Condensed Q&A from March 1, 2018 site visit

View the file

Other files for this federal contract opportunity

Other files attached to Remove and replace roof to riding barn, newest first.
File Type Posted
Attendance_Sheet_03-01-2018.pdf PDF
SOW_3-1-18a.doc DOC document
clz-prov.docx DOCX document
Condensed_minutes,_Q&A,_27Feb18.docx DOCX document
SF18.pdf PDF
Attendance_sheet_02-27-2018.pdf PDF
SOW,_2-22-18.doc DOC document
Gen_Dec_OK180041_1-12-18.doc DOC document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFQ# 1232SD18Q0005

Replace Barn Roof, El Reno, OK Remove and Replace Roof to Riding Barn Q&A from Second Site Visit, Mar 1, 2018, not covered by 1st site visit

Q&As:

Q: Vendor didn’t find an SF1449:

A: Use the SF18

Q: Color of rake edge?

A: Panels are Galvalume. Rake edge shall be a comparable color.

Q: What standards are required for the rake edge?

A: Industrial standards to cover the fascia boards

Q: Kind of panels?

A: R panels.

Q: Are ridge caps fabricated to match the pitch of the roof?

A: Yes

Q: Have the roof panels, ridge caps and hardware been stored?

A: Yes, everything is on a trailer and has been in storage until recently.

Q: Has the material been rained on?

A: Yes, there has been less than 2” of rain since the materials were pulled out of storage.

Q: Will contractor be able to locate disposal dumpsters nearby?

A: Yes

Q: What is the length of the rafters?

A: Unsure, Sheet metal consists of two 24-foot panels that cover top to bottom. Amount of overlap is unknown.

Q: What is the length of the building?

A: Approximately 180 feet x 80 feet.

Q: Does anything need to be done to the ‘wings’?

A: No, They are not part of the SOW.

Q: Are existing panels nailed or screwed?

A: Most are nailed. Some are screwed.

Q: Is an underlayment required?

A: No.

Q: Is a security fence required?

A: The Government erect one up, if necessary.