MS_State_Pavement_Repairs_Final_Specifications.pdf

PDF 303 KB Posted

Attached to
Pavement Repairs at MS State Federal contract opportunity
Solicitation number
1232sd18Q0014
Issued by
Department of Agriculture Agricultural Research Service Central Program Planning Coordination and Support

View the file

Other files for this federal contract opportunity

Other files attached to Pavement Repairs at MS State, newest first.
File Type Posted
signed_Amendment_2,_MS_State_Paving,_1232SD18Q0014.pdf PDF
Davis_Bacon_Wages,_Paving_Repairs_at_MS_State.pdf PDF
SOLICITATION_1232SD18Q0014,_MS_STATE_PAVEMENT_REPAIRS.pdf PDF
MS_State_Pavement_Repairs_Drawings_Final.pdf PDF
Bid_Bond.pdf PDF
ARS_371.pdf PDF
ARS_372.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPECIFICATIONS

PAVEMENT REPAIRS

MISSISSIPPI STATE, MISSISSIPPI

Prepared For:

U.S. DEPARTMENT OF AGRICULTURE

Agricultural Research Service

Prepared By:

The Johnson-McAdams Firm, P.A.

Greenwood, Mississippi

May 4, 2018

TABLE OF CONTENTS Page 1

USDA-ARS

TITLE: PAVEMENT REPAIRS

MISSISSIPPI STATE, MISSISSIPPI

TABLE OF CONTENTS

Section Number Paragraph Title

DIVISION 01 GENERAL REQUIREMENTS

01 00 01 Warranty of Construction 01 00 11 General Paragraphs 01 00 21 Contractor Quality Control 01 33 00 Submittal Procedures 01 50 00 Project Closeout 01 50 60 Environmental Protection

DIVISION 02 EXISTING CONDITIONS

02 41 00 Demolition and Removal

DIVISION 31 EARTHWORK

31 00 00 Earthwork For Structures and Pavements

DIVISION 32 EXTERIOR IMPROVEMENTS

32 11 24 Graded Crushed Aggregate Base Course for Flexible Pavement 32 12 17 Bituminous Paving 32 17 23 Pavement Markings

-- End of Table of Contents --

PAVEMENT REPAIRS, USDA, ARS, MISSISSIPPI STATE, MS 1352M

SECTION 01 00 01 Page 1

SECTION 01 00 01

WARRANTY OF CONSTRUCTION

PART 1 GENERAL

1.1 WARRANTY OF CONSTRUCTION

1.1.1 General

In addition to any other warranties set out elsewhere in this contract, the Contractor warrants that work performed under this contract conforms to the contract requirements and is free of any defect of equipment, material or design furnished, or workmanship performed by the Contractor or any of his subcontractors or suppliers at any tier. Such warranty shall continue for a period of one year from the date of final acceptance of the project. Under this warranty, the Contractor shall remedy at his own expense any such failure to conform or any such defect. In addition, the Contractor shall remedy at his own expense any damage to Government owned or controlled real or personal property, when that damage is the result of the Contractor's failure to conform to contract requirements or any such defect of equipment, material, workmanship, or design. The Contractor shall also restore any work damaged in fulfilling the terms of this clause. The Contractor's warranty with respect to work repaired or replaced hereunder will run for one year from the date of such repair or replacement.

1.1.2 Notification and Compliance

The Government shall notify the Contractor in writing within a reasonable time after the discovery of any failure, defect, or damage. Should the Contractor fail to remedy any failure, defect, or damage described in paragraph 1.1.1 above within a reasonable time after receipt of notice thereof, the Government shall have the right to replace or repair and have the cost billed to the Contractor.

1.2 EXPRESSED WARRANTY

In addition to the other rights and remedies provided by this clause, all subcontractors', manufacturers', and suppliers' warranties expressed or implied, respecting any work and materials shall, at the direction of the Government, be enforced by the Contractor for the benefit of the Government. In such case, if the Contractor's warranty under paragraph 1.1.1 above has expired, any suit directed by the Government to enforce a subcontractor's, manufacturer's, or supplier's warranty shall be at the expense of the Government. The Contractor shall obtain any warranties which the subcontractors, manufacturers, or suppliers would give in normal commercial practice. If so directed by the Contracting Officer, the Contractor shall require any such warranties to be executed in writing to the Government.

SECTION 01 00 01 Page 2

1.3 LATENT DEFECTS

The Warranty specified herein shall not limit the Government's rights with respect to latent defects, gross mistake, or fraud.

-- End of Section --

SECTION 01 00 11 Page 1

SECTION 01 00 11

GENERAL PARAGRAPHS

1.1 DESCRIPTION OF WORK

1.1.1 Work To Be Done

The work to be done consists of furnishing all labor, materials, and equipment and performing all work in strict accordance with these specifications for the Pavement Repairs, USDA, ARS, Mississippi State, Mississippi.

1.1.2 Location

The site of work contemplated by this specification is USDA, ARS, Mississippi State, Mississippi.

1.1.3 Principal Features of Work:

Base Bid:

A. Removal of existing pavement and gravel base.

B. Compaction and stabilization of sub-grade.

C. Construction of aggregate base course.

D. Construction of asphalt pavement.

E. Miscellaneous grading.

F. Striping.

Alternate Bid Item:

A. Removal and repair of sidewalk, curb, and gutter.

Note: The above general outline of principal features of the work does not in any way limit the responsibility of the Contractor to perform all work and furnish all labor and materials required by the plans and specifications. The term "provide" as used in the specifications and on the plans means to furnish and install the work indicated.

Provide a separate Lost for Work noted as an “Alternate Bid Item” as required to perform the work in addition to the base bid.

SECTION 01 00 11 Page 2

1.1.4 Contractor’s Access to Work Areas

The facility shall remain in operation during the execution of this contract. The Contractor shall cooperate fully with the requirements of the facility and shall closely coordinate all work with the Contracting Officer. All work in a particular area of work will be required to be completed to the satisfaction of the Contracting Officer before beginning work in another area. The Contracting Officer may, at his discretion, permit specific work in several areas concurrently if the work does not disturb operation of the facility.

1.2 SITE VISIT

A site visit and inspection tour will be held at USDA, ARS, Mississippi State, Mississippi. All potential bidders will be notified of the exact time and date and are strongly urged to attend the site visit. Inspection may only be made at this time, unless prior written approval is obtained to inspect at another date and time.

Contact:

U.S. Department of Agriculture, ARS

Attn: Mr. Chris Bellamy 810 Highway 12 East Mississippi State, MS 39762 Tel. No.: (662) 320-7447

1.3 COORDINATION OF WORK

1.3.1 Work space and space available for storing materials shall be subject to the approval of the Contracting Officer. Do not store materials and equipment in other than assigned areas.

1.3.2 Execute work so as to interfere as little as possible with normal functioning of the facility, including operations of utility services and any existing equipment, and with work being done by others.

1.3.3 Minimize interference of construction activities with the flow of traffic by keeping roads, walks and entrances to grounds, to parking areas and to occupied areas of buildings clear of construction materials, debris, construction equipment and vehicles except where noted on plans or in specifications. Provide unobstructed access to areas required to remain in operation.

1.3.4 The Contractor shall complete all work within 180 consecutive calendar days after Notice to Proceed. Within 14 calendar days after Contract Award, the Contractor shall provide the Government with a detailed schedule of dates on which the Contractor plans to accomplish the work. In addition, the Contractor shall notify

SECTION 01 00 11 Page 3 the Contracting Officer 20 days in advance of starting work. A planned work schedule shall be submitted to the Contracting Officer for approval. The schedule shall include a detailed description of the methods and equipment to be used for each operation and the sequence of operations. This schedule shall be updated monthly and submitted to the Contracting Officer for approval.

1.3.5 The Contractor shall take all measures and provide all material necessary for protecting existing equipment, property, and ongoing operations in affected areas of construction against dust, noise and debris.

1.3.6 Power sources for the Contractor's operations will be available and supplied by the Government to the Contractor as long as its use does not interfere with the operations of the Government's facilities. Water sources will be available and supplied by the Government to the Contractor as long as its use does not interfere with the operations of any building. The Contractor is responsible for extending utility sources to his work locations. Such extensions shall be removed after work is completed, to the satisfaction of the Contracting Officer.

1.3.7 All references in the specifications to the Contracting Officer and

Contracting Officer's Representative shall constitute referrals initially to the Contracting Officer's Representative.

1.3.8 Contractor shall provide sanitary facilities for use by his employees and the employees of his subcontractors working on job site.

1.4 DRAWINGS

1.4.1 All dimensions shown of existing work and all dimensions required for work that is to be connected with existing work shall be verified by the Contractor by actual field measurements. Any work at variance with that specified or shown on the drawings, shall not be performed by the Contractor until the Contractor has received approval in writing from the Contracting Officer.

1.5 MATERIAL SAFETY DATA SHEETS (MSDS)

Material Safety Data Sheets must be submitted to the Contracting Officer prior to the commencement of any work with any substance that may be considered hazardous.

1.6 UTILITIES OR STRUCTURAL ITEMS CONFLICTING WITH PROPOSED

CONSTRUCTION

In the event the Contractor finds an area where existing utilities or structural items conflict with proposed construction, the Contracting Officer shall be notified immediately. The Contractor shall then propose a method of solving the problem.

Work shall not resume in the problem area until the Contractor has received written approval from the Contracting Officer. There shall be no additional cost to the Government.

SECTION 01 00 11 Page 4

1.7 ACCEPTANCE OF WORK

1.7.1 Final inspection will not be made until the contract work is completed. The Contractor shall notify in writing the Contracting Officer fifteen working days prior to the date on which the work will be ready for final inspection.

1.7.2 Final inspection and acceptance of the work shown by the drawings and specifications forming a part of this contract shall not be binding or conclusive on the Government if it shall be shown that (1) the Contractor has willfully or through collusion with persons or firms engaged in the performance of the contract supplied inferior materials, equipment, or workmanship, or (2) the Contractor has otherwise departed from the terms of the contract.

1.8 CONTRACTOR’S LAYDOWN AREA

The Contractor’s laydown area shall be approximately 20’ x 80’ as approved by the Contracting Officer’s Representative. The Contracting Officer’s Representative shall indicate a specific area upon award of the Contract. Maintain the jobsite, laydown, and storage area in a neat and orderly condition on a continuing basis, and comply with the standards of cleanliness and appearance regulating the facility. The continued availability of the laydown and storage areas to the Contractor is at the convenience of the Government. The Contracting Officer reserves the right to relocate the laydown area as required by the facility activities.

1.9 COORDINATION WITH OTHER WORK

Additional construction work may be underway during the life of this project. The Contractor shall cooperate with other contractors as required.

1.10 CONTRACTING OFFICER AND CONTRACTING OFFICER’S

REPRESENTATIVE

All references in the specifications and on the drawings to the Contracting Officer and Contracting Officer’s Representative shall constitute referrals initially to the Contracting Officer’s Representative.

SECTION 01 00 21 Page 1

SECTION 01 00 21

CONTRACTOR QUALITY CONTROL

1.1 GENERAL

This section covers the quality control inspection, sampling, and testing of all materials, services, and workmanship required to be performed by the contract drawings, specifications, and other contract requirements. The Contractor shall perform all quality control inspection, sampling, and testing required by this contract and shall review and certify that each submittal is correct and in strict conformance with the contract drawings and specifications for all shop drawings and lists of materials, fixtures, and equipment. All work performed under this contract shall be in strict accordance procedures and requirements detailed on the plans and specifications.

1.1.1 Certificate of Compliance

Upon completion of the contract work and prior to final acceptance, the Contractor shall submit to the Contracting Officer a certificate of compliance which states that all materials, equipment, design, and workmanship incorporated in the work are in strict compliance with contract drawings and specifications except for approved deviations.

The certificates of compliance shall be signed and dated by both the manufacturer’s representative and the Contractor. Based upon this certificate of compliance and other contract requirements, the Contractor shall be responsible for correcting at his expense any defects, omissions, and deviations (other than those previously approved) which are detected during the contract period or during the one year warranty period as defined in SECTION 01 00 01, WARRANTY OF

CONSTRUCTION.

1.2 INSPECTION

The Contractor shall inspect all materials, services, and workmanship to assure conformance with contract requirements.

1.3 REVIEW AND APPROVAL OF SHOP DRAWINGS, SUBMITTALS,

MATERIALS, FIXTURES, AND EQUIPMENT

1.3.1 Prior to submission to the Government for approval, the Contractor shall review and certify that all shop drawings, submittals, lists of materials, fixtures, and equipment as called for under the various headings of these specifications are correct and in strict compliance with the contract drawings and specifications. These drawings, submittals and lists shall be accurate, complete, and adequately detailed.

The top copy of data comprising each item listed on the transmittal form shall be

SECTION 01 00 21 Page 2 identified as having received the quality control inspector's approval by being so stamped, signed and dated. Approval of shop drawings, submittals, materials, fixtures, and equipment by the Contracting Officer will not relieve the Contractor of the responsibility for any errors which may exist and the Contractor shall be responsible for the satisfactory construction of all work. All samples of materials submitted as required by these specifications shall be properly identified and labeled for ready identification, and upon being approved, stored at the site of the work for jobsite use until all work has been accepted by the Contracting Officer. The Contractor shall provide four (4) sets of all shop drawings.

1.3.2 All proposed deviations required by the Contractor shall be noted in the "Remarks" column of the Form. The Contractor shall set forth in writing the reason for any deviations and annotate such deviations on the shop drawing. The Government reserves the right to rescind inadvertent approval of shop drawings containing unnoted deviations.

1.4 DAILY RECORDS

The Contractor shall maintain a daily record of quality control measures performed for each shift of Contractor or Subcontractor operations on an appropriate format.

These records shall provide factual evidence that continuous quality control inspections have been performed, including but not limited to the following: job progress, problems encountered; problems resolved; type and number of inspections; results of inspections or tests including all computations; nature of defects; causes for rejection; safety violations; proposed remedial action; and corrective action taken. These records shall cover both conforming and defective items and shall include a statement that all supplies and materials incorporated in the work are in full compliance with the terms of the contract. The Contractor shall maintain a current record of all inspections and shall furnish to the Contracting Officer on a daily basis, legible copies of all inspection records for his permanent retention.

The daily records of inspections shall cover all work placement subsequent to the previous report, and shall be verified by the Contractor's designated representative.

1.5 RECURRING DEFICIENCIES

If recurring deficiencies in an item or items being inspected by the Contractor indicate that the inspection system is not providing adequate quality control, the Contractor shall take such corrective measures as deemed necessary by the Contracting Officer.

1.6 CONFLICTS

In the event of a difference of opinion between the Contractor and the Contracting Officer, the Contracting Officer shall govern.

SECTION 01 33 00 Page 1

SECTION 01 33 00

SUBMITTAL PROCEDURES

1. SHOP DRAWINGS

The Contractor shall furnish the Contracting Officer six copies with such promptness as to cause no delay in this work or the work of any other contractors, one sepia copy of the shop drawings as required for the various subheadings for the Contracting Officer's approval. Shop drawings of any other subcontractor should be reviewed and approved by each subcontractor where their contract work comes in contact with or interferes with that of another subcontractor.

1.1 The Contracting Officer's approval, however, shall not relieve the

Contractor from responsibility for errors in shop drawings. Shop drawings are the instruments of the Contractor, not the Contracting Officer; the Drawings and Specifications shall always be final.

2. SAMPLES

Within and not later than thirty (30) days from the date of the General Contract, the General Contractor shall have secured and submitted to the Contracting Officer for his consideration, two samples of each kind and grade of materials and finish as noted under the various headings of the specifications. These samples shall be finished completely and shall accurately represent the work as it is proposed to be installed. The Contracting Officer will give immediate consideration to such samples and shall notify the General Contractor within ten (10) days after receipt of either approval or rejection. If such samples are rejected, the General Contractor shall, without delay, submit corrected samples for approval, and shall continue to do so until such approval is given the Contracting Officer. All approvals will be given by the Contracting Officer to the General Contractor in writing.

2.1 It shall be the Contractor's responsibility to obtain materials at such time as to cause no delay to the project. No allowance for additional time nor substitution of approved materials will be allowed for Contractor's negligence in late ordering of materials.

3. PRODUCT DATA

Submit six copies of preprinted material such as illustrations, standard schedules, performance charts, instructions, brochures, diagrams, manufacturer’s descriptive literature, catalog data, and other data to illustrate portion of work.

5. GOVERNMENT ACTIONS POSSIBLE

Submittals will be returned to the Contractor with one of the following notations:

SECTION 01 33 00 Page 2

a. Submittals marked “approved” or “approved as submitted” authorize

Contractor to proceed with work covered.

b. Submittals marked “approved as noted” or “approval except as noted;

resubmission not required” authorize Contractor to proceed with work as noted provided the Contractor takes no exception to the notations.

c. Submittals marked “revise and resubmit” or “disapproved” indicate submittal is incomplete or does not comply with design concept or requirements of the contract documents and shall be resubmitted with appropriate changes. No work shall proceed for this item until resubmittal is approved.

M A

T E

R

IA

L A

PP

R

O V

A L

S U

B M

IT

T

L

T

O

U

SD

A /A

R S

C

A

E , C

R

FR

M

C on tr ac to r)

PR

JE

C

T T

IT

L

E

C O

N T

R A

C T

N U

M B

E

(T o be c om pl et ed b y th e

C on tr ac to r)

G ov er nm en t U se

O nl y

SU

B M

IT

T

N

U M

B E

R

PR

E

V

IO

U S

SU

B

M

IT

T A

L N

U M

B E

(o nl y if ite m s l ist ed w er e su bm itt ed p re vi ou sl y)

A ec om m en da tio n C

O R

/E

PM

om m en da tio n C on tr ac tin g O ff ic er pp ro va l/D is ap pr ov al in e o.

Sp ifi ca tio n

Se ct

Pa ra N o.

D ra w o.

D es cr ip tio n of

M at er ia l (I nc lu de ty pe , m od el

, m fg

PP

IS

A

P S ee om m en ts on ev se

A P m ts ev

A P m en ts o n

R ev

If a n ite m is d is ap pr ov ed , a r es ub m itt al is d ue w ith in ca le nd ar d ay s o f t he

C on tr ac tin g

O ff ic er

’s si gn at ur e be lo w

C on tr ac to r

(K tr

A

R

/E

PM

tr ac tin g O ff ic

Y

PE

o r

PR

IN

T

N A

M E

T

IT

PE

o r

PR

IN

T

N A

M E

T

IT

PE

o r

PR

IN

T

N A

M E

T

IT

PE

o r

PR

IN

T

N A

M E

T

IT

SI

G

N A

T U

R E

SI

G N

A T

U R

E

SI

G

N A

T U

R E

SI

G N

A T

U R

E

D A

T E

D

A T

E

D A

T E

D

A T

E

B y co m pl et in g th is fo rm

, t he a bo ve si gn ed c on tra ct or c er tif ie s t ha t t he m at er ia l c om pl ie s w ith a ll sp ec ifi ca tio ns o f t he su bj ec t co nt ra ct

D A

T E

R E

C E

IV

E

D F

R O

M K

T R

D

A T

E R

E C

E

IV

E D

F R

O M

A

E

D A

T E

R E

C E

IV

E

D F

R O

M C

O R

M at er ia l A pp ro va l S ub m itt al C ov er

S he et (1

1/

N

TR

A C

SU

BM

IT

TA

M

M E

N T

S In st ru ct io ns

En te r t he in iti al s o f t he in di vi du al m ak in g th e co m m en t, th e

Li ne

N um be r o f t he it em fo r w hi ch th e co m m en t i s b ei ng m ad e, a nd th e co m m t.

M at er ia l A pp ro va l S ub m itt al

C ov er S he et

(1 1/

R ev er

SECTION 01 50 00 Page 1

SECTION 01 50 00{PRIVATE }

PROJECT CLOSEOUT

1.1 AS-BUILT DRAWINGS

At the completion of the project, the Contracting Officer will furnish the Contractor, free of charge, one (1) set of drawings on which the Contractor will indicate all variations from that shown on the original Drawings.

1.2 SUBSTANTIAL COMPLETION AND COMPLETION OF PUNCH LIST

CORRECTIONS

Set date and notify Contracting Officer as to time construction will be ready for preliminary punch list and, upon completion of that list, set time and date for inspection of punch list corrections. The failure to include any items on such list does not alter the responsibility of the Contractor to complete all Work in accordance with the Contract Documents. When the Contracting Officer on the basis of an inspection, determines that the Work or designated portion thereof is sufficiently complete, in accordance with the Contract Documents, so that the Owner or separate contractors can occupy or utilize the Work or designated portion thereof for the use for which it is intended, he will prepare a Certificate of Substantial Completion which shall establish the Date of Substantial Completion, shall state the responsibilities of the Owner and the Contractor for security, maintenance, heat, utilities, damage to the Work, and insurance, and shall fix the time within which the Contractor shall complete the items listed therein or attached thereto. Warranties required by the Contract Documents shall commence on the Date of Substantial Completion of the Work or designated portion thereof unless otherwise provided in the Certificate of Substantial Completion.

The Certificate of Substantial Completion shall be submitted to the Owner and the Contractor for their written acceptance of the responsibilities assigned to them in such Certificate.

1.3 FINAL INSPECTION

The Contractor shall notify the Contracting Officer and Owner in writing 10 days prior to the date that the project will be ready for final inspection. An inspection of the project will be made by the Contracting Officer and Contractor at a mutually agreed upon time. If the project is complete, in the opinion of the Contracting Officer, the Contracting Officer shall issue a certificate as set forth hereinafter. Minor unfinished items of work may be excluded from the certificate. The Contracting Officer and Contractor shall mutually agree on a date for the completion of these items of work.

Should the Contractor fail to complete the work within the agreed time, the Owner shall have the option of having the unfinished work completed.

SECTION 01 50 00 Page 2

1.4 RELEASE OF LIENS AND CERTIFICATION ALL BILLS ARE PAID

The Contractor, before final acceptance is given by the Contracting Officer, shall furnish for himself and all sub-contractors, in triplicate, duly certified by a notary, a full release of liens, damages, and a guarantee that all materials and labor are paid in accordance with the Contractual Documents.

1.5 GUARANTEE

The Contractor, before final acceptance by the Contracting Officer, shall furnish the

Owner, in triplicate, a written notarized guarantee. All Contractors shall guarantee their work for a period of one year from the date of Substantial Completion as stated by the Contracting Officer. Neither the final Certificate for Payment, nor any provision in the Contract Documents shall relieve the contractors of their responsibility for negligence or defective materials or workmanship within the extent and period covered by law; and upon written notice he shall remedy any defects due thereto, and pay all expenses for any damages to other work resulting therefrom. Emergency defective workmanship and defective materials within the year's guarantee shall be corrected within a few days after receipt of a written order from the Contracting Officer. Any items that are not considered of an emergency nature by the Contracting Officer may be corrected prior to the expiration of the Guarantee period.

1.5.1 The wording for the Guarantee shall be as follows:

"We hereby guarantee all work performed by us on the above captioned project to be free from defective materials and workmanship for a period of one year, or for such longer period of time as may be called for in the Contractual Documents for such portions of the work."

1.6 OTHER FINAL DOCUMENTS

Deliver to the Owner, through the Contracting Officer, all required bonds, warranties, individual guarantees, etc. that are required by the various following sections of these specifications.

1.7 ACCEPTANCE

Upon satisfactory submittal of the above documents the Contracting Officer shall issue to the Owner a certificate recommending final acceptance of the project. Minor unfinished items of work may be listed on the certificate and excepted from final acceptance. A sum sufficient to cover the cost of completing these unfinished items of work will be withheld by the Owner from the final payment. All other funds including retainage shall be due and payable upon receipt by the Owner of the Contracting Officer's certificate. Upon certification by the Contracting Officer that the items of work have been completed, all monies withheld by the Owner shall be due the Contractor.

SECTION 01 50 00 Page 3

PART 2 PRODUCTS

Not used.

PART 3 EXECUTION

SECTION 01 50 60 Page 1

SECTION 01 50 60

ENVIRONMENTAL PROTECTION

1.1 APPLICABLE PUBLICATIONS

The publications listed below form a part of this specification to the extent referenced.

The publications are referred to in the text by the basic designation only.

1.1.1 Environmental Protection Agency (EPA) Regulations:

40 CFR 112 Regulations on Oil Pollution Prevention

40 CFR 261 Regulations Identifying Hazardous Waste

40 CFR 262 Regulations for Hazardous Waste Generators

40 CFR 263 Regulations for Hazardous Waste Transporters

40 CFR 264 Regulations for Owners and Operators of Permitted Hazardous Waste Facilities

40 CFR 403 General Pretreatment Standards

PL 96 510 Comprehensive Environmental Response

Compensation and Liability Act of 1980

1.1.2 Department of Transportation (DOT):

49 CFR 171 Standards for Transportation of Hazardous Materials

49 CFR 172 Hazardous Materials Tables and Regulations

49 CFR 178 Regulations for Shipping Container Specifications

1.2 DEFINITIONS

1.2.1 Sediment

Soil and other debris that have eroded and have been transported by runoff water or wind.

1.2.2 Solid Waste

SECTION 01 50 60 Page 2

Rubbish, debris, garbage, and other discarded solid materials, except hazardous waste as defined in paragraph entitled, "Hazardous Waste," resulting from industrial, commercial, and agricultural operations and from community activities.

1.2.3 Rubbish

Combustible and noncombustible wastes such as paper, boxes, glass, crockery, metal, lumber, cans, and bones.

1.2.4 Debris

Combustible and noncombustible wastes such as ashes and waste materials resulting from construction or maintenance and repair work, leaves, and tree trimmings.

1.2.5 Chemical Waste

This includes salts, acids, alkalies, herbicides, pesticides, and organic chemicals.

1.2.6 Sanitary Wastes

1.2.6.1 Sewage

Waste characterized as domestic sanitary sewage.

1.2.6.2 Garbage

Refuse and scraps resulting from preparation, cooking, dispensing, and consumption of food.

1.2.7 Hazardous Waste

Hazardous substances as defined in 40 CFR 261 or as defined by applicable state and local regulations.

1.2.8 Oily Waste

Petroleum products and bituminous materials.

1.2.9 Landscape Features

Trees, plants, shrubs and ground covers.

1.2.10 Hazardous Substances

As defined in EPA PL 96-510.

SECTION 01 50 60 Page 3

1.2.11 Hazardous Materials

As defined in DOT Regulation 49 CFR 171 and listed in 49 CFR 172.

1.3 ENVIRONMENTAL PROTECTION REQUIREMENTS

Provide and maintain, during the life of the contract, environmental protection as defined. Plan for and provide environmental protective measures to control pollution that develops during normal construction practice. Plan for and provide environmental protective measures required to correct conditions that develop during the construction of permanent or temporary environmental features associated with the project. Comply with Federal, state, and local regulations pertaining to the environment, including water, air, solid waste, hazardous waste and substances, oily substances and noise pollution.

PART 2 EXECUTION

2.1 NATURAL RESOURCES

Preserve the natural resources within the project boundaries and outside the limits of permanent work. Restore to an equivalent or improved condition upon completion of work. Confine construction activities to within the limits of the work indicated or specified.

2.1.1 Landscape Features

Do not remove, cut, deface, injure, or destroy existing landscape features without the Contracting Officer's permission. Do not fasten or attach ropes, cables, or guys to existing nearby trees for anchorages, unless authorized by the Contracting Officer.

Where such use of attach ropes, cables, or guys is authorized, the Contractor shall be responsible for any resultant damage.

2.1.1.1 Protection

Protect existing landscape features which are to remain and which may be injured, bruised, defaced, or otherwise damaged by construction operations. By approved excavation, remove trees with 30 percent or more of their root systems destroyed.

2.1.1.2 Replacement

Remove existing landscape features scarred or damaged by equipment operations, and replace with equivalent, undamaged features. Obtain the Contracting Officer's approval before replacement.

2.1.2 Water Resources

SECTION 01 50 60 Page 4

2.1.2.1 Oily and Hazardous Substances

Prevent oily or other hazardous substances from entering the ground, drainage areas, or local bodies of water. Take precautions to ensure that no oil or other hazardous material is released to the water, land, sanitary sewer system, or storm sewer system. Environmental requirements for the prevention of oil spills are contained in 40 CFR 112. For oil and hazardous substance spills which may be large enough to violate Federal, State or Local Regulations, the Contracting Officer shall be verbally notified immediately. Clean up any spills of oil or hazardous substances which result from the Contractor's operations. If the Contractor cannot clean up any spill in a timely manner, the Government will perform the cleanup at the Contractor's expense.

2.1.3 Fish and Wildlife Resources

Do not disturb fish and wildlife. Do not alter water flows or otherwise disturb the native habitat adjacent to the project and critical to the survival of fish and wildlife, except as indicated or specified.

2.2 HISTORICAL AND ARCHEOLOGICAL RESOURCES

Carefully preserve and report immediately to the Contracting Officer items having possible historical or archeological interest which are discovered in the course of work. Protect monuments, markers, and works of art.

2.3 SOLID AND SANITARY WASTES

Pick up solid wastes, and place in containers which are regularly emptied. Prevent contamination of the site and other areas when handling and disposing wastes. On completion, leave the areas clean. Control and dispose of wastes.

2.3.1 Disposal of Solid Wastes

Dispose of solid wastes in accordance with the requirements specified.

2.3.1.1 Removal From Government Property

Remove solid wastes from Government property.

2.3.2 Garbage Disposal

Place garbage in approved containers, and move to a pickup point or disposal area, where directed.

2.3.3 Sewage, Odor, and Pest Control

SECTION 01 50 60 Page 5

Dispose of sewage through connection to a municipal or district sanitary sewage system, where such a system is not available, use chemical toilets. Empty wastes into a municipal, district, or station sanitary sewage system. Provide pest control and elimination of odors. No substances shall be disposed of which will interfere with treatment plant operations in accordance with 40 CFR 403.

2.4 HAZARDOUS WASTES

2.4.1 General

Handle generated hazardous wastes in accordance with 40 CFR 262. Store hazardous waste in approved containers in accordance with 49 CFR 178. Label to identify the type of waste and the date the container was filled. Remove the containers from the project site, and store and dispose of hazardous waste in accordance with 40 CFR 263 and 264. For hazardous wastes spills, verbally notify the Contracting Officer immediately.

2.4.2 Petroleum Products

Conduct the fueling and lubricating of equipment and motor vehicles to protect against spills and evaporation. Dispose of lubricants and excess oils.

2.5 DUST

Keep dust down at all times, including during nonworking periods. Sprinkle or treat, with dust suppressants, the soil at the site, haul roads, and other areas disturbed by operations. Dry power brooming will not be permitted. Instead, use vacuuming, wet mopping, wet sweeping, or wet power brooming. Air blowing will be permitted only for cleaning nonparticulate debris such as steel reinforcing bars.

2.6 ABRASIVE BLASTING

Abrasive blasting will not be allowed.

2.7 NOISE

Make the maximum use of low-noise emission products, as certified by the EPA.

Blasting or use of explosives will not be permitted without written permission from the Contracting Officer, and then only during the designated times.

2.8 FOOD

Preparation, cooking and dispensing of food products will not be permitted.

2.9 TEMPORARY CONSTRUCTION

SECTION 01 57 50 Page 6

Remove temporary construction facilities including haul roads, work areas, structures, foundations of temporary structures, and stockpiles of excess or waste materials.

Grade temporary roads, parking areas, and temporarily used areas to conform with surrounding contours.

SECTION 02 41 00 Page 1

SECTION 02 41 00

DEMOLITION AND REMOVAL

1.1 REFERENCES

AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)

ANSI A10.6 (1990) Demolition Operations

CODE OF FEDERAL REGULATIONS (CFR)

40 CFR 61-SUBPART M National Emission Standard for Asbestos

1.2 GENERAL REQUIREMENTS

Do not begin demolition until authorization is received from the Contracting Officer.

Remove rubbish and debris from the project site; do not allow accumulations inside or outside the building. Store materials that cannot be removed daily in areas specified by the Contracting Officer.

1.3 SUBMITTALS

Submit the following in accordance with Section 01 33 00, Submittals Procedures.

1.3.1 Statements

a. Demolition plan

Submit proposed demolition and removal procedures to the Contracting Officer for approval before work is started.

1.3.1.1 Required Data

Demolition plan shall include procedures for coordination with other work in progress, a disconnection schedule of utility services, and a detailed description of methods and equipment to be used for each operation and of the sequence of operations.

1.4 REGULATORY AND SAFETY REQUIREMENTS

Comply with federal, state, and local hauling and disposal regulations. Safety

SECTION 02 41 00 Page 2 requirements shall conform with ANSI A10.6, “Demolition Operations - Safety Requirements.”

1.4.1 Notifications

Furnish timely notification of demolition and renovation projects to Federal, State, regional, and local authorities in accordance with 40 CFR 61-SUBPART M. Notify the State's environmental protection agency and the Contracting Officer in writing 10 days prior to the commencement of work in accordance with 40 CFR 61-SUBPART M.

1.5 DUST AND DEBRIS CONTROL

Prevent the spread of dust and debris and avoid the creation of a nuisance or hazard in the surrounding area. Do not use water if it results in hazardous or objectionable conditions such as, but not limited to, ice, flooding, or pollution. Sweep pavements as often as necessary to control the spread of debris.

1.6 PROTECTION

1.6.1 Traffic Control Signs

Where pedestrian and driver safety is endangered in the area of removal work, use traffic barricades with flashing lights. Notify the Contracting Officer prior to beginning such work.

1.6.2 Existing Work

Protect existing work which is to remain in place, be reused, or remain the property of the Government. Repair items which are to remain and which are damaged during performance of the work to their original condition, or replace with new. Do not overload structural elements or pavements to remain. Provide new supports and reinforcement for existing construction weakened by demolition or removal work.

Repairs, reinforcement, or structural replacement must have Contracting Officer approval.

1.6.3 Trees and Landscaping

Conform to Section 01 50 60, Environmental Protection, for protection of natural resources.

1.6.4 Facilities

Protect electrical and mechanical services and utilities. Where removal of existing utilities and pavement is specified or indicated, provide approved barricades, temporary covering of exposed areas, and temporary services or connections for electrical and mechanical utilities.

SECTION 02 41 00 Page 3

1.7 BURNING

Burning will not be permitted.

1.8 RELOCATIONS

Perform the removal and reinstallation of relocated items as indicated with workmen skilled in the trades involved. Repair items to be relocated which are damaged or replace damaged items with new undamaged items as approved by the Contracting Officer.

PART 3 EXECUTION

3.1 EXISTING FACILITIES TO BE REMOVED

Remove existing construction as indicated.

3.2 DISPOSITION OF MATERIAL

3.2.1 Title to Materials

Title to materials resulting from demolition, and materials and equipment to be removed, is vested in the Contractor upon approval by the Contracting Officer of the Contractor's demolition and removal procedures, and authorization by the Contracting Officer to begin demolition.

3.3 CLEANUP

3.3.1 Debris and Rubbish

Remove and transport debris and rubbish in a manner that will prevent spillage on pavements, streets or adjacent areas. Clean up spillage from pavements, streets and adjacent areas.

3.4 COLD MILLING

This work consists of removal of pavement materials on the roadway by cold milling to the designated depth and, loading, hauling, and disposal of the milled materials by the Contractor in accordance with the plans and specifications, or as directed by the Contracting Officer’s Representative. The milled surface shall provide a desirable surface free from gouges, continuous grooves, ridges, oil film, and other imperfections

SECTION 02 41 00 Page 4 of workmanship and shall have a uniform appearance.

3.4.1 Equipment

The equipment to be used for this work shall be a self-propelled milling machine capable of removing a minimum width of four feet. The equipment shall have sufficient power, traction, and stability to remove material and maintain an accurate grade and cross slope. The equipment shall be capable of accurately and automatically establishing profile grades along each edge of the machine by referencing from the existing pavement with means of an approved profile averaging device with extreme contact points with surface at least 30 feet apart, or from an independent grade line and shall have an automatic system for controlling cross slope. The machine shall be equipped with an integral loading and reclaiming means to immediately remove material being cut from the surface and discharge the cuttings into a truck, all in one operation.

Adequate back-up equipment, such as mechanical sweepers, loaders, water truck, etc., and personnel shall be provided to insure that all cuttings are removed behind the milling machine.

3.4.2 Construction Methods

On the roadway, when hot mix asphalt will be required on the milled area, milling operations shall not begin until the Contractor has an approved job-mix formula and is prepared to begin paving operations. The milled roadway shall be covered by placing the first required course within 15 calendar days after milling.

The pavement and shoulder materials shall be removed to the depth, width, grade, and cross section shown on the plans, or as directed by the Contracting Officer’s Representative. The number of passes necessary to accomplish the work required herein and on the plans shall be determined by the Contractor.

The surface of the pavement, after milling, shall be reasonably smooth and true to the established line, grade and cross section. Areas damaged by the Contractor's operations shall be corrected and/or repaired as directed by the Contracting Officer’s Representative at no additional costs to the Government. The Contractor shall take necessary action to prevent or minimize the ponding of water on the milled roadway and shoulder.

Where traffic is required to be maintained adjacent to the milled area, no more than a 2-1/4 inches differential in grade between the milled area and the adjacent surface will be allowed, unless a positive separation in accordance with the plans and specifications is established between the traffic and milled area.

A longitudinal pavement edge that traffic is expected to move across should have an elevation difference of not more than 2-1/4 inches. If the pavement edge is more

SECTION 02 41 00 Page 5 than1-1/2 inches and less than or equal to 2-1/4 inches, uneven pavement signs will be required as shown in the plans, or contract documents. If the pavement edge is less than or equal to 1-1/2 inches, no uneven pavement signs will be required. Transverse pavement joints shall be sufficiently tapered to allow for the safe movement of traffic.

When traffic is required to be maintained adjacent to milled surfaces, traffic control devices shall be provided as directed by the Contracting Officer’s Representative.

It is understood that the milled surfaces shall be covered with the next required course as soon as possible but in no case later than 15 calendar days after milling.

Section 31 00 00 Page 1

SECTION 31 00 00

EARTHWORK FOR STRUCTURES AND PAVEMENTS

PART 1 GENERAL{TC \L1 "PART 1 GENERAL}

1.1 REFERENCES{TC \L2 "1.1 REFERENCES}

AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM)

ASTM D 698 (1991) Laboratory Compaction Characteristics of

Soil Using Standard Effort (12,400 ft-lbf/ft (600 kN-m/m))

ASTM D 1556 (1990; R 1996) Density and Unit Weight of Soil in

Place by the Sand-Cone Method

ASTM D 2487 (1993) Classification of Soils for Engineering Purposes (Unified Soil Classification System)

ASTM D 2922 (1996) Density of Soil and Soil-Aggregate in Place by Nuclear Methods (Shallow Depth)

ASTM D 3017 (1996) Water Content of Soil and Rock in Place by Nuclear Methods (Shallow Depth)

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 (1992) Safety and Health Requirements Manual

MISSISSIPPI DEPARTMENT OF TRANSPORTATION (DOT)

MDOT SS-1 (2017) Mississippi Standard Specifications for Road and Bridge Construction

1.2 DEFINITIONS{TC \L2 "1.2 DEFINITIONS}

1.2.1 Backfill{tc \l3 "1.2.1 Backfill}

A specified material used in refilling a cut, trench, or other excavation, placed at a specified degree of compaction.

Section 31 00 00 Page 2

1.2.2 Cohesive Materials{tc \l3 "1.2.2 Cohesive Materials}

Cohesive materials include materials classified by ASTM D 2487 as GC, SC, ML, CL, MH, and CH. Materials classified as GM and SM will be identified as cohesive only when the fines have a plasticity index greater than zero.

1.2.3 Cohesionless Materials{tc \l3 "1.2.3 Cohesionless Materials}

Cohesionless materials include materials classified by ASTM D 2487 as GW, GP, SW, and SP. Materials classified as GM and SM will be identified as cohesionless only when the fines have a plasticity index of zero.

1.2.4 Compaction{tc \l3 "1.2.4 Compaction}

The process of mechanically stabilizing a material by increasing its density at a controlled moisture condition. "Degree of Compaction" is expressed as a percentage of the maximum density obtained by the test procedure described in ASTM D 698 for general soil types abbreviated in this specification as "_____ percent ASTM D _____ maximum density."

1.2.5 Controlled Fill and Controlled Backfill{tc \l3 "1.2.5 Controlled Fill and Controlled Backfill}

A specified soil mix or gradation of materials constructed to attain maximum bearing strength and minimize consolidation or differential settlement under a load. Controlled fill is sometimes called "structural fill."

1.2.6 Embankment{tc \l3 "1.2.6 Embankment}

A "fill" having a top that is higher than adjoining ground.

1.2.7 Excavation{tc \l3 "1.2.7 Excavation}

The removal of soil, rock, or hard material to obtain a specified depth or elevation.

1.2.8 Fill{tc \l3 "1.2.8 Fill}

Specified material placed at a specified degree of compaction to obtain an indicated grade or elevation.

1.2.9 Hard Material{tc \l3 "1.2.9 Hard Material}

Weathered rock, dense consolidated deposits or conglomerate materials, (excluding manmade materials such as concrete) which are not included in the definition of "rock" but which usually require the use of heavy excavation equipment with ripper teeth or the use of jack hammers for removal.

Section 31 00 00 Page 3

1.2.10 In Situ Soil{tc \l3 "1.2.10 In Situ Soil}

Existing in place soil.

1.2.11 Lift{tc \l3 "1.2.11 Lift}

A layer (or course) of soil placed on top of a previously prepared or placed soil.

1.2.12 Rock{tc \l3 "1.2.12 Rock}

Solid, homogeneous, interlocking crystalline material with firmly cemented, laminated, or foliated masses or conglomerate deposits, neither of which can be removed without systematic drilling and blasting, drilling and the use of expansion jacks or feather wedges, or the use of backhoe-mounted pneumatic hole punchers or rock breakers;

also large boulders, buried masonry, or concrete other than pavement, exceeding 0.8 cubic meter (1 cubic yard) in volume.

1.2.13 Soil{tc \l3 "1.2.13 Soil}

The surface material of the earth's crust resulting from the chemical and mechanical weathering of rock and organic material.

1.2.14 Subgrade{tc \l3 "1.2.14 Subgrade}

The material in excavation (cuts) and fills (embankments) immediately below any subbase, base, pavement, or other improvement. Also, as a secondary definition, the level below which work above is referenced.

1.2.15 Topsoil{tc \l3 "1.2.15 Topsoil}

In natural or undisturbed soil formations, the fine-grained, weathered material on the surface or directly below any loose or partially decomposed organic matter. Topsoil may be a dark-colored, fine, silty, or sandy material with a high content of well decomposed organic matter, often containing traces of the parent rock material.

1.2.16 Unsatisfactory Material{tc \l3 "1.2.16 Unsatisfactory Material}

Existing, in situ soil or other material which can be identified as having insufficient strength characteristics or stability to carry intended loads in fill or embankment without excessive consolidation or loss of stability. Materials classified as PT, OH, or OL by ASTM D 2487 are unsatisfactory. Unsatisfactory materials also include muck, man-made fills, refuse, frozen material, uncompacted backfills from previous construction, unsound rock or soil lenses, or other deleterious or objectionable material.

Section 31 00 00 Page 4

1.3 SUBMITTALS{TC \L2 "1.3 SUBMITTALS}

Submit the following in accordance with Section 01 33 00, Submittal Procedures.

Field Test Reports

Test for moisture-density relation

Density and moisture tests

1.4 DELIVERY AND STORAGE{TC \L2 "1.4 DELIVERY AND STORAGE}

Deliver and store materials in a manner to prevent contamination or segregation.

1.5 CRITERIA FOR BIDDING{TC \L2 "1.5 CRITERIA FOR BIDDING}

Base bids on the following criteria:

a. Surface elevations as indicated.

b. No pipes or other man-made obstructions, except those indicated, will be encountered.

c. Rock or hard material as defined in paragraph entitled "Definitions," will not be encountered.

d. Blasting will not be permitted.

1.6 SITE CONDITIONS{TC \L2 "1.6 SITE CONDITIONS}

1.6.1 Utilities{tc \l3 "1.6.1 Utilities}

Existing utilities are indication to the extent known. It shall be the sole responsibility of the Contractor to field locate existing utilities prior to excavation or construction.

Movement of construction machinery and equipment over pipes and utilities during construction shall be at the Contractor's risk. Contact the utility companies for location(s) of their utilities. Perform work adjacent to privately owned utilities in accordance with procedures outlined by the utility company. Excavation made with power-driven equipment is not permitted within two feet of known Government-owned utility or subsurface construction. For work immediately adjacent to or for excavations exposing a utility or other buried obstruction, excavate by hand. Start hand excavation on each side of the indicated obstruction and continue until the obstruction is uncovered or until clearance for the new grade is assured. Support uncovered lines or other existing work as affected by the contract excavation until approval for backfill is granted by the Contracting Officer. Any utility damaged by the Contractor shall be repaired by the Contractor, to the satisfaction of the Contracting Officer, at no additional

Section 31 00 00 Page 5 cost to the Government.

PART 2 PRODUCTS{TC \L1 "PART 2 PRODUCTS}

2.1 MATERIALS{TC \L2 "2.1 MATERIALS}

2.1.1 Soil Materials{tc \l3 "2.1.1 Soil Materials}

Provide materials free from debris, roots, wood, scrap materials, vegetable matter, refuse or frozen material. Maximum particle size permitted is 3 inches. Use excavated material from the site for the work indicated when material falls within the requirements specified herein.

2.1.1.1 Controlled Fill and Controlled Backfill{tc \l4 "2.1.1.1 Controlled Fill and Controlled Backfill}

Provid…