Amend-2 12363N21Q4020.pdf
PDF 8 MB Posted
- Attached to
- FLAT CREEK BMP PROJECT Federal contract opportunity
- Solicitation number
- 12363N21Q4020
- Issued by
- Department of Agriculture Forest Service
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment -1 12363N21Q4020.pdf | ||
| 12363N21Q4020.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
12363N21Q4020 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
WASHINGTON DC 20250-1138
363N
CHAD AT BULLOCK
MS-1138
1400 INDEPENDENCE AVE SW
USDA-FS STEWARDSHIP CONTRACTING BR
06/29/20210002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
06/21/2021
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
36.204 Disclosure of the magnitude of construction projects.
Advance notices and solicitations shall state the magnitude of the requirement in terms of physical characteristics and estimated price range. In no event shall the statement of magnitude disclose the Government¿s estimate. Therefore, the estimated price should be described in terms of one of the following price ranges: (c) Between $100,000 and $250,000.
This Amendment has two purposes.
1: Discrepancies found in solicitation regarding bentonite. This solicitation does not require any bentonite.
2: Extended RFQ due date till July 13, 2021 10:00 am mt.
LIST OF CHANGES:
Continued ...
15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
CHAD A.T. BULLOCK
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Amendment-2 12363N21Q4020 FLAT CREEK BMP PROJECT Page 1 of 89
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
12363N21Q4020/0002
Period Of Performance Start Date changed from
01-JUL-21 to 16-JUL-21
Bids due date : 06-JUL-21 changed to 13-JUL-21
Date distributed : 21-JUN-21 changed to 29-JUN-21
CHANGES FOR LINE ITEM NUMBER: 1
Period of Performance: 07/16/2021 to 09/01/2022
The "Submit Invoice-to" address for USDA orders is the Department of Treasury's Invoice
Processing Platform (IPP). The contractor must follow the instructions on how to register and submit invoices via IPP as prescribed in the previous communications from USDA and Treasury.
All invoices are to be submitted via the electronic Invoice Processing Platform. This is a mandatory requirement initiated by the U.S.
Department of Treasury and you can find more information at this website https://www.ipp.gov/index.htm. Please make sure that your company has registered at https://www.ipp.gov/vendors/enrollment-vendors.htm to establish your account.
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
Amendment-2 12363N21Q4020 FLAT CREEK BMP PROJECT Page 2 of 89
(x)
12363N21Q4020 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
WASHINGTON DC 20250-1138
363N
CHAD AT BULLOCK
MS-1138
1400 INDEPENDENCE AVE SW
USDA-FS STEWARDSHIP CONTRACTING BR
06/21/20210001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
06/21/2021
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
36.204 Disclosure of the magnitude of construction projects.
Advance notices and solicitations shall state the magnitude of the requirement in terms of physical characteristics and estimated price range. In no event shall the statement of magnitude disclose the Government¿s estimate. Therefore, the estimated price should be described in terms of one of the following price ranges: (c) Between $100,000 and $250,000.
Purpose of this Amendment is to add additional documents and extend RFQ till July 6, 2021
10:00 am mt.
Period of Performance: 07/01/2021 to 09/01/2022
The "Submit Invoice-to" address for USDA orders is the Department of Treasury's Invoice
Processing Platform (IPP). The contractor must follow the instructions on how to register and submit invoices via IPP as prescribed in the previous communications from USDA and
Continued ...
15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
CHAD A.T. BULLOCK
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Amendment-2 12363N21Q4020 FLAT CREEK BMP PROJECT Page 3 of 89
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
12363N21Q4020/0001
Treasury. All invoices are to be submitted via the electronic Invoice Processing Platform. This is a mandatory requirement initiated by the U.S.
Department of Treasury and you can find more information at this website https://www.ipp.gov/index.htm. Please make sure that your company has registered at https://www.ipp.gov/vendors/enrollment-vendors.htm to establish your account.
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
Amendment-2 12363N21Q4020 FLAT CREEK BMP PROJECT Page 4 of 89
12363N21Q4020
1. REQUEST NO.
5a. ISSUED BY
NAME
a. NAME
c. STREET ADDRESS
d. CITY
10. PLEASE FURNISH QUOTATIONS TO
THE ISSUING OFFICE IN BLOCK 5a ON
OR BEFORE CLOSE OF BUSINESS (Date)
2. DATE ISSUED 3. REQUISITION/PURCHASE REQUEST NO. 4. CERT. FOR NAT. DEF.
UNDER BDSA REG. 2
AND/OR DMS REG.1
RATING
6. DELIVERY BY (Date)
7. DELIVERY
9. DESTINATION
a. NAME OF CONSIGNEE
b. STREET ADDRESS
PAGE OF PAGES
5b. FOR INFORMATION CALL: (No collect calls)
TELEPHONE NUMBER
AREA CODE NUMBER
8. TO:
b. COMPANY
e. STATE f. ZIP CODE
c. CITY
d. STATE e. ZIP CODE
IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotations must be completed by the quoter.
11. SCHEDULE (Include applicable Federal, State and local taxes)
THIS RFQ
REQUEST FOR QUOTATION
(THIS IS NOT AN ORDER)
IS IS NOT A SMALL BUSINESS SET ASIDEX
06/21/2021 1030369
1400 INDEPENDENCE AVE SW
MS-1138
CHAD AT BULLOCK
USDA-FS STEWARDSHIP CONTRACTING BR
WASHINGTON DC 20250-1138
09/01/2022
BITTERROOT NATIONAL FOREST
1801 NORTH 1ST STREET
HAMILTON
MT 59840
208 373-4128CHAD A.T. BULLOCK
06/30/2021 1000 MT
FOB DESTINATION
OTHER
(See Schedule)X
ITEM NO.
(a)
SUPPLIES/SERVICES
(b)
QUANTITY
(c)
UNIT
(d)
UNIT PRICE
(e)
AMOUNT
(f)
36.204 Disclosure of the magnitude of
construction projects.
Advance notices and solicitations shall state the magnitude of the requirement in terms of physical characteristics and estimated price range. In no event shall the statement of magnitude disclose the Government¿s estimate. Therefore, the estimated price should be described in terms of one of the following price ranges: (c) Between $100,000 and $250,000.
Period of Performance: 07/01/2021 to 09/01/2022
0001 Flat Creek BMP Project - The project consists of Best Management Practice (BMP) upgrades, road improvement work, and gravel surfacing placement.
Work includes roadway preparation by blading, Continued ...
12. DISCOUNT FOR PROMPT PAYMENT
a. 10 CALENDAR DAYS (%) b. 20 CALENDAR DAYS (%) c. 30 CALENDAR DAYS (%) d. CALENDAR DAYS
NUMBER PERCENTAGE
NOTE: Additional provisions and representations
13. NAME AND ADDRESS OF QUOTER
b. STREET ADDRESS
c. COUNTY
d. CITY e. STATE f. ZIP CODE
14. SIGNATURE OF PERSON AUTHORIZED TO
SIGN QUOTATION
16. SIGNER
a. NAME (Type or print)
c. TITLE (Type or print)
a. NAME OF QUOTER
AREA CODE
NUMBER
15. DATE OF QUOTATION
b. TELEPHONE are are not attached
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition not usable
STANDARD FORM 18 (REV. 6-95)
Prescribed by GSA - FAR (48 CFR) 53.215-1(a)
Amendment-2 12363N21Q4020 FLAT CREEK BMP PROJECT Page 5 of 89
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
12363N21Q4020 shaping, and compaction of existing roadway, ditch and shoulder reconditioning, and gravel surfacing placement at specified locations. This work will also include construction of drain dips suitable for log truck traffic at staked locations within the roadways.
A primary element of this project will be the manufacture, delivery, and proper placement of gravel surfacing, to include blading, watering, and compacting at a specified thickness. Gravel must be produced to meet the specification of
F-SR without bentonite as specified in contract.
Product/Service Code: Z2LB
Product/Service Description: REPAIR OR ALTERATION
OF HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS
Delivery: 09/01/2022
The "Submit Invoice-to" address for USDA orders is the Department of Treasury's Invoice Processing Platform (IPP). The contractor must follow the instructions on how to register and submit invoices via IPP as prescribed in the previous communications from USDA and Treasury.
All invoices are to be submitted via the electronic Invoice Processing Platform. This is a mandatory requirement initiated by the U.S.
Department of Treasury and you can find more information at this website https://www.ipp.gov/index.htm. Please make sure that your company has registered at https://www.ipp.gov/vendors/enrollment-vendors.htm to establish your account.
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Amendment-2 12363N21Q4020 FLAT CREEK BMP PROJECT Page 6 of 89 jastuart Highlight
SCHEDULE OF ITEMS
FLAT CREEK BMP PROJECT
(NFSR 5637 / 5635 / 13480 / 13482)
BITTERROOT National Forest WEST FORK Ranger District RAVALLI County, Montana
BASE ITEMS:
ITEM NO. DESCRIPTION
* METHOD
OF
MEASURE-
MENT UNIT
ESTIMATED
QUANTITY
UNIT
PRICE TOTAL
15101 Mobilization LSQ LS All Req’d $ $
20425 Drainage Excavation, Type II Dip AQ EACH 6 $ $
30101
Aggregate Surface Course, Grading F-SR without Bentonite, 4-inch compacted depth, Compaction Method (b)
CQ CY 1252 $ $
30315 Roadway Reconditioning, Compaction Method (b)
CQ MI 1.36
62201 Equipment Rental, Motorgrader AQ HR 6 $ $
62202 Equipment Rental, Large Dump Truck AQ HR 6 $ $
BASE ITEMS SUB-TOTAL: $
Amendment-1 12363N21Q4020 FLAT CREEK BMP PROJECT Page 5 of 87Amendment-2 12363N21Q4020 FLAT CREEK BMP PROJECT Page 7 of 89
OPTION ITEMS:
The Government anticipates awarding some or all option items. Option items will be awarded in accordance with budgetary constraints. Bidders are required to bid all option items. Reference Drawings Sheet 2 for item locations and specifics.
ITEM
NO. DESCRIPTION
METHOD
OF
MEASURE
-MENT
UNIT ESTIMATED
QUANTITY
UNIT
PRICE TOTAL
20425 Drainage Excavation, Type II Dip AQ EACH 11 $ $
30101.01
Aggregate Surface Course, Grading F-SR without Bentonite, 4-inch compacted depth, Compaction Method (b), FR 5637 - MP 1.75
CQ CY 75 $ $
30101.02
Aggregate Surface Course, Grading F-SR without Bentonite, 4-inch compacted depth, Compaction Method (b), FR 5637 - MP 3.20
CQ CY 75 $ $
30101.03
Aggregate Surface Course, Grading F-SR without Bentonite, 4-inch compacted depth, Compaction Method (b), FR 5637 - MP 3.96
CQ CY 75 $ $
30101.04
Aggregate Surface Course, Grading F-SR without Bentonite, 4-inch compacted depth, Compaction Method (b), FR 5635 - MP 1.12
CQ CY 75 $ $
30101.05
Aggregate Surface Course, Grading F-SR without Bentonite, 4-inch compacted depth, Compaction Method (b), FR 5635 - MP 1.124
CQ CY 75 $ $
30101.06
Aggregate Surface Course, Grading F-SR without Bentonite, 4-inch compacted depth, Compaction Method (b), FR 5635 - MP 1.66
CQ CY 75 $ $
30101.07
Aggregate Surface Course, Grading F-SR without Bentonite, 4-inch compacted depth, Compaction Method (b), FR 5635 - MP 3.93
CQ CY 75 $ $
30101.08
Aggregate Surface Course, Grading F-SR without Bentonite, 4-inch compacted depth, Compaction Method (b), FR 13480 - MP 0.11
CQ CY 75 $ $
30101.09
Aggregate Surface Course, Grading F-SR without Bentonite, 4-inch compacted depth, Compaction Method (b), FR 13482 - MP 0.42
CQ CY 75 $ $
30101.10 Aggregate Surface Course, CQ CY 75 $ $
Amendment-1 12363N21Q4020 FLAT CREEK BMP PROJECT Page 6 of 87Amendment-2 12363N21Q4020 FLAT CREEK BMP PROJECT Page 8 of 89
Grading F-SR without Bentonite, 4-inch compacted depth, Compaction Method (b), FR 13482 - MP 0.64
30101.11
Aggregate Surface Course, Grading F-SR without Bentonite, 4-inch compacted depth, Compaction Method (b), FR 13482 - MP 1.20
CQ CY 75 $ $
30315 Roadway Reconditioning, Compaction Method (b) CQ MI 0.46 $ $
OPTION ITEMS SUB-TOTAL: $
* Designated Method of Measurement AQ – Actual Quantity CQ – Contract Quantity LSQ – Lump Sum Quantity
Amendment-1 12363N21Q4020 FLAT CREEK BMP PROJECT Page 7 of 87Amendment-2 12363N21Q4020 FLAT CREEK BMP PROJECT Page 9 of 89
Flat Creek BMP Project
Solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2021-05
SECTION C - Description/Specifications/Statement of Work/Mapping
452.211-72 Statement of Work/Specifications.
452.211-73 Attachments to Statements of Work/Specifications.
SECTION E - INSPECTION AND ACCEPTANCE
CLAUSES INCORPORATED BY REFERENCE
52.246-12 Inspection of Construction
SECTION F - DELIVERIES OR PERFORMANCE
CLAUSES INCORPORATED BY REFERENCE
52.242-14 Suspension of Work (APR 1984)
CLAUSES INCORPORATED BY FULL TEXT
52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984)
The Contractor shall be required to (a) commence work under this contract within TBD calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 120 Calendar Days after the date the contractor receives the notice to proceed. The time stated for completion shall include final cleanup of the premises.
SECTION H - Special Contract Requirements
H. 1 Fire Control
(a) Contractor's Responsibility for Contractor-Caused Fires. The Contractor, whether or not directed by the Forest Service, shall immediately extinguish, without expense to the Government, all fires on or in the vicinity of the project which are caused by Contractor's employees, whether set directly or indirectly as a result of Contractor operations. The Contractor may be held liable for all damages and costs of additional labor, subsistence, equipment, supplies, and transportation resulting from fires set or caused by the Contractor's employees or resulting from contract operations.
(b) Other Fires. For the purpose of fighting forest fires on or in the vicinity of the project which are not caused by the Contractor or the Contractor’s employees, the Contractor when requested by the Contracting Officer shall place the employees and equipment temporarily at the disposal of the Forest Service. Payment for such services will be made by the Government at not less than the current rate for fire-fighting services established by the Forest Service in the area concerned.
Amendment-2 12363N21Q4020 FLAT CREEK BMP PROJECT Page 10 of 89
Any employees and equipment furnished will be relieved from firefighting as soon as the Forest Service finds that it is practicable to employ other labor and equipment adequate for the protection of the area.
An equitable adjustment in contract time may be made for this period.
(c) Fire Protection Requirements - Fire Plan. At all times during closed fire season period, as specified by State law, the Contractor shall comply with each of the following provisions to the extent applicable to the Contractor’s operation under the contract.
(1) Fire Tools. The Contractor will provide for each employee in the contract area at least one approved hand tool of a type appropriate in the contract area, such as shovel, Pulaski, or ax. Tools required and furnished under (2) and (4) below, shall count toward fulfillment of the above requirement. Where additional tools, beyond those required under (2) and (4) below, are to be provided, the Contractor shall seal such tools in one or more boxes painted red and marked "Tools for Fire Only." All tools required herein shall be kept sharp and in good serviceable condition and maintained at locations to be designated by the Forest Service.
(2) Fire Extinguishers and Tools on Mobile or Stationary Equipment. Each unit of powered equipment used in connection with this contract, including automobiles, trucks, tractors, etc., shall be equipped with serviceable tools and fire extinguishers as follows:
One - fire extinguisher, dry chemical type of not less than 2-1/2 pound capacity with 4 BC or higher rating.
One - shovel, round point #0 lady or equal.
One - ax, 2 pounds or over, 26-inch minimum length, or one Pulaski.
One - water container (at least 1-gallon capacity), not required with stationary equipment.
(3) Spark Arresters. Each internal combustion engine shall be provided with a spark arrester or spark arresting device approved by the Forest Service. Exceptions where the Forest Service may approve mufflers, or other equipment in lieu of spark arresters qualified and rated under Forest Service Standard 5100-1a are: (a) small multi-position engines, such as chain saws, shall meet Society of Automotive Engineers J335b standards; (b) passenger-carrying vehicles and light trucks may have baffle-type mufflers with tail pipe; (c) heavy-duty trucks may have a vertical stack exhaust system and muffler, provided the exhaust stack extends above the cab of the vehicle. An exhaust-driven turbocharger is considered to be a satisfactory spark arrester. Internal combustion engine exhaust systems, arresters, and other devices must be properly installed and maintained.
(4) Smoking. Smoking shall not be permitted within the contract area except on surfaced or dirt roads, at landings, within closed vehicles, in camps, or at other posted places, and shall never be allowed while working or traveling on foot.
(5) Storage of Petroleum and Other Highly Flammable Products. Gasoline, oil, grease, or other highly flammable material will be stored either in a separate building used exclusively for such storage, or at a site where all combustible debris and vegetation is cleared away within a radius of 25 feet. Fire extinguishers and/or sand barrels may be required at such locations specified by the Forest Service when unusually hazardous conditions exist.
Amendment-2 12363N21Q4020 FLAT CREEK BMP PROJECT Page 11 of 89
(6) Debris Burning and Warming Fires. Burning permits will be required for all debris burning fires.
Lunch and warming fires may be allowed in fireproofed areas during periods of low fire danger if and as specified in the fire plan. Such fires must not be left burning unattended.
(7) Under certain atmospheric conditions, smoke accumulations may become excessive and in these cases, the Regional Forester may, at his/her discretion, prohibit all open burning for definite periods within specific areas of the National Forest.
H.2 452.237-74 KEY PERSONNEL (FEB 1988)
(a) The Contractor shall assign to this contract the following key personnel: Project Leader.
(b) During the first ninety (15) days of performance, the Contractor shall make no substitutions of key personnel unless the substitution is necessitated by illness, death, or termination of employment. The Contractor shall notify the Contracting Officer within 15 calendar days after the occurrence of any of these events and provide the information required by paragraph (c) below. After the initial 90-day period, the Contractor shall submit the information required by paragraph (c) to the Contracting Officer at least 15 days prior to making any permanent substitutions.
(c) The Contractor shall provide a detailed explanation of the circumstances necessitating the proposed substitutions, complete resumes for the proposed substitutes, and any additional information requested by the Contracting Officer. Proposed substitutes should have comparable qualifications to those of the persons being replaced. The Contracting Officer will notify the Contractor within 15 calendar days after receipt of all required information of the decision on substitutions. The contract will be modified to reflect any approved changes of key personnel.
(End of Clause) H.3 Incidental Payment Items
The intent of the contract is to provide for the complete construction of the project described in the contract. Unless otherwise provided, the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies and perform all work required to complete the project in accordance with drawings, specifications, and provisions of the contract. Payment for contract work will be made only for and under those pay items included in the Schedule of Items. All other work and materials will be considered as incidental to and included in the payment for items shown.
H.4 Conformity With Drawings and Specifications
Unless working tolerances are specified, all work performed and materials furnished shall be in reasonably close conformity with lines, grades, cross sections, dimensions, and material requirements shown on the drawings, indicated in the specifications, or designated on the ground. "Reasonably close conformity" is compliance with reasonable and customary manufacturing and construction tolerances.
H.5 Samples, Tests, Cited Specifications
Reference made in the contract to specifications, standards, or test methods adopted by AASHTO, ASTM, GSA, or other recognized National technical associations, shall mean specifications, standards, or test methods (including interim or tentative issues) which are in effect on the date of the solicitation.
H.6 Barricades, Warning Signs, and Other Devices
Amendment-2 12363N21Q4020 FLAT CREEK BMP PROJECT Page 12 of 89
The Contractor shall provide, erect, and maintain all necessary barricades, suitable and sufficient lights, danger signals, signs, and other traffic control devices, and shall take all necessary precautions for the protection of the work and safety of the public. Roads closed to traffic shall be protected by effective barricades, and obstructions shall be illuminated during the hours of darkness. Suitable warning signs shall be provided to properly control and direct traffic.
The Contractor shall erect warning signs in advance to any place on the project where operations may interfere with the use of the road or trail by traffic and at all intermediate points where the new work crosses or coincides with an existing road or trail. All road barricades, warning signs, lights, temporary signals, flagmen and pilot car operators and equipment, and other protective devices, except for special devices, shall conform with Part VI of the Manual on Uniform Traffic Control Devices for Streets and Highways, published by the Federal Highway Administration and applicable safety codes.
Necessary warning signs and guards shall be posted during blasting operations to safeguard the public.
H.7 Weed-Free Equipment
In order to prevent the potential spread of noxious weeds into the project area, the Contractor shall be required to furnish the Contracting Officer with proof of weed-free equipment.
The following is considered proof of weed-free equipment:
The Contractor will be required to clean all construction equipment (equipment that operates off existing roads) prior to entry on the project area. This cleaning shall remove all dirt and plant parts and material that may carry noxious weed seeds into the project area. Only construction equipment inspected by the Contracting Officer will be allowed to operate within the project area. All subsequent move-ins of construction equipment shall be treated the same as the initial move-in.
Prior to initial move-in of all construction equipment, and all subsequent move-ins, the Contractor shall make equipment available for inspection at an agreed location.
H.8 Landscape Preservation
(a) The Contractor shall confine operations to within the clearing limits or other areas designated in contract documents, and prevent the deposition of rocks, excavating materials, stumps, or other debris outside of these limits. Material, which falls outside of these limits, shall be retrieved, disposed of, or incorporated in the work as directed by the Contracting Officer.
(b) Operation shall be scheduled and conducted to minimize erosion of soils and to prevent silting and muddying of streams, river, irrigation systems, and impoundments (lakes, reservoirs, etc.)
Pollutants such as fuels, lubricants, bitumens, raw sewage, and other harmful materials shall not be discharged into or near rivers, streams, and impoundments or into natural or manmade channels leading thereto. Wash water or waste water from concrete or aggregate operations shall not be allowed to enter live streams prior to treatment by filtration, settling, or other means sufficient to reduce the sediment content to not more than that of the stream into which it is discharged.
Amendment-2 12363N21Q4020 FLAT CREEK BMP PROJECT Page 13 of 89
CLAUSES SECTION I -
CONTRACT CLAUSES
CLAUSES INCORPORATED BY REFERENCE
52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statement 52.204-9 Personal Identity Verification of Contractor Personnel 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards 52.204-13 System for Award Management Maintenance 52.204-18 Commercial and Government Entity Code Maintenance 52.204-19 Incorporation by Reference of Representations and Certifications.
52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities.
52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment 52.209-6 Protecting the Governments Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment 52.209-10 Prohibition on Contracting With Inverted Domestic Corporations 52.211-18 Variation in Estimated Quantity 52.215-8 Order of Precedence-Uniform Contract Format 52.219-6 Notice of Total Small Business Set-Aside 52.219-28 Post-Award Small Business Program Representation 52.222-3 Convict Labor 52.222-6 Construction Wage Rate Requirements 52.222-7 Withholding of Funds 52.222-8 Payrolls and Basic Records 52.222-9 Apprentices and Trainees 52.222-10 Compliance with Copeland Act Requirements 52.222-11 Subcontracts (Labor Standards) 52.222-12 Contract Termination--Debarment 52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations 52.222-14 Disputes Concerning Labor Standards 52.222-15 Certification of Eligibility 52.222-21 Prohibition of Segregated Facilities 52.222-26 Equal Opportunity 52.222-27 Affirmative Action Compliance Requirements for Construction 52.222-30 Construction Wage Rate Requirements-Price Adjustment 52.222-37 Employment Reports on Veterans 52.222-50 Combating Trafficking in Persons 52.222-55 Minimum Wages Under Executive Order 13658 52.222-62 Paid Sick Leave Under Executive Order 13706 52.223-2 Affirmative Procurement of Biobased Products Under Service And Construction Contracts.
52.223-11 Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons 52.223-12 Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners 52.223-13 Acquisition of EPEAT®–Registered Imaging Equipment 52.223-17 Affirmative Procurement of EPA-designated Items in Service and Construction Contracts 52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving
Amendment-2 12363N21Q4020 FLAT CREEK BMP PROJECT Page 14 of 89
52.223-20 Aerosols 52.223-21 Foams 52.225-13 Restrictions on Certain Foreign Purchases 52.227-1 Authorization and Consent 52.227-4 Patent Indemnity-Construction Contracts 52.228-2 Additional Bond Security 52.228-11 Pledges of Assets 52.228-12 Prospective Subcontractor Requests for Bonds 52.228-14 Irrevocable Letter of Credit 52.232-5 Payments Under Fixed-Price Construction Contracts 52.232-23 Assignment of Claims 52.232-27 Prompt Payment for Construction Contracts 52.232-33 Payment by Electronic Funds Transfer—System for Award Management 52.232-39 Unenforceability of Unauthorized Obligations 52.232-40 Providing Accelerated Payments to Small Business Subcontractors 52.233-1 Disputes 52.233-3 Protest After Award 52.233-4 Applicable Law for Breach of Contract Claim 52.236-2 Differing Site Conditions 52.236-3 Site Investigation and Conditions Affecting the Work 52.236-5 Material and Workmanship 52.236-7 Permits and Responsibilities 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements 52.236-10 Operations and Storage Areas 52.236-11 Use and Possession Prior to Completion 52.236-12 Cleaning Up 52.236-13 Accident Prevention 52.236-14 Availability and Use of Utility Services 52.236-16 Quantity Surveys 52.236-17 Layout of Work 52.236-21 Specification and Drawings for Construction Alt 1 or Alt 2 52.236-26 Preconstruction Conference 52.243-5 Changes and Changed Conditions 52.244-6 Subcontracts for Commercial Items 52.245-1 Government Property 52.245-9 Use and Charges 52.246-21 Warranty of Construction 52.246-21 Warranty of Construction Alternate I 52.249-1 Termination for Convenience of the Government (Fixed Price) (Short Form). Alternate
I 52.249-10 Default (Fixed-Price Construction) also check Alternate I 52.253-1 Computer Generated Form 452.232-70 Reimbursement for Bond Premiums--Fixed-Price Construction Contracts 452.236-71 Prohibition Against the Use of Lead-Based Paint.
452.236-72 Use of Premises.
452.236-73 Archeological or Historic Sites 452.236-74 Control of Erosion, Sedimentation, and Pollution 452.236-76 Samples and Certificates 452.236-77 Emergency Response
Amendment-2 12363N21Q4020 FLAT CREEK BMP PROJECT Page 15 of 89
CLAUSES INCORPORATED BY FULL TEXT
52.222-36 Equal Opportunity for Worker with Disabilities (Jul 2014)
(a) Equal opportunity clause. The Contractor shall abide by the requirements of the equal opportunity clause at 41 CFR 60-741.5(a), as of March 24, 2014. This clause prohibits discrimination against qualified individuals on the basis of disability, and requires affirmative action by the Contractor to employ and advance in employment qualified individuals with disabilities.
(b) Subcontracts. The Contractor shall include the terms of this clause in every subcontract or purchase order in excess of $15,000 unless exempted by rules, regulations, or orders of the Secretary, so that such provisions will be binding upon each subcontractor or vendor. The Contractor shall act as specified by the Director, Office of Federal Contract Compliance Programs of the U.S. Department of Labor, to enforce the terms, including action for noncompliance. Such necessary changes in language may be made as shall be appropriate to identify properly the parties and their undertakings.
(End of clause)
52.225-9 Buy American--Construction Materials (May 2014)
(a) Definitions. As used in this clause--
“Commercially available off-the-shelf (COTS) item”—
(1) Means any item of supply (including construction material) that is--
(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in 46 U.S.C 40102(4), such as agricultural products and petroleum products.
"Component" means any article, material, or supply incorporated directly into construction materials.
"Construction material" means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
Amendment-2 12363N21Q4020 FLAT CREEK BMP PROJECT Page 16 of 89
"Cost of components" means--
(3) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the end product (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(4) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
"Domestic construction material" means--
(1) An unmanufactured construction material mined or produced in the United States;
(2) A construction material manufactured in the United States, if—
(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or
(ii) The construction material is a COTS item.
"Foreign construction material" means a construction material other than a domestic construction material. "United States" means the 50 States, the District of Columbia, and outlying areas.
(b) Domestic preference.
(1) This clause implements41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the component test of the Buy American statute is waived for construction material that is a COTS item (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.
(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows:
NONE
(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that--
Amendment-2 12363N21Q4020 FLAT CREEK BMP PROJECT Page 17 of 89
(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;
(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or
(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.
(c) Request for determination of inapplicability of the Buy American statute.
(1) (i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including--
(A) A description of the foreign and domestic construction materials;
(B) Unit of measure;
(C) Quantity;
(D) Price;
(E) Time of delivery or availability;
(F) Location of the construction project;
(G) Name and address of the proposed supplier; and
(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.
(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.
(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).
(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.
Amendment-2 12363N21Q4020 FLAT CREEK BMP PROJECT Page 18 of 89
(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.
(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute.
(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:
Foreign and Domestic Construction Materials Price Comparison
Construction Material Description Unit of Measure Quantity Price (Dollars)*
Item 1:
Foreign construction material
Domestic construction material
Item 2:
Foreign construction material
Domestic construction material
[List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.] [Include other applicable supporting information.] [* Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).]
(End of Clause)
52.228-13 -- Alternative Payment Protections. (Jul 2000)
(a) The Contractor shall submit one of the following payment protections:
(1) Payment Bond
(2) Irrevocable Letter of Credit (ILC)
(3) Money orders, drafts, cashier’s checks, or certified checks.
(b) The amount of the payment protection shall be 100 percent of the contract price.
(c) The submission of the payment protection is required within 10 days of contract award.
(d) The payment protection shall provide protection for the full contract performance period plus a one-year period.
(e) Except for escrow agreements and payment bonds, which provide their own protection procedures, the Contracting Officer is authorized to access funds under the payment protection when it has been alleged in
Amendment-2 12363N21Q4020 FLAT CREEK BMP PROJECT Page 19 of 89 writing by a supplier of labor or material that a nonpayment has occurred, and to withhold such funds pending resolution by administrative or judicial proceedings or mutual agreement of the parties.
(f) When a tripartite escrow agreement is used, the Contractor shall utilize only suppliers of labor and material that signed the escrow agreement.
(End of Clause)
52.252-2 Clauses Incorporated by Reference. (Feb 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
Federal Acquisition Regulations https://www.acquisition.gov/far
Agriculture Acquisition Regulations https://www.acquisition.gov/far
(End of Clause)
Amendment-2 12363N21Q4020 FLAT CREEK BMP PROJECT Page 20 of 89 https://www.acquisition.gov/far https://www.acquisition.gov/far
NO. DATEBYREVISION DESCRIPTION
SHEET NO.
SET NO.
PROJECT:
DATE:
SHEET INDEX
DATE
PROJECT NUMBER
N
FLAT CREEK BMP PROJECT
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
REGION ONE
BITTERROOT NATIONAL FOREST
RAVALLI COUNTY MONTANA
AREA MAP
MONTANA / IDAHO INDEX MAP
RECOMMENDED BY:
LOCATION MAP
APPROVED BY:
FOREST ENGINEER
BITTERROOT NATIONAL FOREST
DATE
DISTRICT RANGER
BITTERROOT NATIONAL FOREST
DATE
CONSTRUCTION PLANS
SHEET 1 TITLE
SHEET 2 PROJECT MAP
SHEET 3 SUMMARY OF QUANTITIES & GENERAL NOTES
SHEET 4 DRAIN DIP DETAIL AND TYPICAL ROAD CROSS-SECTIONS
APPROVED BY:
FOREST SUPERVISOR
BITTERROOT NATIONAL FOREST
DATE
16 March 2021
Amendment-2 12363N21Q4020 FLAT CREEK BMP PROJECT Page 21 of 89
AutoCAD SHX Text C:\Stuart\PROJECTS\Flat Creek BMP Project\Flat Ck Drawings\DWG\R01_Title.dwg
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text USER NOTES: (NO PLOT) VERIFY THE MAP RETAINS CLARITY WHEN PRINTED IN BLACK AND WHITE
DWG SHEET NO.
OF
SHEET
9/2 8/1
8 0 7:
M
AR
KL
F
CA
D
ST
AN
DA
RD
S\
AG
EN
CY
S
TA
ND
AR
DS
\F
OR
ES
T
SE
RV
IC
E\
NF
S-
CT
B.
DW
G;
CHECKEDDESIGNERDATE
DRAWING TITLE
United States Department of Agriculture Forest Service
NO. DATEBYREVISION DESCRIPTION
DARBY-SULA RANGER DISTRICT
BITTERROOT NATIONAL FOREST
FLAT CREEK BMP PROJECT
NORTERN REGION PROJECT MAP
3/11/21 JAS AMR 2
Amendment-2 12363N21Q4020 FLAT CREEK BMP PROJECT Page 22 of 89
AutoCAD SHX Text
PROJECT NAME
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
E
ROAD NO. 5637 5635 13480 13482
ITEM NO. DESCRIPTION UNIT
SUMMARY OF QUANTITIES
TOTAL
15101 Mobilization
LSQ
1 1
20425
Drainage Excavation, Type II Dip
EA 9 4 1 3 17
30101
Aggregate Surface Course, Compaction Method b
CY 1477 300 75 225 2077
30315
Roadway Reconditioning, Compaction Method b
MI 1.36 0.23 0.06 0.17 1.82
32201
Equipment Rental, Motorgrader
HR 3 1 1 1 6
32202
Equipment Rental, Dump Truck
HR 3 1 1 1 6
DWG SHEET NO.
OF
SHEET
9/2 8/1
8 0 7:
M
AR
KL
F
CA
D
ST
AN
DA
RD
S\
AG
EN
CY
S
TA
ND
AR
DS
\F
OR
ES
T
SE
RV
IC
E\
NF
S-
CT
B.
DW
G;
CHECKEDDESIGNERDATE
DRAWING TITLE
PROJECT NAME
United States Department of Agriculture Forest Service
NO. DATEBYREVISION DESCRIPTION
WEST FORK RANGER DISTRICT
BITTERROOT NATIONAL FOREST
FLAT CREEK BMP PROJECT
NORTERN REGION SUMMARY OF
QUANTITIES &
GENERAL NOTES
3/11/21 JAS AMR 3
GENERAL NOTES:
1) TRAFFIC CONTROL IS THE RESPONSIBILITY OF THE CONTRACTOR, SEE SECTION 156 - PUBLIC TRAFFIC
2) ITEM 30101 - AGGREGATE SURFACE COURSE - ALL QUANTITIES ARE IN PLACE QUANTITIES. CONSTRUCTION WATER, COMPACTION AND HAUL ARE INCIDENTAL TO ITEM 30101. ALL MILEAGES NOTED IN DRAWINGS ARE CALCULATED FROM THE END OF THE COUNTY ROAD, WHICH COINCIDES WITH
THE END OF THE PAVEMENT.
3) CONTRACTOR IS RESPONSIBLE FOR MAINTAINING HAUL ROUTE DURING AND AFTER PERIODS OF HAUL IN A MANNER THAT KEEPS ROUTS SAFE AND ADEQUATELY MAINTAINED TO ACCOMMODATE PUBLIC TRAFFIC. DUST CONTROL IS REQUIRED DURING PERIODS OF ACTIVE HAULING AS REQUIRED
BY SECTION 158. DEVELOP WATER SOURCES ON FOREST SERVICE LAND IAW FSSS 170. DUST CONTROL IS INCIDENTAL TO ITEM 13101.
Amendment-2 12363N21Q4020 FLAT CREEK BMP PROJECT Page 23 of 89
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
E
DWG SHEET NO.
OF
SHEET
9/2 8/1
8 0 7:
M
AR
KL
F
CA
D
ST
AN
DA
RD
S\
AG
EN
CY
S
TA
ND
AR
DS
\F
OR
ES
T
SE
RV
IC
E\
NF
S-
CT
B.
DW
G;
CHECKEDDESIGNERDATE
DRAWING TITLE
PROJECT NAME
United States Department of Agriculture Forest Service
NO. DATEBYREVISION DESCRIPTION
WEST FORK RANGER DISTRICT
BITTERROOT NATIONAL FOREST
FLAT CREEK BMP PROJECT
NORTERN REGION DRAIN DIP DETAIL &
TYPICAL ROAD
CROSS-SECTIONS
3/11/21 JAS AMR 4
A(ft) B(ft) R(ft)
GRADE
TYPE I
TYPE II TYPE III
LENGTH TAPER ROUNDING
0-5
6-9
10-12
LENGTH TAPER ROUNDING LENGTH TAPER ROUNDING
0-5
6-9
10-12
0-5
6-9
30 30
30 50
30 60
2020 25
20 40
20 50
10 - 30
NOTES:
1. CROSS SLOPE OF THE LOW POINT DRAINLINE SHALL BE 5%.
2. SKEW OF DRAINLINE SHALL BE 0-25 DEGREES.
3. WHEN RIPRAP IS SPECIFIED AT OUTLET, IT SHALL BE SHAPED TO
ASSURE WATER GOES ONTO RIPRAP, NOT AROUND.
4. RIPRAP TOP ELEVATION SHALL BE AT TOP OF FINISHED OUTLET
GRADE, NOT SUBGRADE.
5. TAPER LENGTHS SHALL BE WITHIN 10% OF LISTED LENGTHS.
6. UNLESS OTHERWISE SPECIFIED DO NOT INTERCEPT THE
ROADWAY DITCH.
A(ft)
B(ft) R(ft)
A(ft)
B(ft)
R(ft)
B A B
R
R
DRAIN DIP PROFILE
EXISTING ROAD PROFILE
DRAIN DIP
NOT TO SCALE
GRADE
GRADE
10 - 30
M
I N
TYPICAL ROAD SECTION - INSLOPE…
This is the start of the file's text. The full file is on GovTribe.