SOW.pdf

PDF 13 KB Posted

Attached to
Synthetic Shingle Roof Replacement Federal contract opportunity
Solicitation number
1232SC18R0018
Issued by
Department of Agriculture Agricultural Research Service Central Program Planning Coordination and Support

About this file

Statement of Work

View the file

Other files for this federal contract opportunity

Other files attached to Synthetic Shingle Roof Replacement, newest first.
File Type Posted
Responses_to_University_Park_Slate_Roof_Questions.pdf PDF
1232SC18R0018_Amend_2.pdf PDF
1232SC18R0018_Amd_0001.pdf PDF
Attachment_2-_Head_House_Roof_Replacement_Plans.pdf PDF
Attachment_1-_Aerial_View_of_PSWMRU_Head_House.pdf PDF
1232SC18R0018.pdf PDF
Wage_Determination.pdf PDF
Specifications.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REPLACE SYNTHETIC SLATE ROOFING AT HEAD HOUSE (BUILDING 005)

Pasture Systems and Watershed Management Research Unit University Park, PA

May 1, 2018

The Contractor shall provide all labor, material, and supervision to replace the existing deteriorated synthetic shingle roofing system at the head house building of the Pasture Systems and Watershed Management Research Unit (PSWMRU) on Curtin Road, University Park, PA 16802. The head house building (“Building 005”) is approximately 3,200 square feet. An aerial view of the work area is provided as an attachment (Attachment 1: Aerial view of PSWMRU Head House).

Plans prepared in 2001 for a previous re-roofing effort are available and provided as an attachment (Attachment 2: Head House Roof Replacement Plans) and shall apply to this re-roofing effort.

Project specifications are also provided as an attachment (Attachment 3- Replace Synthetic Slate Roofing at Head House Specifications).

All roofing and underlayment is to be removed and replaced with new per the plans and specifications provided. Existing building drains and flashing shall be re-used unless in need of replacement or otherwise indicated to be replaced on the plans.

All new flashing shall be copper to match existing. The tongue and groove sheathing is to be assumed to be intact and shall be replaced on a time and material basis at additional cost if required.

All aluminum guttering and downspouts are to be replaced in kind.

The intent of the replacement is to mimic the materials and installation approach of the roofing system installed on the Main Building in 2011. This building’s roofing system is the EcoStar Majestic Slate 12” Traditional in Midnight Grey. Approved equals shall be considered pending approval by the Contracting Officer.

Contractor’s working hours shall be scheduled to coincide with the working hours of the PSWMRU Campus which are 7:30 a.m. to 4:00 pm. Should it be necessary to work hours other than the regular working hours, the Contractor shall arrange for access to the area with the Contracting Officer.

Any questions or clarifications pertaining to this Statement of Work shall be addressed directly to the Contracting Officer.