Amd 1 Site visit notes 20200817.pdf
PDF 51 KB Posted
- Solicitation number
- 12343420Q0016
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amd 1 Site Visit Attendance.pdf | ||
| 12343420Q0016_Amendment 1.pdf | ||
| Amd 1 Well 061 well log.pdf | ||
| ATTACHMENT 2 Location Map.docx | DOCX document | |
| ATTACHMENT 3 WV20190061_060520.pdf | ||
| ATTACHMENT 1 Lake Sherwood Well Drilling Specifications.pdf | ||
| RFQ_12343420Q0016.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
12343420Q0016
Lake Sherwood Well Drilling and Development
Changes to solicitation:
Specification Section 332100 Water Supply Wells, Part 2 – Products, Well screen
First sentence delete, “stainless steel with openings based on sieve analysis of formation “ Replace with, “ schedule 40 PVC slotted pipe or schedule 40 PVC well screen…”
Question:
Will camping be allowed at Lake Sherwood?
Section 011000 Summary of Work, 1.03 Camping, Camping is not allowed at the construction site without written permission from the Forest.
Clarification: The Contractor shall get written permission to camp at the Volunteer Village Site.
What is the elevation of the elevated water tower?
Approximately 60’ from the ground to the base of the 24’ tall storage tank.
Ground elevation approximately 2,720’
What is the elevation of the existing well site? 2,687’
Is a well log of the existing well available? A copy of the available well log is attached.
File details come from the government source that posted it. Updated .