This document contains location maps and details for bridge replacement projects on the 4C Trail within the Sam Houston National Forest. The maps identify eight bridges by number and location that require repairs or replacement. The project details include the bridge types, lengths, GPS coordinates, and scope of trail clearing work required around each bridge.

The related federal contract opportunity is a pre-solicitation notice for 4-C Trail Bridge Repairs and Replacements issued by the US Department of Agriculture Forest Service. The opportunity involves replacing or repairing the eight bridges identified in the location maps to restore access along the 4C Trail. Contractors will be required to clear vegetation and remove fallen trees near each bridge site.

View the file

Other files for this federal contract opportunity

Other files attached to 4-C Trail Bridge Repairs and Replacements, newest first.
File Type Posted
4CTrailBoardwalks81623.pdf PDF
Amendment 001_4-C Trail Bridge Repairs and Replacements_Signed.pdf PDF
Base Solicitation.pdf PDF
FOUR Cs TRAIL BRIDGE REPLACEMENTS_PLANS.pdf PDF
Wage Determination (Building)_TX202220155.pdf PDF
Trail_Construction Specifications.pdf PDF
4C_Vicinity Map.pdf PDF
Orientation Map.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ú607 - 0.70

Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, Esri (Thailand), NGCC, (c) OpenStreetMap contributors, and the GIS User Community µ

0 0.1 0.2 0.3 0.4 0.50.05 Miles

USDA Forest Service - 4C Trail Bridge Replacement Project Bridge 607 - 0.70

BRIDGE TYPE LENGTH LAT LONG

607 - 0.70 Glulam 60' 31.39555° -95.16124° ú

607 - 5.30

607 - 5.88

Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, Esri (Thailand), NGCC, (c) OpenStreetMap contributors, and the GIS User Community µ

0 0.1 0.2 0.3 0.4 0.50.05 Miles

USDA Forest Service - 4C Trail Bridge Replacement Project Bridges 607 - 5.88 and 607 - 5.30

Trail clearing to start at CR 1170 and end at NF 536 All tall grass and brush to be cleared a minimum of 24" from centerline of trail All downed trees to be cleared a minimum of 48" from centerline of trail, haul off of debris not required

BRIDGE TYPE LENGTH LAT LONG

607 - 5.88 Glulam 60' 31.44468° -95.11765° 607 - 5.30 Single Log Stringer 45' 31.52788° -95.16119°

607 - 12.70

607 - 12.00

Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, Esri (Thailand), NGCC, (c) OpenStreetMap contributors, and the GIS User Community µ

0 0.2 0.4 0.6 0.8 10.1 Miles

USDA Forest Service - 4C Trail Bridge Replacement Project Bridges 607 - 12.00 and 12.70

Trail clearing to start at Camp RD and end at CR 1175 All tall grass and brush to be cleared a minimum of 24" from centerline of trail All downed trees to be cleared a minimum of 48" from centerline of trail, haul off of debris not required

BRIDGE TYPE LENGTH LAT LONG

607 - 12.00 Single Log Stringer 45' 31.48771° -95.16515° 607 - 12.70 Single Log Stringer 40' 31.48507° -95.15678° úúú 607 - 15.29 607 - 15.30

607 - 15.35

607 - 15.40

Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, Esri (Thailand), NGCC, (c) OpenStreetMap contributors, and the GIS User Community µ

0 0.1 0.2 0.3 0.4 0.50.05 Miles

USDA Forest Service - 4C Trail Bridge Replacement Project Bridges 607 - 15.40, 607 - 15.35, 607 - 15.30, 607 - 15.29

Trail clearing to start at FSR 526 and end at FSR 512 All tall grass and brush to be cleared a minimum of 24" from centerline of trail All downed trees to be cleared a minimum of 48" from centerline of trail, haul off of debris not required

BRIDGE TYPE Length Lat Long 607 -15.40 Single Log Stringer 70' 31.52942° -95.16110° 607 - 15.35 Single Log Stringer 40' 31.52788° -95.16119° 607 - 15.30 Single Log Stringer 60' 31.52774° -95.16115° 607- 15.29 Single Log Stringer 20' 31.52771° -95.16114°

Bridges 607 - 0.70
Bridges 607 - 5.88 and 5.30
Bridges 607 - 12.00 and 12.70
Bridges 607 - 15.29 - 15