20210816_21Q4024Amend0001QAs.pdf

PDF 213 KB Posted

Attached to
ROCK FENCE STEWARDSHIP IRSC, Klamath National Forest, Scott River Ranger District, CA
Solicitation number
12363N21Q4024
Issued by

About this file

This solicitation is for a stewardship integrated resource service contract (IRSC) to perform forest management activities and restoration work on 1,245 acres of the Klamath National Forest in California. Services required include thinning of 1,245 acres using skyline, ground-based, and roadside fuel break thinning. Additional restoration work involves improving riparian habitat through large woody debris placement in streams, whole-tree yarding, and removal or decking of biomass. Quotes are due by August 31, 2021 with work expected to be performed between date of award and September 30, 2023. The solicitation was issued by the USDA Forest Service and is open to all contractors registered in the System for Award Management.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF

CONTRACT

1. CONTRACT ID CODE PAGE OF PAGES

1 4

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

0001 08/16/2021 1040322

6. ISSUED BY CODE 363N 7. ADMINISTERED BY (If other than Item 6) CODE

USDA, Forest Service

National Stewardship Contracting Branch

Attn: Jeanne Windle

Custer Gallatin National Forest

3710 Fallon Street, Suite C

Bozeman, MT 59718

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NO.

Potential Quoters

12363N21Q4024

9B. DATED (SEE ITEM 11)

08/02/2021

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 01 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION

OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(X) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN

THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return * copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.

12363N21Q4024, Amendment 0001, Rock Fence Stewardship IRSC

1. This amendment is to provide responses to questions that were asked on the Site Visit tour on Tuesday, August 10, 2021.

Please note there have been minor changes to Appendix A (page 8 of 10 and page 9 of 10); Appendix B (pages 19 of 30 and 23 of

30) and Contract Area Maps (four pages added).

2. This amendment also provides a copy of the sign in sheet from the Site Visit Tour.

3. Response date for the RFQ has NOT changed and RFQ is still due on August 31, 2021 4:00 p.m. PST.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

N. JEAN WINDLE

Contracting Officer

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

30-105 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

Amendment No. 0001, dated 08/16/2021 Rock Fence Stewardship IRSC

Klamath National Forest

Rock Fence Stewardship IRSC

Solicitation Number 12363N21Q4024

Amendment 0001 – Questions and Answers from Site Visit Tour on Tuesday, August 10, 2021

Q1.) Do the Kangaroo Creek stream restoration trees need to be placed or can they be felled into place?

A1 .) Designated tree may either be dropped directly into the stream or moved to stream via pre-identified approaches.

This may need to be implemented with consultation of participating biologist.

Q2.) What is the average distance from yarding road to the bottom of skyline units?

A2.) The estimated average yarding distance for each skyline unit is as follows: Unit 112 – 266 ft, Unit 100 – 495 ft, Unit

60 – 435 ft, Unit 56 – 464 ft, Unit 57 – 296 ft.

Q3.) Do roads need to be cleared of equipment daily for traffic?

A3.) Forest Road 40N08 will need to be kept open for fire protection and other purposes. All spur roads will not need to be kept open. The Contract Area Map has been updated to indicate the 40N08 road as a Keep Open road. During the course of operations, exemptions may be made if fire management concurs.

Q4.) Will the T.E.A be made available? Transaction Evidence Appraisal.

A4.) No, Government estimates must not be publicized or discussed with potential contractors including the timber value appraisal for the IRSC.

Q5.) Is all the project marked individual tree mark? (ITM)

A5.) No, it is a combination of individual tree mark and leave tree mark. (ITM and LTM.

Q6.) Is this project in CCF or MBF?

A6.) Timber removed in this Stewardship Contract will be scaled using tons as the unit of measure.

Q7.) Can temp roads be used in this project?

A7.) There is an estimated need for just over 5 miles of temporary road construction that has been analyzed for use in the

Environmental document. Temporary road use is subject to agreement between the contractor and the Government.

Q8.)If temp roads are built, do they need to be decommissioned or just closed?

A8.) During the site visit, Appendix C was referenced incorrectly relative to use of temporary roads. The T-specs in

Appenidx C are for system roads and special ROW roads. Per Appendix B, B6.63 Temporary Roads, as necessary to attain stabilization of roadbed and fill slopes of Temporary Roads, Contractor shall employ such measures as out-sloping, drainage dips, and water-spreading ditches. After a Temporary Road has served Contractor’s purpose, Contractor shall give notice to Forest Service and shall remove bridges and culverts, eliminate ditches, outslope roadbed, remove ruts and berms, effectively block the road to normal vehicular traffic where feasible under existing terrain conditions, and build cross ditches and water bars, as staked or otherwise marked on the ground by Forest Service. When bridges and culverts are removed, associated fills shall also be removed to the extent necessary to permit normal maximum flow of water.

Q9.) Do we need to put in a formal request to view the project’s Green Cards?

A9.) Green Cards will be made available to the quoter that the contract is awarded to.

Q10.) What are the treatment of stumps specs?

A10.) Contractor shall treat stumps of all live conifer trees equal to or greater than 14 inches stump diameter, unless otherwise agreed in writing. Treatment should be done as soon as possible but should be completed no later than 4 hours after felling. Appendix B, C6.41# - FELLING, BUCKING, AND LIMBING, describes the specifications.

Q11.) Are stream restoration trees in a stream course protection zone and can or should Sporax be used in this buffer?

A11.) Compound shall not be applied to stumps located within 25 feet of live stream courses and meadows and wetlands shown on the contract area map. Sensitive plant populations identified in the project area will also have this buffer as described in Appendix B, C6.41# - FELLING, BUCKING, AND LIMBING.

Q12.) Does the forest have an employee that has a permit for Sporax treatment?

A12.) No, the contractor shall contact the appropriate county for any permit and or other required documents in advance of treatment. Contractor shall submit at the end of each month a monthly summary of pesticide use reports to the appropriate county agricultural commissioner with a copy to the district ranger.

Q13.) Are posted maps geo-referenced and compatible with Avenza?

A13.) Yes, posted maps are geo-referenced and compatible with the Avenza application.

Q14.) What are the options for biomass treatment?

A14.) The options for biomass treatment are to be removed and utilized or decked to contract specifications. These optional items shall be quoted upon separately.

Q15.) Are there Units where biomass removal is mandatory?

A15.) No, all biomass shall be decked or removed in accordance with contractor’s successful quote. Biomass treatment is mandatory, but the optional work activities are deck or remove.

Q16.) Roads that need to have a barrier installed, is just the barrier sufficient or does the road need to have erosion control implemented as well?

A16.) There is only one system road with a requirement to install a barrier and Appendix C describes the T-specs that also apply to that road. Temporary roads will be evaluated after use and erosion control applied as needed and as described in Appendix B. See Answer 8 as well.

Q17.) If we (the contractor) have ideas of a different approaches to the various logging systems can we make a case for change?

A17.) Yes, if you have a different approach you would like considered, detail this in your technical proposal and if accepted it will become part of the contract.

Q18.) If quoting to deck biomass from the treatment area, will it be decked to burn or to chip?

A18.) The solicitation states in Appendix A the specifications for decking. Depending on the utilization opportunities at the time, decks could be either burned or chipped.

Q19.) Can we (the contractor) use lift trees in the skyline corridors?

A19.) Yes, lift trees may be utilized.

Q20.) Do lift/tail trees need to be saved or can they be cut?

A20.) Tail trees are retained unless severe damage has occurred. All lift trees must be inside the cutting unit.

Q21.) How wide can skyline corridors be?

A21.) All skyline corridors shall be by agreement and designated on the ground. Such agreement shall be prior to felling unless ground and timber conditions otherwise justify. Width of said skyline corridors shall be kept to a practicable minimum consistent with the related silviculture prescription, Appendix B, C6.425 - CABLE AND SKYLINE YARDING.

Q22.) Appendix A, page 8 of 10, BIOMASS TREES: Any conifer material (delete 2 feet in height) to 9.9 inches DBH.

Revised - Any conifer material to 3- 9.9 inches DBH. (Rev, 20210816, amendment 0001)

Q23.) Appendix A, page 9 of 10, CROWN RATIO: duplication, see above. (Rev, 20210816, amendment 0001)

CROWN SPACING: duplication, see above. (Rev, 20210816, amendment 0001)

Q24.) Appendix B, page 19 of 30, C6.6# - EROSION PREVENTION AND CONTROL, (5/2008) Erosion prevention and control work, including Streamcourse protection, (delete required by C6.5 and B6.6) shall be completed within l5 calendar days after skidding operations related to each landing are substantially completed or after Forest Service designation on the ground of work where such designation is required hereunder.

Revised - (5/2008) Erosion prevention and control work, including Streamcourse protection, (Rev, 20210816, amendment

0001) shall be completed within l5 calendar days after skidding operations related to each landing are substantially completed or after Forest Service designation on the ground of work where such designation is required hereunder.

Q25.) Appendix B, page 23 of 30, The following definitions shall apply to C7.2# and Clause (delete 42) (C7.22#):

Revised - The following definitions shall apply to C7.2# and Clause 43 (C7.22#): (Rev, 20210816, amendment 0001)

Q26.) As noted at the Site Visit, Forest Service will be correcting some references on the contract area maps to correspond to the IRSC format and associated appendices. Edits to map include:

1) Correcting references in Legend

2) Specifying 40N08 as a Keep Open Road

3) Specifying “FELL” and “TS” under Contractual Requirements in addition to the original Legend symbology

4) Addition of Private Property symbology to maps 2 and 5 (Hayden Ridge area)