This is a Questions and Answers document from a federal contract solicitation addressing clarifications on a multistack chiller repair project.
The requirement involves repairs to Multistack chiller components, with work to commence by September 25th and be completed within 30 days of award. The government clarified that scope is limited to chiller repairs only, with humidifier and backflow preventer repairs excluded. Specific technical information requested includes chiller model and serial number, TXV specifications, Carel control/display model, fuse and contactor ratings, and required glycol type, concentration, and quantity. The government will provide a picture of the unit, with detailed repair specifications available through the manufacturer. CLIN 0001 includes any pump and/or motor repairs determined necessary following diagnostic evaluation of Pump 2. Work will be performed Monday through Friday from 7:30 AM to 3:00 PM on-site. Site access requires presentation of a valid driver's license at the front office to acquire a site badge. No warranty is required, though contractors must be able to document repair performance upon completion. All travel costs must be included in the bid; separate reimbursement is not available. No site visit will be conducted for this requirement.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Multistack info plate.pdf | ||
| Sol_1232SA26Q1319.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
• Although the project title references Multistack chillers, humidifiers, and backflow preventers, the provided scope identifies repairs only to chiller components. Please confirm whether any humidifier or backflow preventer repairs are included and provide the applicable scope.
• Unaware as of yet. These repairs needed were found during annual service of multistack chillers.
• Please provide the chiller model and serial number, TXV specifications, Carel control/display model, fuse and contactor ratings, and required glycol type, concentration, and quantity.
• Will include picture for the unit. The info for repairs were not available just a list of needed repairs. The info should be available through manufacturer.
• Please confirm whether CLIN 0001 includes any repair or replacement determined necessary after the Pump 2 diagnosis.
• Would need to repair pump and or motor once diagnostic has determined the problem.
• Please provide the required performance period and site access instructions, confirm whether a warranty is required, and clarify whether travel must be included in CLIN 0001 or reimbursed separately.
• Would like to start project by Sept 25th and be completed 30 days from award.
Valid driver's license presented to front office to acquire a site badge. Work to be performed Monday through Friday 7:30 AM to 3:00 PM. No warranty required but able to show repair performance once completed. All travel must be included in bid.
*No site visit will be conducted for this requirement. Thank you.