SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
CALL:
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
See Schedule
USDA FOREST SERVICE
AQM ENTERPRISE ACTIVITIES
987 MCCLELLAN RD
VANCOUVER WA 98661-3815
344V
MICHAEL JOHNSON 360-891-5055
12344V18Q0013
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
Chatt-Oconee ERFO Reconstruction (FSR 1227-MP 0.87; FSR 86-MP 6.30; AND FSR 153-MP
3.30)
The project, solicitation and resultant contract will include 2 schedules as follows: SCHEDULE A will consist of FSR 1227-MP0.87 and SCHEDULE B will consist of
FSR 86&153. The intent is to award a single contract that includes both schedules.
SCHEDULE A ¿ The project consists of removal & disposal of existing geoweb material at the low water crossing, followed by road & drainage excavation site prep for new low water crossing foundation. Installation of new pre-cast structural concrete planks for the new low water crossing. Roadway Reconditioning of road areas before
& after the new low water crossing. Any needed erosion & sediment control measures, clearing & disposal of slash/wood debris from roadway, haul & placement of all surface aggregate course material, seeding of disturbed areas, safety & temporary traffic control measures required for reconstruction operations.
SCHEDULE B ¿ The project consists of all designated road & drainage excavation areas, embankment reconstruction & repairs, including any specified linear grading road areas by approved contract methods. Installation of new 24-inch galvanized
Continued ...
11. The Contractor shall begin performance
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
0 calendar days and complete it within 10 ________________ calendar days after receiving
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time
_________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected .
STANDARD FORM 1442 (Rev. 4-85)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
06/18/2018
7/11/2018
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document and return (Contractor is not required to sign this document.)
Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.
No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
2PAGE OF
USDA FOREST SERVICE
AQM ENTERPRISE ACTIVITIES
987 MCCLELLAN RD
VANCOUVER WA 98661-3815
344V
MICHAEL L. JOHNSON
28. NEGOTIATED AGREEMENT 29. AWARD
Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
STANDARD FORM 1442 (REV. 4-85) BACK
Continued...
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
3 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
12344V18Q0013 steel culvert for road ditch relief. Any needed erosion & sediment control measures, clearing & disposal of slash/wood debris from roadway, haul
& placement of all riprap rock, haul & placement of all base & surface aggregate courses, seeding of disturbed areas, safety & temporary traffic control measures required for reconstruction operations.
Per FAR 36.204 the magnitude of the entire contract is between $100,000.00 and $250,000.00
FOB: Destination
001 CHATT-OCONEE FSR 1227 ERFO RECONSTRUCTION
Requisition No: 917085
002 CHATT-OCONEE FSR 86 AND 153 ERFO RECONSTRUCTION
Requisition No: 917086
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
Solicitation: 12344V18Q0013
PROJECT: Chatt-Oconee ERFO Reconstruction FSR 1227-MP 0.87
Method of Estimate Item Description Meaurement Quantity Pay Unit Unit Price Amount
15101 Mobilization L.S.Q. 1 L.S.
15713 Soil Erosion & Pollution Control, Type Silt Fence, Sediment Traps, & Temporary Stream Diversion
L.S.Q. 1 L.S.
20301 Removal of Existing Geoweb Material & Disposal Off of Forest Service Land In Accordance to State Disposal Laws
L.S.Q. 1 L.S.
20408 Roadway Excavation & Preparation of Site Foundation for Concrete Plank Ford, Compaction Method A (1)
C.Q. 0.03 Mile
30208 1-Inch Minus Surface Aggregate, Georgia DOT, GAB Gradation, Compaction Method (1)
A.Q. 131 Ton
30320 Roadway Reconditioning Before & After Concrete Plank Ford Installation Site, Compaction Method A (1)
L.S.Q. 1 L.S.
55303 Precast Structural Concrete Members, Type Low Water Crossing Installation, 8" x 14" x 16' Planks
L.S.Q. 1 L.S.
Total Schedule A:
Schedule A
Schedule Of Items
Pay Item No.
Solicitation: 12344V18Q0013
PROJECT: Chatt-Oconee ERFO Reconstruction FSR 86-MP 6.30
Item Description Pay Unit Unit Price Amount 15101 Mobilization L.S.Q. 1 L.S.
15713 Soil Erosion & Pollution Control, Type Silt Fence, Sediment L.S.Q. 1 L.S.
20424 Drainage Excavation, Type 2'W. x 1'D.
Flat Bottom Ditch A.Q. 200 L.F.
21201 Linear Grading C.Q. 0.04 Mile
30202 GeorgiaDOT Gradation #4, Compaction Method 1 A.Q. 259 Ton
60201 24" Pipe Culvert, Type Galvanized Steel, 0.064" Thickness, Compaction Method 2 A.Q. 36 L.F.
Total FSR 86-MP 6.30:
PROJECT: Chatt-Oconee ERFO Reconstruction FSR 153-MP 3.30
Item Description Pay Unit Unit Price Amount 15101 Mobilization L.S.Q. 1 L.S.
15713 Soil Erosion & Pollution Control, Type Silt Fence, Sediment Traps L.S.Q. 1 L.S.
25102 Placed Riprap, Class 4 A.Q. 42 Ton
25105 Keyed Riprap, Class 5 A.Q. 52 Ton
30202 GeorgiaDOT Gradation #4, Compaction Method 1 A.Q. 21 Ton
30208 1-Inch Minus Surface Aggregate, Georgia DOT,GAB Gradation,Compaction Method
A.Q. 13 Ton
Total FSR 153-MP 3.30:
Total Schedule B:
TOTAL OF SCHEDULE A:
TOTAL OF SCHEDULE B:
CONTRACT TOTAL:
(Schedule A plus Schedule B)
Schedule B Schedule Of Items
Pay Item No.
Method of Meaurement
Estimate Quantity
NOTE: The government intends to award 1 contract for both Schedules. Vendors must quote both schedules.
Pay Item No.
Method of Meaurement
Estimate Quantity
SCHEDULE TOTAL
ADDENDA SHEET
ERFO Reconstruction FSR 1227, 153 & 86
REFERENCE NO. OF DOCUMENT BEING CONTINUED
12344V18Q0013 Updated Thru FAC 2005-98
PAGE
OF
SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
C.1 Statement of Work
SCHEDULE A: FSR 1227 – Statement of Work is listed in Section J “Attachments” as Attachment number 1 pages 1 through 4.
SCHEDULE B: FSR 153 & FSR 86 – Statement of Work is listed in Section J “Attachments” as Attachment number 3 pages 1 through 4.
SECTION D--PACKAGING AND MARKING
D.1 Project Labeling for Official Correspondence The Government singularly identifies each project with a contract number at time of award. The contract number is a unique identifier to purposely and permanently represent an awarded project. The Government issued contract number is to be referenced on all official communication starting upon notice of award.
SECTION F--DELIVERIES OR PERFORMANCE
FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.acquisition.gov/far/
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.242-14 Suspension of Work (APR 1984)
FAR 52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984)
The Contractor shall be required to (a) commence work under this contract within _10_ calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than _120 Days_after the effective date of the notice to proceed. The time stated for completion shall include final cleanup of the premises.
Work Timing Delays due to normal adverse weather, weekends, and holidays have been included in the calculation of contract time.
Winter Shutdown When winter weather sets in and the continuation of work is impractical, the Contracting Officer may authorize a total suspension until such time as work can proceed. During the period of total suspension, the calendar days elapsed will not be charged against the contract time specified.
SECTION G--CONTRACT ADMINISTRATION DATA
REFERENCE NO. OF DOCUMENT BEING CONTINUED
12344V18Q0013 Updated Thru FAC 2005-98
PAGE
OF
GOVERNMENT-FURNISHED PROPERTY
The Government will provide the following item(s) of Government property to the Contractor for use in the performance of this contract. This property shall be used and maintained by the Contractor in accordance with the provisions of the "Government Property" FAR clause contained elsewhere in the contract.
N/A There is No Government-Furnished Property.
Invoices Contract Pay Estimates/Invoices in an approved format prepared by the Contractor, will be submitted for review, approval, and processing to the Contracting Officer. Form FS-6300-30, Contract Pay Estimate and Invoice, is available for the Contractor’s use/choice, if needed for submitting invoices.
Payment for Materials Off Site In accordance with Clause 52.232-5, progress payments may include payment for materials stored off site.
Contractor shall provide a copy of the paid invoice; provide evidence that the material will be included in the finished project; and identify the location where the materials are stored, so that the government may make visual inspection if the Contracting Officer deems it necessary. The Contractor shall be liable for loss, damage, or destruction of the materials until such time as the materials are physically in the possession and control of the government. The Contractor will not be held liable to the extent that the Contracting Officer determines that the loss, damage, or destruction occurred through the fault or negligence of the government or its agents.
Incidental Items The intent of the contract is to provide for the completion of the project described in the contract. Unless otherwise provided, the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies and perform all work required to complete the project in accordance with drawings, specifications, and provisions of the contract. Payment for contract work will be made only for and under those pay items included in the Schedule of Items. All other work and materials, including hardware, will be considered as incidental to and included in the payment of items shown.
AGAR 452.215-73 Post Award Conference (NOV 1996) A post award or pre-construction conference will be scheduled by the COR. (See also Section I, Clause 52.236-26.)
G.1 Electronic Invoicing and Payment Requirements – Invoice Processing Platform (IPP)
(a) Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform (IPP).
"Payment request" means any request for contract financing payment or invoice payment by the Contractor.
To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract. The IPP website address is: https://www.ipp.gov
The Contractor must use the IPP website to register, access and use IPP for submitting requests for payment.
Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email IPPCustomerSupport@fms.treas.gov or phone (866) 973-3131.
(b) Final Payment. The final invoice must be accompanied by a release of claims against the Government arising by virtue of this contract, other than claims, in stated amounts, that the Contractor has specifically
REFERENCE NO. OF DOCUMENT BEING CONTINUED
12344V18Q0013 Updated Thru FAC 2005-98
PAGE
OF
accepted from the operation of the release. Final payment will not be approved without a properly executed Contract Release, Form 6300-16.
(c) In addition, when submitting the invoice, the Contractor shall submit payrolls, subcontractor payment information and a spreadsheet detailing the payment breakdown in accordance with the Pay Items in the Schedule of Items, Section B.1 (either electronically in IPP, hard copy, or via fax) to the Contracting Officer (see FAR 52.232-5 Payments Under Fixed Price Construction Contracts).
G.2 Contract Administration This contract will be administered by the Contracting Officer located at:
Pacific Northwest Region Attn: CO Michael L. Johnson Mljohnson02@fs.fed.us
All matters related to the performance of this contract shall be coordinated through the Contracting Officer.
G.3 Designation of Contracting Officer's Representative The Contracting Officer designates the Contracting Officer's Representative(s) (COR). The COR is responsible for administering the performance of work under this contract. In no event, however, will any understanding, agreement, modification, change order, or other matter deviating from the terms of this contract be effective or binding upon the Government unless formalized by proper contractual documents executed by the Contracting Officer prior to completion of the contract.
The Contracting Officer should be informed as soon as possible of any actions or inactions by the Contractor or the Government which will change the required delivery or completion times stated in the contract, and the contract will be modified accordingly. (This does not apply to individual task assignments which were issued by the COR provided they do not affect the delivery schedule or performance period stated in the contract.)
On all matters that pertain to the contract terms, the Contractor must communicate with the Contracting Officer. Whenever, in the opinion of the Contractor, the COR requests effort outside the scope of the contract, the Contractor should so advise the COR. If the COR persists and there still exists a disagreement as to proper contractual coverage, the Contracting Officer should be notified immediately, preferably in writing if time permits. Proceeding with work without proper contractual coverage could result in nonpayment or necessitate submittal of a contract claim.
G.4 Contractor’s Designated Representative It is required that the Contractor have a designated representative available on the project during the entire project and that the representative be able to speak and understand English. When designating a representative, the Contractor shall furnish a copy of the designation in writing to the Contracting Officer.
Such designation shall clearly indicate the name and limitations (if any) of authority of the representative. If the Contractor intends to designate a representative prior to the pre-work meeting, the representative is strongly encouraged to attend that meeting.
REFERENCE NO. OF DOCUMENT BEING CONTINUED
12344V18Q0013 Updated Thru FAC 2005-98
PAGE
OF
PART II--CONTRACT CLAUSES
SECTION I--CONTRACT CLAUSES
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.204-18 Commercial and Government Entity Code Maintenance (JUL 2016) 52.204-19 Incorporation by Reference of Representations and Certifications (DEC 2014) 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (NOV 2015) 52.213-4 Terms and Conditions-Simplified Acquisitions (Other Than Commercial Items) (JAN 2018) Fill-in: www.acquisition.gov/far/ www.usda.gov/procurement/policy/agar.html
52.219-6 Notice of Total Small Business Set-Aside (NOV 2011) 52.219-28 Post-Award Small Business Program Rerepresentation (JUL 2013) 52.222-6 Construction Wage Rate Requirements (MAY 2014) 52.222-7 Withholding of Funds (MAY 2014) 52.222-8 Payrolls and Basic Records (MAY 2014) 52.222-9 Apprentices and Trainees (JUL 2005) 52.222-10 Compliance with Copeland Act Requirements (FEB 1988) 52.222-11 Subcontracts (Labor Standards) (MAY 2014) 52.222-12 Contract Termination - Debarment (MAY 2014) 52.222-13 Compliance with Construction Wage Requirements and Related Regulations (MAY 2014) 52.222-14 Disputes Concerning Labor Standards (FEB 1988) 52.222-15 Certification of Eligibility (MAY 2014) 52.222-27 Affirmative Action Compliance Requirements for Construction (APR 2015) 52.223-6 Drug-Free Workplace (MAY 2001) 52.223-18 Contractor Policy to Ban Text Messaging While Driving (AUG 2011) 52.223-19 Compliance with Environmental Management Systems (MAY 2011) 52.225-9 Buy American Act-Construction Materials (MAY 2014)
(a) Definitions. As used in this clause-- “Commercially available off-the-shelf (COTS) item”—
(1) Means any item of supply (including construction material) that is—
(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.
“Component” means an article, material, or supply incorporated directly into a construction material.
“Construction material” means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
REFERENCE NO. OF DOCUMENT BEING CONTINUED
12344V18Q0013 Updated Thru FAC 2005-98
PAGE
OF
“Cost of components” means--
(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
“Domestic construction material” means—
(1) An unmanufactured construction material mined or produced in the United States;
(2) A construction material manufactured in the United States, if—
(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or
(ii) The construction material is a COTS item.
“Foreign construction material” means a construction material other than a domestic construction material.
“United States” means the 50 States, the District of Columbia, and outlying areas.
(b) Domestic preference.
(1) This clause implements the 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the component test of the Buy American statute is waived for construction material that is a COTS item. (See FAR 12.505(a)(2)).
The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.
(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows: ______ [Contracting Officer to list applicable excepted materials or indicate “none”]
(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that
(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;
(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or
(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.
(c) Request for determination of inapplicability of the Buy American statute.
(1)
(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including--
(A) A description of the foreign and domestic construction materials;
(B) Unit of measure;
(C) Quantity;
(D) Price;
REFERENCE NO. OF DOCUMENT BEING CONTINUED
12344V18Q0013 Updated Thru FAC 2005-98
PAGE
OF
(E) Time of delivery or availability;
(F) Location of the construction project;
(G) Name and address of the proposed supplier; and
(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.
(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.
(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).
(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.
(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material.
However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.
(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute.
(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:
Foreign and Domestic Construction Materials Price Comparison
Construction material description Unit of measure Quantity Price (dollars) *
Item 1
Foreign construction material
Domestic construction material
Item 2
Foreign construction material
Domestic construction material
[List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.] [Include other applicable supporting information.] [*Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).]
52.227-4 Patent Indemnity – Construction Contracts (DEC 2007) 52.232-5 Payments under Fixed-Price Construction Contracts (MAY 2014) 52.232-23 Assignment of Claims (MAY 2014) 52.232-27 Prompt Payment for Construction Contracts (JAN 2017) 52.236-2 Differing Site Conditions (APR 1984) 52.236-3 Site Investigation and Conditions Affecting the Work (APR 1984) 52.236-5 Material and Workmanship (APR 1984)
REFERENCE NO. OF DOCUMENT BEING CONTINUED
12344V18Q0013 Updated Thru FAC 2005-98
PAGE
OF
52.236-6 Superintendence by the Contractor (APR 1984) 52.236-7 Permits and Responsibilities (NOV 1991) 52.236-8 Other Contracts (APR 1984) 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (APR
1984) 52.236-10 Operations and Storage Areas (APR 1984) 52.236-11 Use and Possession Prior to Completion (APR 1984) 52.236-12 Cleaning Up (APR 1984) 52.236-13 Accident Prevention (NOV 1991) 52.236-17 Layout of Work (APR 1984) 52.236-21 Specifications and Drawings for Construction (FEB 1997) 52.236-26 Preconstruction Conference (FEB 1995) 52.243-5 Changes and Changed Conditions (APR 1984) 52.245-1 Government Property (JAN 2017) 52.245-9 Use and Charges (APR 2012) 52.246-12 Inspection of Construction (AUG 1996) 52.246-21 Warranty of Construction - Alternate I (APR 1984) 52.249-1 Termination for Convenience of the Government (Fixed-Price) (Short Form). (Apr 1984) 52.249-10 Default (Fixed-Price Construction) (APR 1984)
PART III--LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
SECTION J--LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
The following attachments are made a part of this solicitation and any resultant contract.
Title Pages Attachment 1 – FSR 1227 Schedule A:
Section C, Pages 1 through 4 FP 14 Supplemental Specifications, pages 5 through 54
Attachment 2 – FSR 1227 Schedule A Plan Sheets 13 Attachment 3 – FSR 153 & 86 Schedule B:
Section C, Pages 1 through 4 FP 14 Supplemental Specifications, pages 5 through 54
Attachment 4 – FSR 153 & 86 Schedule B Plan Sheets 14 Attachment 5 – FSR 1227 Schedule A: Wage Determination GA180283 01/05/2018 GA283 – Oglethorpe County
Attachment 6 – FSR 153 & 86 Schedule B: Wage Determination GA180225 01/05/2018 GA225 – Rabun County
Attachment 7 – Relevant Experience Submittal 2 Attachment 8 – Past Perfomance Questionnaire 3
NOTE: IN COMPLIANCE WITH THE PAPER REDUCTION ACT, SECTIONS K, L, AND M,
WHICH APPLY ONLY TO THE SOLICITATION PHASE, ARE NOT DUPLICATED AFTER
CONTRACT AWARD. HOWEVER, SECTION K WILL BE INCORPORATED BY REFERENCE
INTO THE RESULTING CONTRACT.
REFERENCE NO. OF DOCUMENT BEING CONTINUED
12344V18Q0013 Updated Thru FAC 2005-98
PAGE
OF
"The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, age, disability, and where applicable, sex, marital status, familial status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or part of an individual’s income is derived from any public assistance program. (Not all prohibited bases apply to all programs.) Persons with disabilities who require alternative means for communication of program information (Braille, large print, audiotape, etc.) should contact USDA's TARGET Center at (202) 720-2600 (voice and TDD). To file a complaint of discrimination, write to USDA, Director, Office of Civil Rights, 1400 Independence Avenue, S.W., Washington, DC 20250-9410, or call (800) 795-3272 (voice) or
(202) 720-6382 (TDD). USDA is an equal opportunity provider and employer.”
PART IV--REPRESENTATIONS AND INSTRUCTIONS
SECTION K--REPRESENTATIONS, CERTIFICATIONS, AND OTHER
STATEMENTS OF OFFERORS OR RESPONDENTS
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
FAR 52.204-8 Annual Representations and Certifications (JAN 2018) (a)
(1) The North American Industry classification System (NAICS) code for this acquisition is 237310.
(2) The small business size standard is $36.5 Million.
(3) The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is 500 employees.
(b)
(1) If the provision at 52.204-7, System for Award Management, is included in this solicitation, paragraph (d) of this provision applies.
(2) If the provision at 52.204-7 is not included in this solicitation, and the offeror is currently registered in the System for Award Management (SAM), and has completed the Representations and Certifications section of SAM electronically, the offeror may choose to use paragraph (d) of this provision instead of completing the corresponding individual representations and certification in the solicitation. The offeror shall indicate which option applies by checking one of the following boxes:
[_] (i) Paragraph (d) applies.
[_] (ii) Paragraph (d) does not apply and the offeror has completed the individual representations and certifications in the solicitation.
(c)
(1) The following representations or certifications in SAM are applicable to this solicitation as indicated:
52.223-2, Affirmative Procurement of Biobased Products Under Service and Construction Contracts.
(2) The following representations or certifications are applicable as indicated by the Contracting Officer:
[Contracting Officer check as appropriate.]
NONE
(d) The offeror has completed the annual representations and certifications electronically via the SAM Web site accessed through https://www.acquisition.gov . After reviewing the SAM database information, the offeror verifies by submission of the offer that the representations and certifications currently posted
REFERENCE NO. OF DOCUMENT BEING CONTINUED
12344V18Q0013 Updated Thru FAC 2005-98
PAGE
OF
electronically that apply to this solicitation as indicated in paragraph (c) of this provision have been entered or updated within the last 12 months, are current, accurate, complete, and applicable to this solicitation (including the business size standard applicable to the NAICS code referenced for this solicitation), as of the date of this offer and are incorporated in this offer by reference (see FAR 4.1201); except for the changes identified below [offeror to insert changes, identifying change by clause number, title, date]. These amended representation(s) and/or certification(s) are also incorporated in this offer and are current, accurate, and complete as of the date of this offer.
FAR Clause Title Date Change
Any changes provided by the offeror are applicable to this solicitation only, and do not result in an update to the representations and certifications posted on SAM.
52.204-16 Commercial and Government Entity Code reporting (JUL 2016)
AGAR 452.219-70 Size Standard and NAICS Code Information (SEP 2001)
The North American Industrial classification System Code(s) and business size standard(s) describing the products and/or services to be acquired under this solicitation are listed below:
Contract line item(s): ALL --NAICS Code 237310 --Size Standard $36.5 Million
The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is 500 employees.
SECTION L--INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR
RESPONDENTS
FAR 52.252-1 Solicitation Provisions Incorporated by Reference (FEB 1998) This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available.
The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
www.acquisition.gov/far/ www.usda.gov/procurement/policy/agar.html
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1)
52.204-7 System for Award Management (OCT 2016) 52.204-16 Commercial and Government Entity Code Reporting (JUL 2016)
52.222-5 Construction Wage Rate Requirements—Secondary Site of the Work (MAY 2014)
(a) (1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements, of this solicitation.
REFERENCE NO. OF DOCUMENT BEING CONTINUED
12344V18Q0013 Updated Thru FAC 2005-98
PAGE
OF
(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.
(b) (1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.
(2) The due date for receipt of offers will not be extended as a result of an offeror’s request for a wage determination for a secondary site of the work.
52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction (FEB 1999)
(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered are, are as follows:
Goals for minority participation for each trade Goals for female participation for each trade
6.2% 6.9%
These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed.
Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.
(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60- 4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative actions obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction," and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.
(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U. S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the--
(1) Name, address, and telephone number of the subcontractor;
(2) Employer's identification number of the subcontractor;
(3) Estimated dollar amount of the subcontract;
(4) Estimated starting and completion dates of the subcontract; and
(5) Geographical area in which the subcontract is to be performed.
(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is Georgia.
52.225-10 Notice of Buy American Act Requirement--Construction Materials (MAY 2014)
(a) Definitions. “Commercially available off-the-shelf-(COTS) item,” "Construction material," "domestic construction material," and "foreign construction material," as used in this provision, are defined in the clause of this solicitation entitled "Buy American Act--Construction Materials" (Federal Acquisition Regulation (FAR) clause 52.225-9).
REFERENCE NO. OF DOCUMENT BEING CONTINUED
12344V18Q0013 Updated Thru FAC 2005-98
PAGE
OF
(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American Act should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-9 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American Act before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.
(c) Evaluation of offers.
(1) The Government will evaluate an offer requesting exception to the requirements of the Buy American Act, based on claimed unreasonable cost of domestic construction material, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(3)(i) of the clause at FAR 52.225-9.
(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.
(d) Alternate offers.
(1) When an offer includes foreign construction material not listed by the Government in this solicitation in paragraph (b)(2) of the clause at FAR 52.225-9, the offeror also may submit an alternate offer based on use of equivalent domestic construction material.
(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and
(d) of the clause at FAR 52.225-9 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.
(3) If the Government determines that a particular exception requested in accordance with paragraph
(c) of the clause at FAR 52.225-9 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic construction material, and the offeror shall be required to furnish such domestic construction material. An offer based on use of the foreign construction material for which an exception was requested-
(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or
(ii) May be accepted if revised during negotiations.
52.236-27 Site Visit (Construction) (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) Site visits may be arranged during normal duty hours by contacting: Deborah Byrd at (770) 297-2926
52.236-28 Preparation of Proposals – Construction (OCT 1997)
AGRICULTURE ACQUISITION REGULATIONS (48 CFR CHAPTER 4) PROVISIONS
AGAR 452.204-70 Inquiries (FEB 1988)
Inquiries and all correspondence concerning this solicitation should be submitted in writing to the Contracting Officer. Offerors should contact only the Contracting Officer issuing the solicitation about any aspect of this requirement prior to contract award.
REFERENCE NO. OF DOCUMENT BEING CONTINUED
12344V18Q0013 Updated Thru FAC 2005-98
PAGE
OF
SECTION M--EVALUATION FACTORS FOR AWARD
M.1 Evaluation Criteria
Evaluation of Quotes
The Government will evaluate quotes in response to this solicitation and will award a purchase order to the responsible quoter whose quote, conforming to the solicitation, offers the best value to the Government. Quotes will be evaluated in accordance with FAR 13.106-2 Evaluation of Quotations or Offers.
The following factors will be used to evaluate quotes:
(1) PRICE: The Forest Service will assess the quoted prices in order to make a determination of price fair and reasonable.
(2) NON-PRICE FACTORS
(A) Relevant experience information. Demonstrated and frequent work that is similar in size and scope.
Offerors that have numerous opportunities will be more favorably rated than offerors with fewer opportunities. (Section J attachment 7 Relevant Experience Submittal)
(B) Past performance information. Past Performance Questionnaire: Each offeror will be evaluated on their performance under existing and prior contracts of a similar nature in type, scope and complexity for the past three (3) calendar years (2014‐2017). Performance information (including responses to the Past Performance Questionnaire – Section J attachment 8) will be used as an evaluation factor against which offerors' relative rankings will be compared to assure best value to the Government.
The final determination of past performance ratings shall rest with the contracting officer.
Non-price factors, when combined, are equally in importance as price.
| ADP728C.tmp |