12363N26Q4087 RFQ-.pdf

PDF 4 MB Posted

Attached to
Allegheny National Forest Road Grading
Solicitation number
12363N26Q4087
Issued by

About this file

This is a Request for Quotes (RFQ) for road grading and compaction services at the Allegheny National Forest in Pennsylvania.

The USDA Forest Service, National Stewardship Contracting Branch, is soliciting quotes for surface grading and compaction on 272.2 miles of forest roads across two zones: West Zone (128.5 miles) and East Zone (143.7 miles). Contractors may bid on one or both zones; those bidding both zones must demonstrate capability for simultaneous operations. The solicitation number is 12363N26Q4087, with a response deadline of April 10, 2026, at 11:00 AM CST. This is a small business set-aside under NAICS code 237310 (Highway, Street, and Bridge Construction) with a small business size standard of $45 million. The contract type is firm fixed price, and award is anticipated for a single contractor. All responsible sources may submit quotes, which must remain valid for 60 days post-submission.

Key performance requirements include road maintenance using motor graders (minimum 85 horsepower, 18-foot wheelbase), vibratory steel wheel rollers (minimum 6 tons), and road rakes. Work must be performed Monday through Friday during daylight hours. Contractors must comply with Forest Service specifications (FSSS/FP-14), call the Pennsylvania One Call System before earthwork, obtain necessary permits, manage invasive species (particularly Japanese stilt grass), and maintain quality control. Evaluation criteria include relevant past performance (minimum three references), technical approach, acceptability (pass/fail), and cost/price reasonableness. A pre-work conference will establish final road priorities and schedules. Proposals must include technical information with past performance documentation and a completed pricing schedule. Contractor key personnel must include an experienced grader operator, roller operator, and road rake operator per zone.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. GENERAL INFORMATION

Document Type:

Solicitation Number:

Posted Date:

Original Response Date:

Current Response Date:

Product or Service Code:

Set Aside:

NAICS Code:

Combined Synopsis/Solicitation 12363N26Q4087 3/26/2026 4/10/2026 N/A F099 Small Business 237310 Highway, Street, and Bridge Construction – $45 Million

Contracting Office Address

USDA Forest Service Procurement and Property Services National Stewardship Contracting Branch 1400 Independence Ave. SW, MS-1138 Washington DC 20250-1138

This is a combined synopsis/solicitation for commercial services prepared in accordance with FAR 12. This announcement constitutes the only solicitation; offers are being requested, and a separate written solicitation will not be issued.

Solicitation number 12363N26Q4087 is issued as a Request for Quotes (RFQ) for the Allegheny National Forest Road Grading.

This acquisition is not set aside for small business concerns. This solicitation incorporates provisions and clauses by reference. The full text of provisions and clauses may be accessed electronically at www.acquisition.gov.

The associated North American Industrial Classification System (NAICS) code for this procurement is 237310 – Highway, Street, and Bridge Construction, with a small business size standard of $45 Million. The product service code is Z1LB. The government intends to award a Firm Fixed Price contract resulting from this combined synopsis/solicitation to the responsible offeror whose offer, conforming to the synopsis/solicitation, will be most advantageous to the government (as determined by the solicitation evaluation criteria). All responsible sources may submit a quotation which will be considered by the agency, and proposals shall be valid for 60 days after the date of receipt for the solicitation.

Points of Contact

Thomas Tran, Contracting Officer, thomas.tran2@usda.gov No organized site visit is scheduled for this project. Interested vendors are encouraged to visit the project area to familiarize themselves with the requirements.

Offerors shall quote in accordance with the SOW. Please provide your price and technical proposal separately.

Proposals that do not have a technical proposal and past performance, may not be considered.

Quotes shall be valid for a minimum of 60 calendar days after submission.

Please label file name by format below:

Company name, price or technical proposal or both and name of project Ex. USDA Price/Technical Proposal Solicitation #

12363N26Q4087 Allegheny National Forest Road Grading Page 1 of 70 https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-12 http://www.acquisition.gov/ mailto:thomas.tran2@usda.gov

Payment will be made via EFT. Invoice using IPP.Gov Set Aside For: Large Small

Woman- Owned SDVOSB Hubzone 8(a)

(Please check all that apply) x

**MUST HAVE ALL INFO BELOW**

Company Name:

Vendor Rep:

Phone:

Email:

Mailing Address:

UEI SAM #

Contractor Signature: ______________________________________

**QUOTES ARE DUE BY: 04/10/2026 by 11:00AM CST**

Questions are due by 04/02/2026

12363N26Q4087 Allegheny National Forest Road Grading Page 2 of 70

SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO.

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION

a. NAME

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

CALL:

FOR

SEALED BID (IFB)

NEGOTIATED (RFP)

5. REQUISITION/PURCHASE REQUEST NO.

1165231

USDA-FS STEWARDSHIP CONTRACTING BR

1400 INDEPENDENCE AVE SW

MS-1138

WASHINGTON DC 20250-1138

363N

THOMAS TRAN

b. EMAIL thomas.tran2@usda.gov

3/26/2026

1. SOLICITATION NO.

12363N26Q4087

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

11. The Contractor shall begin performance upon receipt of notice to proceed and shall be completed no later than September 30, 2026.

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

negotiable. (See FAR Clause 52.211-10)

13. ADDITIONAL SOLICITATION REQUIREMENTS

a. Offers to perform the work specified in Item 10 shall be submitted by 11:00 am CDT, April 10, 2026. If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing bid bonds shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due.

is not required.is, b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than

12b. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in Item 12b.) 10

NSN 7540-01-155-3212

mandatory

30 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected .

STANDARD FORM 1442 (Rev. 4-85)

Prescribed by GSA

FAR(48 CFR) 53.236-1(d)

USDA-FS STEWARDSHIP CONTRACTING BR

1400 INDEPENDENCE AVE SW

MS-1138

WASHINGTON DC 20250-1138

SOLICITATION FOR PRICING AND TECHNICAL PROPOSALS

1165231 R9 PA Allegheny NF Road Grading

See Schedule of Items, specific work description, supplemental specifications/terms and conditions, and attachments that apply to the work. These terms supplement the base IDIQ terms and conditions.

**ALL DOCUMENTS, INCLUDING A SCANNED COPY OF THE FULLY EXECUTED BID BOND IF REQUIRED, SHALL BE SUBMITTED ELECTRONICALLY TO THOMAS TRAN AT thomas.tran2@usda.gov AND

RECEIVED BY THE DEADLINE IN BLOCK 13.

xThis performance period is x x (If total price exceeds $150,000 - see page 5) x

12363N26Q4087 Allegheny National Forest Road Grading. Page 3 of 7112363N26Q4087 Allegheny National Forest Road Grading Page 3 of 70

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)

15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14.)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (Must be fully completed by offeror)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document and return (Contractor is not required to sign this document.)

Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.

No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE

BY

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)

See schedule

USDA-FS STEWARDSHIP CONTRACTING BR

1400 INDEPENDENCE AVE SW

MS-1138

WASHINGTON DC 20250-1138

363N

INVOICE PROCESSING PLATFORM IPP

ALL INVOICES MUST BE SUBMITTED

ELECTRONICALLY THROUGH THE

INVOICE PROCESSING PLATFORM IPP

VIA WWW IPP GOV

THOMAS T. TRAN

28. NEGOTIATED AGREEMENT 29. AWARD

Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

copies to issuing office.)

10 U.S.C. 2304(c) 41 U.S.C. 3304(a)x x

STANDARD FORM 1442 (REV. 8/2014) BACK

Continued...

12363N26Q4087 Allegheny National Forest Road Grading Page 4 of 70

ITEM NO. DESCRIPTION UNIT QTY PRICE TOTAL

30300

West Zone - Road Grading and Compaction

Mile 128.5

30300

East Zone - Road Grading and Compaction

Mile 143.7

Total Miles 272.2

ALLEGHENY NATIONAL FOREST

WEST ZONE AND EAST ZONE - ROAD SURFACE GRADING SERVICE

SCHEDULE OF ITEMS

BASE BID

Applicable FSSS/FP-14 Specifications: 303.04, 303.05, 303.06

12363N26Q4087 Allegheny National Forest Road Grading Page 5 of 70

US Department of Agriculture (USDA)

Statement of Work

12363N26Q4087 Allegheny National Forest Road Grading Page 6 of 70

Contents Project General Information

1.0 Scope of Work

2.0 Background

Contractor Requirements

3.0 Technical Requirements / Tasks

4.0 Contractor’s Key Personnel

12363N26Q4087 Allegheny National Forest Road Grading Page 7 of 70

Project Allegheny National Forest Road Grading

General Information

1.0 Scope of Work

The objective of this project is to restore and maintain the drivability, drainage, and safety of designated Forest Service roads through grading operations. This work supports forest management, fire access, recreation, and administrative use.

It is required that multiple crews operate simultaneously across the West Zone and East Zone of the forest to maximize efficiency and reduce overall project duration. Prospective bidders may bid on one zone or both zones. If bidding on both zones, bidders must state in the technical proposal how they are able to operate both zones simultaneously.

Note: FR 615 is listed on the West Zone road list, however this road is outside of the West Zone geographic area. It is Roper Hollow Road in Elk Township that is on the western side of the Allegheny Reservoir.

2.0 Background

Roads to receive maintenance operations are located within the Allegheny National Forest, which lies within Warren, Mckean, Elk, and Forest Counties of Pennsylvania. In the past, this work has been accomplished with two Ranger District grading contracts. Road lengths that will receive maintenance will vary from 0.1 mile to 12 miles. Total distance of a road will not always be designated for maintenance. Type of surfacing may vary on any one road. Maintenance activities include surface grading.

12363N26Q4087 Allegheny National Forest Road Grading Page 8 of 70

Contractor Requirements

3.0 Technical Requirements / Tasks

Contractor will provide all equipment, labor, materials, tools, and other incidentals and execute all work necessary to perform the required road maintenance on the designated National Forest roads in accordance with the specifications, and bidder’s technical proposal which is incorporated by reference. The work consists of routine maintenance activities normally associated with gravel and native-surfaced roads. All work performed will be completed in accordance with the Standard Specification for Roads and Bridge on Federal Highway Projects FP-14 and the Forest Service Supplemental Specifications to the FP-14 (FSSS) included as part of this contract.

GENERAL NOTES:

1. Prior to any earth disturbing activities, contractor shall call the Pennsylvania One Call System (800‐242 1776) and all Oil and Gas Operators in the work area to determine locations of any underground utility lines.

2. A pre‐work conference will be conducted after the contract award at which time a listing of roads will be given to the Contractor. This listing will show individual roads by road number and mileage. Adjustments to this schedule may be made as priorities change. Any such adjustments require prior written documentation (Work Order) from the Contracting Officer (CO).

3. Contractor shall install temporary traffic control devices on all roads worked on in this project. Signs shall conform to the Manual on Uniform Traffic Control Devices (MUTCD). Contractors sign plan must be approved by Forest Service prior to work. Signs will be covered or removed on weekends, holidays, and any days when contractor is not working.

4. Work hours will be during daylight hours, Monday thru Friday. No evening work or work on weekends or Federal holidays will be allowed without approval of the Contracting Officer's Representative.

5. The contractor shall be held liable and is responsible for any damage caused by their personnel or equipment to any pipelines, trees, culverts, signs, posts, riprap, gates, or structures. Repair or replacement shall be at the Contractor's expense and at no additional cost to the Government. Ordered repair of culvert inlet or outlet shall be by field methods such as, jacking out or cutting away damaged metal which obstructs flow, or replacing a section if beyond repair. All cut edges and damage to galvanized coating shall be cleaned and treated with zinc‐ rich coating. In addition, any damage done to underground or over‐ground pipelines or utilities owned by oil and gas operators will be repaired at the contractor’s expense. Wounds on trees caused by grading will be treated with a commercial tree dressing.

6. Mitigation for Non‐Native Invasive Species (NNIS) will be discussed at the pre‐work conference each year. Maps of infestations and appropriate prevention and mitigation measures will be supplied and discussed. Construction Requirements and equipment cleaning for mitigation are as described in Supplemental Specification 151.

7. Prior to starting work, the contractor will submit to the Contracting Officer and COR for approval, a plan of operation indicating the planned grading operations and proposed timetable to complete the scheduled work activities. Contractor shall notify the COR of any changes to the plan of operation by phone call or e‐mail. At a minimum, contractor shall contact the COR weekly to discuss the progression of the grading operations.

8. Contractor is responsible for having in place a quality control system that will ensure work is performed in an acceptable manner. The Contractor will promptly furnish the COR with all inspection documents. Government Inspection is for the Government’s benefit.

12363N26Q4087 Allegheny National Forest Road Grading Page 9 of 70

ROAD GRADING AND COMPACTION:

Applicable FSSS/FP-14 Specifications: 303.04, 303.05, 303.06

1. The Government reserves the right to prioritize roads that need worked first. Roads considered Priority may be labeled as such in the supplied road lists, and shall be accomplished prior to other roads being maintained, unless prior approval has been given by the Contracting Officer’s Representative (COR).

2. The Government may require certain Priority Roads to be graded twice in one season. When this occurs, the road may be listed as such on the supplied road list. The first and second gradings shall both require rolling and will be paid at the unit price.

3. Roads shall be completed in such a manner that water shall not pond on roadbed or in ditch lines.

4. Contouring, topsoil re‐spreading, seeding and mulching of disturbed areas as determined by the Forest Service is required.

5. Roadway sod encountered during road reconditioning operations will be spread and leveled outside road template avoiding piles. Natural terrain depressions and opening are the preferred waste locations. Seeding and mulching may be required to supplement natural revegetation.

6. All proposed equipment to be used for performance of the work shall be of modern design, of the proper size and type, in good mechanical condition, and furnished with the appropriate and required attachments to effectively and efficiently perform the requirements of the contract. Equipment used under this specification shall meet the following specific requirements as to dimensions, power, size, type or capacity:

a. Motor graders shall be self‐propelled tandem drive with pneumatic tired wheels, power operated controls, eighty‐five (85) horsepower or greater, and a wheelbase of at least eighteen (18) feet.

Additionally, motor graders shall be equipped with the following:

i. Moldboard of not less than eleven (11) feet or more than fourteen (14) feet.

ii. A carbide tipped scarifier type cutting blade, Kennametal or similar (preferred, but not required)

iii. A scarifier attachment with a minimum of four (4) teeth.

iv. A Rollover Protective Structure (ROPS)

v. Minimum of four (4) amber flashing lights (2 forward & 2 rear)

vi. Fire extinguisher (minimum type B‐C)

vii. Emergency spill kit

viii. A reflective slow moving vehicle emblem mounted on the rear

b. A vibratory steel wheel roller shall be furnished, minimum of 6 tons. The compactor shall be equipped with amplitude and frequency controls and specifically designed to compact the material on which it is used.

c. A road rake suitable to properly meet the requirements of this contract shall be furnished. Rake shall be sufficiently weighted and operated at a low speed to prevent any bouncing of the rake during its use to remove larger material from the graded road surface.

d. Any movement or transportation of equipment to or from the work area(s) required to pursue the work, or for repair or replacement is considered for the Contractor's convenience and shall be accomplished at the Contractor's expense. The Contractor's proposed equipment shall be made available to the Contracting Officer for inspection prior to beginning work on each task order. The Contractor shall be responsible for using the equipment as specified in their Technical Proposal. Deviations from the Technical Proposal require approval by the CO.

7. All work should be so scheduled that at the end of a working day, the road is passable for the type of traffic normally using the road. If for any reason traffic hazards are left in or adjacent to the road after normal work hours, they shall be properly signed as hazards and visibly illuminated at night. Segments of unfinished work which may present a hazard to road users, such as rolls of surface materials, berms on the shoulder, etc. may not be left in the roadway overnight, weekends, or holidays.

8. The Contractor shall use industry standard methods to blade and properly shape the total roadbed width, including curve widening, turnarounds, turnouts, and parking areas that are part of the roadbed cross section, to

12363N26Q4087 Allegheny National Forest Road Grading Page 10 of 70 produce a surface which is uniform, consistent to grade and has either a crowned cross slope or a unidirectional cross slope across the entire roadbed width as indicated by the character of the existing surface. Typically, the roadbed shall be shaped so the crown is at the centerline with a uniform downward transverse cross slope of at least to 1/2 inch per foot towards each roadbed edge. Rounding of the crown at the road centerline and excessive cross slope shall be avoided. Unidirectional cross slope shall be the same slope rate as the crowned cross slope rate. The transition between crowned and unidirectional cross‐sloped sections shall be smooth and uniform.

9. The Contractor shall take reasonable measures to reclaim onto the roadbed all suitable aggregate material that has been worked to the roadbed edges by traffic or other means. Also, care shall be exercised during grading operations to avoid blading aggregate surface off the roadbed and to avoid fouling aggregate surfaces with unsuitable material or other debris removed from roadway ditches, berms, slides or other sources. Proper grading principles and techniques shall be utilized to ensure adequate mixing action of the loosened material, material movement along the moldboard face to its discharge end and the prevention of excess material loss from the moldboard toe or undercutting along the roadbed edge and the resulting formation of a “secondary ditch” (“high shoulder/berm”). Cutting secondary ditches or formation of high shoulders/berms along the roadbed edges is unacceptable and shall be removed. Do not undercut the tow of the cut slope when grading roads. Avoid over widening of roads due to repeated grading over time.

10. All pre‐existing berms, not natural, and secondary ditches shall be removed from the roadbed edge to the maximum extent possible to facilitate and expedite drainage off and away from the roadbed surface. All suitable aggregate material removed shall be incorporated into the roadbed and unsuitable soil and other material shall be disposed of as specified herein.

11. Grading operations shall be conducted as applicable and shall include the removal of, by scarifying and/or cutting out to a depth below all existing corrugations (washboards), potholes and ruts. Just filling in is unacceptable.

12. Road shoulders shall be properly shaped and have sufficient slope away from the traveled way and meet the traveled way edge at the same elevation to provide for drainage directly off and away from the traveled way surface and not create a low shoulder or drop‐off which is a safety hazard. The edge line of the roadbed shall be definite, continuous, and smooth to the extent that existing conditions and material permit, with no abrupt changes in alignment.

13. The finished roadbed surface shall have a proper and uniform crown or unidirectional cross slope and shall provide a smooth driving surface consistent with the various road maintenance level requirements stated in these notes. At intersections, the roadbed of all side roads, open or closed, shall be graded, as necessary, to insure a smooth and uniform transition.

14. All loose stones, sod clumps and other debris shall be removed from the roadbed surface and disposed of as described in these notes. All unsuitable soil material resulting from grading operations shall be disposed of five (5) feet beyond the roadbed edges by feathering out and/or scattering, so as not to create a berm, or be placed at locations approved by the COR where it will not interfere with roadway or existing drainage. No material resulting from the grading operation shall be deposited in roadway ditches, culvert inlets and outlets, immediately adjacent to roadbed edges, streams, wetlands, water bodies or at other locations where it will interfere with roadway or existing drainage. Any material deposited shall be immediately removed.

15. Grading shall be performed only when the roadbed material has suitable moisture content, five (5) to fifteen (15) percent by weight, for the roadbed to be properly graded, shaped, and compacted by traffic. Grading shall not be performed when the roadbed material moisture content is either too high or too low to properly grade the roadbed. Sufficient evidence of high moisture content is when the roadbed shows signs of becoming unstable as indicated by sponginess, shoving, rolling or other displacement of the roadbed material under traffic or maintenance equipment. Sufficient evidence of low moisture content is when the roadbed shows signs of not being able to be compacted by traffic, dust generation, and continuing raveling. No additional compensation shall be due the Contractor for any suspensions resulting from too dry or too wet soil moisture condition. Unless authorized by the COR, no surface blading shall be performed while moisture content is outside this range.

16. Road grading operations shall proceed in an orderly manner and shall not exceed one (1) mile in length without written permission from the COR. No unfinished work that may present a hazard to road users, such as berms of material, scarified roadbed, etc., shall be left within the roadbed limits overnight, on weekends or holidays.

12363N26Q4087 Allegheny National Forest Road Grading Page 11 of 70

17. All established grass and other vegetation shall be removed from within the roadbed limits. Established grass and other vegetation shall not be removed from areas outside the roadbed except as necessary to provide drainage.

18. All fallen trees, limbs, branches, and other obstructions in the roadbed and/or up to six (6) feet beyond each edge of the roadbed or in ditches and drainage ways shall be removed and disposed of manually or mechanically. All woody material removed shall be disposed of by scattering ten (10) feet beyond the existing roadway clearing on the down slope side of the road. All trees shall be limbed, and slash shall be cut or lopped and shall be made to lie within three (3) feet of the ground surface.

19. All stones removed from the roadbed shall be disposed of by scattering a minimum of five (5) feet beyond the roadbed on the down slope side of the road.

20. Ditch run‐outs shall be cleaned and opened for a distance of one motor grader length, outward from the roadbed, to provide drainage away from the roadbed. Additional ditch run‐outs shall be installed through existing berms or at other locations where long uninterrupted stretches of ditch line exist on moderate and steep grades, as mutually agreed, to maintain proper drainage away from the roadbed. Ditch run‐outs shall be cut uniformly outward at an angle of between 20 to 45 degrees from the ditch centerline at the same grade as the ditch line.

Material excavated from these run‐out ditches shall be used to form run‐out ditch blocks and/or properly disposed of by scattering. Excavated material shall not be used in the roadbed.

21. To prevent sediment from entering streams, all ditches, run‐outs or any location of bare soil that outlets into an active stream and is located within 25 feet of an active stream shall be seeded and mulched daily. The seed mixture shall contain only native and non‐invasive species to the state of Vermont. The seed mixture shall be approved by the COR prior to use. All mulch shall be free of nonnative and invasive species. A current list of noxious weed species of concern to the Forest Service is available by contacting the Forest Botanist, April Moore, at the Allegheny National Forest Supervisor’s Office at 4 Farm Colony Drive, Warren, PA 16365.

4.0 Contractor’s Key Personnel

At a minimum, the contractor’s key personnel for a single zone are an experienced grader operator, roller operator and road rake operator.

12363N26Q4087 Allegheny National Forest Road Grading Page 12 of 70

EVALUATION CRITERIA:

TECHNICAL PROPOSAL INSTRUCTIONS (Listed below are examples of instructions and criteria for information only.)

General

Proposals shall be submitted in two parts: a technical proposal and a price proposal. Each part shall be separate and complete in itself so that evaluation of one may be accomplished independently of the other. The price proposal shall be submitted with the solicitation forms.

Offerors are cautioned that sufficient and detailed information must be presented in their proposals to enable the Government to evaluate their proposals fully in accordance with the evaluation and award criteria contained herein. The Government is not obligated to ask for additional information and in the absence of appropriate information, the proposal will be rated deficient.

Price Proposal

A completed schedule of items with pricing information completes this requirement.

Technical Proposal

Offerors shall submit technical information for their firm and any proposed major subcontractors. Please submit your past performance with the technical information.

Also, the offeror shall submit information that illustrates a technical understanding of the work to be performed.

1) Relevant Past Performance:

Relevant Past Performance shall be obtained from previous work with the Federal Government and utilized for evaluation on this contract. Please provide at least 3 past performances.

(2) Technical Approach:

All offerors should show a high level of understanding of the work to be performed. This can be accomplished by submitting with the proposal the following information:

1. Description of how the work will be performed

2. Schedule (accomplishing work while meeting weather conditions)

3. Key Personnel

12363N26Q4087 Allegheny National Forest Road Grading Page 13 of 70

4. List of equipment to be used

(3) Cost or Price: A completed schedule of items with subsequent pricing information completes this requirement.

EVALUATION CRITERIA

Technical Evaluation Criteria

Technical proposals will be evaluated and rated by a Technical Evaluation Panel. Proposals shall be prepared in accordance with the proposal preparation instructions. The following factors and their associated sub-factors will be used in the technical evaluation process are listed below: Relevant Past Performance and Technical approach of work to be performed.

1) Relevant Past Performance:

a) Relevant Past Performance shall be provided and utilized for evaluation on this contract.

2) Technical Approach:

b) Understanding of Proposed Work: Offeror demonstrates a technical understanding of the proposed work including but not limited to preliminary scheduling, equipment requirements, site conditions and location, project challenges, and material requirements.

(3) Acceptability:

We will view the acceptability of each offer on a pass or fail criteria. An offeror’s documented response to the solicitation will not be deemed acceptable, if not received by the specified closing date and time, and the submitted proposal not clearly demonstrate the offerors understanding the needed work. In such cases the offeror will be viewed as having “failed” this criterion and will not be considered for award. An acceptable offer will receive a “pass” rating and will then be evaluated solely on price.

(4) Cost or Price:

Each acceptable offer will be evaluated for reasonableness of proposal price. This criterion will include consideration of cost information provided. It is the Government's intent to assess the unit prices to determine reasonableness and offeror's understanding of the work and ability to perform the contract. The importance of price may become greater as the differences between technical proposals decrease. Where technical proposals are determined to be substantially equal, price may control award.

12363N26Q4087 Allegheny National Forest Road Grading Page 14 of 70

(b) Award. A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer’s specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.

12363N26Q4087 Allegheny National Forest Road Grading Page 15 of 70

Road # Miles Notes 113 0.6 118 1.2 123 2.2 124 3.9 126 2.3 Coordinate with OGM Operator 130 3.4 131 8.3 133 10.3 Maintain from Ludlow to well pad at mile 6.89. There is a Restricted 6 Ton Bridge at mile 4.

133E 1.4 134 2.1 Maintain to FR 134A at mile 2.1

134A 0.7 135 8.9 From pavement on township road to FR 136. Weight Restricted Bridge at MP 8.2 Next to FR143 136 4.6 Maintain from FR 135 to Beuhler Corners at mile 4.6 143 6.6 148 1.7 Grade to FR 163 152 4.4 157 2.4 SR2005 to parking area 185 5.2 195 4.3 Grade to OGM Road Left Just past Gate 226 3.9 Start at SR 66 end and Grade to gate at trail parking area. Not a thru road.

227 6.1 228 5.2 232 2.0 Maintain to Timberline ATV Trail at mile 2.0 234 2.4 237 6.4 264 1.0 297 1.8 324 1.6 325 0.7 End of township grading to FR 152 intersection.

329 1.0 End At Gate

332A 0.6 338 2.0 339 5.1 340 1.4 343 1.9 Start at FR 136 end and grade to FR 442 349 2.0 353 1.2 383 1.1 Grade to the gate 395 1.9 Maintain to third gate near FR 395D 403 2.6 443 1.9 444 1.8

446-1 1.5 Grade to Second Powerline 458 1.4

458A 0.5 468 1.7 Grade with FR 133 491 1.9 580 3.8 584 2.2 661 0.6

Total 143.7

EAST ZONE ROADS

ROAD GRADING

ALLEGHENY NATIONAL FOREST

Prior to starting work on the Allegheny National Forest (ANF) lands and when leaving ANF lands, all equipment will be visually inspected to ensure it is free of soil, seeds, vegetative matter or other debris that could contain or hold seeds. The contractor/Project supervisor shall not move equipment which last operated in areas that were infested with ANF invasive species of concern into an un-infested treatment block without using whatever clearning measures are necessary to ensure the equipment is free of non-native invasive plants of concern. Disassembly of equipment components or specialized inspection tools are not required. The contractor/project supervisor must advise the designated inspector what measures were taken to clean the equipment following use on non-ANF lands or areas infested with an invasive species and arrange for the designated inspector to inspect prior to use of equipment. Pictures with dates may be submitted as proof of equipment cleaning. Equipment shall be considered free of soils, seeds, or other such debris when a visual inspection does not disclose such material. If the contractor desired to clean the equipment on national forest land, the contractor and designated inspector shall agree on locations for the clearning and control of off-site impacts, if any. Japanese stilt grass (Microstegium vimineum, also known as Napalese browtop) a non-native, highly invasive grass has been found along some roads and efforts to minimize transfer of seeds through soil movement and equipment should be taken.

Roads indicated as priority roads and shall be accomplished prior to other roads being maintained, unless prior approval has been given by the Contracting Officer’s Representative (COR)

12363N26Q4087 Allegheny National Forest Road Grading Page 16 of 70

Road # Miles Notes 101 1.2 End grading at FR 101B 114 1.1 116 6.1 117 1.5 119 3.7 Start from Economite Rd, grade to Campsite #9 BRIDGE AT MP 1.72 HAS 30 TON WEIGHT LIMIT 127 7.7 145 7.0 Grade from Muzette to gate at mile 7.0. Coordinate with Minard Run 10 business days before grading.

154 6.4 BRIDGE CROSSING THE FARNSWORTH BRANCH AT MILEPOST 5.4 HAS A 3 TON WEIGHT LIMIT.

165 0.7 179 3.5 180 8.0

180A 1.6 180D 0.1 209 5.9 210 3.2 211 1.7 212 3.4 215 0.4 216 2.6 217 2.5 End grading at FR 217A

218A 1.9 219 2.5 221 4.3 222 4.7 223 4.5 241 1.9 244 0.2 Fish Hatchery BRIDGE HAS 9 TON LIMIT AT MP 0.19 252 4.2

252B 0.9 253-1 1.4 253-2 2.6 255 2.5 256 1.9 282 0.9 410 2.5 437 4.2 438 2.2

438A 0.7 441 1.4

441A 1.2 449 4.1 Grade from FR 116 to FR 449C 521 1.1 561 1.6 615 1.4 Roper Hollow 631 2.7 683 2.7

128.5 Total Miles

WEST ZONE ROADS

ROAD GRADING

ALLEGHENY NATIONAL FOREST

Prior to starting work on the Allegheny National Forest (ANF) lands and when leaving ANF lands, all equipment will be visually inspected to ensure it is free of soil, seeds, vegetative matter or other debris that could contain or hold seeds. The contractor/Project supervisor shall not move equipment which last operated in areas that were infested with ANF invasive species of concern into an un-infested treatment block without using whatever clearning measures are necessary to ensure the equipment is free of non-native invasive plants of concern. Disassembly of equipment components or specialized inspection tools are not required. The contractor/project supervisor must advise the designated inspector what measures were taken to clean the equipment following use on non-ANF lands or areas infested with an invasive species and arrange for the designated inspector to inspect prior to use of equipment. Pictures with dates may be submitted as proof of equipment cleaning. Equipment shall be considered free of soils, seeds, or other such debris when a visual inspection does not disclose such material. If the contractor desired to clean the equipment on national forest land, the contractor and designated inspector shall agree on locations for the clearning and control of off-site impacts, if any. Japanese stilt grass (Microstegium vimineum, also known as Napalese browtop) a non-native, highly invasive grass has been found along some roads and efforts to minimize transfer of seeds through soil movement and equipment should be taken.

Roads indicated as priority roads and shall be accomplished prior to other roads being maintained, unless prior approval has been given by the Contracting Officer’s Representative (COR)

12363N26Q4087 Allegheny National Forest Road Grading Page 17 of 70

SCHEDULE NOTES

a. Award will be made to one contractor. Contractors must submit pricing for all items.

b. Contractor must be registered and active on www.sam.gov to be considered.

THIS IS A FREE REGISTRATION.

c. Award anticipated to be a firm fixed price contract.

d. Wage Rates are required for this Call Order.

Requirements of all equipment (restated from BPA):

1. All equipment and vehicles to be used at the job site shall be cleaned and free of invasive species (noxious weeds), seeds, external grease and oil and shall be inspected prior to entrance onto Federal lands. The restriction shall include equipment and vehicles intended for off-road use as well as on road use, whether they are owned, leased, or borrowed by the Contractor or Subcontractor.

2. All protective plating and armoring shall be intact and properly functioning on the equipment to reduce the potential for damaging hydraulic hoses or the undercarriage.

3. Spill kit approved by OSHA for petroleum product leaks will be on site at all times.

DELIVERIES OR PERFORMANCE

FAR 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF

WORK (APR 1984) ALTERNATE I (APR 1984)

The Contractor shall be required to (a) commence work under this contract within fourteen (14) calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than _To Be Determined for Each Individual Project BPA Call. [For each Individual Project Call the Contracting Officer will specify either a number of days after the date the contractor receives the notice to proceed, or a calendar date.] The time stated for completion shall include final cleanup of the premises.

The completion date is based on the assumption that the successful offeror will receive the notice to proceed by_To Be Determined for Each Individual Project BPA Call. [For each Individual Project Call the Contracting Officer may provide a date for notice to proceed]. The completion date will be extended by the number of calendar days after the above date that the Contractor receives the notice to proceed, except to the extent that the delay in issuance of the notice to proceed results from the failure of the Contractor to execute the contract and give the required performance and payment bonds within the time specified in the offer.

12363N26Q4087 Allegheny National Forest Road Grading Page 18 of 70

GOVERNMENT FURNISHED PROPERTY

The Government will provide the following item(s) of Government property to the Contractor for use in the performance of this contract. This property shall be used and maintained by the Contractor in accordance with the provisions of the "Government Property" FAR clause contained elsewhere in the contract:

PROTECTION OF HABITAT OF ENDANGERED, THREATENED AND SENSITIVE

SPECIES

Location of areas needing special measures for protection of plants or animals listed as threatened or endangered under the Endangered Species Act of 1973, as amended, or as sensitive by the Regional Forester under authority of FSM 2670, are shown on the Plans and identified on the ground. Measures need to protect such areas have been included elsewhere in this contract or are as follows: _To Be Determined (For each Individual Project, the Contracting Officer will specify items or locations for protection.)

If protection measures prove inadequate, if other such areas are discovered, or if new species are listed as federally threatened or endangered, or as sensitive by the Regional Forester, Forest Service may either cancel or unilaterally modify this contract to provide additional protection regardless of when such facts become known. Discovery of such areas by either party shall be promptly reported to the other party.

CONTRACT CLAUSES

FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

www.acquisition.gov www.usda.gov/procurement/policy/agar.html

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

CALL ORDER CLAUSES FROM BPA

Service Activity Clauses are Applicable

Or

Construction Activity Clauses are Applicable

Construction Bond Clause Reiteration:

FAR 52.228-2 Additional Bond Security (OCT 1997) (Applicable if contract exceeds $35,000) FAR 52.228-11 Individual Surety - Pledge of Assets (FEB 2021) (DEVIATION MAY 2023) (Applicable if contract exceeds $35,000) FAR 52.228-12 Prospective Subcontractor Requests for Bonds (MAY 2014) (Applicable if contract exceeds $35,000)

12363N26Q4087 Allegheny National Forest Road Grading Page 19 of 70 http://www.acquisition.gov/ http://www.usda.gov/procurement/policy/agar.html

FAR 52.228-14 Irrevocable Letter of Credit (NOV 2014) (Applicable if contract exceeds $35,000) FAR 52.228-15 Performance and Payment Bonds – Construction JUN 2020) (DEV. MAY 2023) (Applicable if contract exceeds $150,000)

I.2 FAR 52.217-7 OPTION FOR INCREASED QUANTITY -- SEPARATELY

PRICED LINE ITEM

The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor within [will be filled in on Individual Project Calls, as applicable]. Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.

I.3 FAR 52.217-8 OPTION FOR EXTEND SERVICES (FAR 52.217-8) (NOV

1999) The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months. The Contracting Officer may exercise the option by written notice to the Contractor within the period of performance.

FAR 52.225-9 BUY AMERICAN ACT-CONSTRUCTION MATERIALS (OCT 2022)

(a) Definitions. As used in this clause— Commercially available off-the-shelf (COTS) item—

(1) Means any item of supply (including construction material) that is–

(i) A commercial product (as defined in paragraph (1) of the definition of “commercial product” at Federal Acquisition Regulation (FAR) 2.101);

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.

"Construction material" means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.

Cost of components means—

12363N26Q4087 Allegheny National Forest Road Grading Page 20 of 70 https://www.acquisition.gov/far/part-2#FAR_2_101

(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or

(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.

Critical component means a component that is mined, produced, or manufactured in the United States and deemed critical to the U.S. supply chain. The list of critical components is at FAR 25.105.

Critical item means a domestic construction material or domestic end product that is deemed critical to U.S.

supply chain resiliency. The list of critical items is at FAR 25.105.

Domestic construction material means—

(1) For construction material that does not consist wholly or predominantly of iron or steel or a combination of both-

(i) An unmanufactured construction material mined or produced in the United States; or

(ii) A construction material manufactured in the United States, if–

(A)The cost of its components mined, produced, or manufactured in the United States exceeds 60 percent of the cost of all its components, except that the percentage will be 65 percent for items delivered in calendar years 2024 through 2028 and 75 percent for items delivered starting in calendar year 2029. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic. Components of unknown origin are treated as foreign; or

(B) The construction material is a COTS item; or

(2) For construction material that consists wholly or predominantly of iron or steel or a combination of both, a construction material manufactured in the United States if the cost of foreign iron and steel constitutes less than 5 percent of the cost of all component used in such construction material. The cost of foreign iron and steel includes but is not limited to the cost of foreign iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the construction material and a good faith estimate of the cost of all foreign iron or steel components excluding COTS fasteners. Iron or steel components of unknown origin are treated as foreign. If the construction material contains multiple components, the cost of all the materials used in such construction material is calculated in accordance with the definition of "cost of components".

Fastener means a hardware device that mechanically joins or affixes two or more objects together. Examples of fasteners are nuts, bolts, pins, rivets, nails, clips, and screws.

Foreign construction material means a construction material other than a domestic construction material.

Foreign iron and steel means iron or steel products not produced in the United States. Produced in the United States means that all manufacturing processes of the iron or steel must take place in the United States, from the initial melting stage through the application of coatings, except metallurgical processes involving refinement of steel additives. The origin of the elements of the iron or steel is not relevant to the determination of whether it is domestic or foreign.

Predominantly of iron or steel or a combination of both means that the cost of the iron and steel content exceeds 50 percent of the total cost of all its components. The cost of iron and steel is the cost of the iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the product and a good faith estimate of the cost of iron or steel components excluding COTS fasteners.

Steel means an alloy that includes at least 50 percent iron, between 0.02 and 2 percent carbon, and may include other elements.

"United States" means the 50 States, the District of Columbia, and outlying areas.

(b) Domestic preference.

12363N26Q4087 Allegheny National Forest Road Grading Page 21 of 70 https://www.acquisition.gov/far/part-25#FAR_25_105

(1) This clause implements 41 U.S.C.chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the domestic content test of the Buy American statute is waived for construction material that is a COTS item, except that for construction material that consists wholly or predominantly of iron or steel or a combination of both, the domestic content test is applied only to the iron and steel content of the construction materials, excluding COTS fasteners. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.

(2) This requirement does not apply to information technology that is a commercial product or to the construction materials or components listed by the Government as follows:

_________________NONE_______________________________

[Contracting Officer to list applicable excepted materials or indicate "none"]

(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that-

(i) The cost of domestic construction material would be unreasonable.

(A) For domestic construction material that is not a critical item or does not contain critical components.

(1)…

This is the start of the file's text. The full file is on GovTribe.