12363N25Q4120_Sol.pdf
PDF 5 MB Posted
- Solicitation number
- 12363N25Q4120
- Issued by
-
Department of Agriculture Forest Service
About this file
This document is a Request for Proposal (RFP) for weed survey and treatment services for the Angeles National Forest, focusing on Early Detection Rapid Response (EDRR) for areas affected by the 2024 Bridge Fire and 2025 Eaton, Hurst, and Hughes Fires. The solicitation is restricted to current LMIR Invasive Plant Control BPA Holders, with a proposal due date of August 11, 2025 at 10:00 AM Mountain Time and an estimated period of performance from September 1, 2025 to December 30, 2025.
The project requires a two-person botanical survey crew and a four-person treatment crew to survey and remove non-native plants across approximately 987 acres, including dozer lines, roadsides, trails, and riparian areas. The contractor must provide personnel with expertise in weed identification, GPS mapping, and herbicide application, using specific treatment methods for various invasive plant species. The estimated effort includes 24 survey days and 60 treatment days, with work occurring in remote, rugged terrain. Deliverables include comprehensive spatial data and treatment logs, and the contractor must possess a valid California Pesticide Use Applicator License.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUMIS CHECKED
CODE 18a. PAYMENT WILL BE MADE BY
CODE
FACILITYCODE
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER
OFFEROR
363N
WASHINGTON DC 20250-1138
MS-1138
1400 INDEPENDENCE AVE SW
USDA-FS STEWARDSHIP CONTRACTING BR
91T5 CODE 16. ADMINISTERED BYCODE
X
X
X
115310
SIZE STANDARD:
100.00 % FOR:SET ASIDE:UNRESTRICTED OR363N
REQUEST FOR
PROPOSAL
(RFP)
INVITATION
FOR BID (IFB)
10. THIS ACQUISITION ISCODE
REQUEST FOR
QUOTE (RFQ)
14. METHOD OF SOLICITATION
13b. RATING
NORTH AMERICAN INDUSTRY
CLASSIFICATION STANDARD
(NAICS):
SMALL BUSINESS
07/21/2025
573-453-8424JAMES KAMINSKI
(No collect calls)
INFORMATION CALL:
FOR SOLICITATION 8. OFFER DUE DATE/LOCAL TIME
08/11/2025 1000 MT
b. TELEPHONE NUMBERa. NAME
4. ORDER NUMBER3. AWARD/ 6. SOLICITATION
12363N25Q4120
5. SOLICITATION NUMBER
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS 1. REQUISITION NUMBER
1151748OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
TELEPHONE NO.
17a. CONTRACTOR/
See Schedule
15. DELIVER TO
WASHINGTON DC 20250-1138
MS-1138
1400 INDEPENDENCE AVE SW
9. ISSUED BY
7.
2. CONTRACT NO.
EFFECTIVE DATE
$34
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW
ISSUE DATE
DELIVERY FOR FREE ON BOARD
(FOB) DESTINATION UNLESS
BLOCK IS MARKED
11.
SEE SCHEDULE
12. DISCOUNT TERMS THIS CONTRACT IS A RATED
ORDER UNDER THE DEFENSE
PRIORITIES AND ALLOCATIONS
SYSTEM - DPAS (15 CFR 700)
13a.
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
(SDVOSB)
HUBZONE SMALL
BUSINESS
8(A)
USDA-FS STEWARDSHIP CONTRACTING BR
WOMEN-OWNED SMALL
BUSINESS (WOSB)
ECONOMICALLY DISADVANTAGED
WOMEN-OWNED SMALL
BUSINESS (EDWOSB)
24.
AMOUNT
23.
UNIT PRICE
22.
UNIT
21.
QUANTITY
20.
SCHEDULE OF SUPPLIES/SERVICES
19.
ITEM NO.
DELIVER TO:
USDA FOREST SERVICE
ANGELES NATIONAL FOREST
SUPERVISOR OFFICE
701 N SANTA ANITA AVE
ARCADIA CA 91006 US
Solicitation is Restricted to the LMIR BPA Holders.
ALL QUOTES SHALL BE EMAILED TO:
CHAD.BULLOCK@USDA.GOV; JAMES.KAMINSKI@USDA.GOV:
10_OFFE.ysj40mmi1wx6v5x0@u.box.com on or BEFORE
(Use Reverse and/or Attach Additional Sheets as Necessary)
HEREIN, IS ACCEPTED AS TO ITEMS:
XX
DATED
CHAD A. BULLOCK
. YOUR OFFER ON SOLICITATION (BLOCK 5),
INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER
ARE
ARE
31c. DATE SIGNED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or print)
ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL
SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4. FAR 52.212-3
AND 52.212-5 ARE ATTACHED. ADDENDA
26. TOTAL AWARD AMOUNT (For Government Use Only)
OFFER
STANDARD FORM 1449 (REV. 11/2021)
Prescribed by GSA - FAR (48 CFR) 53.212
ARE NOT ATTACHED.
ARE NOT ATTACHED.
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
30b. NAME AND TITLE OF SIGNER (Type or print)
30a. SIGNATURE OF OFFEROR/CONTRACTOR
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
25. ACCOUNTING AND APPROPRIATION DATA
29. AWARD OF CONTRACT: REFERENCE
12363N25Q4120 Angeles National Forest BAER EDRR Page 1 of 26
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32c. DATE 32b. SIGNATURE OF AUTHORIZED GOVERNMENT REPRESENTATIVE
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
40. PAID BY39. S/R VOUCHER NUMBER38. S/R ACCOUNT NUMBER
37. CHECK NUMBER
FINALPARTIAL
36. PAYMENT
FINALPARTIAL
35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER33. SHIP NUMBER
COMPLETE
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
42d. TOTAL CONTAINERS42c. DATE REC'D (YY/MM/DD)
42b. RECEIVED AT (Location)
42a. RECEIVED BY (Print)
41c. DATE41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
STANDARD FORM 1449 (REV. 11/2021) BACK
24.
AMOUNT
23.
UNIT PRICE
22.
UNIT
21.
QUANTITY
20.
SCHEDULE OF SUPPLIES/SERVICES
19.
ITEM NO.
August 11, 2025, 10:00 AM MOUNTIAN TIME.
Since all documents will be submitted to me electronically. Follow this naming convention for your attachments and keep the subject line the same or just reply all to this email.
25Q4120-LMIRBPA-VendorName-Quote AND
25Q4120-LMIRBPA-VendorName-Technical.
Be sure to fill out all required documentation.
Required to be filled in below:
Company Name:___________________________________
POC Name:_______________________________________
Phone number:___________________________________
Email:__________________________________________
BPA/IDIQ/MATOC Contract #_______________________
UEI SAM #______________________________________
Contractual POC: Chad A.T. Bullock Contracting
Officer, chad.bullock@usda.gov 385-368-5300
Contractual Technical: James Kaminski APSO, james.kaminski@usda.gov 573-453-8424
Delivery: 10 Days After Award
Period of Performance: 09/01/2025 to 12/30/2025
Weed treatment on various FY24/25 Fires on
Continued ...
32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT REPRESENTATIVE
12363N25Q4120 Angeles National Forest BAER EDRR Page 2 of 26
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED
(A) (B) (C) (D) (E) (F)
12363N25Q4120
Angeles National Forest
The "Submit Invoice-to" address for USDA orders is the Department of Treasury's Invoice
Processing Platform (IPP), https://www.ipp.gov.
If the contractor lacks an IPP account, USDA will automatically initiate the enrollment process with Treasury using the contractor's SAM.gov
Accounts Receivable POC as the IPP account holder. Once the enrollment process is complete, the IPP account holder will receive notification and can being invoicing. More information about
IPP can be found at: https://www.ipp.gov
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
12363N25Q4120 Angeles National Forest BAER EDRR Page 3 of 26
PROJECT
UNIT
SOL. #
ITEM NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL PRICE
1 Crew Day (4 person treatment crew + supervisor, equipment and transportation) - BRIDGE Fire Area day 30. -$
2 Crew Day (2 person treatment crew + equipment and transportation) - BRIDGE Fire Area day 13. -$ BRIDGE Fire Subtotal -$
3 Crew Day (4 person treatment crew + supervisor, equipment and transportation) - EATON Fire Area day 21. -$
4 Crew Day (2 person treatment crew + equipment and transportation) - EATON Fire Area day 9. -$ EATON Fire Subtotal -$
3 Crew Day (4 person treatment crew + supervisor, equipment and transportation) - HURST Fire Area day 2. -$
4 Crew Day (2 person treatment crew + day 1. -$ HURST Fire Subtotal -$
3 Crew Day (4 person treatment crew + supervisor, equipment and transportation) - HUGHES Fire Area day 5. -$
4 Crew Day (2 person treatment crew + equipment and transportation) - HUGHES Fire Area day 3. -$ HUGHES Fire Subtotal -$
TOTAL -$
NOTES:
Signature Phone Vendor Name FAX Address Email
Angeles National Forest
1. Responses for quantities less than those listed in the numbered items may be rejected.
2. Responses without prices for each item and sub-item may be rejected.
PRICE SUBMITTED BY:
Schedule Of Items
ANF 04/20/2025
SUPPLIES OR SERVICES, AND PRICES/COSTS
BRIDGE, EATON, HURST, and HUGHES Fires EDRR - Weed Survey and Treatments
12363N25Q4120 Angeles National Forest BAER EDRR Page 4 of 26
US Department of Agriculture (USDA)
Statement of Work
ANF EDRR TREATMENT
12363N25Q4120 Angeles National Forest BAER EDRR Page 5 of 26
Contents Project General Information
1.0 Scope of Work
2.0 Background
Contractor Requirements
3.0 Technical Requirements / Tasks
4.0 Government Furnished
5.0 Deliverables / Schedule
6.0 Travel
7.0 Contractor’s Key Personnel
8.0 Security Requirements
9.0 Data Rights
10.0 Section 508 – Electronic and Information Technology Standards Attachment
12363N25Q4120 Angeles National Forest BAER EDRR Page 6 of 26
Project BRIDGE, EATON, HURST, and HUGHES FIRE BAER – EDRR Weed Survey and Treatments
General Information
1.0 Scope of Work
Description of work: The purpose of this project is to procure services (labor and materials) to survey and remove certain non-native plants from areas affected by the 2024 Bridge Fires and 2025 Eaton, Hurst and Hughes Fires on the Angeles National Forest. Survey and treatment areas may include: bull dozer lines, roadsides, some trails, and riparian areas within and nearby 2024 and 2025 Fire footprints on the Angeles National Forest. The contractor will work with the Angeles National Forest to complete EDRR (Early Detection Rapid Response) survey and treatment within approximately 987 acres of land affected by fire or fire suppression action (see maps and table below).
Early Detection Rapid Response (EDRR) will involve detection and treatment of noxious weeds affected by the 2024 and 2025 Fires burn and suppression actions (dozer lines, roads widened as line, drop points, safety zones, spike camps) on NFS lands. These areas will be surveyed for evidence of introduction or spread of noxious weeds. If any new or outlying populations are found, these will be mapped and documented for treatment and where possible hand and/or chemical treatments will be applied during at the same time the surveys are conducted.
Access to survey and treatment areas is by vehicle and foot. Vehicle access includes a variety of road conditions including ungraded dirt roads. Roads are frequently traveled and used by forest staff and neighboring residents, so care will be needed in these areas. Survey and treatment work may occur on rough, uneven and remote terrain and will require hiking.
The Angeles National Forest will be ordering a fixed quantity of “days” of labor. The days of labor will be for a four-person crew plus one supervisor for eight hour work days with transportation, tools, and chemicals (including chemical/herbicide spill kit) provided by the contractor. The Angeles National Forest will also be ordering a fixed quantity of “days” of labor for a two-person botanical survey crew. The days may be non-contiguous.
The contractor will provide:
1) A survey crew of two botanists to survey areas for invasive plants. The crew will be “on-call” to work the amount of days ordered under the contract over one season (5/1/2025 -02/31/2026). This crew will consist of one experienced botanist who will be able to identify weed species of concern (including new introductions) and one individual that can identify target plants with the assistance of the primary botanist. It is estimated that this survey effort may entail approximately 24 field days. Some work may occur in remote locations requiring substantial driving on rough, infrequently maintained dirt roads and hiking on uneven terrain, riparian corridors, and steep slopes.
2) A treatment crew of four individuals and one supervisor to conduct eradication activities. The crew will be “on-call” to work the amount of days ordered under the contract over one season (4/1/2025 -12/31/2025). It is estimated that this treatment work may entail approximately 60 field days. Some work may occur in remote
EDRR BAER Totals Bridge ACRES Dozer Line Mixed Construction Drop Points Dozer Pushes
277 70 3.4 32 39 Suppression 122 13 Infestations BAER
Eaton ACRES Dozer Line Mixed Construction Drop Points Dozer Pushes
72 23 15 10 5 Suppression 130 TBD Infestations BAER
Hurst ACRES Dozer Line Mixed Construction Drop Points Dozer Pushes
16 5 Suppression
BAER
Hughes ACRES Dozer Line Mixed Construction Drop Points Dozer Pushes
65 24 4 0 2 Suppression 22 13 Infestations BAER
NA
12363N25Q4120 Angeles National Forest BAER EDRR Page 7 of 26 locations requiring substantial driving on rough, infrequently maintained dirt roads and hiking on uneven terrain, riparian corridors, and steep slopes.
Target weed control and eradication may involve various methods. Weed treatments in the burn and suppression areas may require a mix of basal bark and/or cut stump applications to larger trees, and foliar application of smaller herbaceous plants and sprouts. Work may also involve manual control methods such as hand pulling annual weed species, weed wrenching, and cutting thick stems/trunks.
All treatment efforts will be recorded with a GPS and field notes. Herbicide use logs detailing daily chemical applications must be provided to the US Forest Service.
2.0 Background
Location: The project is located across two ranger districts (LA Gateway RD and SGM Monument RD) of the Angeles National Forest, in and around the 2024 and 2025 Fire footprints, where previous weed infestations were observed and heavy equipment and/or crews worked on fire suppression (Fig. 1).
Description: The 2024 and 2025 Fires burned areas on the Angeles National Forest during the summer of 2024 and winter of 2025. The fire burned areas with known weed infestations that are likely to spread in the post-fire environment (P1a). In addition, suppression activities, including the creation of “dozer lines” have the potential of introducing or spreading weed infestations (P1b). This contract will provide labor and material supplies for surveying for new weed infestations and treating, either manually or with herbicides, new and existing weed infestations in the Airport fire burned area and suppression footprint.
The work areas encompass multiple vegetation communities across diverse, steep terrain. Canyons are narrow and steep-walled, ridges may be uneven and steep. Most weed infestations that will need immediate survey and treatment may be located along roads, trails, and dozer lines, which are the main transportation corridors for weed spread after fire. See Tables 1-5 for Potential Species of concern/target and suppression acreages for the appropriate Fires.
The contractor will be expected to complete work within specified timeframes for each funding source. If additional time is required, notification must be sent to CO and COR 14 days prior to date listed below for approval.
FY 24 Bridge Fire – October 18, 2025 FY 25 Eaton, Hurst, Hughes – January 20, 2026
Table 1a: Potential Treatment Species Acres for the Bridge Fire (P1a) Scientific name Common Name Cal-IPC Ratings Acres Centaurea stoebe ssp. micranthos spotted knapweed High 4.8 Hedera helix English ivy High 1 Rubus armeniacus Himalayan blackberry High 1.6 Spartium junceum Spanish broom High 364.2
Table 1b: Potential Suppression Treatment Acres for the Bridge Fire (P1b)
Suppression Feature Acres Completed Dozer Line 171 Completed Hand Line 23 Completed Mixed Construction Line 8 Repair Line 0.3 Dozer Push 30 Drop Point 29 Helispot 16
12363N25Q4120 Angeles National Forest BAER EDRR Page 8 of 26
Table 2a: Potential Treatment Species Acres for the Eaton Fire (P1a) Scientific name Common Name Cal-IPC Ratings Acres Ageratina adenophora sticky snakeroot Moderate <1
Carduus pycnocephalus Italian plumeless thistle Moderate 1
Centaurea melitensis Maltese star-thistle Moderate 3 Cirsium vulgare bull thistle Moderate 7 Hedera helix English Ivy High <1
Pennisetum setaceum crimson fountaingrass Moderate 15
Spartium junceum Spanish broom High 107
Table 2b: Potential Suppression Treatment Acres for the Eaton Fire (P1b)
Suppression Feature Acres Completed Dozer Line 34 Completed Hand Line 8 Completed Road as Line 14 Dozer Push 5 Drop Point 6 Helispot 4
Table 3: Potential Suppression Treatment Acres for the Hurst Fire (P1b only, no P1a)
Completed Dozer Line 16
Table 4a: Potential Treatment Species Acres for the Hughes Fire (P1a) Scientific name Common Name Cal-IPC Rating Acres Arundo donax giant reed high <1 Centaurea melitensis Maltese star-thistle moderate <1 Robinia pseudoacacia black locust limited <1 Salsola tragus prickly Russian thistle limited 1 Spartium junceum Spanish broom high 4 Tamarix ramosissima saltcedar high 13
Table 4b: Potential Suppression Treatment Acres for the Hughes Fire (P1b)
Completed Dozer Line 59 Completed Hand Line 5 Dozer Push 2
12363N25Q4120 Angeles National Forest BAER EDRR Page 9 of 26
Contractor Requirements
3.0 Technical Requirements / Tasks
3.1. General Requirements
• The Contractor shall furnish the necessary personnel, supplies, materials, equipment, transportation, services and facilities to perform these specifications.
• Any prospective contractor bidding on this contract must provide a list of experience working in wildland weed removal with references for each job listed as qualifying experience. Award will be based on best value, considering cost AND work experience doing similar weed removal work in remote, backcountry locations.
3.2. Treatment Crew requirements
• Contract will be for a set number of crew days. Bids will be for cost of providing a crew (4 people plus one supervisor plus transportation and tools and chemicals) for one day (8 hours per day plus travel time) with the capabilities described in the specifications. Days will not be contiguous. It is estimated that approximately 60 treatment crew days will be ordered under this contract. The contractor must guarantee that no more than three-week notice is required to reserve a crew for specific days of work under this contract.
• One crew day will be for 8 hours of work plus travel time.
• Crew supervisor must possess valid California Certified Pesticide Applicators license or certificate.
• Some infestations may be best treated by manual removal. Annual weed species must be treated and removed prior to seeding. Removal may involve bagging biomass or seed heads to prevent seed release and spread. This material must be properly disposed where it can’t further spread of the species.
• See 3.4. for herbicide treatment specifications
3.3. Survey Crew Requirements
• Survey will be conducted by two qualified individuals with ability to identify target plant species, including uncommon or new introductions and with the ability to operate a GPS for mapping species locations. One of the individuals will have formal botany training and have demonstrated experience surveying for weeds of concern in Southern California.
• The survey crew supervisor will be able to identify target plant species and have experience with surveying/treating weeds in Southern California. The supervisor will also be familiar with herbicide formulation, application, and forest-approved herbicide use plans.
• Target plant species will be discussed with the COR of this contract with input from the 2-person botany crew and forest personnel. The main species of concern are Spanish broom, fennel, Italian thistle, pampas grass, jubata grass, crimson fountaingrass, tamarisk, saltcedar, tree tobacco, yellow star-thistle, prickly Russian thistle, blessed thistle, Maltese thistle/tocalote, non-native mustards, spotted knapweed, English ivy, Himalayan blackberry, sticky snakeroot, bull thistle, perennial pepperweed, giant reed, black locust, and perennial veldt grass (see Table 6) or any encountered weed species with a moderate or high Cal-IPC Rating. The survey will not focus on common, highly abundant non-native species.
• The survey will take place over 10-15 field days.
• Survey will require hiking over rough terrain and rocks with little to no shade.
• Data will be submitted in a GIS format. Shapefile or geodatabase is acceptable.
3.4. Herbicide formulation and application requirements
12363N25Q4120 Angeles National Forest BAER EDRR Page 10 of 26
• The Contractor will follow all Local, State and Federal laws applicable to herbicide/pesticide application in forestry/wildland settings. These include laws related to having a licensed pesticide applicator conducting or supervising the mixture and application of herbicides in the project area and ensuring that proper safety gear/ PPE is provided and used by workers.
• The Contractor shall adhere to the Angeles National Forest Invasive Plant EAs, Santa Clara Watershed EA, San Gabriel EA, Rest of Area EA (Appendix A). See Resource Protection Measures in weed EAs (Appendix A) and Attachment A: Pesticide Use Proposal.
• The herbicide formulation for woody plants (e.g. tamarisk) may consist of a solution of triclopyr (ex. Garlon 4
Ultra) OR imazapyr (ex. Habitat) OR other weed EA-approved herbicides (Appendix A) and surfactant as directed on the label. No diesel or other petrochemical based surfactants may be used. The formulation used must have final approval by the COR and will be tailored to cut stump, basal bark or foliar application depending on the situation.
• For herbaceous species, a targeted foliar application of an aquatically approved formulation of glyphosate (ex.
Rodeo, Aquamaster) may be used. Other herbicides may also be used in some situations; refer to weed EAs (Appendix A). Herbicides will be mixed with a surfactant as directed on the label. No diesel or other petrochemical based surfactants may be used.
• Herbicides will be colored with a biodegradable dye to facilitate visual control of application.
• Non-target plants may need to be pruned or folded away from the target plant to prevent damage.
• The final herbicide and surfactant formulations used must be approved by the Forest Service and will be documented in a Pesticide Use Proposal (PUP) signed by the Forest Service.
• The contractor must report to the Forest Service the total amount of herbicide applied and chemical formulation and location applied detailed for each day.
12363N25Q4120 Angeles National Forest BAER EDRR Page 11 of 26
Fig. 1. Bridge Fire map of survey and treatment areas
12363N25Q4120 Angeles National Forest BAER EDRR Page 12 of 26
Fig. 2. Eaton Fire map of survey and treatment areas
12363N25Q4120 Angeles National Forest BAER EDRR Page 13 of 26
Fig. 3. Hurst Fire map of survey and treatment areas
12363N25Q4120 Angeles National Forest BAER EDRR Page 14 of 26
Fig. 4. Hughes Fire map of survey and treatment areas
12363N25Q4120 Angeles National Forest BAER EDRR Page 15 of 26
Table 6. List of previously observed non-native weed targets that may be prioritized for survey and treatment.
EDRR BAER Noxious Weed Treatment List
Species Herbicide Rx1 Herbicide Rx2 Herbicide Rx3 Cultural Rx
Arundo donax
(giant reed)
If plants are too tall to effectively spray from ground, cut them and use either a cut stump treatment of undiluted glyphosate (e.g. AquaMaster®) immediately after cutting, or allow for resprouting (3-6 weeks) and apply foliar or spot spraying application glyphosate (e.g.
AquaMaster®) at 2-3% (at 25-40 gpa)and 0.5% of a non-ionic surfactant (e.g. Agri-
Dex®). Otherwise treat with 3% glyphosate (e.g. AquaMaster®) plus 0.5% surfactant (at 60-100 gpa).
Bending over tall plants prior to spraying can also be used on tall plants.
Treatments later in summer or early fall are most effective.
Low volume foliar or spot spraying application of 5% imazapyr (e.g.
Habitat®) plus 5% MSO surfactant applied in spring to 20- 25% of leaf surfaces.
Wait at least 6 months before considering retreatment.
Cutting is not effective.
Tamarix spp.
(tamarisk, saltcedar)
Foliar or spot spraying application of imazapyr (e.g. Habitat®) at 1% in water with non-ionic surfactant (e.g. LI-700) at 0.25%. Late summer, early fall. Spray to wet (25- 50 gpa). Imazapyr is slow acting
(allow 2 seasons before considering retreating).
A tankmix of imazapyr (e.g.
Habitat®) at 1% solution plus 3% solution glyphosate (e.g.
AquaMaster®) plus 1% MSO surfactant, applied in fall, high volumes (spray to wet). Imazapyr is slow acting (allow 2 seasons before considering retreating).
If trees too tall to safely foliar or spot spray, cut stump with diluted imazapyr (e.g.
Habitat ® ) at 6 ounces/gallon water
- 5% solution;
or undiluted triclopyr ester (e.g. Garlon 4
Ultra®), or basal bark with triclopyr ester (25%) in MSO or basal oil surfactant in fall
(only to smooth-barked younger trees).
Handpulling smaller plants is effective, with some root removal.
Ailanthus altissima (tree-of-heaven)
Different treatments depending on size of target. For small seedlings or sprouts (less than 4-5 feet tall), foliar or spot spraying application with 1-2% glyphosate (e.g.
Accord Concentrate®) with 0.5% non-ionic surfactant, even coverage (10-30 gpa). For small saplings (trees with smooth bark), basal bark application with triclopyr ester (e.g. Garlon 4 Ultra®) at 25% mixed with a methylated seed oil
(MSO) or basal oil surfactant, applying to lower 1-2 feet of stem, spray to wet in summer or fall.
Larger trees without smooth bark, hack and squirt or frill then apply undiluted imazapyr (e.g. Arsenal AC®) or triclopyr amine (e.g.
Garlon 3A®) in the summer or fall.
Imazapyr is slow to act so don't expect fast changes (about a year).
If trees cannot be left in place to die (after hack and squirt or frill), then use a cut stump method;
applying undiluted triclopyr ester (e.g.
Garlon 4 Ultra®) or diluted imazapyr (e.g.
Arsenal AC®) (6 ounces Arsenal AC® per gallon water) to the stump surface within minutes of cutting stem.
Hand cutting is ineffective. Young seedlings (not root suckers) can be pulled by hand but the roots must be removed or they will resprout.
12363N25Q4120 Angeles National Forest BAER EDRR Page 16 of 26
Alternanthera philoxeroides (alligator weed)
Triclopyr amine (e.g.. Garlon 3A®) applied at rate of 1 lb ae/acre (2-3 pints/acre) mixed with 1% non-ionic surfactant applied at 20 gpa 2-4 times/year.
2% glyphosate solution (e.g. Accord
Concentrate®) plus 0.5% non-ionic surfactant at 50 gpa.
Digging can be effective on very small populations, but care must be taken to remove all pieces, as rooting from fragments can occur.
Cortaderia jubata (jubata grass)
Glyphosate (e.g.. Accord Concentrate®) as a 2% solution plus 0.5% non-ionic surfactant applied at 50-100 gpa foliar spot spraying application in summer or fall (July – October)
Wicking application, using 30% glyphosate
(e.g. Accord Concentrate®) plus 10% surfactant in water in early summer or fall.
Digging can be effective tool although very labor intensive for larger clumps.
Cortaderia selloana (pampas grass)
Glyphosate (e.g., Accord Concentrate®) as a 2% solution plus 0.5% non-ionic surfactant applied at 50-100 gpa foliar or spot spraying application in summer or fall
(July - October).
Wicking application, using 30% glyphosate
(e.g. Accord Concentrate®) plus 10% surfactant in water in early summer or fall.
Digging can be effective tool although very labor intensive for larger clumps.
Vinca major (big periwinkle)
Foliar or spot spraying application with 2% solution of glyphosate plus 0.5% non-ionic surfactant in water in the spring.
Foliar or spot spraying application with 2% solution of triclopyr amine (e.g. Garlon 3A®) plus
0.5% nonionic surfactant in water in the spring.
Delairea odorata (cape ivy, German ivy)
0.5% glyphosate (e.g. Roundup Pro®) plus 0.5% triclopyr ester (e.g. Garlon 4
Ultra®) plus 0.1% silicone surfactant (e.g.
Sylgard®) applied as foliar or spot spraying spray, spray to wet (70 gpa), late spring, early summer.
Hand pull in small areas and remove all fragments of stems and roots. Brush blade larger areas and follow up with manual or herbicide treatment.
12363N25Q4120 Angeles National Forest BAER EDRR Page 17 of 26
Arctotheca calendula (capeweed)
Glyphosate at 2-3% (e.g. Roundup Pro®) (or 1.5% - 2.25% Accord Concentrate® plus 0.5% non-ionic surfactant) applied during flowering but before seed set.
Triclopyr ester (e.g.
Garlon 4 Ultra® (4 lb ae/gallon)) at 2% solution plus surfactant. Applied during flowering.
Small, younger patches can be hand pulled, make sure bulk of roots are removed. Once stolons form do not attempt pulling as vegetative spread would be likely result.
Ricinus communis (castor bean)
Chlorsulfuron (e.g. Telar XP®) at 1 1/3 ounces of product per acre plus 0.25% non-ionic surfactant applied in late winter or early spring. Don't exceed 1 1/3 ounces of Telar XP® per acre.
Glyphosate at 8 qts or 2% (e.g.
Roundup Pro®) applied in late winter or early spring at 100 gpa.
For larger plants, cut stump with 50% glyphosate
(e.g. Accord Concentrate®) or 30% solution of triclopyr ester (e.g.
Garlon 4 Ultra®), immediately after cutting plant
Handpull and remove root systems in small infestations. Make sure workers are wearing gloves.
Pennisetum setaceum (crimson fountaingrass)
Glyphosate (e.g. Accord Concentrate®)at 2% applied as a foliar or spot spray in spring and summer, including 0.5% nonionic surfactant.
Small infestations can be removed by uprooting or cutting with weed eaters.
Larger plants will require picks or mattocks. If seed is present, seed heads should eb cut and bagged for off-site disposal.
Ageratina adenophora (croftonweed, eupatorium)
Glyphosate (e.g. Accord Concentrate®) applied as a 1% solution plus 0.5% non-ionic surfactant, spray to wet, in late summer or fall when actively growing.
Triclopyr ester (e.g.
Garlon 4 XRT®) at 0.5% (2 qts/100 gallons water), high volume, in late summer or fall when actively growing.
Throughly wet, especially at base.
Wicking application, using 30% glyphosate
(e.g. Accord Concentrate®) plus 10% surfactant in water in early summer or fall.
Handpull and remove root systems in small infestations.
Hedera helix (English ivy)
From summer to fall, apply 3% solution of triclopyr ester (e.g. Garlon 4 Ultra®) with non-ionic surfactant. Thoroughly wet the foliage but not to point of runoff.
Some control may be achieved with glyphosate
(e.g. Accord Concentrate®) as a 3% solution with 0.5-1% non-ionic surfactant, but repeat applications are necessary.
Handpull and remove root systems in small infestations. Solarization (i.e., tarping) can also be effective.
12363N25Q4120 Angeles National Forest BAER EDRR Page 18 of 26
Ehrharta erecta (erect veldtgrass)
2% glyphosate (e.g. Accord Concentrate®), with added 0.5-1% nonionic surfactant, applied when plant is actively growing and green, in spring/early summer. Will likely require at least two years of chemical control followed by manual control of new seedlings.
Small areas can be handpulled.
Ehrharta calycina (purple veldtgrass)
2% glyphosate (e.g. Accord Concentrate®), with added 0.5-1% nonionic surfactant, applied when plant is actively growing and green, in spring/early summer. Will likely require at least two years of chemical control followed by manual control of new seedlings.
Small areas can be handpulled.
Foeniculum vulgare (fennel)
Triclopyr (either amine [e.g.. Garlon 3A®] or ester [e.g. Garlon 4 XRT®]) applied in spring/summer as a 2% solution (95 to
100% mortality).
Glyphosate (e.g. Accord Concentrate®) in late spring/summer as a 2% solution plus 0.5-1% non-ionic surfactant. (75-80% reduction in cover)
Hand pull or cut above-ground portions using handtools (small or diffuse populations only).
For large areas, brush blade and follow-up with herbicide.
Genista monspessulana (French broom)
Triclopyr ester (e.g. Garlon 4 Ultra®) as a 2% solution plus 0.5-1% non-ionic surfactant applied to foliage in spring;
even coverage is important. .
Glyphosate (e.g. Accord Concentrate®) as a 3% solution 0.5- 1% non-ionic surfactant in spring or fall as foliar or spot spraying application.
Basal bark application using imazapyr (e.g. Stalker®) in a 6-10% solution or triclopyr ester (e.g. Garlon 4
Ultra®) in a 10- 20% solution mixed with MSO (e.g.
Hasten® or
Competitor®) or a basal oil, applied in fall.
Or a tankmix of the two - 3-5% imazapyr (e.g.
Stalker®), 15- 20% triclopyr ester (e.g.
Garlon 4
Ultra®) in a basal oil or
MSO.
Hand pull seedlings when soil is moist and infestation is small or scattered.
Larger plants can be removed with a weed wrench.
12363N25Q4120 Angeles National Forest BAER EDRR Page 19 of 26
Cytisus striatus (Portuguese broom)
Triclopyr ester (e.g. Garlon 4 Ultra®) as a 2% solution plus 0.5-1% non-ionic surfactant applied to foliage in spring;
even coverage is important.
Glyphosate (e.g. Accord Concentrate®) as a 3% solution 0.5- 1% non-ionic surfactant in spring or fall as foliar or spot spraying application.
Basal bark application using imazapyr (e.g. Stalker®) in a 6-10% solution or triclopyr ester (e.g. Garlon 4
Ultra®) in a 10- 20% solution mixed with MSO (E.g.
Hasten® or
Competitor®) or a basal oil, applied in fall.
Or a tankmix of the two - 3-5% imazapyr (e.g.
Stalker®), 15- 20% triclopyr ester (e.g.
Garlon 4 Ultra®) in a basal oil or
MSO.
Hand pull seedlings when soil is moist and infestation is small or scattered.
Larger plants can be removed with a weed
Cytisus scoparius (Scotch broom)
Triclopyr ester (e.g. Garlon 4 Ultra®) as a 2% solution plus 0.5-1% non-ionic surfactant applied to foliage in spring;
even coverage is important.
Glyphosate (e.g. Accord Concentrate®) as a 3% solution 0.5- 1% non-ionic surfactant in spring or fall as foliar or spot spraying application.
Basal bark application using imazapyr (e.g. Stalker®) in a 6-10% solution or triclopyr ester (e.g. Garlon 4
Ultra®) in a 10- 20% solution mixed with MSO (e.g.
Hasten® or
Competitor®) or a basal oil, applied in fall.
Or a tankmix of the two - 3-5% imazapyr (e.g.
Stalker®), 15- 20% triclopyr ester (e.g.
Garlon 4
Ultra®) in a basal oil or
MSO.
Hand pull seedlings when soil is moist and infestation is small or scattered.
Larger plants can be removed with a weed
Ulex europaeus (gorse)
Triclopyr ester (e.g. Garlon 4 Ultra®) as a 2% solution plus 0.5-1% non-ionic surfactant applied to foliage in spring;
even coverage is important.
Imazapyr (e.g. Arsenal AC®) as a 2% solution plus 0.5% non-ionic surfactant applied to foliage in spring or summer
10-15% triclopyr ester (e.g. Garlon 4
Ultra®) in water plus an acidifier as a cut stump treatment.
12363N25Q4120 Angeles National Forest BAER EDRR Page 20 of 26
Rubus armeniacus (Himalayan blackberry)
Best if vegetation is cut first and then resprouts treated. Triclopyr ester (e.g.
Garlon 4 Ultra®) using a 2% solution plus 1% non-ionic surfactant applied at flowering to green berry stage (late spring/early summer). Repeat as needed.
Glyphosate (e.g. Accord Concentrate®) applied as a 3 or 4% solution plus 0.5-1% non-ionic surfactant, to the foliage during flowering stage.
Handpull seedlings making sure to remove root system. Cut larger canes and remove root crown.
Mow or brush blade larger infestations before hand removal.
Lolium multiflorum (Italian ryegrass)
Glyphosate (e.g. Accord Concentrate®) as a 2% solution plus 0.5-1% non-ionic surfactant appied when the boot to head stage is reached.
Asphodelus fistulosus (onionweed)
Glyphosate (e.g. Accord Concentrate®) as a 5% solution plus 0.5-1% non-ionic surfactant applied in spring during flowering
Chlorsulfuron (e.g. Telar XP®) at 1 1/3 ounces product/acre applied as a foliar or spot spray plus
0.25% non-ionic surfactant.
manual removal before seeds develop can control small populations, however partially buried plants can survive.
Acroptilon repens (Russian knapweed)
Chlorsulfuron (e.g. Telar XP®) at 1-3 ounces/acre plus 0.25% surfactant applied in fall to rosette. Spray to wet (20- 40 gpa).
Aminopyralid (e.g.
Milestone®) 5-7 oz/acre in spring plus 0.25 - 0.5% of non-ionic surfactant, applied in spring (eraly bud to flowering) or in the fall to dominant plants
Glyphosate (e.g. Accord
Concentrate®) applied as a foliar or spot spray (3 lb ae/ac) at bud stage.
Centaurea maculosa (spotted knapweed)
Aminopyralid (e.g. Milestone®) 5-7 oz/acre in spring plus 0.25% of non-ionic surfactant, applied from the rosette to the bolting stage.
12363N25Q4120 Angeles National Forest BAER EDRR Page 21 of 26
Centaurea solstitialis (yellow starthistle)
Aminopyralid (e.g. Milestone®) 4 oz/acre plus 0.25% of non-ionic surfactant, applied from the rosette to the bolting stage (November thru April). .
Nicotiana glauca (tree tobacco)
Cut stump treatment with glyphosate (at 50% dilution or undiluted), imazapyr (8 ounces Arsenal AC®/gallon water or 16 ounces Stalker®/gallon water), or triclopyr ester at 30% dilution or undiluted.
Glyphosate diluted with water, triclopyr and imazapyr diluted with MSO (e.g.
Hasten®) or a basal oil.
Basal bark application using 20% imazapyr (eg
Stalker®) in MSO or basal oil, applied in summer/fall.
Foliar or spot spraying application with glyphosate (eg
Roundup Max®) at 2-3%.
Provides partial control, at best.
Manual removal using weed wrench can be effective if most of major roots are removed.
Cutting is inefefctive.
Robinia pseudoacacia (black locust)
Cut close to the ground, followed by treatment with herbicide.
Triclopyr with different formulations for riparian areas (e.g., Garlon 3A diluted 50% in water or undiluted) or upland areas (e.g., Pathfinder II).
Pull seedlings by hand.
12363N25Q4120 Angeles National Forest BAER EDRR Page 22 of 26
4.0 Government Furnished
• The Government will provide gate key for vehicular access to some work sites.
• The Government will also provide GIS data of infestations, suppression areas and land ownership.
5.0 Deliverables / Schedule
Projected Start Date: May 1st, 2025 Projected Completion Date: December 31st, 2025
Work will occur during optimal times to detect or treat target species (see Table 2).
Deliverables:
The contractor will deliver a summary of all survey efforts and accompanying spatial data.
• Summary will include description of where and when surveys occurred and target species mapped and detected.
• Spatial data must be submitted in an ESRI ArcPro compatible format, either shapefile or geodatabase. The spatial data must include the spatial extent of areas surveyed as a polygon, and point/polygon data of target species detected including attributes for species and percent cover of target species in mapped polygon.
The contractor will deliver a summary of all treatment efforts and accompanying spatial data.
• All treatment efforts will be recorded with a GPS and field notes. Herbicide use logs detailing daily chemical applications must be provided to the US Forest Service.
• The daily logs must detail herbicide formulation applied and the total amount of spray (including dilutant) applied each day along with the spatial area where the application occurred.
6.0 Travel
The work will require multiple multiday trips to the project area. The cost of travel will be included in the cost paid per crew day and not a separately reimbursable expense.
7.0 Contractor’s Key Personnel
• Survey will be conducted by two qualified individuals with ability to identify target plant species, including uncommon or new introductions and with the ability to operate a GPS for mapping species locations. One of the individuals will have formal botany training and have demonstrated experience surveying for weeds of concern in Southern California. The second individual must be able to identify target weed species with technical assistance from the formal botanist.
• Treatment crew will have individuals trained and qualified for safe herbicide application in wildland settings. The crew foreman must be able to correctly identify target weed species and ensure crew targets the correct plants.
• The Contractor must possess a valid California Pesticide Use Applicator License/Certificate and be registered to work in Los Angeles County, California with appropriate category.
8.0 Security Requirements
Not applicable
9.0 Data Rights
The data provided to the Government will become the property of the US Government.
10.0 Section 508 – Electronic and Information Technology Standards Not applicable
Attachment If applicable, include an Attachment stating Evaluation Factors and significant Subfactors representing the key areas of importance and emphasis to be considered in the source selection decision
12363N25Q4120 Angeles National Forest BAER EDRR Page 23 of 26
This solicitation implements two FAR class deviations to ensure compliance with Executive Orders 14148, 14173, 14168 and 14208, issued since January 20, 2025. These deviations reflect recent policy updates and remove outdated requirements, as outlined below.
The following FAR provisions and clauses are hereby removed in their entirety from the LMIR Stewardship BPA:
• 52.222-21 Prohibition of Segregated Facilities
• 52.222-22 Previous Contracts and Compliance Reports
• 52.222-23 Notice of Requirement for Affirmative Action To Ensure Equal Employment
Opportunity for Construction
• 52.222-24 Preaward On-Site Equal Opportunity Compliance Evaluation
• 52.222-25 Affirmative Action Compliance
• 52.222-26 Equal Opportunity
• 52.222-27 Affirmative Action Compliance Requirements for Construction
• 52.222-29 Notification of visa denial
• 52.223-10 Waste Reduction Program (MAY 2024)
• 52.223-19 Compliance with Environmental Management Systems (MAY 2011)
• 52.223-22 Public Disclosure of Greenhouse Gas Emissions and Reduction Goals—
Representation (DEC 2016)
• 52.222-55 Minimum Wages for Contractor Workers Under Executive Order 14026*
*This provision was removed to comply with the Executive Order titled "Additional Rescissions of Harmful Executive Orders and Actions," dated March 14, 2025.
The following FAR clauses now include deviations to align with recent Executive Orders:
• 52.204-8 Annual Representations and Certifications (JAN 2025) (DEVIATION FEB 2025)
• 52.212-3 Offeror Representations and Certifications—Commercial Products and
Commercial Services (MAY 2024) (DEVIATION FEB 2025)
• 52.212-5 Contract Terms and Conditions Required To Implement Statutes or Executive
Orders—Commercial Products and Commercial Services (JAN 2025) (DEVIATION FEB 2025)
• 52.223-1 Biobased Product Certification (MAY 2024) (DEVIATION FEB 2025)
• 52.223-2 Reporting of Biobased Products Under Service and Construction Contracts (MAY
2024) (DEVIATION FEB 2025)
• 52.223-10 Waste Reduction Program (MAY 2024) (DEVIATION FEB 2025)
• 52.223-23, Sustainable Products and Services (MAY 2024 (DEVIATION FEB 2025))
12363N25Q4120 Angeles National Forest BAER EDRR Page 24 of 26
All call orders will incorporate these changes by reference at award.
Disclaimer: System updates may lag policy updates. The System for Award Management (SAM) may continue to require entities to complete representations based on provisions that are not included in agency solicitations. Examples include 52.222-25, Affirmative Action Compliance, and paragraph (d) of 52.212-3, Offeror Representations and Certifications—Commercial Products and Commercial Services. Contracting officers will not consider these representations when making award decisions or enforce requirements. Entities are not required to, nor are they able to, update their entity registration to remove these representations in SAM.
In advancement of Section 2 of Executive Order 14208, the removal of requirements related to Executive Order 14057 eliminates all non-statutory sustainability requirements or preferences in purchases of food service wares, including paper straws. In addition to removing requirements related to Executive Order 14057, the attachment also reflects recent updates to Code of Federal Regulation citations for the U.S. Department of Agriculture’s BioPreferred® Program, a statutory purchasing preference program.
These class deviations will remain in effect until rescinded or incorporated into the FAR.
12363N25Q4120 Angeles National Forest BAER EDRR Page 25 of 26
PROJECT TECHNICAL CAPABILITY QUESTIONNAIRE FOR EVALUATION FACTORS
1. Similar Project Experience Provide examples of projects/work within the prior three (3) years which involve weed identification and pesticide application/use. Include the dates of performance and client contact information including name and phone number.
2. Understanding of Work/Capability Demonstrate an understanding of work that will be undertaken and scope of project. Propose solutions within the proposal that are realistic and the best cost benefit to meeting objectives. Provide a brief explanation of your ability to accomplish this work.
3. Schedule of Work Required to submit an expected project schedule. Please assume the work start date of 08/01/2025.
12363N25Q4120 Angeles National Forest BAER EDRR Page 26 of 26
| BAER EDRR SOI.pdf |
| Schedule |
| Appendix A1 Rest of EA _Invasive_Plant_Treatment_Project_EA.pdf |
| CHAPTER 2 - ALTERNATIVES, INCLUDING THE PROPOSED ACTION |
| Human Health and Safety |
| Invasive Plants and Native Vegetation |
| Special Status Plants |
| Wildlife |
| Soils and Hydrology |
| Special Land Designations (Wilderness and Research Natural Areas) |
| Recreation and Scenic Resources |
| Consequences Relative to Significance |
| INTERDISCIPLINARY (ID) TEAM MEMBERS: |
| FEDERAL, STATE, AND LOCAL AGENCIES: |
| REFERENCES |
| APPENDIX A - SUMMARY OF PUBLIC COMMENTS DURING SCOPING |
| APPENDIX D –RESPONSES TO COMMENTS ON PRELIMINARY EA |
| MARGULIS, C. “MONSANTO LIES, AGAIN (AND AGAIN AND AGAIN)” |
| APPENDIX E –T&E SPECIES ACCOUNTS |
| Appendix A2 San Gabriel Monument EA _Invasive_Plant_Treatment_Project_EA.pdf |
| Chapter 1 - Introduction |
| Background |
| Purpose and Need for Action |
| Proposed Action |
| Decision Framework |
| Public Involvement |
| Issues |
| Chapter 2 - Alternatives, including the Proposed Action |
| Alternatives |
| Alternative 1, No Action |
| Alternative 2, Proposed Action |
| Proposed Action |
| Treatment Prescriptions |
| Treatment Methods |
| Herbicide Treatment Method |
| Treatment Areas |
| Project Area Map |
| Restoration |
| Restoration Strategies Considered |
| Monitoring |
| Access |
| Design Features |
| Alternative 2 Design Features (specific to herbicide use) |
| General |
| Worker and Public Safety |
| Biology Resources |
| Special Status Plant Species (Federally Listed Threatened, Endangered, Proposed, Candidate Species and Forest Service Sensitive Species) |
| Special Status Wildlife Species (Threatened, Endangered, Proposed, Candidate and Forest Service Sensitive) |
Hydrology Resource
| Additional Design Features |
| General |
| Biology Resources |
| Special Status Wildlife and Plant Species |
| Invasive Plant and Fauna Species |
| Wildlife Species |
| Hydrology Resource |
| Special Land Designations |
| Wilderness Areas |
| Recreation Resource |
| Scenic Resource |
| Land Use |
| Heritage Resources |
| Fire/Fuels Resource |
| Air Quality Resource |
Alternative 3, No Herbicides
| Alternatives Considered but Eliminated from Detailed Study |
| Various Treatment Methods as Part of the Integrated Weed Management Prescription |
| Broadcast Prescribed Fire |
| Grazing |
| Broadcast Spraying of Herbicides |
| Large and Heavy Equipment |
| Organic Herbicides |
| Herbicide, Only Proposed Treatment Method |
| Biocontrol Agents |
Comparison of Alternatives
| Chapter 3 - Affected Environment and Environmental Consequences |
| Fire and Fuels |
| Alternative 1, No Action Alternative |
| Direct, Indirect and Cumulative Effects |
| Alternative 2, Proposed Action |
| Direct and Indirect Effects |
| Human Health and Safety |
| Alternative 1, No Action Alternative |
| Direct, Indirect and Cumulative Effects |
| Alternative 2, Proposed Action |
| Direct, Indirect and Cumulative Effects |
| Invasive Plants and Native Vegetation |
| Affected Environment |
| Environmental Consequences |
| Direct, Indirect and Cumulative Effects |
| Alternative 1, No Action Alternative |
| Alternative 2, Proposed Action |
| Adaptive Management or Early Detection and Rapid Response Strategy |
| Restoration and Monitoring |
| Vectors Associated with Project Implementation |
Special Status Plants
| Affected Environment |
| Environmental Consequences |
| Direct, Indirect and Cumulative Effects |
| Alternative 1, No Action Alternative |
| Alternative 2, Proposed Action |
| Wildlife |
| Affected Environment |
| Special Status Wildlife Species |
| Environmental Consequences |
| Direct, Indirect and Cumulative Effects |
| Alternative 1, No Action Alternative |
| Alternative 2, Proposed Action |
| Mammals and Birds |
| Reptiles |
| Amphibians |
| Fish |
| Alternative 2, Proposed Action |
| Special Status Wildlife Species |
Alternative 3, No Herbicides
| Soils and Hydrology |
| Affected Environment |
| Environmental Consequences |
| Direct, Indirect and Cumulative Effects |
| Alternative 1, No Action Alternative |
| Alternative 2, Proposed Action |
| Alternative 3, No Herbicides |
| Special Land Designations (Wilderness and Research Natural Areas) |
| Affected Environment |
| San Gabriel, Cucamonga, Sheep Mountain, Pleasant View Ridge and Magic Mountain Wildernesses and Falls Canyon Research Natural Area are all within the Project Areas. |
| Research Natural Areas (RNAs) |
| Environmental Consequences |
| Direct and Indirect Effects |
| Alternative 3, No Herbicides |
| Alternative 1, No Action |
| Alternative 2, Proposed Action (Adaptive Management Strategy – Herbicide Use) |
| Alternative 3, No Herbicides |
| Recreation and Scenic Resources |
| Affected Environment |
| Recreation Users |
| Scenic Resources |
| Environmental Consequences |
| Direct, Indirect and Cumulative Effects |
| Alternative 1, No Action Alternative |
| Alternative 2, Proposed Action |
| Recreation Users |
| Scenic Resources |
| Alternative 3, No Herbicides |
| Recreation Users |
| Scenic Resources |
| Consequences Relative to Significance |
| Context |
| Intensity |
| Beneficial and Adverse Impacts |
| The Degree of Effect to Public Health and Safety |
| Unique Characteristics of the Geographic Area, including Historic and Cultural Sites |
| The Degree to which the Effects on the Human Environment are likely to be Highly Controversial |
| The Degree to which the Possible Effects on the Human Environment are Highly Uncertain or Involve Unknown Risks |
| The Degree to which the Action may Establish a Precedent for Future Actions with Significant Effects or Represents a Decision in Principle about a Future Consideration |
| Whether the Action is related to other Actions with Individually Insignificant but Cumulatively Significant Impacts |
| The Degree to which the Action May Adversely Affect Districts, Sites, Highways, Structures, or Objects Listed in or Eligible for Listing in the National Register of Historic Places, or may cause Loss or Destruction of Significant Scientific, Cultural,... |
| The Degree to Which the Action may Adversely Affect an Endangered or Threatened Species or its Habitat that has been Determined to be Critical under the Endangered Species Act of 1973 |
| Whether the Action Threatens a Violation of Federal, State, or Local Law or Other Requirements Imposed for the Protection of the Environment |
| Chapter 4 – List of agencies and persons consulted |
| INTERDISCIPLINARY (ID) TEAM MEMBERS: |
| Janet Nickerman, Forest Botanist |
| FEDERAL, STATE, AND LOCAL AGENCIES: |
| TRIBES: |
| OTHERS: |
| References |
| Appendix A, Summary of Public Comments and responses |
| First Study to Confirm Glyphosate Levels in Breast Milk of American Moms |
| Appendix B - Additional Invasive Plant information |
| Appendix C Potential Treatment Prescription Options |
| Appendix D –Monitoring Plan |
| 1 Introduction |
| 2 BASELINE DATA COLLECTION |
| 2.1 Populations and/or Invasive Species |
| 2.1.1 Evaluation Question |
| 2.1.2 Approach |
| 3 PROJECT IMPLEMENTATION MONITORING |
| 3.2 Miles and/or Acres Treated Annually and Treatment Method Used |
| 3.2.1 Implementation Evaluation Question |
| 3.2.2 Approach |
| 4 PROJECT IMPLEMENTATION AND EFFECTIVENESS MONITORING |
| 4.1 Project Design and Design Features |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .