5_ExistingCulvertDetails_Amendment1.pdf

PDF 108 KB Posted

Attached to
NFSR #250 Reconstruction (M. P. 29. 30 to M. P. 47. 28) - R1, Nez Perce-Clearwater NFs, North Fork RD
Solicitation number
12363N24R4005
Issued by

About this file

This document appears to be an amendment to an existing set of details regarding culverts on a federal contract opportunity. The key details are:

The NFSR #250 Reconstruction project aims to correct the impacts of ineffective shaping and drainage on National Forest Service Road 250 and replace end-of-life drainage structures, improving the drivability and drainage of the road system. The work involves the removal of existing culverts and installation of 62 corrugated metal culverts of varying lengths and diameters. The project area is approximately 18 miles long along the North Fork of the Clearwater River, with work to be performed between MP 29.30 and MP 47.28. The government's construction estimate is between $250,000 and $500,000, and the work must be completed between July 1 and October 31 in 2024 and 2025 due to fish habitat concerns. At least 25% of the culvert installation must be completed by October 31, 2024. Bid bonds are required, and performance and payment bonds will be required from the awardee.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

M.P.

Pipe Dia.

(in)

Pipe Length

(FT)

Dist. From Inlet to

Shoulder (Ft)

Distance Between Shoulder

(Ft)

Dist. From Shoulder to Outlet

(Ft)

Width of Surfacing

(Ft.)

Inlet

Depth (Ft) Outlet

Depth (Ft)

29.45 36 34 7 19 8 18 5 12

29.68 24 36 10 18 8 17 2 8

30.10 36 60 20 23 18 21 4 8

30.30 24 34 11 18 3 18 3 4

30.40 18 72 10 22 40 20 3 6

30.94 18 60 8 20 27 19 3 6

31.48 18 30 3 18 8 18 2 5

31.74 18 38 8 19 11 17 6 10

31.97 18 34 8 17 8 17 3 6

32.06 18 44 9 19 15 18 2 6

32.22 18 38 10 17 10 17 3 4

32.33 18 32 7 19 6 18 3 6

32.38 18 44 6 17 11 17 3 5

32.66 24 32 9 17 6 17 3 5

33.00 18 38 12 16 9 16 5 6

33.08 24 34 7 18 8 17 3 6

33.16 18 38 12 17 9 16 4 10

33.18 18 32 8 18 5 16 5 8

33.74 18 36 4 17 14 16 4 12

34.16 24 36 4 17 14 17 4 12

34.20 24 36 9 15 12 14 4 9

34.37 24 40 8 16 16 16 3 12

34.62 18 40 7 20 11 19 3 6

35.58 24 38 10 16 11 16 4 7

35.59 24 38 6 16 16 16 5 10

36.00 18 36 7 17 11 16 3 5

36.10 24 34 6 16 11 16 2 5

36.26 18 30 4 20 7 18 3 4

36.32 18 30 4 20 7 18 3 4

37.00 24 32 9 15 9 15 5 7

37.07 18 28 11 14 3 14 5 7

37.45 18 36 12 18 8 14 5 7

37.87 18 38 12 18 8 16 7 9

37.95 18 42 12 15 14 14 5 12

38.58 24 40 10 16 11 14 5 12

38.62 24 32 11 16 5 16 3 6

39.78 18 40 14 18 8 17 4 6

42.24 18 30 4 16 9 16 3 5

42.39 18 46 8 20 15 19 3 6

42.86 18 48 9 20 16 19 3 6

43.25 18 32 4 20 7 19 3 6

43.54 18 30 3 20 6 19 3 6

AMENDMENT 1 - ATTACHMENT 5

43.59 18 30 3 20 6 19 3 6

43.65 18 30 3 20 6 19 3 6

43.81 18 30 3 20 6 19 3 6

44.20 18 34 5 20 8 19 3 6

44.29 18 40 5 20 12 19 3 9

44.43 18 46 8 20 15 19 3 6

44.45 18 44 7 20 14 19 3 6

44.53 36 52 16 20 16 19 6 9

44.59 18 34 4 20 9 19 3 6

44.81 24 60 16 20 26 19 10 11

45.07 18 36 6 15 13 19 3 6

45.18 18 42 6 20 14 19 3 6

45.31 18 40 5 20 13 19 3 6

45.51 36 40 5 20 13 19 3 6

45.58 18 40 5 20 13 19 3 6

45.84 24 40 5 20 13 19 3 6

46.38 18 40 5 20 13 19 3 6

46.43 18 40 5 20 13 19 3 6

46.50 36 44 6 20 15 19 3 6

46.83 18 44 7 20 17 19 3 10

7.048387

Sheet1

File details come from the government source that posted it. Updated .